Loading...
HomeMy WebLinkAbout600087.tiffPAULY ,AIL BUILDING COMPANY ( N eon r claw 0) 2215 DE KALB STREET ST. LOUIS 4, MO. January 13, 1960 Mr. George Anderson, Chairman Board of County Commissioners Weld County Court House Greeley, Colorado Dear Mr. Anderson: RE: Weld County Jail Equipment at Greeley, Colorado We propose to furnish all necessary parts, equipment, tools, qualified labor and all necessary insurance coverage; same to completely overhaul all locking mechanisms consist- ing of two rows of cells, six cells each on first floor, and two control cabinets and two rows of cells consisting of nine cells each and two control cabinets on the second floor. Also, replace seventeen wall door locks and furnish three new keys for each lock combination. Also, furnish two bronze keys for control cabinets. All work, as herein mentioned, is to be completed by us in a first class workmanlike manner, with the exception of any painting as may be found necessary after work is completed, for the amount of - Nine thousand five hundred ten and no/100 Dollars, ($9,510.00). After this work is completed, we will guarantee all locking mechanism for a period of one year or the same as a new installa- tion. ms ACCEPTED BY:;. Very truly yours, PAULY JAIL BUILDING COMPANY T.J. Tysdal Assistant to the President x. i £QUIPPING INSTITUTIONS OF DETENTION IN UNITED STATES FOR 99 YEARS I- 4 4 co b P' N• �¢zz z o a 000 0 0 O O W W •—• p 3 W J M 4J H H pC a C7 CO Hello