HomeMy WebLinkAbout980297.tiffRESOLUTION RE: APPROVE CHANGE ORDER #1 WITH J-2 CONTRACTING COMPANY AND AUTHORIZE CHAIR TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Change Order #1 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and J-2 Contracting Company, with terms and conditions being as stated in said change order, and WHEREAS, after review, the Board deems it advisable to approve said change order, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Change Order #1 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and J-2 Contracting Company be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said change order. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 18th day of February, A.D., 1998. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: �,., i, 1 Ifl ,_, �, EXCUSED Weld County/ BY Deputy C APP my Attorn cc : Pi,,) y Constance L. Harbert, Chair W. H.' aster, ro-Te orge . Baxter Dal- . Hall Barbara J. Kirkmeyer 980297 EG0037 CHANGE ORDER CHANGE ORDER NO. 1 DATE: PROJECT: Rehabilitation of Weld County Bridge WEL129.0-092.OA TO (CONTRACTOR): J-2 Contracting Company, 2221 2nd Ave., Greeley, CO 80631 JUSTIFICATION: Varying Site Conditions Caused by Rich Water You are directed to make the following changes in the work. All other terms and conditions of the contract not expressly modified hereby shall remain in full force and effect. ITEM NO. DESCRIPTION EST. OTY. UNIT UNIT COST AMOUNT 203 Unclass. Exc. 541.55 C.Y. $ 15.00 $8123.25 212 Seeding & Mulching 1.25 Acre $713.47 $ 891.84 617 15" Culvert 30.00 L.F. $ 12.72 $ 381.60 304 A.B.C. (Gravel) 120.00 C.Y. $ 3.06 $ 367.20 The original contract sum was $ 53,448.00 Net change by previous change orders $ 0.00 The contract sum prior to this Change Order was $ 53,448.00 The contract sum will be (increased) (decreased) or (unchanged) by this Change Order $ 9,763.89 The contract sum including this Change Order will be $ 63,211.89 The new contract time will be (increased) (decreased) or (Unchanged) by ) days. The date of completion as of the date of this Change Order is therefore 1/30/98 ACCEPTED BY: Au- C.n..,TM`rBE,aL. C. ORDERED BY: BOARD OF COUNTY COMMISSIONERS Cofitractor WELD COUNTY, COLORADO 1 a a do Prvt Address By (->2t C X II, 3) By Date t)} /1 R's :),/5/`-)8 02/18/98 Date ATTEST: Weld Co BY: Depu sZ !Zi-«'.;�-�7� oard lett, COLORADO MEMORANDUM TO: Clerk to the Board DATE: February 10, 1998 FROM: Wayne Howard, Civil Engineer IIF SUBJECT: Change Order #1 for Contract with J-2 Contracting Company for the Rehabilitation of Weld County Bridge WEL129.0-092.0A. Please place the following item on the Board's next agenda: Change Order #1 for Contract Agreement with J-2 Contracting Company and Weld County. The appropriate documentation is attached. cc: Drew Scheltinga, County Engineer Bridge File 129/92A m:wpfles\engineer\agenda) 980297 Justification for Change Order #1 for J-2 Contracting Company Weld County entered into a contract with J-2 Contracting to perform emergency repair work on bridge #129.0-092.0A. This bridge was damaged during the '97' flooding and is 100% funded by FHWA. The contract included foundation and minor erosion repair work. During the course of the dewatering phase it was discovered that large amounts of silt was deposited after the flooding. This silt had to be removed before repairs to the foundation could be made. An additional 541.55 c.y. of excavation was needed to remove the extra silt. The additional silt that needed to be removed and stockpiled added one acre of unanticipated damage to grassland at the site. The property is owned by the Town of New Raymer and agreements were made to seed and mulch the disturbed area and replace a 15" driveway culvert and regravel the driveway. These changes added $9,763.89 to the project. The project is complete and invoices are being made to FHWA for this project. 980297 Hello