Loading...
HomeMy WebLinkAbout961446.tiff CHANGE ORDER CHANGE ORDER NO. 1 DATE: July 12, 1996 PROJECT: DESIGN OF WELD COUNTY BRIDGE WEL 061.0-054.0A TO (ENGINEER): RANGE ENGINEERING. INC. JUSTIFICATION: Change in Scope of Work- Costs for Prestressed Concrete Test Pile Study and Railing Design for Bridge 61/54B You are directed to make the following changes in the work. All other terms and conditions of the contract not expressly modified hereby shall remain in full force and effect. Lump sum change order for adding railing rehab design, for bridge 61/54B, in the amount of $4,500.00 and adding test piling study costs to contract in the amount of$17,150.00. (This cost includes all fees associated with the study as shown on the attached estimate.) The original contract sum was $ 55,560.00 Net change by previous change orders $ 0.00 The contract sum prior to this Change Order was $ 55,560.00 The contract sum will be(Inexeased) (decreased) or(unchanged)by this Change Order $ 21,650.00 The contract sum including this Change Order will be $ 77,210.00 The new contract time will be (increased) (decreased) or(unchanged) by (0) days. 961446 E6OO35 ACCEPTED BY: BOARD OF COUNTY COMMISSIONERS WEL OUNTY,COLORADO By Range Engineering. Inc. BY I Dale K. Hall, eciperary hair 08/05/96 NAME 0/47-14/ (Plea* Type) L. VON e4-ram,,./ � ADDRESS 2(¢h alit 6-te-eitdm,- a-vdnRC, <ensE _ �SLZZZ (Seal) flcilqr Stl Ada?in 1esi ATTEST: ErLtbi/ O CONTRACTOR: ,/2 4. �® 'r; 'L� *Clerk to the Board BY ,0/7 S d oL47 BY (Please Type) De s ty Clerk to the Board TITLE eo,N,,I). sss. June 6, 1996 E ENGINEERING, INC. Weld County Public Works Department 2145 5. Clermont St. /Denver. CO 80222 933 North 11th Avenue Tele. (303)758-43491 Fax(3031 753-1510 Greeley, Colorado 80632 ATTN: MR. WAYNE HOWARD ESTIMATED COST FOR PRESTRESSED CONCRETE TEST PILE STUDY Range Engineering. Inc. Coordination with sub-consultants, suppliers and contractors to determine costs associated with conducting a test pile installation and analysis: $ 737.00 11 Hours at $67.00/hour Two (2) days of Engineer time to observe test pile installation: 1,072.00 16 Hours at $67.00/hour Miscellaneous time to coordinate WEAP analysis to calibrate test pile results to equipment actually used to install the piling for the new bridge: 402.00 6 Hours at $67.00/hour Travel Time (2 Trips): 240.00 4 Hours at $60.00/hour Sub-total - Range Engineering, Inc. $ 2.451.00 Goble Rausche Likins and Associates. Inc. Field Measurements: , 80.00 Engineer: 2 Days at $640/day 1$ 1,280.00 Equipment: 2 Days at $580/day 400.00 Equipment Mobilization: 1 at $400/each 240.00 Travel Time (2 Trips): 4 Hours at $60/hour CAPWAP Data Analysis Services: 600.00 CAPWAP Analysis: 2 at $300/each June 6, 1996 Weld County Public Works Department ATTN: Mr. Wayne Howard Estimated Cost for Prestressed Concrete Test Pile Study Page 2 of 2 WEAP Analysis: Bearing Graph: 1 at $750/each 750.00 Report 720.00 Travel Expenses: At Cost - Estimate 60.00 Sub-total - Goble Rausche Likins & Assoc., Inc. $ 5.210.00 Hydro Conduit Deliver three (3) - 12" x 12" square prestressed concrete piles, 55 feet long (FOB job site) $ 1.800.00 Contractor (To be selected) Furnish labor and equipment to drive (2) 55'-0" prestressed concrete piles at project site on Weld County Road 61 approximately 10 miles east of Greeley. 42,000 ft.-lb. minimum rated energy diesel hammer required. Access to pile driving locations to be furnished by Weld County. Estimated Cost $ 7.675.00* Total Estimated Cost $17,136.00 USE - TOTAL ESTIMATED COST $17,150.00 * Estimated Contractor cost based on the average of quotes received from Reiman Corp. and Les Matson Construction Inc. ''ft ME(YIORA(1DUM To Barbara J. Kirkmeyer, Chair Date July 30, 1996 COLORADO From Wayne Howard, Engineer II Subject: Change Order Approval Enclosed is the Change Order for Engineering Services on Weld County Bridge 61/54A between Weld County and Range Engineering,Inc.that has already been approved by the Board. Please sign the Change Order and return it to me at your earliest convenience. Thank you. 961354 Hello