HomeMy WebLinkAbout961242.tiff CHANGE OWNER �a ORDER ARCHITECT CONTRACTOR f FIELD ❑ A1A DOCUMENT G701 OTHER ❑ M, ( PROJECT: weld County North Jail Complex CHANGE ORDER NUMBER: 1 (name,(( address)dy 2110 t'9t' Street DATE: 6/21/96 Tor(ee ONTR'ACTOR80631 ARCHITECT'S PROJECT NO:9407 (name, address) Roche Constructors, Inc. CONTRACT DATE: 4/15/96 P.O. Box 1727 CONTRACT FOR:General construction Greeley, Co: 80632 The Contract is changed as follows: ! . Pronosal request No. 1 (RCI cor #1) : Delete fuel storage tank for emergency nower gererator: ($19,576.00) Deduct 2. Pronosal rezuest No. 2 (RCI cor #2) : Install touch-activated switching in lieu of AML micro switches: $11,887.00 Add Total: ($7,689.00) Deduct Not valid until signed by the Owner, Architect and Contractor. The original(Contract Sum)(Guaranteed Maximum Price)was f 7,285,700.00 Net change by previously authorized Change Orders $ - .00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $ 7,285,700.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order in the amount of $ (7,689.00) Deduct The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be IS 7, 278,011.00 The Contract Time will be(increased)(decreased)(unchanged)by ( 0 )days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have bet n authorized by Construction Change Directive. Bley Associates Roche Constructors, I ioners ARCHITECT CONTRACTOR w 7 2020 Clubhouse Dr. • • :.. I .e Street Address Address i � ••r Gree Co806'�d . ::. \11'��1I ) s' SR1! . :r. 7 Y, �. BY141 BY /•, Air Aug DATE ' i •. I ) •. AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • A1A® • ©1987 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 .. 961242 i)UCC` 7 WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. OWNER PROPOSAL ARCHITECTgg REQUEST CONTRACTOR FIELD AIA DOCUMENT G709 ❑ OTHER'• OTHER PROJECT: Weld County North Jail Complex PROPOSAL REQUEST NO: 1 (name, address) • OWNER: Weld County DATE: 6-6-96 TO: (Contractor) Roche Constructors ARCHITECT'S PROJECT NO: 9427 361 71st Avenue Greeley, Colorado 80631 CONTRACT FOR: J CONTRACT DATED: Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifica- tions to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: (written description of the Work) Contractor shall delete underground fuel storage tank for emergency power generator as referenced in Construction Documents. Contractor shall submit credit to Owner. Attachments: (List attached documents that support description) • AR - - > •• 131es0ci$tes � BY: .r ey l - CAUTION: You should sign an original ALA document which has this caution printed in red. ^I� An original assures that changes will not be obscured as may occur when documents are reproduced. ALA DOCUMENT G709 • PROPOSAL REQUEST • APRIL 1970 EDITION • AIAO • ©1970 • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. PROPOSAL OWNER ARCHITECT QX REQUEST CONTRACTORFIELD ®❑ AlA DOCUMENT G709 OTHER PROJECT: Weld County North Jail Complex PROPOSAL REQUEST NO: 2 (name, address) OWNER: Weld County DATE: 6-6-96 TO: (Contractor)I ARCHITECT'S PROJECT NO: 9427 Roche Constructors I 361 71st.Avenue Greeley, Colorado 80631 CONTRACT FOR: L_ CONTRACT DATED: Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifica- tions to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Description: (Written description of the Work) The Contractor shall. add to the Contract Alternate No. 9 as described in Specification Section 01030 .- Description of Alternates - It Contractor shall furnish and install touch activated switching as specified in Section 13941-8 in lieu of switching specified for base bid. Attachments: (List attached documents that support description) • ARCH r'+ . y Associates BY• or F. Bley AIACAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT G709 • PROPOSAL REQUEST • APRIL 1970 EDITION • AIAOO • ©1970 • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. Roche n� Constructors, Inc. (-TEAM°EWA� ■E 361 71st Avenue • Post Office Box 1727 SV Greeley,Colorado 80632 Phone(970)356-3611 • FAX(970)356-3619 June 11, 1996 VIA FACSIMILE AND U.S. MAIL Mr. Loren Bley Bley Associates 2020 Clubhouse Drive Greeley, Colorado 80634 Re: Weld County North Jail Complex RCI Project No. 9604 Dear Loren: The following change order requests are submitted for your review and approval. RCI COR#1 Proposal Request No. 1 - Delete Fuel Storage Tank For Emergency Power Generator <$19,576.00> RCI COR #2 Proposal Request No. 2- Install Touch Activated Switching In Lieu of AML Micro Switches $11.887.00 Total Deduct <$7,689.00> A formal change order will be issued upon your approval. Please let me know as soon as possible if you have questions. Sincerely, ROCHE CONSTRUCTORS, INC. ei.„...____. 4Gary . Culver Project Manager GKC/bjg' Enclosures pc: Carlin Nafziger 9604 4825 Quality Court 337 North Vineyard 2710 Gateway Oaks Drive Las Vegas, Nevada 89103 Ontario,California 91764 Sacramento,California 95833 Phone(702)871-8666 Phone(909)984-2400 Phone(916)649-9299 FAX(702)871-9570 FAX(909)391-6872 FAX(916)927-4893 ROCHE CONSTRUCTORS, INC. CHANGE ORDER REQUEST SUMMARY SHEET WELD COUNTY NORTH JAIL COMPLEX 11th Avenue and "0" Street, Tract A Greeley, Colorado 80631 Project No. 9604 RCI's COR #1 June 10, 1996 Description of Change: Proposal Request No. 1 - Delete Fuel Storage Tank For Emergency Power Generator Subcontractor and Supplier Breakdown: Company Amount Wray Plumbing and Heating Co. <$19,576.00> Sub-Total <$19,576.00> Roche Constructors Breakdown: Material Sub/Equip Labor Sub-Totals Taxes (0% mat'l; 50% labor) Sub-Total RCI Total Summary: Subcontractor Totals <$19,576.00> RCI Work Subtotal Overhead (7%) Subtotal Profit (10%) Sub-Total <$19,576.00> Payment and Performance Bond (1.4%) Total: <$19,576.00> This price is good for seven (7) days. Time extension required for this work: 0 . ROCHE CONSTRUCTORS, INC. CHANGE ORDER REQUEST SUMMARY SHEET WELD COUNTY NORTH JAIL COMPLEX 11th Avenue and "0" Street, Tract A Greeley, Colorado 80631 Project No. 9604 RCI's COR #2 June 10, 1996 Description of Change: Proposal Request No. 2 - Install Touch Activated Switching In Lieu of AML Micro Switches. Subcontractor and Supplier Breakdown: Company Amoun Allwest Systems, Inc. 89,960 Sub-Total $9,960 Roche Constructors Breakdown: Material Sub/Equip Labor Sub-Totals Taxes (0% mat'l; 50% labor) Sub-Total RCI Total Summary: Subcontractor Totals $9,960 RCI Work $0.00 Subtotal $9,960 Overhead (7%) $697 Subtotal $10,657 Profit (10%) $1,066 Sub-Total $11,723 Payment and Performance Bond (1.4%) S164 Total: 511 887 This price is good for seven (7) days. Time extension required for this work: 0 . • Gny PLUMBING & HEATING (tea, MECHANICAL CONTRACTORS P.O. BOX 2186, Ft. Collins, CO 80522 413 N. Hwy 287, Ft. Collins, CO 80524 Phone: (970) 482-5354 Fax: (970) 482.0298 May 29, 1996 Roche Constructors, Inc. 361 71st Avenue P.O. Box 1727 Greeley, Colorado 80632 Attention: Mr. Gary Culver Subject: Weld County North Jail Complex Dear Gary: Pursuant to your request, we submit this pricing for the deletion of the underground fuel storage tank for the above subject project. The breakdown is as follows: Material: (excavation, backfill, compaction, bedding materials, accessories) $16,001.00 Labor: $ 3,575.00 Total Deduct: $ 19,576.00 Please review and if you should have any questions or concerns, do not hesitate to contact me. Respectfulla Wray Plumbing and Heating Company r_HL & SUUND P'AGL d2 I ALLWES SYSTEMS , INC . June 7, 1996 Mr. Gary Culver Roche Constructors, Inc. 361 71st Ave. Greeley, Colorado 80632 RE: Weld County Jail North Complex - Alternate No. 9, Contract Bid Documents Dear Gary, Based on our previous discussions Aliwest Systems will provide the Touch Activated Switching as specified and as called out in Addendum No.4, Section 13941-6, Para 1.04 F- "Control Devices Alternate" on this project for $ 9,960.00. This Alternate is to change the type of devices used on all Security Door Control Panels and will not effect any other portion of the project. Please give me a call if you have any questions. Sincerely Jim Gray Manager Detention Division Allwest Systems Incorporated copy: file 5701 N. Logan St. • Denver. Colorado 80216 • (303) 293-2345 • Fax: (303) 293-2131 Hello