HomeMy WebLinkAbout990585.tiff MINUTES OF THE WELD COUNTY UTILITIES ADVISORY COMMITTEE
A regular meeting of the Weld County Utilities Coordinating Advisory Committee was held on Thursday, March
11, 1999, at 10:00 a.m., in the Conference Room of the Weld County Administrative Offices at 1400 N. 17th
Avenue, Greeley, Colorado.
Members Present
Cody Wooldridge, Central Weld Water District
Gene Rempel, Public Service Company
Jerry Adams, Greeley Gas Company
Gary Sandau, LaSalle Fire District
Don Carroll, Weld County Public Works
Also Present: Scott Ballstadt, Department of Planning; Wendi Inloes, Secretary.
CASE NUMBER: S-487
PLANNER: Scott Ballsta.dt
APPLICANT: Weld County Department of Planning Services
REQUEST: Vacate Compo Way south of Compo Road to the southern boundary of Dos Rios Estates-
see application summary
LEGAL DESCRIPTION: Compo Way, Dos Rios Estates, a subdivision located in Section 34, T5N,
R66W of the 6th P.M., Weld County, Colorado
LOCATION: Dos Rios Estates being part of Section 34, T5N, R66W. For a more precise location, see
legal.
Scott Ballstadt, Department of Planning,explained that Compo Way was originally intended to connect Compo
Road with WCR 396, and since it was impractical to build the road where it was platted, there was never any
construction. Residents of the western portion of Dos Rios have been using a ditch riders road for many
years, and in 1997, a storm washed out Compo Road. There is currently a 10-foot utility easement along the
back side of the lots, but does not extend into the right-of-way.
Don Carroll asked if anyone was aware of anything in the easement currently. Cody Wooldridge said their
water line stops before the road, but did ask that an easement be extended for future use. Scott said he was
not sure if they could ask for an easement on the adjacent property since it was not a part of Dos Rios, but
did not believe the owner would have a problem. Don said his only concern is if Joyce Alleley, property owner,
developed the property, and Cody said they had been contacted already on development. Cody also noted
that when the original plat was done, there was only a 10-foot easement instead of the 15-foot easement, and
did not know if they could make any change with the required 15-foot easement.
Cody Wooldridge moved to continue the existing easement on the south end across Compo Way and also
a 10-foot easement down the west edge of Compo Way, and highly recommend that it is noted on the plat
map that before anything can be done with Parcel A, a 10-foot easement needs to be continued across the
southern west half. Motion carried unanimously.
Respectfully submittn
()Ja-
AL/
Wendi Inloes
Secretary
wS
�Y ti 990585
ID
Hello