Loading...
HomeMy WebLinkAbout972447.tiffRESOLUTION RE: APPROVE INSTALLATION OF TRAFFIC CONTROL DEVICES ON WELD COUNTY ROAD 30 AT WELD COUNTY ROAD 43 WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Weld County Department of Public Works has recommended to the Board that "Stop" and "Stop Ahead" signs be removed from Weld County Road 43, and WHEREAS, the Weld County Department of Public Works has recommended to the Board that "Stop" and "Stop Ahead" signs be installed on Weld County Road 30 at Weld County Road 43, to ensure safety to the traveling public, and WHEREAS, the Board has determined that said traffic control devices are necessary for the protection of the general public. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Department of Public Works be, and hereby is, directed to remove "Stop" and "Stop Ahead" signs from Weld County Road 43, and install signs on Weld County Road 30 at Weld County Road 43, for the safety of the general public, and said signs shall conform to the State Manual of Uniform Traffic Control Devices. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 24th day of November, A.D., 1997. BOARD OF COUNTY COMMISSIONERS WELD UNTY, COLIADO ATTEST Weld Countydi' BY. Deputy Cler AS TORM: y At &-: PR); (.1.56' George .e' Baxter, Chair stance L. Harbert, Pro-Tem W. H. Webster 972447 EG0036 to MIDe COLORADO MEMORANDUM TO: Drew Scheltinga, County Engineer FROM: Dean Dreher, - DATE: November 14, 1997 SUBJECT: Signing at WCR 43 and WCR 30 Due to the recent paving of WCR 43, the Engineering Department requests the Board's consideration to change the location of the current stop and stop ahead signs at the intersection of WCR 30 and WCR 43. The paving of WCR 43 established it as a "through" road. The change includes the removal of the southbound stop and stop ahead signs from the current location to the proposed location on WCR 30 to stop westbound traffic. The attached diagram shows the proposed change. cc: Dave Becker, Operations Director Marc Street, Maintenance -Support Supervisor WCR 43, 30 files m:\wpfiles\dean\wcr43 972447 972447 /aar nf, 'Oh an it nnu iini.i 2c_nc\ c»r inufl\ n Wi�oc. COLORADO LLD Crf MEMORANDUM, n. TO: Clerk to the Board DATE: November 14 19 Ei:( to TEE ' FROM: Dean Dreher, Engineering ,%' SUBJECT: Relocation of Regulatory Signs Please place the following item on the Board's next agenda. Relocation of stop and stop ahead signs at the intersection of WCR 43 and WCR 30. The appropriate documentation is attached. cc: WCR 43, 30 files m:wpfiles\engineer\agenda) 972447 55 Hello