HomeMy WebLinkAbout962418.tiff ','' mEmoRAnDum rl ywok
Todd Hodges, Current Planner ``, , ebi
ttIA SSA
To Date 'inn�r'�.
av*
COLORADO From Don Carroll, Project Coordinator IUD
Subject: S-381, West Hill-N-Park, 4th Filing
On February 5, 1996, I made a field trip to West Hill-N-Park to verify the items on "Exhibit A" for
the Improvements Agreement. On page one of"Exhibit A",the applicant indicated that these items
have been completed. I am in agreement with the completed items on page one.
On page two, the applicant indicated some additional funds set aside for street lighting. There is no
street lighting in place at this time.
The street signs are in place and complete.
Under fencing requirements, the applicant indicated completion; however, there is approximately
100 ft. of chain link fence missing at the north end of the Fourth Filing adjacent to 47th Avenue.
This needs to be completed.
Additional funds have been aside for landscaping, park improvements and the 47th Avenue
barricaded section on the Third and Fourth Filings.
I am in agreement with what has been presented in "Exhibit A" except for the section of missing
fence. This item would be approximately $100 - $200 in cost.
The applicant needs to sign and date both "Exhibit A" and "Exhibit B" of the improvements
agreement prior filing the final plat.
cc: Commissioner Hall
S-381
:don-c\plan3
962418
02/08/96 13:30 FAX 970 352 2888 WELD PUBLIC WORK a002
r
EXHIBIT "A"
Name of Subdivision: West 11111-N-Park
Filing: Fourth
Location: Part of the Southwest One Quarter (SWA) of Section
Twenty Six (26) , Township Five (5) North, Range Sixty Eight (68)
West of the 6th P.M. , Weld County, Colorado.
Intending to be legally bound, the undersigned Applicant hereby
agrees to provide throughout this subdivision and as shown on the
subdivision final plat dated , 19 , recorded on
9 19 in Book Page No.
Q Reception No. the following
i
it, improvements .
rj (Leave spaces blank where they do not apply)
Estimated
Improvements Unit Cost Construction Cost
r Street grading Completed ``"-
t.-- Street base completed ''
3514- ✓ Street paving Completed ✓
✓ Curbs, gutters & Completed 1"
culverts
Sidewalk n/a
Storm sewer facility Completed
•
Retention ponds Completed
Ditch improvements n/a
Subsurface drainage n/a
Sanitary sewers Completed
Sanitary sewers Completed
Trunk and forced lines Completed
Mains Completed
Laterals (house connected) tl/a
.-,-..\-,--,,,...,.nn
xnenvvcn.n.,n
•
962418
02/08/96 12:32 TX/RX NO.3086 P.002 II
02/08/98 13:30 FAX 970 352 2888 WELD PUBLIC WORK I !003
I
On-site sewage facilities n/a
On-site water supply & storage n/a
Water mains-includes Sore Completed
Fire hydrants Completed
Survey & street Completed
monuments & boxes
Street lighting $9, 340 . 00
f Street name signs completed
i-rS Fencing requirements Completed
Y
1Landscaping (north boundary) $2, 700 . 00
Park improvements
including maintenance
(Third Filing) $15, 794 . 00
(Fourth Filing) $17, 800 . 00
Additional 25% for Third Filing $ 3 , 948 . 05
Additional 25% for Fourth Filing $ 4,450 . 00
Road Culvert Completed
Grass Lined Swale n/a
Telephone completed
Gas completed
Electric completed
Water Transfer Contract with
Town of Evans
47th Avenue barrier - Completed
Maintenance $200 . 00
SUB-TOTAL $54 , 232 . 05
Engineering and Supervision Costs (included in above) (testing,
inspection, as-built plans and work in addition to final plat;
supervision of actual construction by contractors)
TOTAL ESTIMATED COST OF IMPROVEMENTS AND SUPERVISION $54 , 232 . 05
•
Y.\wa.\LVgDvni.s.\:..aaWvu.ApR
962418
02/08/96 12:32 TX/RX NO.3086 P.003
mEmoRAnDum
WIDc Todd Hodges, Current Planner October 30, 1995
To
COLORADO• Don Carroll, Project Coordinator ,,cttc,e c\ `'\4 ,l F)
From
„.> 0
sc
Subject: West Hill-N-Park, 4th Filing OG
I have reviewed the improvements agreement on the final plat as well as the documentation, and I
have the following comments:
I would like to have a typical cross section of the subdivision roads placed on the mylar. The cross
section needs to reflect the depth of base, asphalt and curb section. I visited the site and compared
the items listed on Exhibit A to the actual site conditions. The applicant has indicated that the items
have been completed; however, the street base item has not been completed. I would like the
applicant to add the additional street base item to Exhibit A to reflect the actual field condition.
Street lights and street name signs have not been installed on the site. These items are not complete
on Exhibit A and need to be included.
Exhibit B needs to be adjusted to reflect the changes on Exhibit A.
cc: Commissioner Webster
Hill-N-Park, 4th Filing
do/fc:plan2.dc
962418
Hello