Loading...
HomeMy WebLinkAbout951005.tiffRESOLUTION RE: ACTION OF BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO, CONCERNING SITE APPLICATION FOR A LIFT STATION FROM POUDRE TECH METROPOLITAN DISTRICT AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has received a site application from Poudre Tech Metropolitan District, 8200 Eastman Park Drive, Windsor, Colorado 80550, for a lift station located on the following described parcel of land, to -wit: NW% of Section 28, Township 6 North, Range 67 West of the 6th P.M., Weld County, Colorado WHEREAS, the regulations for site applications for a lift station require review of the site application by the Board of County Commissioners, and further, that various local and state agencies be given the opportunity to review and comment on said site application, and WHEREAS, the site application from Poudre Tech Metropolitan District was submitted to the Board of County Commissioners of Weld County for review and comment, a copy of said application being attached hereto and incorporated herein by reference, and WHEREAS, after study and review, the Board finds that said site application is compatible with the Weld County Comprehensive Plan, and that it is in the best interest of Weld County to recommend approval of said application. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the site application submitted by Poudre Tech Metropolitan District be, and hereby is, recommended favorably to the Colorado Department of Health as being compatible with the Weld County Comprehensive Plan. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said site application. 951005 PL0079 eLL:Pc;A7 ILiLu 72:042) Gt1;»elf)e. RE: SITE APPLICATION - POUDRE TECH METROPOLITAN DISTRICT PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of May, A.D., 1995. ATTEST: Weld County Clerk to the Board BY: Deputy Cli APPROVED AS jC FORM. BOARD OF COUNTY COMMISSIONERS COUNTY, CJLODO Dale K. Hall, Chairman arbar9 J. Kirkmeyer, Tern George er FXCUSFf r)ATF (IF SIfNING Constance L. Harbert W. H. Webster i'Y J, (AYE) 951005 PL0079 E!Baxt DATE: May 10, 1995 NAME: Poudre Tech Metropolitan District ADDRESS: 8200 Eastman Park Drive, Windsor, CO 80550 REQUEST: Site Application for a lift station CJ LEGAL DESCRIPTION: NW4 of Section 28, T6N, R67W of the 6th P.M., Weld County, -CO iso LOCATION: South of Weld County Road 66 and west of State Highway 257, in the Town of Windsor THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: Improvement to the treatment facility will not adversely affect the local water quality. The design of the system will be of sufficient capacity to serve the approved service area. The Weld County Health Department has reviewed this proposal and has no objections to the lift station. The request complies with the Weld County Comprehensive Plan. The request proposes improvements to an existing sewage treatment facility which services the incorporated municipality of Windsor. 951005 COLORADO DEPARTMENT OF HEALTH Water Quality Control Division 4210 East 11th Avenue Denver, Colorado 80220 APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF: A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS, OUTFACE SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY. B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3)) APPLICANT: Poudre Tech Metropolitan District ADDRESS: 8200 Eastman Park Drive PHONE: (303) 686-5828 Consulting Engineer's Name and Address: TST, Inc., 748 Whalers Way, Building D Fort Collins, CO 80525 A. Summary of information regarding new sewage treatment plant: PHONE: (303) 226-0557 1. Proposed Location: (Legal Description) 1/4, 1/4, Section _ Township , Range County. 2. Type and capacity of treatment facility proposed: Processes Used Hydraulic Organic gal/day Present PE Design PE lbs. BOD5/day %'Domestic 3. Location of facility: Attach a map of the area which includes the following: (a) 5 —mile radius: all sewage treatment plants, lift stations, and domestic water supply intakes. (b) 1 —mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Effluent disposal: Surface discharge to watercourse Industrial Subsurface disposal Land Evaporation Other State water quality classification of receiving watercourse(s) Proposed Effluent Limitations developed in conjunction with Planning and Standards Section, WQCD: BOD mg/1 SS mg/1 Fecal Coliform /100 ml Total Residual Chlorine mg/1 Ammonia mg/1 Other 5. Will a State or Federal grant be sought to finance any portion of this project? 6. Present zoning of site area? Zoning with a 1 -mile radius of site? 7. What is the distance downstream from the discharge to the nearest domestic water supply intake? (Name of Supply) (Address of Supply) What is the distance downstream from the discharge to the nearest other point of diversion? (Name of User) (Address of User) -1- WQCD-3 (Revised 8-83) 951095 sbid4 rcb 8. Who has the responsibility for operating the proposed facility? 9. Who owns the land upon which the facility will be constructed? (Please attach copies of the document creating authority in the applicant to construct the proposed facility at this site.) 10. Estimated project cost: Who is financially responsible for the construction and operation of the facility? 11. Names and addresses of all water and/or sanitation districts within 5 miles downstream of proposed wastewater treatment facility site. (Attach a separate sheet of paper if necessary.) 12. Is the facility in a 100 year flood plain or other natural hazard area? If so, what precautions are being taken? Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources or other Agency? (Agency Name) If so, what is that designation? 13. Please include all additional factors that might help the Water Quality Control ' Division make an informed decision on your application for site approval. 8. Information regarding lift stations: 1. The proposed lift station when fully developed will generate the following additional load: Peak Hydraulic (MGD) 0.222 P.E. to be served 560 2. Is the site located in a 100 year flood plain? No If yes, on a separate sheet of paper describe the protective measures to be taken. A orreab / 3. Describe emergency system in case of station and/or power failure. p 57NDg6.enerator will be on site. 4. Name and address of facility providing treatment: Town of Windsor Wastewater Treatment Plant 5. The proposed lift station when fully developed will increase the loading of the treatment plant to g0* % of hydraulic and 80* % of organic capacity and the Town of Windsor (Treatment Agency) A1h/ 17, /Qps Date agrees to treat this wastewater? Yes X No S gnat .re and Title * Town of WIndsor is currently @ 1.0 MGD capacity; however they are in the process of expanding to 1.5 MGD (to be done April 1996). The percentages above are based on the 1.5 MGD capacity. It is assumed that we will not be at our projected numbers until summer or fall of 1996, if not later. -2- WQCD-3 (Revised 8-83) 951005 C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the 201 Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further comments'or questions, please call 320-8333, Extension 5272. Recommend Recommend No 1. 32/9s y 2. 427/21 X 3. 544 95 x 4. 5. 6. 5/2' 95 Comment Signature of ,aor ,,..� ement ... en IILNINTIR f1. JOYL ite / /,9jh1e/t/ Local Government: Cities or Towns (If site is inside boundary or within three San itption//D,4stricts. Board of County `C'ommisioners Local Health Authority Cry/ .unty Planning Authority N/c u/c1 74) u5cil of Governments/Regional Planning State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures.) I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater Treatment Works," and have posted the site in accordance with the regulations. An engineering report, as described by the, regulations, has been prepared and is enclosed. DATE. Signature of Applicant TYPED NAME WQCD-3 (Revised 8-83) 951095 ATTACHMENT TO SITE APPLICATION In accordance with C.R.S. 1981, 25-8-702 (2)(a), (b), and (c), and the "Regulations for Site Applications for Domestic Wastewater Treatment Works", the Water Quality Control Division must determine that each site location is consistent with the longrange, comprehensive planning for the area in which it is to be located, that the plant on the proposed site will be managed to minimize the potential adverse impacts on water quality, and must encourage the consolidation of wastewater treatment works whenever feasible. In making this determination, the Division requires each applicant for a site approval for a domestic wastewater treatment works to supply an engineering report describing the project and showing the applicant's capabilities to manage and operate the faility over the life of the project to determine the potential adverse impacts on water quality. The report shall be considered the culmination of the planning process and as a minimum shall address the following: Service area definition including existing population and population projections, flow/loading projections, and relationship to other water and wastewater treatment plants in the area. Proposed effluent limitations as developed in coordination with the Planning and Standards Section of the Division. (Allow minimum four weeks processing time.) Analysis of existing facilities including performance of those facilities. Analysis of treatment alternatives considered. Flood plain and natural hazard analysis. Detailed description of selected alternatives including legal description of the site, treatment system description, design capacities, and operational staffing needs. Legal arrangements showing control of site for the project life. Institutional arrangements such as contract and/or covenant terms for all users which will be finalized to accomplished acceptable waste treatment. Management capabilities for controlling the wastewater throughout and treatment within the capacity limitations of the proposed treatment works, i.e., user contracts, operating agreements, pretreatment requirements. Financial system which has been developed to provide for necessary capital and continued operation, maintenance, and replacement through the life of the project. This would include, for example, anticipated fee structure. Implementation plan and schedule including estimated construction time and estimated start-up date. Depending on the proposed project, some of the above items may not be applicable to address. In such cases, simply indicate on the application form the non' applicability of those.. WQCD-3 (Revised 8-83) 951(W5 C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the 201 Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further comments or questions, please call 320-8333, Extension 5272. Recommend Recommend No 1. 2. Date Approval 3. 5//0/(15 4. 5. 6. 7. is Laensrovi Comment Si_nng salReorosentatlye City/County Planning Authority MPS MRna Management Agency Local Government: Cities or Towns (If site is inside boundary or within three mk1eaZ -0 Gantt ion pistriats. County 'C6:gml�n )T//�J ut loci Health A ty Council of Governments/Regional Planning State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures.) I certify that I am familiar with the requirements of the "Regulations [or Site Applications For Domestic Wastewater Treatment Works," and have posted the site in accordance with the regulations. An engineering report, as described,by the, regulations, has been prepared and is Inclosed. DATE Signature of Applicant TYPED NAME -3- WQCD-3 (Revised 8-83) 951025 C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the 201 Facility Plan or 208'Water Quality Management Plan, as they affect water quality? If you have any further comments'or questions, please call 320-8333, Extension 5272. 1. 2. 3. 4. Recommend Recommend No Date 1iooroval pjamssysjs,Comment Signature of Renrosantative IMP IIIMPP LI At Management Agency ,Local Government: Cities or Towns (If site is inside boundary or within three miles) and Sanitation Districts. Board of County Commissioners Local Health A thor.ity s. 4—/9-9S V z--v4—ll/x7? L City/County Planning Authority 6. 7. Council of Governments/Regional Planning State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures.) I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater Treatment Works," and have posted the site in accordance with the regulations. An engineering report, as described,by the regulations, has been prepared and is enclosed. DATE Signature of Applicant TYPED NAME WQCD-3 (Revised 8-83) 951005 Hello