Loading...
HomeMy WebLinkAbout650260.tiff/3; i/ CA4 S aca'{( COOPERATIVE AGREEMENT WITH STATE HIGHWAY DEPARTMENT PROJECT S 0024 (24): BE IT RESOLVED, by the Board of County Commissioners of Weld County, Colorado that they hereby approve a certain agreement with the State Highway Commission of Colorado, a public corporation, for the use and benefit of the Department of Highways of the State of Colorado, dated December 29, 1965, whereby the County has reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project S 0024 (24) of improvements approximately 10.033 miles long, beginning at a point approximately 0.5 miles East of Briggsdale extending east on State Highway No. 14, as per terms of said agreement on behalf of Weld County by signatures of the Board, as per agreement attached hereto and made a part of this resolution. The above and foregoing resolution was, on motion duly made and seconded, adopted by the following vote: AYES: 12.. -n -c -Z -Z.-4).1-711- :05.2 DATED: DECEMBER 29, 1965 APPROVED: ( elta_ /".2. LQ , County Attorney WELD COUNTY, COLORADO .4,54„40-s,--- OMMISSIONERS File No. 907. FORM<.D.H. t& DEPARTMENT OF HIGHWAYS STATE OF COLORADO 4201 E. ARKANSAS AVE. DENVER. COLORADO 80222 oMENTF HIGxi" 9tt STATE OF COLORADO Board of County Commissioners Weld County Greeley, Colorado Gentlemen: Project S 0024(24) Briggsdale - East if OSnail 6,17 January 5, 1966 CHAS. E. SHUMATE CHIEF ENGINEER Attached is your completed copy of the Cooperative Agreement for Project S 0024(24), beginning at a point approximately 0.5 Miles East of Briggsdale-East, signed by you on December 29, 1965. Please accept our thanks for your splendid cooperation in this matter. Very truly yours, CHAS. E. SHUMATE Chief Engineer By DRW:mm Attachment cc: Glen McEldowney R. F. File T. C. Reseigh 17 Planning and Research Engineer • Form PR -4 -DOH Rev. 6/1/65 rroject S 0024(24) County Weld Date COOPERATIVE AGREEMENT THIS AGREEMENT entered into this 29th day of December 19 65 , by and between the County of .weld party of the first part, and THE DEPARTMENT OF HIGHWAYS, STATE OF COLORADO, party of the second part, WITNESSETH that WHEREAS, The Department has constructed, or proposes to construct, or provide for the construction of, a project known as Project S 0024(24) approximately 10.033 miles long, beginning at a point approximately on State Highway No. 14 in the County and WHEREAS, The said State Highway is part of the Federal Aid Secondary System, NOW, THEREFORE, in accordance with the Federal Aid Act of 1950, the Parties have jointly reviewed the Geometric Standards governing the type of construction for said Project and have agreed as follows: That, the 1964 Annual Average Traffic Volume, as determined from actual vehicular count, by the Planning and Research Division of the.Department is found to be 780 vehicles per day. Therefore, in accordance with approved and established practices, the traffic volume twenty years hence is estimated to be 1800 vehicles per day. Consequently, the type of construction shall be that designated as Type V of the Geometric Standards dated February, 1963, more fully described as follows: The surface shall consist of Asphalt Pavement , 40 21 feet wide on a roadway 40 V feet, wide. The maximum grade shall be 4,0 percent and the curvature shall not exceed 0 degrees and ,g minutes. 'The rights of way shall not be less than inn feet in width -Bridges-and-Separations-shall have a design -load -of -/- Those structures having a length less than sixty (60) feet shall have a clear roadway width, between curbs or wheel guards, of f feet and those having a length of sixty (60) feet and over shall have a clear roadway width of ' 3/ feet.' r=-\4,..1(' \This Agreement shall be binding upon and inure to the benefit of the Successors and assigns of the Parties Thereto. This Agreement is executedwith reference to the signatories•on behalf of the 'County by virtue of a Resolution passed at the meeting of the Board of County Commissioners held on nprpmhpr 29.,_3565_ a certified copy of which is attached hereto. 1/ 12' lanes with 8 root shoulders. 2/ Type "C" modified. 3/ No Bridges. SEAL ATTEST:', 60n44:!,1 6649-rnAdt' County Clerk !Deputy Count BOARD OF COUNTY COMMISSIONERS WELD COUNTY THE DEPARTMENT OF HIGHWAYS STATE OF COLORADO Form PR -4a —DOH Rev. 6/1/65 CERTIFICATE Greeley , Colorado December 29 . 19 65 This is to certify that at a regular meeting of the Board of County Commissioners of Weld County, held on December 29 19 65 , the following resolution was adopted: "RESOLVED, that this Board hereby approves a certain Agreement with THE DEPARTMENT OF HIGHWAYS, STATE OF COLORADO, dated Dacamhar 94 , 19,5__ whereby the County has reviewed and approved the Geometric Standards designated to govern the construction of a Federal Aid Secondary Project to consist of improvementp on State Highway No. 14 beginning at a point approximately 0.5 Miles East of iBriggsdaie - east as per terms of said Agreement on behalf of Weld County by signatures of the entire Board." S•E A L, Cfirv.�J unty Clerk Deputy Clerk Hello