HomeMy WebLinkAbout972414.tiffRESOLUTION
RE: APPROVE CHANGE ORDER #97-110 FOR "H" STREET ROADWAY AND
WATERLINE IMPROVEMENTS AND AUTHORIZE CHAIR TO SIGN
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with Change Order #97-110 for "H" Street
Roadway and Waterline Improvements between the County of Weld, State of Colorado, by and
through the Board of County Commissioners of Weld County, on behalf of the Department of
Public Works, and J-2 Contracting Company, with terms and conditions being as stated in said
change order, and
WHEREAS, after review, the Board deems it advisable to approve said change order, a
copy of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that Change Order #97-110 for "H" Street Roadway and Waterline
Improvements between the County of Weld, State of Colorado, by and through the Board of
County Commissioners of Weld County, on behalf of the Department of Public Works, and J-2
Contracting Company be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said change order.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 17th day of November, A.D., 1997.
ATTEST:
Weld Co
BY.
APP
Deputy Clerk t. ' e =dard
FORM:
my Attor ey
Fr; J-2
BOARD OF COUNTY COMMISSIONERS
WELOUNTY, COLORADO
`George'. Baxter, Chair
7
stance
L. Har e, P l stance L. Harbert, ro= em
Dale,K. Hall
ar�ZA— 41L lit C L
J. Kirkmeyer , lu / / hi,
W. H. ebster ,
972414
EG0036
Contracting Co.
(Phone) 970-686-2294
1200 Carousel Dr. #101, Windsor, CO 80550
(Fax) 970-686-7581
CHANGE ORDER
NO. 97-110
Owner: Weld County
915 10th St.
Centennial 3rd Floor
Greeley, CO 80631
C.O. Date: November 14, 1997
Project: "H" St. Roadway and Waterline
Improvements
Description: Sanitary Sewer and Waterline
Changes
Total Pervious Change Orders: $0.00
Amount of This Change Order: $34,502.00
Special Instructions:
Total Change Orders to Date: $34,502.00
Original Contract Amount: $255,275.61
Total Cont and Change Orders: $289,777.61
DESCRIPTION:
AMOUNT:
Item#1: - Install approximately 1355LF 8" SDR35 @$16.40/LF
$22,222.00
Item#2: - Install 4ea. Manholes @$1420.00/ea.
$ 5,680.00
Item#3: - Lower Waterline at Sewerline Crossing
$ 2,900.00
Item#4: - Install Additional 72LF Waterline and Fittings for Proposed
Public Work Building
$ 3,700.00
Special Conditions:
1. Dewatering beyond the capacity of one (1) 3" trash pump will be
performed by Weld County.
2. Time count on the projects is to be stopped until weather permits
paving in Spring 1998. The contractor agrees to make every effort
to complete all other project items in 1997, weather permitting and
maintain the road passable for Weld County truck traffic.
The work covered by this Change Order shall be
performed under the same terms and conditions
as those in the original contract.
LD COUNTY
Signature/4-0'Titl.
T (11/17 97)
Date: November 14, 1997
Date: November 14, 1997
ITOTAL CHANGE ORDER: $34,502.00
J-2 CONTRAC ING COMPANY
972414
Hello