Loading...
HomeMy WebLinkAbout911386.tiff RESOLUTION RE: APPROVE SUPPLEMENTAL CONTRACT WITH ZOYIOPOULOS AND ASSOCIATES, INC. AND AUTHORIZE CHAIRMAN TO SIGN - BRIDGE 60.5/29A WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Supplemental Contract with Zoyiopoulos and Associates, Inc. , with the further terms and conditions being as stated in said contract, and WHEREAS, after review, the Board deems it advisable to approve said contract, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Supplemental Contract with Zoyiopoulos and Associates, Inc. be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said contract. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 25th day of November, A.D. , 1991. ATTEST: tidth BOARD OF COUNTY COMMISSIONERS WELD COUN Y, OLORADO Weld County Clerk to the Board Gordon/. a'y�• `rma Deput erk tto the Boar Geo e Ken '.y, ro-Tem` APPROVED AS TO FORM: / �uP�crrc � Constance L. Harbert ul;torarvir C. W. Kirby tio ii()L41V,a7 W. H. Webster 911386 Crvca5 Gam - A-PP / kG SUPPLEMENTAL CONTRACT By mutual agreement, this supplemental agreement dated November 8, 1991, between Weld County and Zoyiopoulous & Associates, hereby amends the contract between these two entities dated April 3, 1991, for engineering services to replace the bridge on Weld County Road 60.5 over Sheep Draw, between Weld County Road 29 and Weld County Road 30 near Greeley, Colorado. I. In Section IV, Paragraph H, change the lump sum compensation as follows: I. Engineering Study $ 9,840.00 2. Preliminary Engineering $ 8,610.00 3. Final Engineering $ 3,690.00 4. Construction Engineering $ 1,720.00 5. Final Project Close-out $ 740.00 6. "Total Lump sum not to be exceeded without a Change Order" amount from $22,100.00 to $24,600.00 II. In Section V, change the time of performance as follows: The preliminary design will be submitted to the County for review within twenty-four (24) days of the authorization to proceed. The final design will be submitted to the County for review within forty- five (45) days of the date of authorization to complete design. BOARD OF COMMISSIONERS OF WELD COUNTY, COLORADO By: "/cian Chai Date Attest: County Clerk to the Bo rd e/f- ty Clerk ZOYIOPOLOUS & ASSOCIATES 117,7) By:�, Date e l 4 VrCir � e- D MEMORAnDum Yli`,PC To Carol Harding, Clark to the Board's Office Dace November 19, 91 COLORADO Fmm Denny Graham, Civil Engineer II f .�, subject: Agenda Item Please place the following item on the Board's next agenda: Supplemental Contract with Zoyiopoulos and Associates, Inc. The attached Supplemental Contract covers engineering services for added work to design Bridge 60.5/29A for four lanes in lieu of two at the request of the City of Greeley. DMG/mw:msupp.mrw Attachments cc: Commissioner Harbert Bridge File - 60.5/29A 911386 Hello