Loading...
HomeMy WebLinkAbout992762.tiff ENT Op DEPARTMENT OF THE ARMY 4 rri C , CORPS OF ENGINEERS, OMAHA DISTRICT 4i COUNT'''. l', TRI-LAKES PROJECT OFFICE, 9307 S. PLATTE CANYON ROA vIA �.,a U'f I LITTLETON, COLORADO 90126-6901 /`. REPLY TO !"L9 NOV 0 AM 9. 04 or" ATTENTION OF: November 3, 1999 RECEIVED Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection near Windsor, Colorado Gentlemen: An inspection of the Emergency Streambank Protection Project constructed to protect County Road 27 and Bridge 27-62b on the Cache la Poudre River was recently completed. Overall, the project was in good condition. It was noted that the project is losing riprap at the waters edge. Especially at Sta 7+35. At Sta 8+50 the river is eroding the soil along the windrow refusal. It is recommended that this Riprap and soil be replaced to maintain the integrity of the project. It is also recommended that a woody vegetation control be initiated. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, Timo . Care Operations Manager OEM, &g- 992762 cr1T OF DEPARTMENT OF THE ARMY ��pe\�'\���I \442, F CORPS OF ENGINEERS, OMAHA DISTRICT �,�q d 4�� 2 TRI-LAKES PROJECT OFFICE, 9307 S. PLATTE CANYON ROAD G LITTLETON, COLORADO 60126-6901 , p,,c REPLY TO 4 siA7, °u,F,4 ATTENTION OF: November 3,1999 Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection for County Bridges #28/23A, #61/54B, and #87/42.5 Gentlemen: An inspection of the Emergency Streambank Protection Project constructed to protect these County bridges was recently conducted. The projects were found to be in good condition. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, Tim . Ca Operations Manager tiKT_of DEPARTMENT OF THE ARMY Q, Ee, CORPS OF ENGINEERS, OMAHA DISTRICT 07 > Z TRI-LAKES PROJECT OFFICE, 9307 S. PLATTE CANYON ROAD G1 9 9 ' I LITTLETON, COLORADO 80128-6901 I ll %" REPLY TO s p,, ATTENTION 0"t November 3, 1999 Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection near Platteville, Colorado Gentlemen: An inspection of the Emergency Streambank Protection Project constructed to protect County Road 32-1/2 and Bridge 31-1/2-21b was recently conducted. The project was found to be in good condition. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, Timor 1. C. ey Operations Manager ti$T of DEPARTMENT OF THE ARMY 4 � TRI-LAKES OF ENGINEERS, OMAHA DISTRICT t �' S PROJECT OFFICE, 93O7 S. PLATTE CANYON ROAD LITTLETON, COLORADO 8O128-69O1 °P REPLY TO l j�slarie u%' ATTENTION OF: November 3, 1999 Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection near Kersey, Colorado Gentlemen: An inspection of the Emergency Streambank Protection Project to protect County Road 388, near Kersey, Colorado was recently conducted. The project was found to be in generally good condition. It was noted that the toe section of the project has been dislodged. Also rock from the window refusal has become dislodged. It is recommended that this rock be replaced. A slightly larger gradation of stone is recommended for the toe maintenance. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, Timo . Care Operations Manager NT Op DEPARTMENT OF THE ARMY 474.- ----,,,t)tl\ t � CORPS OF ENGINEERS, OMAHA DISTRICT TRI-LAKES PROJECT OFFICE, 9307 5. PLATTE CANYON ROAD m z LITTLETON, COLORADO 80128-6901 �e/ •2? - REPLY TO ATTENTION OFf November 3, 1999 Weld County Board of Commissioners P.O. Box 758 Greeley, Colorado 80632-0758 RE: Emergency Streambank Protection near Johnstown, Colorado Gentlemen: An inspection of the Emergency Streambank Protection Project constructed to protect County Road 17 where it crosses the Bi.g Thompson River was recently conducted. The project was found to be in good condition. There is still one tree growing in the riprap, which we recommend be removed to maintain the structural integrity of the project. The Riprap is starting to break down. This Riprap should be replaced with Riprap as specified in the Operation and Maintenance manual. There is head cutting above the project that should be monitored. If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at 303-979-4120. Sincerely, Tnno . C Operations Manager Hello