September 24, 1999
Mr. W. B. Shafer
754 Weld County Road 23 3/4
Brighton, CO 80601
Re: WCR 23.5 - WCR 2 to Wattenburg
Dear Mr. Shafer:
Thank you for your letter of September 17, 1999.
As you noted in your letter,the Department of Public Works has determined the referenced roadway
segment does qualify for paving, and it is in the process of being programmed for an improvement
project.
Unfortunately,this project is more complicated than simply laying asphalt on the existing roadway.
Our experience indicates that upgrading a roadway to paved standards without considering its
alignment may be problematic. As you well know, there are several curves on the northern part of
this road segment. It will be necessary to design improvements to these curves (smooth the
alignment by "softening" these curves). This type of improvement will require acquisition of
additional right-of-way and relocation of utilities. These are time consuming activities.
With the existing work load assigned to the department,this improvement will not be started until
2001.
In the interim, the Board will consider reducing the speed limit on WCR 23.5 to lessen the impact
of dust to the adjacent property owners. The original intent was to reduce the speed to the advisory
speeds currently posted on the curves noted earlier. The Board will take your recommendation of
a lesser speed limit into consideration.
Mr. W. B. Shafer
September 24, 1999
Page 2
In the interim, I have asked the Department of Public Works to determine whether additional
grading will improve the road roughness you noted in you letter.
Very truly yours,
BOARD OF COUNTY COMMISSIONERS
___Tht)ijzi
Dale K. Hall, Chair
pc: Frank B. Hempen, Jr, Director of Public Works/County Engineer
Marc Street, Maintenance-Support Supervisor
Scott Schreiber,Motor grader Supervisor
WCR 23.5 file
m_A macs\frank\23-5re
COI' I I S PONDENCE RESPONr.
SE
RECEIVEDDEPARTMENT OF,%,/L6-.4- ,��'/statc.—
SEP 2 21999
WELD OGUN * * * PLEASE RESPOND WITHIN THREE DAYS.* * *
DE
PT
WORKS
IF RESPONSE WILL BE DELAYED,
PLEASE NOTIFY "CTB GROUP" BY E-MAIL
OF EXPECTED DATE FOR RESPONSE.
RECOMMENDED ACTION:
Narrative:
GB MG DH BK GV
BOARD ACTION: (Initial by Approval)
Agree with Recommendation � ./!f
Worksession
METHOD OF RESPONSE:
Board Action
Work Session
Letter (Attached)
Telephone Call
No Response (explain)
4dm:: signatUre
M:\CAROL\O P MAN\R DC OM P2
STIUMEN NINON
Bill and Kay Sharer
754 County Rd.23 3/4
Brighton,CO 80601
Fax 303-637-7300 r i ... n, r.1
Home Phone 303-637-7775
Email BShafer007(a}aol.com
September 17, 1999
Mr. Dale K. Hall, Chair
Board of County Commissioners
P.O. Box 758
Greeley, CO 80632
Dear Mr. Hall:
Thank you,for responding to my letter of August 18th.
Actually, posting 35 mph speed limit signs on this part of 23 1/2 will be
totally futile, since no one in their right mind travels more than 25 mph. If they
do they destroy their car. I invite you to come on down and experience it
yourself.
Also, we have been informed that the Public Works Department has
already qualified this road for improvement. We just want it moved up on your
priority list. It really is intolerable.
Sincerely,
W. B. Shafer
cc Frank B. Hempen, Jr., Director of Public Works/County Engineer
Marc Street, Maintenance-Support Supervisor
Scott Schreiber, Motorgrade Supervisor
WCR 215 file
\ OFFICE OF BOARD OF COUNTY COMMISSIONERS
J PHONE (970) 356-4000. EXT. 4200
FAX: (970) 352-0242
P.O. BOX 758
C; GREELEY, COLORADO 80632
COLORADO
September 2, 1999
W.B. Shafer
Stillwater Ranch
754 County Road 23 3/4
Brighton, CO 80601
Dear Mr. Shafer:
This letter is in response to your letter dated August 18, 1999, regarding the dust and washboard
problem on Weld County Road (WCR) 23.5 between WCR 2 and WCR 6.
The Public Works Department is submitting a request to the Board of Weld County Commissioners
to approve changing the speed limit from 55 MPH to 35 MPH. The lower speed may reduce the dust
problem as well as the washboard problem.
The Public Works Department will review this roadway segment for inclusion in future project
improvement listings. If it qualifies as an improvement project, it will be prioritized in a
recommendation to the Board and scheduled as a future paving/grading project.
Sincerely,
BOARD OF COUNTY
COMMISSIONERS
Dale K. Hall, Chair
cc: Frank B. Hempen, Jr., Director of Public Works/County Engineer
Marc Street, Maintenance-Support Supervisor
Scott Schreiber, Motorgrader Supervisor
WCR 23.5 file
miwptiles\wcr23-5Jet
1 /
COI 992360
STIUWATEI I*CI
Bill and Kay Shafer
754 County Rd.23 3/4
Brighton,CO 80601
Fax 303-637-7300 --'
Home Phone 303-637-7775
Email BShafer007@aol.conr
August 18, 1999
Weld County Commissioners
P.O. Box 758
Greeley, CO 80632
Re: County Rd. 23 1/2
Dear Sirs:
Weld County Rd. 23 1/2 is the sole access to our ranch. We use 23 l/2
both when going north toward Highway 52, and when we go south to Rd. 2. We
are in and out on the south portion between 23 3/4 and Rd. 2 several times a day.
The condition of this road is intolerable. It washboards within hours of the
weekly grading and is absolutely miserable until the next grading. It is muddy
when wet, and when dry, which is most of the time, the dust clouds are
unbelievable. I'm sure that it far exceeds permissible dust pollution standards for
Weld County, and that if a corporation or business was causing this much dust you
would shut them down immediately.
The roughness of the road makes it impassable at over 15 or 20 miles per
hour. It is ruining the suspension on our cars, to say nothing of the psychic and
physical wear and tear on our bodies.
Something must be done, and soon. Paving seems to be the most logical
solution. This road has more and more traffic all the time. A steady stream of
produce trucks, farm equipment, and passenger vehicles keep it in a constant state
of disrepair.
Sincerely,
W. B. hafer
CORRESPONDENCE ASP�E DEPARTMENT OF J� `��'a CJ -'
* * * d.
PLEASE RESPOND WITHIN THREE DAYS.* * *
IF RESPONSE WILL BE DELAYED,
PLEASE NOTIFY "CTB GROUP" BY E-MAIL
OF EXPECTED DATE FOR RESPONSE.
RECOMMEND_ED ACnION,
GB MG DH BK GV
BOARD ACTION: (Initial by Approval)
Agree with Recommendation
Worksession
Board Action
TT Work Session
Letter (Attached)
Telephone Call
No Response (explain)
Department Head Si afure
M:\CAROL\O P MA N\R D C O M P 2