Loading...
HomeMy WebLinkAbout931095.tiff CONTRACT FOR ENGINEERING SERVICES FOR WELD COUNTY BRIDGE NO. WEL 023.0-074.OA T I, S, AGREEMENT, made and entered into this c25 EI — day of -Itl tA2 , 1993, by and between the COUNTY OF WELD, of the State of Colorado, with offices at 915 - 10th Street, P. 0. Box 758, Greeley, Colorado, 80632, hereinafter referred to as "County" , and the professional consulting firm of MERRICK AND CO. , with an office at 10855 East Bethany Dr. , '-verr, Colorado, 80222, hereinafter referred to as "Engineer" . QURoRA Scoll , } WITNESSETH THAT WHEREAS, the County has established a program of design and construction of public improvements for Weld County Bridge No. WEL 023.0-074.OA; and WHEREAS, the County desires to obtain professional engineering services for the design of public improvements related to the heretofore-mentioned project; and WHEREAS, Engineer represents that they possess the necessary qualifications to perform these services. NOW, THEREFORE, for the consideration herein expressed, it is hereby agreed as follows by and between the County and Engineer: I. EMPLOYMENT OF ENGINEER. The County hereby agrees to engage Engineer and the Engineer hereby agrees to perform the services hereinafter set forth. II. PROJECT DESCRIPTION This project will consist of the following improvements: A. The design of a vehicular bridge on County Road 8 between County Road 74 and County Road 76 and crossing the Larimer-Weld Canal near Severance, CO. B. The design of the approach roadways on each side of the bridge. 1 III. SERVICES TO BE PROVIDED BY THE ENGINEER A. Design Criteria All work shall be in compliance with the following: Bridge design based on HS 20-44 loading. Standard Specifications for Highway Bridges, AASHTO, latest edition; A Policy on Geometric Design of Highways and Streets, AASHTO, latest edition Standard Specifications for Road and Bridge Construction, CDOH, latest edition M & S Standards, CDOH, latest edition Uniform Manual of Traffic Control Devices, FHWA, latest edition Colorado Department of Highways Requirement for Off- System Bridges Contract between Weld County and Consultant B. Pre-Design Meeting Attend Pre-Design meeting with Weld County to discuss the scope of work and design parameters. C. Subsurface Exploration Drill test holes and obtain samples. Determine relevant soil characteristics. For pavement design, determine R-values using Vheem test procedure for two representative samples, one from each side of bridge. Prepare soils investigation report showing log of drill holes supporting abutment, pier and footer designs. D. Survey Locate existing corners and establish ties to existing corners. Establish horizontal control and vertical control. Survey topography. Survey roadway cross sections at 50 feet stations and at road approaches. Survey data pertinent to hydrology and hydraulic study. Submit copy of field book to Weld County for use during construction. E. Utility Coordination Contact all utilities involved regarding project and meet with utilities at project site to locate existing and proposed facilities. Determine impact of project on utilities and resolve adjustments, if any. 2 931095 F. Preliminary Hydrology and Hydraulic Design Obtain historical data Determine precipitation, runoff, peak flows and frequency. Receive drainage requirements from Weld County. Determine water surface profile and perform hydraulic analysis. Determine size and skew of structures. G. Preliminary Structure Design Determine foundation type based on soils investigation. Determine feasible superstructure alternatives for the structure. Select type of substructure and superstructure. Prepare general layout for substructure and superstructure. H. Preliminary Roadway Design Design horizontal and vertical alignments. Determine roadway typical cross sections. Plot roadway plan and profile on plan sheets. Perform pavement structure designs. I. Preliminary Right-of-Way and Easements Determine preliminary ROW and easements required from preliminary structure design and roadway designs. J. Permits Prepare applications and supporting documents for all permits, such as : Corps of Engineers 404 permit and wetlands permit, and Colorado Department of Health 401 and 402 permits. Environmental investigations and permit submittals will not be the consultant's responsibility. K. Preliminary Design Report The Preliminary Design Report shall include the following: Soils Investigation Report Substantiate selection of superstructure and substructure based on cost analysis and hydrology/hydraulic study. Plan sheets to include: General layout of substructure and superstructure Roadway plans and profiles Typical roadway cross sections Submit for review and approval. 3 931095 L. Final Hydrology and Hydraulic Design Review preliminary hydrology and hydraulic design and update in accordance with Preliminary Design Report review. Determine if embankment protection is required. M. Final Structure Design Revise the preliminary structure design incorporating comments from the Preliminary Design Report review and proceed with the final design. N. Final Roadway Design Revise the preliminary roadway design incorporating comments from the Preliminary Design Report review and proceed with the final design. Plot roadway cross sections including road approaches, if any. 0. Final Right-of-Way and Easements Include the limits of the existing right-of-way and new right-of-way in the plan sheets. Include the limits of new easements, in the plan sheets. Incorporate the property owner names in the plan sheets. Generate legal descriptions for new right-of-way, certified to by Registered Professional Land Surveyor. P. Utility Coordination Subsequent to the Preliminary Design Report review adjustments shall be coordinated with all utility owners and documented. Q. Traffic Control Plan Determine detour route and submit to Weld County for approval. Prepare traffic control plan in accordance with The Manual on Uniform Traffic Control Devices. R. Final Plan Sheets Revise preliminary plan sheets to include changes from the Preliminary Design Report review. The final plan sheets are to include the following: Sheet Index Project site map with detour route and traffic control signing Summary of approximate quantities Roadway general notes and typical cross section Roadway plan and profile - stationing; construction centerline; section line; corners; ties to corners; temporary benchmark elevation and location; existing and proposed contours; topography; existing and proposed drainage; utilities; existing right-of-way; new right- of-way; new easements; names of property owners, 4 931095 vertical curve design data; horizontal curve design data; and approach drives. Bridge general notes Geology data - location of test holes, boring log and legend, soil test results Hydrology/hydraulic data - flow line elevation, freeboard, design flow, design velocity. Piling layout including estimated pile tip elevation and actual pile load or caissons layout. Substructure layout and details including embankment protection, if required. Superstructure layout and details including computed deck elevations at 10 pts per girder. Bridge rail and guardrail layout and details Roadway cross sections - construction centerline; profile grade elevations; existing right-of-way or new right-of-way; road approaches. Compute final quantities based on final design. Final quantities shall also be independently computed and compared. Compute total construction cost based on final quantities. Write special provisions as required due to deviations of CDOH standard specifications. Compute bridge ratings for CDOH HS 20 Inventory, HS 20 Operating, Type 3 Operating, Type 3S2 Operating and Type 3-2 Operating vehicles. Submit copy of all design and quantity computations. Submit final plan sheets, special provisions and independent computations of final quantities for review and approval. S. Completion of Design Phase Incorporate corrections to final plan sheets and special provisions in accordance with the review as necessary. Transmit the original drawings to Weld County. T. Construction Phase Review shop drawings. Provide consultation during construction. IV. COUNTY'S RESPONSIBILITIES The County shall: A. Provide to the Engineer full information as to the County's requirements. B. The County shall receive and examine documents submitted by the Engineer, interpret and define the County's policies, and render decisions and authorizations in writing 5 931095 promptly to prevent unreasonable delay in the progress of the Engineer's services. C. Make available any and all information, requested by the Engineer, in existing County files pertinent to the project site which shall include, but not be limited to, utility companies, right-of-way, roads, adjoining property, improvements, traffic counts, projected traffic counts, surveys and plats. D. Furnish above services at the County's expense, in such a manner that the Engineer may rely upon them in the performance of his services under this Agreement. E. The County will print all construction documentation (contract documents, technical specifications, and drawings) . Distribution to prospective bidders will also be performed by the County. F. Arrange for or guarantee full and free access for the Engineer to enter upon all property required for the performance of the Engineer's services under this Agreement. G. For the required design work and services described herein 1 Lcfeie the County agrees to pay the Consultant, and the ,�,I' Consultant agrees to accept lump sum compensation as follows: BRIDGE ITEM 23/74A FIELD WORK AND PRELIMINARY DESIGN Field Surveying $ 2,000.00 Geotechnical Investigation $ 1,900.00 Hydrology/Hydraulic Analysis $ 1,000.00 Roadway Design $ 1,000.00 Bridge Design $ 4,000.00 SUBTOTAL S 9.900.00 FINAL DESIGN Hydrology/Hydraulics Design $ 1,000.00 Roadway, Utility & R.O.W. Design $ 2,000.00 Bridge Design S 9.000.00 SUBTOTAL $12.000.00 CONSTRUCTION PHASE Shop Drawings & Coordination $ 1.000.00 OVERALL TOTAL $22.900.00 6 931095 V. TIME OF PERFORMANCE The Preliminary Design will be submitted to the County for review within ninety (90) days of the Authorization to Proceed. The Final Design will be submitted to the County for review within sixty (60) days of the date of Authorization to Complete Design. VI. TERMINATION OF AGREEMENT This Agreement may be terminated for cause by the County or Engineer upon fifteen (15) days written notice. In the event of termination, Engineer shall be paid for services performed to termination date as mutually determined by County and Engineer. VII. CHANGE OR EXTRA WORK In the event the County shall require changes in the scope of work to be performed, which said changes cause an increase or decrease in the Engineer's total lump sum fee, the Engineer shall be compensated as mutually agreed upon by and among the County and Engineer. Any claim by the Engineer for compensation must be made in writing prior to performance of any changed work or services. VIII. INSURANCE The Engineer shall carry the following minimum amounts of insurance: (1) Workmen's Compensation in statutory limits (2) Comprehensive General and Automobile Liability Policy for amounts not less than: Bodily Injury $600,000 each occurrence or $600,000 combined and single limit Property Damage $150,000 each occurrence (3) Architects' and/or Engineers' Professional Liability Policy for amounts not less than $600,000.00 aggregate Said insurance shall be maintained in full force and affect during the term of this contract and for two (2) calendar years thereafter. Certificates showing the engineering firm 7 024 nnr is carrying the above described insurance shall be furnished to the County prior to commencement of the work. .k'ocGcAerAI (Mb il4j rgna %A cut Lieb,I(�.- Said insuranceAshall include a an additional named insured, Weld County, Colorado, by and through the Board of Weld County Commissioners, including its agents and employees. IX. VENUE This transaction shall be governed by the laws of the State of Colorado. X. NON-DISCRIMINATION The Engineer shall not commit any of the following employment practices and agrees to prohibit the following practices in any subcontracts. A. To discharge from employment or refuse to hire any individual because of their race, color, religion, sex, national origin, disability, age, or marital status. B. To discriminate against any individual in terms, conditions, privileges or employment because of their race, color, religion, sex, national origin, disability, age, or marital status. XI. BENEFITS The Engineer, as an independent contractor, its agents or employees, will receive no benefits directly or indirectly that accrue to County employees, in the performance of this contract. XII. OWNERSHIP OF ENGINEERING DOCUMENTS A. All tracings, plans, specifications, estimates, and miscellaneous items purported to contribute to the completeness of the work shall be delivered to and become the property of the County. Reproducible copies of drawings and plans will be retained by the Engineer. B. Basic survey notes, sketches, charges, computations and other data prepared hereunder shall be made available to the County upon request. C. All documents, including drawings and specifications prepared by the Engineer pursuant to this Agreement are instruments of services in respect to the project. They are not intended or represented to be suitable for reuse by County or others on extensions of the project 8 931095 or on any other project. Any reuse without written verification or adaptation by Engineer for the specific purpose intended will be at County's sole risk without liability or legal exposure to Engineer and the County shall indemnify and hold harmless the Engineer from all claims, damages, losses and expenses including attorney's fees arising out of, or resulting therefrom. Any such verification or adaptation will entitle Engineer to further compensation at rates to be agreed upon by County and Engineer. 9 93109; EXECUTED this .J TM1 OS day of (Je( , A.D. , 1993. COUNTY OF WELD 4-724Z.Aryte..2--1,‘A., - Constance L. Harbert /%5/93 ATTEST: F ! I Chairman o /+i V �I BOARD OF COUNTY COMMISSIONERS Weld County Clerk to the Board By: D,put� lanaia , Deputy Cl k 40o Baaxoard MERRICK AND COMPANY BY: /dc-..-...e. c- ,z2UC....4, 2g ucF2 TITLE: (70e-.1/4.1/5.7- DATE: ear /f /SS.. APPROVE S TO FORM: 11. Count ttorney �'XC 10 C]'?7 nine CERTIFICATION OF ENGINEER I hereby certify that I am the duly authorized representative of the firm of Merrick and Company, whose address is 10855 East Bethany Dr. , Denver, CO 80222, and that neither I nor the above firm I hereby represent has: A. employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above Engineer) to solicit or secure this contract; B. agreed, as an expressed or implied condition for obtaining this contract to employ or retain the services of any firm or person in connection with carrying out the contract; or C. paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above Engineer) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out the contract; except as here expressly stated (if any) : er /1'j /SS3 (Date) (Signature) 11 93109. CERTIFICATION OF WELD COUNTY I hereby certify that I am the duly authorized representative of Weld County, State of Colorado, and that the above Engineer or his representative has not been required, directly or indirectly as an expressed or implied condition in connection with obtaining or carrying out this contract to: A. employ or retain, or agree to employ or retain, any firm or person; or B. pay, or agree to pay to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind; except as here expressly stated (if any) : (ftelS1/1-2 /993 Sfy (Date) Constance L. Harbert /Q/aslu Chairman, BOARD OF COUNTY COMMISSIONERS ATTEST: al / / D 1r lir/ Weld County Clerk atee4 tothe Board � /J BY: ��.I /GcJL-�c . Deputyrk+o Board 12 9109; _ ,caac ww)liete biii IVnn dra return Lo : Weld county Aco)un%irx; r_.m J ATTN: Payroll (C:tober 1983) Payer's Request for Tax), .yer P.O. Box 758 • Department of the Treasury ' Identification Number Greeley, CO 80632 Internal Revenue Service • Name as shown on account if joint account,also give pint owner's name) )s Address ME RICK & COMPANY Engineers & Architects • City.Stale,and ZIP code 10855 E.Bethany-Drive I P. 0. Box 22026 Denver, Colorado 8O222 List account number(s)here(See Instructions)► . PART I.—Taxpayer Identification Number vat'\ .(R f i u�yJ.., PART II.—Backup Withholding On Accounts Opened After 12/31/83 Social security number Enter the taxpayer identification number in the Check the box if you appropriate box. For most individual taxpayers, are NOT subject.,to this is the social security number. backup withholding Note:if the account is in more than one name, OR under the provisions of see the chart on page 2 tor guidelines on which Employer Identification number section 34O6(6)(1 HC) number to give the payer. ', ��r��� of the Internal Revenue ?jug ry��ja/ Code ► (See Highlight below.) Certification.—Under the penalties of perjury, I certify, �that the inforrti3tion provided on this form is true, correct, and complete. Signature► �,�1/C i�� �C1..*G'&' />V Date ► / _// C ?1 • Instructions(Section references are fo the infernal Revenue Code.) yments of Interest, Dividends, and Patronage Highlight for interest or Dividend Accounts Opened After ividends 12/31/83—Backup Withholding Accounts Opened Before January 1, 1984 You may be notified that you are subiect to backup withholding under To certify that the taxpayer identification number is correct for accounts section 3406(a)(1)(C)because you have underreported interest or opened belore January I, 1984,fill out your name and address,enter your dividends or you were required to but laded to file a return which would account number(s)(if applicable),complete Part I.sign and date the form have included a reportable interest or dividend payment.If you have NOT and return it to the payer. been so notified,check the box ii,PART II.Note:Backup withholding may apply to existing accounts as well as accounts opened alter December 31, Accounts Opened After December 31, 1963 1983. To certify that the taxpayer identification number is correct and that you are Caution:There are other situations where you may be subject to backup not subject to backup withholding under section 3406(axlxC)for accounts withholding.Please read the instructions below carefully. opened after December 31. 1983.fill out your name and address,enter Purpose of Form your account number(s)(if applicable),complete Parts I and II,sign and date the form and return it to the payer. Use this form to report the taxpayer identification number(TIN)of the If you are subject to backup withholding and are merely providing your record owner of the account to the payer(or broker) correct taxpayer identification number to the payer,fill out your name, Beginning January 1, 1984.payers must generally withhold 20%of address.enter your account number(s)(if applicable),and complete Part I. taxable interest,dividend,and certain other payments if you lad to furnish payers with the correct taxpayer identification numher(this is referred to as Other Payments backup withholding).For most individual taxpayers,the taxpayer identilication number is the social security number. II you are merely providing your correct taxpayer identification number to To prevent backup withholding on these payments,be sure to notify the payer for payments other than interest.dividends,and patronage payers of the correct taxpayer identification number and,for accounts you dividends,you need not sign this form.Fill out your name and address, open alter December 31. 1983.properly certify that you are not sublect to enter your account number(s)(if applicable),complete Part I and return backup withholding under section 3406(aX1XC). the form to the payer. You may use this form to certify that the taxpayer identification number you are giving the Payer is correct and,for accounts opened alter Account Numbers December 31,1983,that you are not subject to backup withholding. If you have more than one account with the same payer(for example,a If the payer provides a different form than Form W9 to request the savings account and a certificate of deposit at the same bank),the payer taxpayer identification number,please use it. may request a separate Form W9 for each account depending on how the Backup Withholding payer's records are kept. You are subject to backup withholding if: What Number to Give the Payer (I)You fail to furnish your taxpayer identification number to the payer,OR Give the payer the social security number or employer identification (2)The Internal Revenue Service notifies the payer that you furnished an number of the record owner of the account.If the account belongs to you incorrect taxpayer identification number,OR as an individual,give your social security number.If the account is in more (3)You are notified that you are subject to backup withholding(under • than one name or is not in the name of the actual owner,see the chart on section 3406(a)(1)(C)).)(C)),OR page 2 for guidelines on which number to report. (4)For an interest or dividend account opened after December 31, 1983,you fail tocertify to the payer that you are not subject to backup Obtaining a Number withholding under(3)above,or fad to certify your taxpayer identification nurnier. If you don't have a taxpayer identification number or you don't know your For paymes number,obtain Form 55.5.Application for a Social Security Number Card. withholding nosy d her tor han s i n a iterest o pdesdends,you are subject to backup or Form S5-4,Application for Employer Identification Number,at the local office of the Social Security Administration or the Internal Revenue Service (See the section on the back titled"Payees Exempt from Backup and apply for a number.Write'applied for'in Part I in place of your Withholding.") number.When you get a number,submit a new Form W9 to the payer. (Give this form to the payer, not to the internal Revenue Service) 93109:, Form W9(10.831 MEMORAnDUM WIIDeTo Clerk to the Board Date tobe ly/�/J. 1993 COLORADO From Denny M. Graham. Civil Engineer II /Y subject:Contract Bridge 23/74A Enclosed are two copies of the signed contract with Merrick Engineers & Architects. Please have these executed, returning one copy and one original to this office for delivery to Merrick Engineers & Architects. DG/pds:ctb26 Attachment cc: Commissioner Baxter File 931095 CC; oo 32- Lon ❑•❑ ❑❑❑ MERRICK ,,(,,\, HS 8,:AR(':111IF( IS October 18, 1993 Weld County 915 - 10th Street P.O. Box 758 Greeley, CO 80632 RE: Agreement for Engineering Services Between Merrick&Company and Weld County Dear Ms. Harbert: Enclosed are two signed originals of the above referenced agreement for your files. After signing, please return one fully executed original to Merrick for our files. We look forward to working with Weld County on this project and if you have any questions, please feel free to call me at (303) 751-0741. Sincerely, MERRICK&COMPANY / efot Robert O. Strine. Vice President, Administrative Services ROS:pjm Enclosure 931095 !1085O F ,s, Bi FIAN1 UsnrI RP O. Bov 2207() m DE NtE R OR ann 40'222 ■.303j 251-0741 tte \X 4(13) 7:51-2581 Hello