Loading...
HomeMy WebLinkAbout992360.tiff • IN *tit OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (970) 356-4000, EXT. 4200 ' FAX: (970) 352-0242 P.O. BOX 758•O' GREELEY, COLORADO 80632 COLORADO September 24, 1999 Mr. W. B. Shafer 754 Weld County Road 23 3/4 Brighton, CO 80601 Re: WCR 23.5 - WCR 2 to Wattenburg Dear Mr. Shafer: Thank you for your letter of September 17, 1999. As you noted in your letter,the Department of Public Works has determined the referenced roadway segment does qualify for paving, and it is in the process of being programmed for an improvement project. Unfortunately,this project is more complicated than simply laying asphalt on the existing roadway. Our experience indicates that upgrading a roadway to paved standards without considering its alignment may be problematic. As you well know, there are several curves on the northern part of this road segment. It will be necessary to design improvements to these curves (smooth the alignment by "softening" these curves). This type of improvement will require acquisition of additional right-of-way and relocation of utilities. These are time consuming activities. With the existing work load assigned to the department,this improvement will not be started until 2001. In the interim, the Board will consider reducing the speed limit on WCR 23.5 to lessen the impact of dust to the adjacent property owners. The original intent was to reduce the speed to the advisory speeds currently posted on the curves noted earlier. The Board will take your recommendation of a lesser speed limit into consideration. Mr. W. B. Shafer September 24, 1999 Page 2 In the interim, I have asked the Department of Public Works to determine whether additional grading will improve the road roughness you noted in you letter. Very truly yours, BOARD OF COUNTY COMMISSIONERS ___Tht)ijzi Dale K. Hall, Chair pc: Frank B. Hempen, Jr, Director of Public Works/County Engineer Marc Street, Maintenance-Support Supervisor Scott Schreiber,Motor grader Supervisor WCR 23.5 file m_A macs\frank\23-5re COI' I I S PONDENCE RESPONr. SE RECEIVEDDEPARTMENT OF,%,/L6-.4- ,��'/statc.— SEP 2 21999 WELD OGUN * * * PLEASE RESPOND WITHIN THREE DAYS.* * * DE PT WORKS IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL OF EXPECTED DATE FOR RESPONSE. RECOMMENDED ACTION: Narrative: GB MG DH BK GV BOARD ACTION: (Initial by Approval) Agree with Recommendation � ./!f Worksession METHOD OF RESPONSE: Board Action Work Session Letter (Attached) Telephone Call No Response (explain) 4dm:: signatUre M:\CAROL\O P MAN\R DC OM P2 STIUMEN NINON Bill and Kay Sharer 754 County Rd.23 3/4 Brighton,CO 80601 Fax 303-637-7300 r i ... n, r.1 Home Phone 303-637-7775 Email BShafer007(a}aol.com September 17, 1999 Mr. Dale K. Hall, Chair Board of County Commissioners P.O. Box 758 Greeley, CO 80632 Dear Mr. Hall: Thank you,for responding to my letter of August 18th. Actually, posting 35 mph speed limit signs on this part of 23 1/2 will be totally futile, since no one in their right mind travels more than 25 mph. If they do they destroy their car. I invite you to come on down and experience it yourself. Also, we have been informed that the Public Works Department has already qualified this road for improvement. We just want it moved up on your priority list. It really is intolerable. Sincerely, W. B. Shafer cc Frank B. Hempen, Jr., Director of Public Works/County Engineer Marc Street, Maintenance-Support Supervisor Scott Schreiber, Motorgrade Supervisor WCR 215 file \ OFFICE OF BOARD OF COUNTY COMMISSIONERS J PHONE (970) 356-4000. EXT. 4200 FAX: (970) 352-0242 P.O. BOX 758 C; GREELEY, COLORADO 80632 COLORADO September 2, 1999 W.B. Shafer Stillwater Ranch 754 County Road 23 3/4 Brighton, CO 80601 Dear Mr. Shafer: This letter is in response to your letter dated August 18, 1999, regarding the dust and washboard problem on Weld County Road (WCR) 23.5 between WCR 2 and WCR 6. The Public Works Department is submitting a request to the Board of Weld County Commissioners to approve changing the speed limit from 55 MPH to 35 MPH. The lower speed may reduce the dust problem as well as the washboard problem. The Public Works Department will review this roadway segment for inclusion in future project improvement listings. If it qualifies as an improvement project, it will be prioritized in a recommendation to the Board and scheduled as a future paving/grading project. Sincerely, BOARD OF COUNTY COMMISSIONERS Dale K. Hall, Chair cc: Frank B. Hempen, Jr., Director of Public Works/County Engineer Marc Street, Maintenance-Support Supervisor Scott Schreiber, Motorgrader Supervisor WCR 23.5 file miwptiles\wcr23-5Jet 1 / COI 992360 STIUWATEI I*CI Bill and Kay Shafer 754 County Rd.23 3/4 Brighton,CO 80601 Fax 303-637-7300 --' Home Phone 303-637-7775 Email BShafer007@aol.conr August 18, 1999 Weld County Commissioners P.O. Box 758 Greeley, CO 80632 Re: County Rd. 23 1/2 Dear Sirs: Weld County Rd. 23 1/2 is the sole access to our ranch. We use 23 l/2 both when going north toward Highway 52, and when we go south to Rd. 2. We are in and out on the south portion between 23 3/4 and Rd. 2 several times a day. The condition of this road is intolerable. It washboards within hours of the weekly grading and is absolutely miserable until the next grading. It is muddy when wet, and when dry, which is most of the time, the dust clouds are unbelievable. I'm sure that it far exceeds permissible dust pollution standards for Weld County, and that if a corporation or business was causing this much dust you would shut them down immediately. The roughness of the road makes it impassable at over 15 or 20 miles per hour. It is ruining the suspension on our cars, to say nothing of the psychic and physical wear and tear on our bodies. Something must be done, and soon. Paving seems to be the most logical solution. This road has more and more traffic all the time. A steady stream of produce trucks, farm equipment, and passenger vehicles keep it in a constant state of disrepair. Sincerely, W. B. hafer CORRESPONDENCE ASP�E DEPARTMENT OF J� `��'a CJ -' * * * d. PLEASE RESPOND WITHIN THREE DAYS.* * * IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL OF EXPECTED DATE FOR RESPONSE. RECOMMEND_ED ACnION, GB MG DH BK GV BOARD ACTION: (Initial by Approval) Agree with Recommendation Worksession Board Action TT Work Session Letter (Attached) Telephone Call No Response (explain) Department Head Si afure M:\CAROL\O P MA N\R D C O M P 2 Hello