HomeMy WebLinkAbout690248.tiffCONTRACT AGREEMENT
THIS AGREEMENT made this 25th day of June, 1969 by and between
WELD COUNTY, COLORADO, acting herein by and through its Board of
County Commissioners, who are duly authorized to act for and in behalf
of said Weld County, Colorado, hereinafter called the OWNER, and
EAGLE ENGINEERING CO., INC., a Colorado Corporation, licensed to
operate under the laws of Colorado, hereinafter called the ENGINEER.
WHEREAS: the OWNER desires to employ the ENGINEER to render engineering
services for the improvement, repair and/or replacement of bridges,
roadways, culverts, etc., damaged by recent floods in Weld County,
Colorado, and further to aid any and all County Offices requiring
assistance in design, inspecting, contracting and accounting, in order
to comply with the requirements of the Office of Emergency Planning,
hereinafter referred to as the OEP, and
WHEREAS, the ENGINEER agrees to perform the various professional services
required for the above named improvements,
NOW, THEREFORE, THIS AGREEMENT WITNESSETH: That for and in consideration
of the mutual covenants and promises between the parties hereto, it is
hereby agreed that the ENGINEER shall furnish engineering services and
the OWNER shall make payment for same in accordance with the terms and
conditions set forth hereinafter.
A. The ENGINEER hereby agrees to furnish and perform the various pro-
fessional services required as follows:
1. Provide complete general and detail plans, specifications and
detailed estimate of cost.
2. Prepare forms for construction proposals, advertisements, con-
struction constracts and bonds, subject to the approval of the
OWNER.
3. Receive and tabulate proposals, report same to the OWNER, and
assist in awarding contract for construction.
4. Furnish general supervision of the construction including line
690248
and grade surveys as the constructions progresses, to assist
in a correct interpretation of the plans and specifications
and to safeguard the OWNER against defects and deficiencies on
the part of the Contractor.
5. Furnish and perform the supervision of work of inspection bureaus
and laboratories in the inspection and tests of material,
entering into the construction of the improvements; receive and
pass upon by approval or rejection all reports by such labor-
atories or bureaus on the material tested for use. The cost of
all such tests and inspections by laboratories or bureaus to be
paid for by the OWNER.
6. Receive, review and certify to the accuracy of all requests for
payment under the OEP Program. Tabulate and certify final pay
estimates to the OWNER.
7. Assist in the preparation of all correspondence by and between
the OWNER and OEP, and assist in the preparation of all forms
as required by the OEP for initial, partial, and final payment.
8. Provide any and all technical information as required at meetings
with the OWNER and OEP as well as attend meetings as requested
and required by the OWNER.
9. Provide any additional investigations, studies, and reports,
preliminary general plan or plans, approximate estimate of
cost and all necessary conferences with the OWNER in regard to
construction.
B. The OWNER hereby agrees to pay the ENGINEER as compensation for
such engineering services, a fee based on the hours worked in accordance
with the Fee Schedule shown below. The OWNER further agrees to pay the
ENGINEER on a monthly basis, upon presentation of a statement showing
the type of work performed with the hours and rates shown thereon.
Fee Schedule:
Principal Engineering
Design Engineering
Drafting
Surveying (2 man crew)
Secretarial
Speciftcation Writing
$10.00 per hour
8.00 per hour
6.00 per hour
15.00 per hour
3.00 per hour
8.00 per hour
C. It is further mutually agreed by the parties hereto:
1. That the above fee schedule shall include all travel, insurance,
out -of -office expense, telephone and telegraph costs, and profit.
2. That the total fee paid the ENGINEER shall not exceed the per-
centage fee as shown on curve "B" as published by the American
Society of Civil Engineers, page 18, of the Manual of Engineering
Practices.
3. That the ENGINEER shall have complete authority over all con-
struction, inspection, and negotiations as they pertain to
existing and future construction as required to fulfill the
requirements of the OEP and to protect the OWNER.
4. That any drawings and specifications used are instruments of
service and as such the original documents, tracings, and field
notes are and remain the property of the ENGINEER whether the
work for which they were prepared be executed or not, and shall
not be used by the OWNER for any other project or construction.
5. That all questions in dispute under this agreement shall be
submitted to arbitration at the choice of either party hereto.
6. That the OWNER and ENGINEER each binds himself, his partners,
successors, executors, administrators and assigns, to the other
party to this agreement. Except as specified above, neither the
OWNER nor the ENGINEER shall assign, sublet, or transfer his
interest in this agreement without the written consent of the
other party hereto.
IN WITNESS THEREOF, the parties hereto have affixed their hands and seals
this 25th day of June, 1969.
ATTEST:
By:
ATTEST:
By: 'LWI
Secretar
Lstot
For tW COUNTY OF WELD, COLORADO
T ty Commissioners
F9f—EAGLE ENGINEERi-N6 CO., I
By: aLx.J v30-4
President
70
MEDIAN FEES
FOR ENGINEERING PROFESSIONAL SERVICES
AS A PERCENTAGE OF NET CONSTRUCTION COST.
THE FEES ARE TO BE ADJUSTED TO SUIT SPECIAL CONDITIONS.
14
2
II
o 9
C
u.
C
0
0
N
C
N 7
a
E
0
C)
6
5
!ll 1 i I T
li�ll � I►f'I' 1
1 r I • I
t
i
I i'rTl
i I
+ .....•
-. --t ; '4.-4—,-- __ : ..
-4044..
•
I I
I,i 1 1444.4 •-y..-.-..}.:-..-+h
- .-1{.+. 4 i .;;
I • .1
_1 1 ' , 4440.... }.-i-=»-*+-- - . ..-a F i ; lip . ; «.j.i , ;.
...__1 -4.--i•+►,.. . ..-_.. _ j -...;-•-.---.,•-i• +.+ 4.
t p •-r•H..
•
• :4444"_•
r { I it
I ;r
I;14
.01 .05 .1 .5 I 5 10
Net Cost in Millions of Dollars
it
1
---- B
5O 1OO
CURVE A , ENG. PROJECTS OF ABOVE AVERAGE COMPLEXITY
CURVE B , ENG. PROJECTS OF AVERAGE COMPLEXITY
Hello