Weld County Board of Commissioners
P.O. Box 758
Greeley, Colorado 80632-0758
RE: Emergency Streambank Protection near Windsor, Colorado
Gentlemen:
An inspection of the Emergency Streambank Protection Project constructed to protect
County Road 27 and Bridge 27-62b on the Cache la Poudre River was recently completed.
Overall, the project was in good condition. It was noted that the project is losing riprap
at the waters edge. Especially at Sta 7+35. At Sta 8+50 the river is eroding the soil along the
windrow refusal. It is recommended that this Riprap and soil be replaced to maintain the
integrity of the project. It is also recommended that a woody vegetation control be initiated.
If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at
303-979-4120.
Sincerely,
Timo . Care
Operations Manager
OEM, &g- 992762
cr1T OF DEPARTMENT OF THE ARMY
��pe\�'\���I \442,
F CORPS OF ENGINEERS, OMAHA DISTRICT
�,�q d
4�� 2 TRI-LAKES PROJECT OFFICE, 9307 S. PLATTE CANYON ROAD
G LITTLETON, COLORADO 60126-6901
, p,,c REPLY TO
4 siA7, °u,F,4 ATTENTION OF: November 3,1999
Weld County Board of Commissioners
P.O. Box 758
Greeley, Colorado 80632-0758
RE: Emergency Streambank Protection for County Bridges #28/23A, #61/54B, and
#87/42.5
Gentlemen:
An inspection of the Emergency Streambank Protection Project constructed to protect
these County bridges was recently conducted.
The projects were found to be in good condition.
If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at
303-979-4120.
Sincerely,
Tim . Ca
Operations Manager
tiKT_of DEPARTMENT OF THE ARMY
Q, Ee, CORPS OF ENGINEERS, OMAHA DISTRICT
07 > Z TRI-LAKES PROJECT OFFICE, 9307 S. PLATTE CANYON ROAD
G1 9 9 ' I LITTLETON, COLORADO 80128-6901
I ll
%" REPLY TO
s p,, ATTENTION 0"t November 3, 1999
Weld County Board of Commissioners
P.O. Box 758
Greeley, Colorado 80632-0758
RE: Emergency Streambank Protection near Platteville, Colorado
Gentlemen:
An inspection of the Emergency Streambank Protection Project constructed to protect
County Road 32-1/2 and Bridge 31-1/2-21b was recently conducted.
The project was found to be in good condition.
If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at
303-979-4120.
Sincerely,
Timor 1. C. ey
Operations Manager
ti$T of DEPARTMENT OF THE ARMY
4 � TRI-LAKES
OF ENGINEERS, OMAHA DISTRICT
t �' S PROJECT OFFICE, 93O7 S. PLATTE CANYON ROAD
LITTLETON, COLORADO 8O128-69O1
°P REPLY TO
l j�slarie u%' ATTENTION OF: November 3, 1999
Weld County Board of Commissioners
P.O. Box 758
Greeley, Colorado 80632-0758
RE: Emergency Streambank Protection near Kersey, Colorado
Gentlemen:
An inspection of the Emergency Streambank Protection Project to protect County Road
388, near Kersey, Colorado was recently conducted.
The project was found to be in generally good condition. It was noted that the toe
section of the project has been dislodged. Also rock from the window refusal has become
dislodged. It is recommended that this rock be replaced. A slightly larger gradation of stone is
recommended for the toe maintenance.
If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at
303-979-4120.
Sincerely,
Timo . Care
Operations Manager
NT Op DEPARTMENT OF THE ARMY
474.- ----,,,t)tl\ t
� CORPS OF ENGINEERS, OMAHA DISTRICT
TRI-LAKES PROJECT OFFICE, 9307 5. PLATTE CANYON ROAD
m z
LITTLETON, COLORADO 80128-6901
�e/
•2? - REPLY TO
ATTENTION OFf November 3, 1999
Weld County Board of Commissioners
P.O. Box 758
Greeley, Colorado 80632-0758
RE: Emergency Streambank Protection near Johnstown, Colorado
Gentlemen:
An inspection of the Emergency Streambank Protection Project constructed to protect
County Road 17 where it crosses the Bi.g Thompson River was recently conducted.
The project was found to be in good condition. There is still one tree growing in the
riprap, which we recommend be removed to maintain the structural integrity of the project.
The Riprap is starting to break down. This Riprap should be replaced with Riprap as specified
in the Operation and Maintenance manual. There is head cutting above the project that should
be monitored.
If you have any questions, please feel free to contact Mr. Roy Ranisate of this office at
303-979-4120.
Sincerely,
Tnno . C
Operations Manager