HomeMy WebLinkAbout971102.tiffiefer WI�Yc COLORADO May 15, 1997 Western Mobile Attn.: Julie Goettemoeller 1590 W. 12th Ave. Denver , CO, 80204 a Subject: USR-536 (Stromquist Pit and Asphalt Plant) I-25 project and addition of temporary batch plant. DEPARTMENT OF PLANNING SERVICES PHONE (303) 353-3845, EXT.3540 WELD COUNTY ADMINISTRATIVE OFFICES 1400 N. 17TH AVENUE GREELEY, COLORADO 80631 Dear Ms. Goettemoeller: The Department of Planning Service's staff, Weld County Attorney's office, and Public Works Department have reviewed the request to add a temporary asphalt plant and to operate at night to meet the needs of the project along with the Case file for USR-536. Usually operation other than daylight hours would not be allowed but due to the nature of the project the proposal will be allowed conditioned upon the following: 1. The portable asphalt plant and proposed operation hours shall be allowed until the completion of the project at which time the hours of operation will resume to daylight hours only and the portable asphalt plant shall be removed from the site. 2. The hauling of materials for the project shall maintain compliance, at all times; with the approved haul route and weight requirements. 3. Western Mobile shall be responsible for mitigating any potential noise complaints due to the night operation of the portable asphalt plant and the night hauling of materials to the project sight. If you have any questions, I may be reached at the number or address above. Sincere Todd A. Hodges Current Planner II cc: Don Carroll USR-536 case file �L,-' 'J lJ 971102 'PLO7''7 s' mEmORAnDU 111k COLORADO To From Subject: Todd Hodges, Current Planner II Date April 14, 1997 Don Carroll, Project Administrator 1W Verifying the Existing Haul Route (Western Mobile) for Additional Night Hauling At the request of the Planning Department, I visited the Stromquist Farm Property. Weld County has Road Maintenance and Improvements Agreements in place with Western Mobile on designated haul routes for the Rinn Area. I visited with Julie Geottemueller, the. Western Mobile Representative (303)657-4331, to verify the designated haul route that is currently in place. I emphasized that all trucks leaving the facility must utilize the existing haul route and weigh no more than legal weight. The Town of Frederick has annexed a portion of the haul route. It is WCR 5 north of WCR 18 for a distance of 1,619 feet, and 2,553 feet south of WCR 18. Weld County has the remaining portions of the designated haul routes. Attached are the copies of the existing Road Maintenance and Improvements Agreements with Western Mobile. The applicant has requested an amendment to their permit to allow night hauling for a special state project to overlay I-25. The Weld County Public Works Department has received complaints about the noise from early morning hauling in this area. We recommend night hauling be allowed only if required by the Colorado Department of Transportation for special projects such as the overlay of I-25. The Engineering Department has no objection to additional hauling from the facility if the vehicles are kept on the designated haul routes. Road repairs will be handled through the existing agreements. cc: Commissioner Harbert Drew Scheltinga, County Engineer USR-536, Western Mobile/Boulder Stromquist Julie Geottemueller, Western Mobile m:\wpfiles\don-chvestern Weld County Planning Dept. APR 1 5 1997 9 'ED 03/24/97 15:41 WESTERN MOBILE + 919703526312P466 NO.305 901 Western er Aggnpate • Agrwa. Cmravm March 24, 1997 Mr. Todd Hodges Weld County Planning and Zoning 1400 N. 17th Ave Greeley, CO 80631 via Fax 970-352-6312 Cerperan - Canal Services 1550W. tat Ave. Denvv< Colorado 00200 203.657.4334 Fax 303. 657.4339 RE: Special Project for USR-536:82:51, Stromquist Pit and Asphalt Plant Dear Mr. Hodges: As we had discussed on the telephone last Friday, Western Mobile needs to move a portable asphalt plant into the above mentioned site as part of a highway paving contract The specifics of the project follow: Job location: Project production; Time frame: Plant location: Hours of operation: Paving I-25 from Hwy 7 to 120th Ave 61,446 tons Mid -April through June North of existing plant 6 pm - 5 am In order to complete this project as CDOT has requested, we will need to operate the plants at night. Sty issues, traffic, lane closures, and plant production capacities are always magp concerns. In evaluating the project, it will be inefficient to limit production to the daylight hours. I would appreciate your help in expediting this process. In order to remain within the project time frames we will need set up the portable plant as soon as possibleShould you have any additional questions, please contact me at (303) 657-t331. Sincerely, Julie Goettemoeller Senior Land Manager cc: Eric West, Boulder Asphalt Manager Dave Glardon, Stromquist Manager Loring Knutson, Highway Paving Manager 03/24/97 15:46 VJrlri Cnu it :ni1fnq Dept. MAR 2 n 7927 A Rutland Group company IM TX/RX NO.6773 P.001 15:42 WESTERN MOBILE + 919703526312P465 NO.305 902 03/24/97 I_ PARSHALL CHANDJE,C �' ii 11 ENTRANCE EXIT -O,_ ACCESS --- -- ROAD . S 7 INSTALL PARSHALL FuWM W/ W CHANNEL (24 02"Irb 4-,5) • DITCH 03/24/97 15:46 TX/RX NO.6773 P.002 • Hello