Loading...
HomeMy WebLinkAbout982493.tiff RESOLUTION RE: APPROVE AMENDED ROAD MAINTENANCE AND IMPROVEMENTS AGREEMENT - WESTERN MOBILE, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, by Resolution dated November 4, 1998, a Site Specific Development Plan and Special Review Permit#1199, for Western Mobile, Inc., on the following described real estate, to-wit: Part of Section 4, Township 2 North, Range 68, and part of Section 9, Township 2 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, pursuant to certain Conditions of Approval in said Resolution, the Board has been presented with an Amended Road Maintenance and Improvements Agreement between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and Western Mobile, Inc., with terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said amendment, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Amended Road Maintenance and Improvements Agreement between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and Western Mobile, Inc., be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 23rd day of December, A.D., 1998. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: 1yK�7 " _ EXCUSED �D (,,,9 ,,, Constance L. Harbert, Chair Weld County Clerk to the o F , n� ,�' p W. 7c1 r, Pro- BY: �211�`a�J Deputy Clerk to the "a c rfr eorge . Baxter R AS • FORM: Dale K. Hall minty • .rney EXCUSED Barbara J. Kirkmeyer 982493 OP ,G, L tstn ire-1c-2v PL1271 MF,MORANT� ►u M� 21 F 1 2: 59 Will C CLERK TO THE BC,°:,9 COLORADO TO: Clerk to the Board DATE: December 21, 1998 FROM: Frank B. Hempen, Jr., Director of Public Works/County Engineer SUBJECT: Agenda Item Please place the following item on the Board's next agenda Amended Road Maintenance and Improvements Agreement with Western Mobile, Inc. (Hamm Gravel Pit). The appropriate documentation is attached. Enclosures pc: Western Mobile Inc. File WCR7 Hamm Gravel Pit Soy/ COUNTY OF WELD, STATE OF COLORADO AMENDED ROAD MAINTENANCE AND IMPROVEMENTS AGREEMENT This AGREEMENT,made and entered into the 23rd day of December 1998,by and between the COUNTY of WELD, STATE of COLORADO,hereinafter called "County" and WESTERN MOBILE,INC. (HAMM GRAVEL PIT),hereinafter called "WMI" and WHEREAS, WMI has been granted a Weld County Use by Special Review Mining Permit for an open-cut sand and gravel operation on portions of the East 1/2 (E1/2) of Section 4 and the North 1/2 (N1/2)of the Northeast Quarter(NE 1/4) of Section 9 all located in Township 2 North, Range 68 West of the 6th Principal Meridian and WHEREAS, the existing County road that serves the gravel pit may require increased maintenance and improvement due to heavy truck traffic, and WHEREAS, the County and WMI agree that such maintenance and improvements will enhance the accessibility and safety of the road that serves said gravel pit. NOW, THEREFORE, in consideration of the mutual covenants and conditions hereinafter set forth, the County and WMI agree as follows: 1. The County road that serves said gravel pit is Weld County Road (WCR) 7 between the Hamm Pit entrance and Colorado State Highway 119. 2. WMI agrees to excavate and patch any damage to that section of WCR 7 between the Hamm Pit entrance and Colorado State Highway 119 created by heavy truck hauling from the Hamm Gravel Pit, as determined by Weld County Public Works Department. 3. At any time in the future, when damage to that section of WCR 7 between the Hamm Pit entrance and Colorado State Highway 119 has increased beyond the point that patching can reasonably restore the road, WMI will cooperate with County in the reconstruction of those parts of said road. 4. When reconstruction is required, the details of such reconstruction and the amount of aggregate base course required will be determined by sampling and testing of the existing road by the Weld County Public Works Department. 5. When reconstruction is required,WMI will supply and pay the cost of the hot bituminous pavement, aggregate base course, equipment,and labor for construction. 6. When reconstruction is required, County will reimburse WMI the cost of AC-10 liquid asphalt for the manufacture of hot bituminous pavement. 7. All construction and materials controls for a project will be in accordance with the 1991 Standard Specifications for Road and Bridge Construction, and modified by the December 1, 1996, Supplemental Specifications, as provided by the Colorado Department of Transportation. During Construction, signage shall be posted in accordance with the Uniform Manual on Traffic Control Devices. 111111111111 111111 11111 lii 11111 1111111 III VIII IM IIII 2665504 01/07/1999 01:50P Weld County CO 2(; ,M3 1 of 3 R 0.00 D 0.00 JA Suki Tsukamoto Amended Road Maintenance and Improvements Agreement Page 2 8. The term of this Agreement is from the date of entering as an aforementioned, and shall run continuously until WMI ceases its operation of said gravel pit. 9. County shall be responsible for payment of costs due in future fiscal years only if funds are appropriated and are otherwise available for the services and functions that are described herein. 10. No Third Party Beneficiary Enforcements: It is expressly understood and agreed that enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement shall be strictly reserved to the undersigned parties, and nothing contained in this Agreement shall give or allow any claim or right of actions whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be deemed an incidental beneficiary only. 11. Indemnification:To the extent authorized by law, WMI agrees to indemnify, save, defend, and hold harmless County from any and all liability incurred as a result of acts, omissions, or failures to act by WMI in its performance of the duties set forth in this Agreement on those portions of WCR 7 described in this Agreement The term liability includes, but is not limited to,any and all claims, damages,and court awards, including costs, expenses, and attorneys'fees,incurred as a result of any act or omission by WMI and its employees. 12. Modifications and Breach:This Agreement contains the entire agreement and understanding between the parties to this Agreement and supersedes any other agreements concerning the subject matter of this transaction, whether oral or written. No modifications, amendment, novation,renewal, or other alteration of or to this Agreement shall be deemed valid or any force or effects whatsoever,unless mutually agreed upon in writing by the undersigned parties. No breach of any term, provision, or clause of this Agreement shall be deemed, waived or excused,unless such waiver or consent shall be in writing or signed by the party claimed to have waived or consented. Any consent by any party hereto,or waiver of, a breach by any other party, whether expressed or implied, shall not constitute a consent to waiver of, or excuse for any different or subsequent breach. 13. Non-Assignment:This Agreement shall not be assignable without prior written consent of County or WMI, whichever is the non-assigning party. 111111 1111 111111 Jill 11111 1111111 III IIIII 1111 IIII 2665504 01/07/1999 01:50P Wald County CO 2 of 3 R 0.00 D 0.00 JA Suki 7sukamoto Amended Road Maintenance and Improvements Agreement Page 3 IN WITNESS THEREOF, the parties hereto have duly executed the Agreement the day and year first above writte A1"1hST: RD OF COUNTY COMMISSIONERS COUNTY, COLORADO Weld County Cler s ` __ BY: ice% e�iF%;. .L;�� BY: gPirZ—fr.;;;,,,-,---X9/4.-Ae"--7 Deputy County Constance L. Herbert, Chair(12/23/98) WES RN MOBILE, INC. I:���--/ BY: C,t) ,,('- TITLE: 4s St U & Pt it-e.. R. . 1 111111 11111 111111 11111 IIII 11111 1111111 III 11111 IIII IIII 2665504 01/07/1999 01:50P Weld County CO 3 of 3 R 0.00 D 0.00 JR Sukl Tsukamoto Hello