Loading...
HomeMy WebLinkAbout590137.tiffPERMITTEE'S NAME . ✓ O 1 s ADDRESS it✓S —'/ ST Yoe:: request for permission to install a _Zett✓/G line along or across County Highway No. _ —, at 3sc, - -7$`fZ WELD COUNTY, COLORADO 5 -1 7 f Z4159 UNDERGROUND AND UTILITY PERMIT //� /4prf! Z Iii71 DATE is granted, provided that the Permittee will own and maintain the same after installation. IY^ IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Penalties will own and maintain n the same after installation. The tole"../0 12.--701€ • line shall be installed beneath the surface of the right of way at a minimum depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and pecked, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing ;Mail be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring Or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling ab all be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to each statutes as are apsicalle. SPECIAL PROVISIONS: Attached / ©r twl a CG r4)4e fresQ r `74) 7C-1ne / >97SC The Permittee shall maintain the installlat:on at all times and agree to hold Weld County, Colorado, the agencies thereof. and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit - This work shall be completed within ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified In special provisions, Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County,. Colorado, at the lccations designated by Weld County, Colorado. directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public mast ';e protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ed Ah /. 1 .r ..` 5g 7 -4}.5#01 or Ma successor, will represent Weld County, Colorado, In the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Maintenance Man on this section of the highway, with headquarters at Fo�iM�,xe swar�bo. in accepting this permit the uudereigr^d, representing the Permittee, verities that be has read and understands all of the foregoing provisions; that he has authority to sign for and bind the�itt.ee; and that by vj(ne of his signature the Permittee Is bound by all the conditions set forth herein. 4,,,k3 7c1 SPECIAL • `INSTRUCTIONS REQUIREMENTS-FOQt1NSTALL*11O*OF lkTILLTLESCIATHtt TILEGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to workon or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY: 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. .,. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two Inches in diameter -or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permitter,, at a rate specified by Weld County. 13. All drainage facilities or siphons wal be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. AR' damaged sections are to be inspected by Weld County, Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends foe 46° Bends at 45' Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3^ 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" - 1.0 sq. ft - _. 0.4 sq. ft - 0.20cu. yds. 6" 2.2 sq. ft 09 eq. tt - 0.37 cu, yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 en. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. --2.00'cn.'yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 en. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu.. yds. 20^ 24.0 sq. ft. - - 9.3 sq. it, - 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: - Open cuts across the driving surface of the roadway may be psrmitted at the discretion of Weld County. Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over ni;;ht or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back fill and tamping operation will be executed i. n no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determ ine wL ether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. .1, Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year alter construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification. for the executiott: of said -repairs. 5. If the Permittee has not reyah•ed-said-open-eat or cut; within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses c lnnected therewith. 6. No open cuts within paved roadway will be allowed witto it scoring pavement parallel to the center line of the utility and perpendicular to the, center line of the road 'with a minimum width of 12 inches. 7. All water lines arid-gewet finis are Eb De Mdtfably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. -.. 9. That in all cases where existing black top or hard *surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person caning the hard surfaced roadway to be disturbed prior to the conunencen tent of the work, - said bond shall assure recovery bythe-County of any expense incurred, within a period of one year following the completion . and . acceptance -of . the restored. portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall bo set by the Board of Comity Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 4S- 75 PROJECT: PERMIT # REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH 4rIf County tngineer Inspector 4f .ABC., it -01'1-7g P£RMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT /— i97f 0 #4, A--/ Your request for permission to install a _Asci too` e r°- C7 DATE •Pine ate Or across County Highway No. 7.2-- at is granted, provided that tit ermittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will ownand a and main n the same after installation. Thera_ 444-- line shall be installed beneath the surface of the right of way at a minimum depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition- The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( •Yn ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway alter dark, unless otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance withdirections given by Weld County, Colorado or by their agar'. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Wald County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside Conn .-,4ght of way limits. !!Sy Maintenance Man on this section of the highway, with headquarters at c2eti^ 7 t '� , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. B THE BOHiiD 9F COUNTY COMMISSIONERS WE J���y WELD Call ,COLO /./ C -ter In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. CR��s -"goo SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Linder no condition is an asphalt surface to be cut unless otherwise specified In the special provisions. 5. Mud -Jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved county road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9, Manholes and other points of access to other underground utilities may be permitted within the right of way only when t"ey are located beyond the shoulder of the through -traffic roadway. 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such ➢ermits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The deaision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 en. yds. 3^ 0.6 sq. ft. 0.3 sq, ft. 0.11 cu. yds, 4" 1.0 sq. ft. 0.4 eq. ft. 0.20 cu. yds. 6^ 2,2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds, 10^ 6.9 so. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 aq. ft. 8.5 sq. ft. 1.50 cu. yds, 14" 12.0 eq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 eq. ft. 2.70 cu. yds. 1S" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yda. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving suraace of the roadway may be permitted at the discretion of Weld Comity, Colorado, and only after the following provisions re met. 1. No open trenches or hazardousruts will be left over night or or: weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% cf original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee, 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one. (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith_ 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular tothe center line, of the road alias; minimum width of 12 inches. 7. All water lines and sewer lines -are to be adtthbiy'encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT ' DATE 7-10-7V/ PROJECT: (I /44,4510.2 LOCATION: 57 PERMIT # 952 REPORT: Due to this permit beg more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH — �o,ln dine r— Inspecto Form 3 6/1/74 • quested to do so by Weld County, Colorado WELD :COUNTY, COLORADO" UNDERGROUND AND UTILITY ;`PERMIT' PERMITTEE'S NAME Home Light & Power Company ADDRESS 810 9th Street Your request for permission to install a _ Power DATE October 9 19 73 line along or across County Highway No. Mountain Bell Exchange Building is granted, provided that the Permittee will own and maintain the same after installation. 35 , at IT IS ONDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The power line shell be installed beneath the surface of the right of way at a minimum dapth of 36 inches, and the disturbed portion of the right of way shall be restored to Its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by. the method of boring or jack- ing through and beneath the road surface; however, open cut shall he allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Afieehed Open Cut The Permittee shall maintain the in and their officers and employees harmles\ Zr ed with the installation, maintenance, alte connected therewith, within the area.@overe This work shall be completed with work shall be allowed on Saturdays or Sun specified in special provisions. Saturday and Permittee will be required to shut off because of necessary highway construction or maintenance operations. Rot times and agree to hold Weld County, Colorado, the agencies thereof, all loss and damage or any claims which may arise out of or be connect- or presence of the installation herein referred to or any work or facility mit. days ( Oct. 19, 1973) days from the above data No .. No open trench permitted in traveled roadway after dark, unless otherwise nday work would apply to Heavy Traffic Roads. Ines and remove all combustible materials from the County right of way when re- Permittee shall mark this installa on with markers acceptable to Weld County,. Colorado, at thelocations designated by Weld County, Colorado, directly above uch installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be }, otected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be ilistalled by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future the. would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits v v�v 7— q -5'o , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS trot WELD /PMSNTY, COLORADO - Tr°. Supervisor ting this perm the wide : red, representing the Permittee, verifies. that he has read and understands all of the foregoin: pFy talons; that he has an •' • rity to sign for and bind the Pepin ea; and that b rtne of his signature the Permittee is bound by all the conditions set forth herein. rqi V • SPECIAL C INSTRUCTIONS REQUIREMEIlTS:cFOdt-1$STAh4AT(,Oi}# UU1LITIE5:5WfTH ,Tg-,TIGHT OF WAY DEPARTMENT Of HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or A; equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Ender no condition is an asphalt surface to be cut unless otherwise specifiedin the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being Inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasepient of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if tines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway - 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along,,,-, the slope of the shoulder. In the event such permits are. issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be bona e by the Permittee, at a rats specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfiliing is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.`S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90• Bends ",for 45" Bends at 450 Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft 0.05 en. yds. 3" 0.6 sq. ft. 0.3 eq. ft. 0.11 cu. yds. 4" 1.0 SQ. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. it. 0.37 en. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.6 eq. ft. 110 cu. yds, 12" 8.6 sq. ft. - 9.6. SQ. It. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 en. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4-00 cu. yds. 24" 34.0 sq. ft 14.0 eq. ft. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after. notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No opencuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dls- hating the roadway. 8. No puddling will be allowed. 9. Tbat in all cases where existing black top or hard surfaced ro.:ds must be cut, then in such case a non -cancellable cash or surety bond payable to the Comity shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion andacceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. U`t '3'1 A&S • • ta /)PPRUX K sobrill of EciPASSc L113 E t>;TH T# /1/a/ieifl D&Pitt Of . 13 CR6 ED }O Co13OP&iE,. YRE')(N • c; . Yolif R79J aR O 176L1--- • FORM Sa, MINOR PURCHASE ,�IORDER 1 - C To: /I / j1, L /OCWT? ADD: WWW CITY AND STATE DELIVERY R REQUIRED: COc0Ri3vo HOME LIGHT AND POWER CC ANY 810 NINTH Sr_ CGREELEY. COLORALjO - ....all Dawn To U. AT: ♦ DATE: /O-10-7 O- JO- / 3 VIA: F-O.S.: M N° 6141 - SHOW THIS NUMBER ON ALL INVOICES, SHIPPING PAPERS AND ALL PACKAGES. IA 1 RESALE TAX EXEMPT SERVICE I TAXABLE PURCHASE Ifif)N'TR(J INV,IIt IN i(:I`I:(.A I1 TO FT (1O% 8- GRILLIEY C.),.Oil Ally] II QUANTITY CATALOG NUMBER COMPLETE DESCRIPTION I ACCT. COpr PRICE BY CarArRa55 Co,vrY �04D f 6-1 L Itille JOB NUMBER: TO BE USED FOR: �,{ f^]E L "F ORDER NUMBER MUST APPEAR ON INVOICES. SHIPPING PAPERS. PACKAGES AND CORRESPONDS4CE. PREPAY ALL SHIPPING CHARGES. ADD TO IF VOICE UNLESS ITEMS ARE PRICED P.O.B. DESTINATION. I. rAUTHORIZED REPRESENTATIVE u. n o Tit I/moj��// r� .nf/,�Ft_ .�, W 1cl i reimport �� ^� j(�,is8t�ui� Iti r r spa. Tie,: 'i 7:41; a rg:i. -awita, Neal rVialititibtarailit 'Sm., MAMMA ( fit EglitillinCIMCONiatrit iTtti rlW YYA r OS a :I a it 6 m� bI ,g oy iikaitinteg T� ���Iy�"��►j� 1*I�l71iS FISAIl1ls!'t • s f l'1i MineagaritattlitiliNtjeraltrag tbetiorillaibinworicefigiloslerzkerzwgneatin !"..,:,..4,.....ala ror * fiat ti._.,1 , lot mun e r r /*�� 'r�y . Maga estrmssamtnimarri umematuanattsamanaciagetwoor �'" !m l fl avitingestria, h t i Stijl 'l CDOMB' ti'a Milli rits= Qiiiielillni Egraisimegativarlartailariastwils suiewmumanzatiritagangraianam 11Mitelillifittia l e '�� , 11101.! b5 =tw. wan WRENSIENge, * MMIUMMUNtili a 4$, a i_f_-_, .--- -. ir ISOTIMIS w#r' iE Teri . � -6,4 0.0 k 4 Y • WELD COUNTY, COLORADO • UNDERGROUND AND UTILITY" PERMIT PERMITTEE'S NAME �/p/ +f ADDRESS E4 i"L� l% Yo request for permission to install a line along or across County Highway No. 3d at S,,, /7 t- / is granted, provided that the Permittee will own and maintain the same atter installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The (rn !/ t��`'li line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necasstty of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such- statutes as are applicable. - - - - SPECIAL PROVISIONS: Attached s&'c ,qrracC Ei<o cFrrE The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. xi 40 e This work shall be completed within © ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such aB manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directionsgiven by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside: County right of way limits. S i 7-4457 a or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this hermit may be terminated forthwith. Maintenance Man on this section of the highway, with headquarters at By: Sueerviser THE BOARD OP COUNTY COMMISSIONERS WE t,ja'X* TY, COLORADO In a • • ling this permit e e under ned, representing the Permittee,verifies that be hasread and understands all of the foregoing provisions: that he has autho ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. t. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special prrovisions, 5. Mud -jacking -will be required where bores are larger than lines or encasements_ 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be Installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 gsl pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any Perini! 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Alldamaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is, completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2^ 3" 4" 6- 8" 10" 12^ 14" 16" 18^ 20" 24" THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.5 Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft - 2.2 sq. ft, 3.8 sq. ft- 5.9sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 eq. ft. 19.0 sq. ft. 24.0 eq. ft. 34.0 sq. ft. Minimum Thrust Area for 46° Benda 0,2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 eq. ft. 1.6 sq. ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 456 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cn. yds. 0.37 en. yds, 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 an. yds. 2.70 cu. yds. 3.40 cu. yds. 4A0 cu. yds. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six Inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. Site inspections by Weld County. Colorado, willdetermine whetherexcavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired saidopen cot or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed_ 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work said bondshall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. • 1A, i/////�►►� • ���RKr 2R2 Tauba ,Via Rap 2 w 74A Mswnia. µ. l06ST September 24, 1')i3 The Board of County Commissioners Mr. Harry S. Ashley Weld County Commissioner District #2 Greeley, CO 80631 Dear Mr. Ashley: 3r(s C/cr/c O)/ permit mo o✓ 1 STATE LORADO COUNTY OF WELD s5. Filed w ih tn€ Clerk of the Board of County Commission'-; SEP 2 41973 CODYT{ CLERK ARD ItCORDER By Deputy Our feedlot is located in NE' Section 17, T3N, R67W. Domestic water is supplied by a well located in NWT Section 16, T3N, R67W, on the East side of the St. Vrain River, and has been for a long period of time prior to my leasing, and later purchasing this property. The reason for the well being located in this specific location is that many test holes, and previous wells have indicated thi- is necessary to furnish ample water and of a higher duality than other areas available to us. Over a period of years, we have had several problems with the maintenance of this pipe line under the river, and this summer we found the soil structure under the St. Vrain had shifted to almost pure sand; therefore, we were unable to reinstall under the river. Mr. Vern Golden and Mr. John Taggert, from Golden Construction Company, who had previously installed this line, along with their engineers, told me they could not install this line underground and suggested we contact you to see if we could install our line under your bridge. We, at that moment, called Byron Ewing whom I knew designed this bridge, and who was your repre- sentative, Byron, upon finding I was in serious trouble with water for our feedlot, and that I had professional people to do the engineering and install- ation, told us it would be alright. I looked at a bridge with a water line installed under it, South of Berthoud, to get an idea if this was what we needed, and then employed Golden Construction Company to install this line. It is a metal encasement, 10 inch diameter, pith a glass insulated pipe installed on the inside, which is guaranteed not to freeze, and Golden Construction Company does guarantee the entire installation. We do have a driveway from our pasture to the East side of the bridge on the South side of the road, and also one on the West end on the South side. This made it possible for the end of the pipe to be buried to prevent freezing. The North side being completely exposed on both East and West ends with no fill to bur-' the ends of the pipe in to prevent freezing, plus digging completely across the road on both ends prompted us to ask for a South side installation. Again, I contacted Byron as to our final plans, and that we would like to install it on the South side,due tc our property lying on. the South side, and our approaches to the bridge, which would allow us to bury the end of the pipA prevent freezing, Byron advised us to keep the pipe above the stringers under the bridge. With this approval, I told Golden Construcation Company to go ahead. This was a very expensive project, and I think a very neat installation. (Con't.) ///O r September 24, 1973 Mr. Harry Ashley Page Two • • After the installation, I learned it would have been more desirable to Mr. Horst, if it would have been on the North side of the bridge. I immediately contacted Golden Construction Company, and they advised me it would take a complete new installation, at great expense, due to the new type insulated pipe, which they had put inside of the metal encasement, and their guarantee would be null and void if we had to relocate this present pipe. I am sorry about this matter, and if you will allow me to let this remain on the South side of the bridge, I assure you we will paint and maintain this pipe and will repair it at our expense if it is ever damaged by draglines, or such equipment by the county. I hope you can see fit to grat2 me this privilege. Respectfully, BRH;mas Ben R. Houston Owner s. a .a M Sc' N. Say u tl• p .t-- . repro mite:mem fratif!Eri"-.4iiiiieviseviiillia 2 50 II NM taig �, �r an:0sw WON OraitaireardrillralliatIKUOM ITC tire 442141=41,WitirAN ail motor i d sriaritwargraismotransimunri WINZiNtInifiiiirAtitfor: MOM iiiiiimu nOCw Mal: 2115151.45155 PROM teilirillieletalli 110111111155.11 Wm SIM_. ilIMMA�I NM I MIRMISAMIalittlti WI --z? 5 11550111151 „, J.- Miran -war. ar. Arafir d i1 S @�., ilk- AVM ilirigtratiffit011 kiltMIgi ala I rNA ME g,?.4t5 M MR NM RI 11` `. ' Karmot kancllasagatimatikflhR*2 t.flIP � t K,IESCQf '7i� tlift, t o Jain — R.6611 SMUT 0 Utility I& Transport Field Report Applicant's Name /Ict-etv-At- Type of Permit Permit No. 76g... Date Issued Expiration Data •)2.6c 7_s :Location and Damage R.aport:'.Date Timm (If no apparent damage at this time, so state) Inspection Date '- i n-P��c/Ci v2H pi . 73 WELD Q)UNTY, CJOLORAEO BOARD OF COUNTY COMISSIONERS s Cousi OF WELD CII d;w.$K tfil CleEkcif 'he Board BY: 74l (9 Au prized Agent WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE /1-4e /4 Z 19 %3 PERMITTEE'S NAME ADDRESS ijesre L /defy /given G. /ST70 /4VE Your request for permission to install aN UNPLiCeedelwi0 20 T 4�� vG line eg er across County Highway No. t az' oie is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The U NOE.e LicoM#O line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration. removal or presence of the installation herein referred to or any work or facility connected therawith, within the area covered by this permit. This work shall be completed within G ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right o way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this install on and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: forego' is bounfl Dyye ggi the cod Ygrth CUUN V Or WELD . C:erk o', the : oard of CoL:.ty THE BOARD OF COUNTY COMMISSIONERS WELD TV, COLORADO • ed. representing the Perm i ee, v that he has read and understands all of the rity to sign for and bind the Permittee and that by virtue of his signature the Permittee herein. APR 5 1973 .CN eou'ry c.[q{ Lxo RECORD', By __. Deputy 136 SPECIAL` INSTRUCTIONS REQUIREMENTS' FOR-;1NSTALI ATtON OF llTIVTIES.qVaITHH THE. -RIGHT Of WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon ::.stalla- tion. Damaged portion of drainage or siphon facility will be replaced. Alldamaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO. R. O. W.'S Pipe Size 2" 3^ 4^ 6^ 8" 10^ 12^ 14" 16" 18^ 20^ 24" Minimum Thrust Area for Tees and 90° Bends 0-3 sq. ft. 0.6 sq. ft. 10 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft 8.5 sq. ft. 12.0 sq. ft 15.0 aq. ft. 19.0 sq. ft 24.0 sq. ft 34.0 sq. ft Minimum Thrust Area for 45• Benda 0.2 sq. ft. 0.3 sq. ft 0.4 sq. ft. 0.9 sq. It. 1.6 sq. ft. 2.5 sq. tt. 3.5 sq. ft. 4.8 eq- ft - 6.3 sq. ft. 7.9 sq. ft. 92 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45" Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 en. yds. 2.00 en. yds. 2.70 cn. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% oI original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permitted assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond -shat ,assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored. portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace laid dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County_ Theamount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME Q may/e ADDRESS •'7s0 cel t( aPPas Bay 6 r?r c rectal Coln / aTannest fmarrareo "stall a atereCee line along e w County Highway No. 40 at is granted, provided that the Permittee will own and maintain the same after installation. £vs a DATE //aelf'k /) 1s 73 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and teat the Permittee will own and maintain the same atter installation. //n / The M/!l-'e /a / line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, red the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it ahail be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch. canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - - SPECIAL PROVISIONS: Attached -" The Permittee shall maintain the installation at all times and agree to bold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work ahail be completed withinc". r X % ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveljd roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy. Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do So by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the fature that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way li its. a CZ-Cr N �+y Maintenance Man on this section of the highway, with headquarters at --1254c �� Sag/ Is'oqp or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ma THEBOARD OF COUNTY COMMISSIONERS WELD ��UMTY, COLORADO.` In ep g this permit the dersigned, representing the Permittee, verifiesthat he has read and understands all of the foregoing pro. !sons; that he has uthority to sign for and bind the Pcpiittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 3S' 2- O_,-7 SPECIAL INSTRUCTIONS REQUIREMENTS .FOR 4PISTALSAT*ON OF UTILITIES WITH3N-.; T+HE ,. RIGiIT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right oI way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface' EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. .- 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits areissued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be born e by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before beingconcealedin any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately atter backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90" Bends 0.3 sq. ft 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft. 8.8 aq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft 19.0 sq. ft 24,0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 450 Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft 3.5 aq. ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. it. 14.0 sq. ft. Minimum Volume of Concrete at 450 Vertical Benda Down 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 en. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cm yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General; Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado- and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90%. of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in ail cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bondshall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said Dodd e*all be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. co es hi ^I 0s 43 to n1 4*.- 11 43 I 03 la ft) y t m r ttl R69W T4 N LAR/MER COUNTY WELD COUNTY R68W T4 AI 4K S N w UI (COLORADO 0 2 y a Nett O O a a APPROX 1446n BURY ril tak N \-)4 ca AND O _ LARIMER CO. nWELB�CO. o 4.0 B� O U1 .43 EXIST. LITTLE 'Sp THOMPSON WATER `C0 DISTRICT\-% 03 t. ? 0 0 ma ri 241 ci RR. I RED COURT COUNTY LINE ROAD EXISTING 2"WATER LINE — r I-90'Elbow x 23b Do o RO o el , � a y y 4 Q ti- n tbq.t.4 •43.Q3o c $cm ct to A4 C0R m00 14: 000 > > > H m m m m 00 0 M m m N N (A nnn 70 JO A W v v H -4 OOO zZZ 114S SSes IRRIGATION DITCH WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME ADDRESS DATE 3-9 Hanson Brothers 1973 7Qi Fremont Ave., Fort Morgan, Colorado 80701 Road Your request for permission to install a 1" water line along or across County WSW No. scz 750 g-st south from NE corner 7 57-16 is granted, provided that the Permittee will own and maintain the same after installation. 139 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation- s The 1water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The hack filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches cf back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically posaihle. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted, This work muat be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable..:. SPECIAL PROVISIONS: Attached. All barricades and/or other Warning devices used in any construction within public Riclirt-S-o; Way•shali conform to the Manual on Uniform Traffic Control Devices for Streets E Highaays'1971.and any state or federal revision'thereto- No pole guy wires or any support structures are to be located closer than.100 feet from the center line of 'any county road. work shall be allowed on Saturdays or Sundays. No' ope& trench permitted in traveled roadway after dark, unless otherwise specified in special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations, Permittee shall mark this installation with markers acceptable to Weld County,. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordancewith directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way IlyiIts. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD NTY,COLORADO. j x In cep• • ; this p .• t the , • •ersigned, representing. the Permittee, verifiesthat hd'hasread and understands all of the foregoing p . ions; that he ... authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, cx 7— 9.9 315- 7 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will .be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being. inspected. 7, No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope totoe of elope -under -all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Cr' :1uu, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfllling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUME REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size Minimum Thrust Area Minimum Thrust Area for Tees and 90• Rends for 45• Bends Minimum Volume of Concrete at 45° Vertical Benda Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 en. yds. 8" 0.6 sq. ft. 0.3 aq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 en. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8^ 3.8 sq. ft. 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft - 1.50 cu. yds. 14" 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds. 18^ 19.0 sq. ft. 7.9 sq. ft 3.40 cu. yds. 20^ 24.0 sq. ft. 9.3 sq. ft 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 se. ft. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de termined unsuitable the material will be removed from the site at the expense of the Fermittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether In a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the executionof said repairs. 5. If the Permittee has not reyaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 0. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or bard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name e the contractor or the person causing the bard surfaced roadway to be disturbedprior to the commea:ement of the work, said bond shall assure recovery by the County of any expense incurred, within aperiod of one yea-. following the completion and acceptance of the restored portion or portions of the hard surf roadway. Said 'r,covery to be in the amount necessary to repair or replace said dis- turbed portion f the s ced t way. dd shall not be cancelled without thirty days notice to the County. The amount a bon eel�b ounty Commissioners and shall be reasonable; however, in no event shall the ad- Seas than $100.00. N., -C 7 WELD COUNTY, COLORADO UNDERGROUND ` AND UTILITY _ PERMIT _ .. .. , . DATE O c� ly72\ PERMITTEE'S NAME PC v1Ifitl17 SC!3/,+e CcAKCPC ADDRESS r —A J1�G / GC'G% go b 6 Your request for permission to install a ./ t-ii(2-et-frr-1.'�ltne along or across County Highway No at 74.. '_ __c7(744 SCC- 30 r - / 7 6S -G/ is granted, provided that the Permittee will own and maintain the same aster installation. IT IS 'UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The I c,t� a- line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturb ton of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be Imparted or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code andto. aaek:: r tatetes at .rte ' SPECIAL PROVISION$: Attached - All barricades and/or other warning devices used in any construction within public — - Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. -rue rermittee amm muumuu um mauuy{uoa a% as, ua+avv a......e•w .4, Ann,. nous w.....a, ...,an auv. uav aWaaC+aei meteor, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to P_eavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the Installation Placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, In the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith_ THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO �. By: Me l(irsLr+df Swerv4or In a this Dernlit the yd'deratgned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign far and bind the Permityy+; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPtCIAL= INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIESI-WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. S. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasemc.nta- 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of elope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted 12. The construction of underground installations will generally require theservices of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately atter backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 8" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 900 Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.6 sq. ft 12.0 sq. ft. 15.0 sq. ft. 19.O sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Theist Ares Minimum Volume of Concrete foe 45• Bends at 45" Vertical Bends Down 0.2 sq. ft. 0.3 se. ft - 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 cu. yds- 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu- yds. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, willdetermine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one. (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Pormittee is allowed seven (7) days after notification for the execution -of said repairs. 5. If the Permittee has not repaired -said open -cut or cuts within the allowed seven (7) days. Weld County, Colorado, win repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed - 9. That in all rases where existing black top or hard surfaced roads must be cut then in such case a noncancellable cash or surety bond payable to theCounty shall be required in the malts of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencementof the week, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however. in no event shall the bead be less than 5100.00. ,i-/7 72 WELD COUNTY, COLORADO UNDERGROUND AND ` UTILITY- PERMIT DATE November 6 PERMITTEE'S NAME Hilltop Sanitation District 1972 ADDRESS c/o Clarence Sitzman 10Q0 50th Avenue (351-0052) Your request for permission to install a 8" se=a sewer line along or across County Highway No. 33 at 47th Avamtp (from HIOtway 34 south to approx 300' north of 13th Street is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The 8" 9a.IIitaZy sewer line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling On the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically poesible..This installation shall be installed bythe method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such-. statutes as are applicable_ SPECIAL PROVISIONS: 'Attached All barricades and/or other warning devices used in any construction within public nights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8. Highways 1971 and any state or federal revision thereto. The Permittee shall maintain the installation at all times and - agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit, This work shall be completed within seven ( 7 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County,. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may reedit in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at fl or his Successoor, will represent Weld County, Colorado, in the construction of this installation and any directions that be may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. 8y: THE BOARD OF COUNTY COMMISS4ONERS WELD COUNTY, COLORADO T 24,4fee 99 In 5locapt ig this permit the tinders ed. representing the Permittee, verifies that he hasread and understands all of the foregoing provisions: that he bas autho to sign for and bind the Permtttee; and that he virtue. Of his signature the Permittee is bound by all the conditions set forth herein. Engineer (352-0100) SPECIAL INSTRUCTIONS REQUIREMENTS FOR-INSTALLAT ION OF UTILITIES- WITHIN TitE.f:RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will 'be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless-otherwiseseedbed in the special. provisions.. 3. Mud -jacking will be required where bores are larger than lines or encasements. 6. The endsof bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope ender allhighwaysand paved County road intersec- • tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally requirethe services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. AD costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backtllling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46° Bends at 46° Vertical Bends Down 2" 0.3 sq. ft 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft 0.11 cu. yds. 4" 1.0 sq. ft 0.4 sq. ft 0.20 en. yds. 6" 2.2 sq. ft. 0.9 sq. ft 0.37 cu. yds. 8" 3.8 sq. ft 1-6 sq. ft 0.66 cu. yds- 10" 5.9 sq. ft 2.5 sq. ft 1.10 en. yds. 12" 8.6 sq. ft 3.5 sq. ft. 1.50 cu. yds. 14^ 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds. 18" 19.0 sq. ft. 79sq. ft. 3.40 cu. yds, 20" 24.0 sq. ft -. 9.3 sq. ft 4.00 cu. yds. 24" 34.0 eq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work +s being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met 1. No open trenches or hazardous rats will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from thesite at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days atter notification forthe execution of said repairs. 5. If the Permittee has not reyatred-said opou--cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion -and-. acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din. barbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however. in no event shall the bond beless t Ian'=1oe.00. if/_22-72_ WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT ''// /' DATE A4v 2a 1972, PERMITTEE'S NAME Q%. /7u f /tsaii ,J((y(# coX P /L�•LL� ADDRESS /` t / lx /99 /7TH (7 6/e•• de e06/0 Your request for permission to install a ('S 4 nr- line along or Agrees County Highway No- 3 7 , at o _pm;e t AV fl;/e n(o . f4 or iti/o7 is grant -, provided that the Permittee will own and maintain the same after installation. /54 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The kg" won"''tt /U- line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made In six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code ant to surlystatues se are Rolilt abfe=- ,: : . SPECIAL PROVISIONS' Attached All barricades and/or other warning devices used in any construction within public — Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for _ Streets 8 Highways 1971 and any state or federal revision thereto. ' ne retentwe w ulna wart county, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 ( ) days from the above. date. No work shall be allowed on Saturdays or Sundays. No open trait ch permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be Protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by, Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Go ME— NEB Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By. suns 0 Supervber In\lecrang this per t the r ersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bin the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD CpyNTY, COLORADO -. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES ,WITHIN THE, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. it All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires Inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons win be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or bon -ow pits are to be restored to original condi- tion immediately after backftlling is completed 14. No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 9" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90• Bends 0.3 sq. ft - 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 8Q- 11- 5.9 sq. ft 8.5sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft 24.0 SQ.. ft. 34.0 eq. ft. Minimum Thrust Area Minimum Volume of Concrete for 4P• Bends et 450 Vertical Bends Down 0.2 sQ. ft 0.05 en. yds. 0.9 sq. ft. 0.11 ca. yds. 0.4 sq. ft. - 0.20 en. yds_ 0.9 sq. ft 0.37 cu. yds. 1.6 sq. ft. 0.66 cu. yds. 2.5 sq. ft. 1.10 cu. yds. 3.5 sq. ft. 1.50 cu. yds. 4.8 eq. ft. 2.00 cu. yds, 6.3 sq. ft. 270 en. yds. 7.9 sq. ft. 3.40 ce. yds. 9.3 SQ. ft. - 4.00 cu. yds.. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will he left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch 'will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cute for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5, If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 3. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense Incuned, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dia. turbed portion of the hard surfaced roadway. Said bend shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. PERMITTEE'S NAME ADDRESS a'-1// sTul Mar i WELD COUNTY, COLORADO UNDERGROUND AND ° UTILITY PERMIT DATE 17 May HALL 8 IRWIN CONSTRUCTION 1972 &?CV 7(J, S'`-F/cc4., , (' 1 rO6') Your request for permission to install a storm sewer line along or across County Highway No. VillWest is granted, provided that the Permittee will own and maintain the same after installation. "C" St at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 24" concrete line shall be installed beneath the surface of the right of way at a mint -main depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back till shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted, This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 ( ) days from the above date. No work shall be allowed on Saturdays or Sundays, No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads, Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in. staliation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits, Ed Horst Maintenance Man on this section of the highway, with headquarters at Johnstown or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By' Ma In acce t ig this permit the undersigned, representing the Perini foregoing provisions; that he has authority to sign for and bind e P is bound by all the conditions set forth herein. PZ� t he has read and understands all of the by virtue oftgnature the Permittee SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES, WITHIN THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado_ 3. Any materials from excavation as the result of utility installation W111 be- removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions - 5. Mud -Jacking will be required where bores are larger than lines or encasements. 0. The ends Of bored sections ARE NOT to be covered before being .inspected. _ 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved Countyroadintersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of weer at sites of drainage or siphon installa- tion_ Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original Condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below_ THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90a Bends far 45a Bends at 459 Vertical Bends Pown 2" 0.3 sq. ft. 0.2 sq. it. 0.05 an. yds. 3" 0.6 sq. ft. 0.3 eq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft 0.4 sq_ ft 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft 0.37 cu. yds. 8" 3.8 sq. ft 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 en. yds. 12•" 8.6 sq. ft 3.5 sqr ft 1.50 cu. yds. 14" 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 ca.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General; Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be lett over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts_and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for-backfiil. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period oI one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the executionofsaid repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without farther dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 3100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME ADDRESS We a A1RJiti `JGQis, `0. -.?.21I - n r DATE /0- <4 192/ Your request for permission to install aeirAix e /061- Lc/ line County Highway to:/e vs" --7- at ? 3`ic- &As"r %6 2 ' /ice , is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 1 -VA -CL' s'+ /.C2 - line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath In a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL ROVISIONS: Attached // 4 _ \- ! 7Th/ J The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agendas thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 7l/ ( \Jr T7- ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in tc4eled roadway after dark, unless otherwise specified in specie; provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will 'e required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by 'Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right f way limits. _ + Maintenance Man on this section of the highway, with headquarters at• Cis" j 7c V or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Mr' THE H. RD OF COUNTY COMMISSIONERSWEL jADit ate:, C-Y� <, dMe Supervbar - i IY accepting this permit the undo geed, representing the Permittee; frerlttea foregoingvisions; that he has a rlty to sign for and bind the P is bound by all the conditions set forOh herein. has read and understands all of the virtue of b1tare the Permittee SPECIAL INSTRUCTIONS REQUIREMENTS:FOR INSTALLATION OF UTILITIES .r WITHIN THE, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH- DAT. " 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required wnere bores are larger than lines or encasements. $. The ends of bored sections ARE NOT to be covered before being inspected. 7, No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure.. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance, . of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the elope of the shoulder. In the event such permits are iscued, ft will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12, The construction of underground installations will generally regni.e the services ofan inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permlttee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately non completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S . Minimum Thrust Area Pipe Size for Tees and 90° Bends 2" 0.3 sq. ft 3" 0.6 sq. ft. 40 - 1.0 sq. ft. 6^ 2.2 sq. ft. 8" 3.8 sq. ft. 10^ 5.9 sq. ft. 12" 8.5 sq. ft. 14^ 12.0 sq. ft. 16" 16.0 sq. ft. 18^ 19.0 sq. ft. 20^ 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0:4 sq. ft 0-9 sq. ft 1.6 sq. ft. 2.5 sq. It. 3.5 sq. It. 4,8 9q. ft. 6.3 sq, ft. 7.9 eq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Sends Down 0.05 en. yds, 0.11 cu. yds. 0.20 ca. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2,00 cu. yds. 2.70 cu. yds. 2.40 cu. yds- 4.00 ca. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operation will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. if it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permlttee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permlttee is allowed seven (7) days after notification for the 'exeettion.: of Said 'repairs. 5. If the Permittee has not repaired said open cut or cats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permlttee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing 'the hard surfaced roadway to be disturbed prior to the commencement of the work. said: bond shall- asiiure recovery by the County of any expense incurred, within a period of one year following the completion -and acceptance. -'of -the restored::, portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. ,n! v PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND `UTILITY PERMIT DATE 23 Sep le 71 Hall -Irwin Construction Greeley 2211 —2cF7 Your request for permission to install a water line line along or across County Highway No. 35 60.5 to 62. On 35th Ave - 4th St to C St. at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The water line line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching_ In no case shall the flow of water ever be impnried or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within thirty ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads- Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power. water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. to Hon r - Maintenance Man on this section of the highway, with headquarters at .TD ,4G'7bWA' or his successor, will represent Weld County. Colorado. in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE w By: h - y4a= '�- ma .\\L`Syarvisor In acceplung this permit the undo ed, representing the Po foregoing provisions; that he has authoty to sign for and bind is bound by all the conditions set forth herein. OARD OF COUNTY COMMICIONERS _ "GOUNT�O)QftA_ _ t he has read and understands all of the by virtue of h - a tare the Permittee SPECIAL INSTRUCTIONS REQUIREMENTS FOR -INSTALLATION- OF UTILITIES WiTH4N THE.: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to workon or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated oy Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAT.' 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. C. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe orslopeunder all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter: or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. i0. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that materialremoved must be replaced in like kind and with same or bettor compaction. No segregation of material will be permitted. _ 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County,. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner_ Drainage ditches or borrow pica are to be restored to original condi- tion immediately after backftlling i® completed. - 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu- yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.3 sq, ft 0.4sq. ft. 0:20 cu: yds. 6" 2.2 sq. ft. 0.9 'sq. ft. - 037 cn. yds. 8" 3.8 sq, ft. 1.6 sq.. ft. 0.66 cu. yds. . 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 ca. yds. I2" 8.5 sq. ft. 3.5 sq. ft 1.50 cu. yds. 14" 12.0 sq, ft. 4:8 sq. 'ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq- ft- 2.70 cu. yds. 18" 19.0 aq. ft. 7,9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft. - 9.3 sq. ft. 4.00 cu. yds.- 24" 34.0 sq. ft 14.0 sq_ ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one Inch will be a dry select road base material compacted to 90% of original. Site inspections by Weld County, Colorado, will determine, whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removedfrom the siteat the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the execution.ofsaid repairs. 5. If the Permittee has not Malted eeid open cut or cute within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inrhes. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing 'the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall` assure recovery by the County of any expense incurred, within a period of one year following the completion.;aud:. aceeptanee of . the restored' portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. 2. 3. WELD COUNTY, COLORADO UNDERGROUND AND IUT1LITY . PE 1T PERMITTEE'S NAME ADDEEss yI eta diefiet4 gos/‘ Your request for permission to install af[.line along or across County Highway No. DATE 19 7/ 7 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee win own and maintain the same after installation. The �'Mir W line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, It shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal Cr water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such- statntoe as are applicable- " - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be conned- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or faririty connected therewith, within the area covered bythisPermit This work shall be completed within —l&.L5..(_L ( 3 0 ) days from the above data No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance, with directions given by, Weld County, Colorado or by their agent In the event any changes are made tothis roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. �D etes,eP7— Maintenance Man on this section of the highway, with headquarters rc or his successor, will represent Weld County, Colorado, in the ccnatractioa of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: atomiser In cep• ng this permit the and foregoing provisions; that he has autho is bound by all the conditions set forth THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO. read and understands all of the e of his signature the Permittee ereigne epresenting the Permittee, verifies that he b tiereta sign for and bind the Permittee; and�bat by si A git-trr SPECIAL -INSTRUCTIONS REQUIREMENTS FOR IPlSTAU.ATION OF UTILITIES WIThIN THE RIGHT OF WAY DEPARTMENT OF. HIGHWAYS, WELD COUNTY, COLORADO 1. No, cleated ortrack equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of. way are to be returned to original conditionat a time designated by Weld County, Colorado 2. Anymaterials from excavation as the result of utility installation will be removed from highway surface EACH DAY, 4. Under no condition is as asphalt surface to be cut unless otherwise specified In the special provisions 5 Mud -lacking" will; be 1%aufrsd where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT. to be covered before being inspected. 7.: No :plastic line is to . be installed without encasement under pavement regardless of press -no and size. S. Encasement of .line will be required from toe of slope to:toe of slope under all highways and paved. County road intersee- tlonsand approaches, if lines are over two inches in diameter or more than 100 pal pressure, 9, Manholes andother pointsof access to other underground utilities may be permitted: within the right of way only when they are located., beyond the shoulder of the through -traffic roadway. 10 All requests for installation- will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit: , I1. Where special cases warrant Weld ::County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are. issued, It will be required by the contractor that material removed must •be replaced in. like kind and with same or better compaction, No ,segregation of material will be permitted. 12.. -The construction of underground Installations will genera'1y require the services *fan inspector furnished by Weld County, Colorado. The decision In regard to which projectrequires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately neon completion of work at sites of drainage or siphon installa- tion.. Damaged portion of drainage or siphon facility will be. replaced ..:All damaged sections are to be inspected by Weld _ -County, Colorado, before being,concealed any manner. Drainage ditches or borrow pits are to,be restored to originaIcondi- tonimmediately after backfiliing. is completed. ... 14.. No meters are to be placed- within the highway right of way, excepting within corporate limits where municipal regulations allow installation. ., .. 15. Thrust blocks will be required on all vertical and horizontal -bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED. FOR WATER- LINES INSTALLED ON WELD COUNTY, 'COLORADO R. 0. W_'S Minimum Thrust Area Minimum Thrust Area : Minimum_ Volume of. Concrete Pipe size for, Tees: and 90° Sends for 46°: Bends at 46° Vertical Bends` Down 3,. 6^ , 0-3 eq.'ft.' 0.2sq. ft 0.05 cu. yds._. 0.11. cu. yds. : ld sq. ft. ._. 0:4sq. ft. 020 cu. yds. 8' -3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds... 10^ 5.9 sq. ft 2.6 Et - ft. 1.10 cu. yds. 12" .. 8.5 sq. ft 14^ 12.0 sq. ft. 4.8 sq. ft. ,.; 2.00 em yds. 16" 16.0 eq. ft .6.3 aq• ft 230 cm yCs: 18' 19.0 sq. ft 7.9 sq, ft ' 3.40 cu. yds.: 20" 24.0 sq. ft:. -9.3 sq ft. 4.00 ;cu. yds: 24^ 34,0 sq. ft. 14 0 sq. ft 520 Oujda OTE TO APPLICANT. This permit shall be made available at the site where and when work is being done SPECIAL PROVISIONS: General: Open cuts across thedriving surface of the roadway may.. be permitted .:at the discretion of Weld County, Colorado.and only. after the following provisions are met 1..:No open trenches or hazardous rats will be left over nightor on weekends. Excavations -will' be securely tampedto pre- , Vent hazards developing before excavation is resumed. , 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final':- one inch willbe a dry select road -base material compacted to 90% Of. original: 3. Site Inspections by Weld County,- Colorado, ;:will determine whether excavated material is suitable for backlit!.If It is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. ". Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year, after construction whether Ina gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 6. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld`County. Colorado, will ' - repair said cut and will bill Permittee for all expenses connected therewith. 6: No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the roadwith a minimum width of 12 inches. 7.' All water, lines and sewer lines are to be suitably encased to allow for repair and/or maintenance:. without further din. turbine the roadway. - - 8. No puddling. will Abe allowed" 9. That in an cases where existing blacktop or hard surfaced roads must be cut, then in such case a non -cancellable -cash or surety : bond payable to -the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencementof the work. satd bond shallassure recovery by the County of any expense incurred, within a. period of oneyear following the completion and.. acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in theamountnecessary to- repair or replace said dis tutted portion of the hard surfaced roadway- Said bond shall not becancelled without thirty days notice to the County. The amount of said bondshill beset by the Board of County Commissioners and shall be reasonable; however, in no event ' shall the bond be less - than 3100.00. t 41 o2/'/7/7/ WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME DATE 10 Feb Tarn of Hudson 19 71 ADDRESS Hudson Colo Your request for permission to Install a 8" fate- main line along or across County highway No. old US 6 starting at SH shop No 8321, then going E 7/10 mi along S R.O.W. is granted, provided that the Permittee will own and maintain the same after installation. at IT IS UNDERSTOOD that the Permitted will cause the installation at no expense whatsoever to Weld County and that the Permittoe will own and maintain the same after installation. The S' water main 10*Wesban be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder Portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS' Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the Installation, maintenance, alteration, removal or presence of the instillation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within 60 ( sixty ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Pennittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at Its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Everitt 1008 , Maintenance Man on this section of the highway, with headquarters at La Salle or hie successor, will represent Weld County, Colorado, IA the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. A Sapeerbo. Ming this permit the under foregoing provisions; that he has an Is bound by all the conditions set forth herein. TH W OF COU TV COMMISSIO Geb ed, representing the Permittee, verifies that be has read and understands all of the ty to sign for and bind the Permittee: and that by virtue of his signature the Permittee SPECIALINSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4, tinder no condition is an asphalt surface to be cut unless otherwise specified in the,. special. provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7, No plastic line is to be installed without encasement under pavement regardless. of pressure and size... S. Encasement of line will be required from toe of slope to toe'of slope underallhighways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests :or installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. 'Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing -to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S Pipe Size Z" 3" 4" 6" 8^ 10^ 12" 14" 16" 18" 20" Minimum Thrust Area for Tees and 90° 9_nds 0.3 sq. ft 0.6 sq. ft, 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0sq. ft. 16.0 sq. ft. 19.0 sq-ft 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 450 Bends at 45° Vertical Bends Down 0.2 Sq. it- 0.05 cu. yds. 0.3 sq. ft. 0.11 cu. yds, 0.4 sq. ft. 0.20 cu. yds. 0.9 sq. ft. 0.37 cu. yds. 1.6 sq. ft. 0.66 cu. yds. 2.5 sq. ft. 1.10 cu. yds. 3.5 sq. ft 1.50 cu. yds_ 4.8 sq. ft. 2.00 cu. yds. 6.3 aq. ft. 2.70 cu. yds. 7.9 sq- ft. 3.40 cu. yds_ 9.3 sq. ft. 4.00 cu. yds. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts acres the driving surface of the roadway may he permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically :tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. - 2. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution Of said repairs. 5. If the Permittee has not repaired said open cut or cats within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be get by the Board of County Commissioners and shall be reasonable; however, in 110 event shall the bond be lees than $100.00. 7! Y (354:) GAA Z iT.. LUYMOFS wTTS A2cSWa—For Court of Record —Out West P. & S. Co.. ao o.Snr[nae, Coro. STATE OF COLORADO, County of ' Morgan _ FARMERS ELEVATOR COMP/tNY, A Corporation, Vs. K. G. HCLZViCRTI:, •___. — PLAIN LI Mr'_ DEFENDANT_.._ THE PEOPLE OF THE STATE OF COLORADO, a.12) CCUM'TY GCt4(WISSIGNERS In The_ .District _.._.Court Civil Action No— __2g333� bin( 0 Gillian', COLA. RECEIVED APR 20 1970 wM- at7ta;S{IOSIIZIZ;1SW(1Q A .:- a Y ur. Garnishee: You are hereby notified that you are attached as garnishee in the above entitled action, and you are commanded not to pay any debt due or to become due from yourseL. v_s____•to the said K. G. kiolzworth __defendant_ , or either of them, and that you must retain all personal property, debts, credits, money, effects and chases in action of said.__.__ K. defendant___, or either of them in your possession or control, in order that the same may be dealt with according to law. You are required to answer the interrogatories attached hereto within twenty days from the date of the service of this Writ upon you. In case of your failure within the time aforesaid, the plaintiff may apply to the Court for relief against you. Given under my hand this - - 640 day of April , 19 7p - STATE OF COLORADO, korgon County. F .KMERS 1:.i. EVATOR CaSP 4w, A Corporation, Vs. K. C. HOLZ:VCRTH • PLATIrrirs'_., DEFENDANT... - 1. Are you in any manner indebted to the defendant_ either property or money, and is the same now due;- if not, when is the same to become due? State fully all particulars. ,, 'aeld County Commissioners ANSWER • K. C. Holzccrth TO CHIEF ACCOUNTING OFFICER' `{��o ` e 2. Have you in your possession, in your charge, or under your control, any property, effects, goods, chattels, rights, credits, or choses in action of said defendant—, or in which__.._.he interested? If so. state what is the value of the same, and state fully all the particulars. ANSWER: 3. Do you know of any debts owing to the said defendant._., whether due or not due, or any property, effects, goods, chattels, rights, credits or chosen in action belonging to h irk _or in which_ he interested and now in possession or under the control of others? If so, state the particulars. ANSWER • GARMSEEE I, do solemnly swear, or affirm, that the answers to the foregoing interrogatories by me subscribed are true, so help me God. GARNISHEE Subscribed and sworn to before me this_ day of _ _.._., A. D. 19.� STATE OF COLORADO, Ss. County of __._.._•-.-•- ' I do hereby certify that I have duly served the within summons on this---.. _..�.._. ..-__..day. of. 4. D. 19 , by personally delivering a true copy of the same to the within garnishee =HARD P. MARTIN By_ V7 Ca G W O SzERIFF DEPUTY MEERUT V p TACY, (O., 0010 • • GREELEY, COLORADO SEVl- I o, I (f (09 THE REQUEST FOR PERMISSION TO INSTALL LOCATION DESCRIBED AS FOLLOWS: YLyLG 1 4 / eZatt �f v SIZE TYPE Zoo o ! ,241 It 244Lt . 9 + 1*/3 �y�} 6it' -gad II C 2tJ�onYLe`,t A gr / e -t .ecru -naO6 *---ten-a--C}-l—e I5 GRANTED SUBJECT TO THE FOLLOWING CONVITiONS AND FESTRICTtONS AND AGREEMENTS: THAT YOU RESTORE THE DISTURBED PORTIONS OF ALL OF THE RIGHT -Or -WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, ANO ALL DIRT AND DEBRIS TO BE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL BE BURIED IN ACCORDANCE WITH THE COUNTY EN— GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN 8E REPLACED IMMEDIATELY; THAT ALL TUSESBE MARK- ED AHEAD OF TRENCHER; THAT TRENCHING BE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, NDT7D EXCEED THREE AND ONE-HALF (34) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUME FILL RESPONSIBILITY FOR ANY DAMAGE IT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO BE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BONO SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FOLLOWING THE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY. SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION OF THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY GAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALL BE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL BE REASONABLE; HOWEVER, IN NO EVENT SHALL THE BOND BE LESS THAN $50.00. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAV- ELING PUBLIC DURING THE INSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES. BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES ARE MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL 50 REMOVE OR RELOCATE AT YOUR OWN EXPENSE JPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS OF ANY NATURE WHATSOEVER WHICH MAY ARISE By REASON OF GRANTING PERMISSION TO LAY THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION of SAID PIPELINE ANO THE MAINTENANCE THEREOF. WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY, THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS_ THIS UNDERSTANDING AND AGREEMENT WILL BE BINDING UFO, YOUR RESPECTIVE AGENTS, HEIRS, EXECUTORS, AD- MINISTRATORS, SUCCESSORS ANO ASSIGNS. LICENSEES NAME ADDRESS ,117 THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO // l� Greeley, Colorado /9'7 The request for permission to install eight inch vitrified clay pipe SIZE TYPE location described as follows: Shown in red on attached plan. Crossing No. 1 - Open cut on 20th Street. Crossing No. 2 - Open cut on 47th Avenue. Crossing No. 3 - Open cut on 35th Avenue. Sic- io4'f f 5 M is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (32) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top cr hard surfaced roads must be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees -in isrs-taLL proper markers for buried- Lines per -County speci- fications. This understanding and agreement will be binding upon Your respective ants, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS 'AELD COUNTY. COLORADO LICENSEES Highland Hills of Greeley Sanitation District Name c/o Highland Nurseries 50th Avenue and 20th Street, Greeley, Colorado 80631 Address 03 tO > q D mmm 000 PI In in non NOISIA3a IA ✓ • m m Q .313324 J Fri 0 mz > r mmm m E -0 O D O z u,m c� D z Ci o 0 0 .'0 C o 0 X fl ■ e# ■ ■ ■ _ ■ ■ Sal 1 I ■e■■■■■■■■■■■■■■■■e■ee■■_ii In II r i • ■ -1i ►1 I i �—J ff/Ge4'ZAVA "f/LG FIND. .4a GO. 50 No 11 o i I flsi <117;1 ft r\ N y • • • a k v RN ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Yi■' i_ O � AA • :ea: ,H' "sr:r o i, ■ II II QI II II o n, n v y V. O \ " rti oo�� atW,10 yntilia rtt � December 14, 1965 Greeley, Colorado District No. 2 The request for permission to install location described as follows: 6 inch Tile SIZE TYPE Coming approximately s miles south of County Road Number 46 between sections 32 and 33, Township 3 North, Range 68 West of the 6th P. M. Cutting from Section 32 into Section 33 cutting County Road No. 47. ( To correct drainage) is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trenche er; that trenching be as close to outer edge of shoulder as possible, not tc exceed three -:nd one-half (3-w) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the•roadway; that you maintain this line at ail times; that you check and m-:n- tain backfill after all storms and assume full responsi`)lity for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is st.=:-__; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full reapon :y for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatscevF which may arise by reason of granting permission to lay the above mentioned pipeli. i- eluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be Finding upon your respective agents, heirs, executors, administrators, successors and assigns. LICENSEES Name Address THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 15,t5 _SP tenree.6. 771) W e0 2I SSO Greeley, Colorado March 20, 1964 The request for permission to install a 10 inch tile sewer line approximately 2500 feet south of the Northeast corner of Section 14, Township 5, Range 66 Jest of the 6th P. M., Weld County, Colorado is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill o❑ crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trencher; that trenching be as close to outer edge of shoul- der as possible, not to exceed three and one-half (3-2) feet; that pipe be placed un- der all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and maintain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense toWeld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with pro- per warning signs and signals, i.e., flares, both day and night; that you assume full responsibilty for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the remo- val or relocation of this installation you will so remove er relocate at your own ex- pense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatso- ever which may arise by reason of granting permission to lay the above mentioned pipe- line including costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE HOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES Name VJ ac()," c Addrets Greeley, Colorado April 12. 1963 The request for permission to install for irrigation purposes, a 12" concrete tile *ggilftiglitoittaitt at a depth of 5 feet, beginning at the SW corner of Section 34, Township 1 North, Ran,e 67 West, on the east side of County Road #248 in District Two as near the telephone poles as possible and continuing North 1 mile to the NW corner of Section 34: is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it.may cause. That you agree to pay for any repairs that must be made• to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all camages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding upen your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO By /fl n&.L /Z die. / e LICENSEES Name a1 je ccti (2v /GAS rig-At-Leaf9.-e- Ad Tess A` 2 -fa t //Z /5A„ �� Greeley, Colorado April 2. 1963 The request for permission to install a sewer line beg inning raft 2OFasxvxSIxSAKItx approximately 400 feet west of the Northeast cornrr of Secticn 1, Township 6, Range 66; thence north approximately 30 - 40 feet. Dist. # 2 - Co Road # 100 is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications, That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made - to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written roquestfrom Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission tc lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will. be binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORA00 3y ;.IcENsggs gamer�� • - Address Greeley, Colorado July 10, 1 s✓/ f The request for permission to install pipeline across bagiAAIAetxstx#M* sn 9th Street in Evans, about 3 blocks West of 1lth Avenue. Evans, Colorado is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilii.ng to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right•of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding uocn your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO LICENSEES Name 11 Address A -Leta Greeley, Colorado JUNE 12 , 1962 The request for permission to install SEWER LINE beginning at theEAST side of Sixth Avenue crossing Old U. S. Hwy #6., at Hudson, Colorado. is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, The backfiiling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and All claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the Installation of said pipeline and the maintenance thereof. That this understanding and agreement .will be binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO By HUDSON SANITARY DISTRICT HUDSON, COLORADO Address Greeley, Colorado July 10, 1962 fy1,4 The request for permission to install pipeline across beginntnaxatxas en 9th Street in Evans, about 3 blocks West of 11th Avenue. Evans, Colorado is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the 2ngineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation withproper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding uocn your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO LICENSEES Name /1--- 6 a - Address HUDSON SANITARY DISTRICT HUDSON, COLORADO Greeley, Colorado JUNE 12 , 1962 The request for permission to install SEWER LINE beginning at theEAST side of Sixth Avenue crossing Old U. S. Hwy ##6., at Hudson, Colorado. is granted subject to the following conditions and agreements; That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthatawst bemade to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with pxoper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfromWeldCounty. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement -will be binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO / ;<,</Leyd Address Z96T `ZT 3NNf CgCnmm�y CD Oo ccnnar�+ z r.H cn (n O .•(w n7 zz 0mz i-+ r U C) i 1-4 w r • Cl) ZZ m,•.. r C\` P- OL(n • erm ppC7:U O C z _4-.-.....J._. ;r Greeley, Colorado February 28, 1962 The request for permission to install Irrigation pipe line under road. beginning at the first road south of Valley View School House, then about z mile east. The ripe will be installed 4 feet underground. is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfiIling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weid County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement willbe binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO B „cc/ I1 P j LICENSEES .D_.47 211'2> Name 8/ J' /L/ ret4.4) Address Greeley, Colorado September 21, 1959 The request for -permission to installs 10 inch drainage tile line beginning at the East intersection line of County Road 1366 between Sections 1 & 2, Twp 5 N, R-66 M, and across said road and North in barrow pit of said Road for approximately 40 feet -North between Section 35 & 36, Twp 6 N, R 66 W. is granted subjectto the following conditions and agreements= That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weld County. Weld County will not be responsible for any damage they n.ay cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement-will.be binding upon your respective heirs, executors, administrators and assigns. HOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO By LICENSEES Name irgAr� ,, c-- '/ Address "tatth' •efid pp b(A 7D Than O Z • O y O.O b -1 o' � WM 2103 (/) Sry P A O' to 2; by t7 rn D> b 0•.. m 2 T b a r" -. c z ~ the X 2 i— -. - J to U,'a p- • y N)O.*a tyic . 0Zr �..K, -.. OZ>. Greeley, Colorado The request for permission to install 4• Cass" o1)lc SIZE TYPE location described as follows: R 1) 'rb, tcr p r o. - 1- i $ ) d.. °� at +e� 5J0 N W� o - )≤-5—fey 1�i q Sc L c_ G �. e �;�-y Z r r 0 h1 l o,. C.o. OR) a-7 q. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of bacl;fill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all ':ay signs taken down be replaced immediately; that all tubes be marked ahead of trench - at t--enching be as close to outer edge of shoulder as possible, not to exceed three -half (34-) feet; that pipe be placed under all tubes and bridges; that all lines ag black top or hard surfaced roads must be bored or pushed under the surfaced `r of t:le roadway; that you maintain this line at all times; that you chrck and main- -tkfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and t:at this work will be completed within a reasonable time after construction is started; t:;2t you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever iirh may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the 1: _'-c;rys to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, administrators, successors and assigns. LICENSEES ma.V? a\ Address \--)1S ‘e,e.�c tab\O THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO /1aa�ce l�rr� Greeley, Colorado The request for permission to install 1}" metal atural gas line SIZE TYPE location described as follows: Beginning at South east corner of Section 3, Township 5 North, Range 66 West; North * mile approximately; West on County Road #306 for approximately 1200 feet; District #2 is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (34) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or rellcation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. cari Address THE BARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 0<e.;:n; aLaiN Greeley, Colorado The request for permission to install a tile line beginning at thec a point apprnximatPly 350 feet Snnth of the renter line hotwoen Sections 1Q -Ind ?!1, Township 2, Range 68 entering the right-of-way at said point and running North approximately 600 feet is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backftiling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular materials such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers specifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installa- tion. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is started. That the travelling public be protected during the installation with proper warning signs and signals, both day and night. That you assume full respon- sibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the high- way right-of-way. BOARD OF 'TY COMMISSIONERS ORADO BY atif rman A, o • ". :O ��0 �`, X •••g3s•nbw - • M [I1 N 0 M b9 � Po * r� • O r Veys Gm m Mp► b' N&TOZ eel * •- ata ZR *g'D O \n et X1 V 1 so pa 0 • = A (�i37 Greeley, Colorado Tho request for permission to install lIculitraremtml Slwetrical tine SIZE TYPE location described as follows: To cross County Road 2,125' South of the hartbeest lit) corner of Section Twenty-three (23), Township Five 5) North of Range Slaty -six (66) west of the 6th P.M., Veld County, Colorado. is yrantcd subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all "say signs taken down be replaced immediately; that all tubes be marked ahead of trench- - , °'at trenching be as close to outer edge of shoulder as possible, not to exceed three -•-half (3) feet; that pipe be placed under all tubes and bridges; that all lines z';ing black top or hard surfaced roads must be bored or pushed under the surfaced .'cn of the roadway; that you maintain this line at all times; that you check and main- -?kfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and i:at this work will be completed within a reasonable time after construction is started; t'.•3t you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in those highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever h may arise by reason of granting permission to lay the above mentioned pipeline in- cleding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. W2ld County will not be responsible for any damages caused in the maintenance of the -Jays to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, eAa.:.ors, administrators, successors and assigns. LICENSEES ae II48T MD FOWIR =PANT Name 1500 • Sixth Avenme Greeley, Colorado Address by; Richard R.Fennel.Wy Superintendent THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO zt` / Greeley, Colorado, 4/, y / , The request for permission to install a 12" concrete tile for irrigation SIZE TYPE location described as follows: My Parmt description is SE4: Sec 16 T6 R64. My irrigation water comes into my place on the northeast corner across the country road. The present structure is hazardous from a safety standpoint in that it juts out into the roadway. Also, The berrow pits on both sides of th fl3€road cannot be maintained and th water both irrigation and flood, run onto the road, across and into my field. This new structure would bypass the old one and make it possible for abetter system of maintaining the road and controlling the flood water. This structure is meeting with the approval of the ASC office. The distance across th road is 65 ft. See the back for a diagren. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3:Lj feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE HOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO r1/4 ,�� LICENSEES dic_te4x... d.wrara.< Name e s__"/6 Addres .2.24 jaze r /—e sre r a�,��= 7ioeesI v %I,_AT' tarLL/Ji!-1-e Q b y N r N �.,..:p l.c.„,_ Greeley, Colorado LICENSEES The request for permission to install 6TM & 8" Cast Iron Pipe (Waterc:ain) SIZE TYPE location described as follows: 1. Parallel to State Highway No. 52 and across old Rt. No. 6. 2. Across old Rt. No. 6 at the intersection of old Rt. No. 6 and 2nd Avenue. 3. On North borrow ditch of Main St. running from Cedar to right-of-way on new Highway No. 6. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and .^ne-half (3:L) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save geld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BDARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO TOWN OF HUDSON Name Address 011A/c/r o, Hot( y /'c //ctila,- C Ov/p/c- lot/ C/QZ/74„Q�C //c/6r/.r e/Cy. SEE Name or SubJ1ot File Dross reference form under Junta Or subject at top of the sheet and by the latest date of papa% Describe matter for Identification purposes. The peppy themselves, should be filed under nanit er subject after "fa" FNs Na • • PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO' UNDERGROUND AND UTILITY PERMIT DATE October 12 Industrial Gas Services, Inc. 19 73 4704 Harlan Street, Denver, Colorado 80212 Your request for permission to install a 4n Gas line along or across County Highway No 6 at RD 35 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld Permittee will own and maintain the same after installation. The 411 Gas line shall be installed beneath the surface of the right of way of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of stable granular material such as crushed rock or gravel. County and that the at a minimum depth back filling on the back fill shall be of Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such, statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. ,Li I''1- e This work shall be completed within / ( r ) days from the above date- No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- staliation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County rig lt; of spay limits. aC p d2"9/ or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By , Maintenance Man on this section of the highway, with headquarters at supervi In : _. ting this ti:. it the - ereigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Industrial GasServices, Inc. THE BOARD OF COUNTY COMMISSIONERS W2C NTY, COLORADO /D/a 9/7-S qe7/91 • • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line Is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 pat pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground Installations will generally require the services of an inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfllling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2" 0.3 sq. ft. 3^ 0.6 sq. ft. 4^ 1.0 sq. ft. 6^ 2.2 sq. ft. S^ 3.8 sq. ft. 10^ 5.9 sq. ft 12" 3.5 sq. ft. 14^ 12.0 sq. ft. 16" 15.0 sq. ft. 18" 19.0 sq. ft. 20" 24.0 sq. ft 24" 34.0 sq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.36q.ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 456 Vertical Bends Down 0.05 cn. yds. 0.11 cu. yds. 0.20' cu. yds. 0-37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts acroas the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway- If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within pa ad roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior tc the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions o' the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dig, Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. Thi amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. rivatiiiiiiikiriatiiNgittlitiri falliteligillaalkorilla Ztsw gs`o igitS Clal)Stra: :Si\ rail MerlErtatalgerialFrtritga ki\icocauurtiv�►� ma ,>.,,�� iE' ie D tai' see , EGAMIL �It���",� i=Wer " Y.�IYYYYt ��lh4R g�_. IG _•�P.T. l}�Q-i'� Jai'!✓��T /L������Ti���`1Y���� �' �N Pi re Mali -SIES151111101ATIMINEUESCUMMANIS SECIESINNEMrileatrainfillittiqp Ditifearall . r. tillifilliaraltallitsrarin s� ers scar - - mu Ian insalwarisemmt gligiffiffillar'irmatiMiattlattOELITNINAGIIMIZIMIlt 4iffelyirtirabir: ,. oh]�y�1r I 14 qtrisretum =Zy I- `t %^ i 6Y 'ice '��, ^J rn'-i i YL %-/`,�.',�-�C i•- :. '•• I � •. Rz�o S l� GA R6M f Y. ROOW Y p y T ti3 •'j c o u .. T et t. �� --'i+ j] ]i b 73 ]7 ]1 al u [s p N :iP' COLORADO OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (303) 3532212 EXT. 221, 222 & 223 BOX 758 GREELEY, COLORADO 80631 August 12, 1974 A. E. Woodley Transcontinent Oil Company First National Bank Building Denver, Colorado 80202 Re: Acceptance of Road Repairs Dear Mr. Woodley: As per your request for acceptance of road repairs in Weld County, this letter will be a formal acceptance of all road repair and re -gravel of affected County Roads that were damaged in gas pipe- line installation along and across roads as described in Underground and Utility Permits No.778 dated October 2, 1973, No.797 dated October 12, 1973 and No. 798 dated October 12, 1973 and issued to Industrial Gas Services Inc., 4704 Harlan, Denver, Colorado 80212. Sincerely, Weld County Commissioners (ec c (Ji� (7?--/ � � CC: r . Lyle Bush -Adolph Coors Company Mr. Guy Stroud -Industrial Gas Services, Inc. Mr. Truman Clayton -Joyce Western Construction Co. WELD COUNTY COMMISSIONERS HARRY S. ASHLEY GLENN K. BILLINGS ROY MOSER PERMITTEE'S NAME 4704 Harlan Street, Denver, Colorado 80212 ADDRESS WELD COUNTY, COLO ro UNDERGROUND AND, UTILITY PERMIT DATE October 12 1973 Industrial Gas Services, Inc. 2 n 3' 4“ Gas Your r uest fo er is oa install o t ' e en or cros County w No. a ri mi .RD 29 from RD north; t 1 mi. RD 6- from RD 29 .ast; BI mi. � '1 rrom RD 6 tsouth 1 mi. RD 8_from RD 3 est;3/4 mi, RD 55 from.RD 20 South: 1 mi. RD 53 from RD 20S; is granted, provided that the Permittee will own and maintain the same after installation. 3/4 mi .RD 18 from RD 53 1r; k mi RD 55 from RD 38 North IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 241,3n.4" Gas line shall be installed beneath the surface of the right of way at a minimum depth of 336 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the lasttwelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such- statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to bold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. �l This work shall be completed within ! ase ( r -17- -7 1Y'7 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to. Weld County, Colorado,at the locations designated by Weld County, Colorado, directly above such instal!erions such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directionsgiven by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. � c! , Maintenance Man on this section of the highway, with headquarters at 7 — 1 O T' i or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must he followed or this permit may be terminated forthwith. By: e Supervi V 7/19-1-7q,111, THE BOARD OF COUNTY COMMISSIONERS WELD3QTY, COLORADO /3-6-1/1-421,th-4-4/C-9 piing this p% .•it the tin ifled, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has a ority to sign for and bind the Permittee; and that by virtue of h!s signature the Permittee is bound by all the conditions set forth herein. Industrial Gas Services, Inc. 4t777 Rid • ! SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4- Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Stud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drains 3e or siphon facility will be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUME REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0-05 cu. yds. 3^ 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. 0.37 Cu. yds. 8^ 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.6 sq. ft. ' 3.5 sq. ft 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft 2.00 cu. yds. 16" 16.0 sq. ft. 6.3 eq. ft 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts 'will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed. 2. Final back fill and tamping operations. will be executed in no more than six Inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cute within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. S. WILLIS L u. f_ .• a _ SZ T2w Is 1. 1.. 12 10 a o 4 2 Mi: 7e.= .. not • >• a .. 4 L 1*W(A nvia.alsiburin_ mane mvirmakter tetitrackwasitainanwt �A � . Mallia2110.101MitroliMi ;Wen mancimarammitiogroteitairio ►Y�1 �7e�+l� F StailablatEMIDEirraii IlifaCMCIMEIMIIPIWASLIBI wmawnwamviztammen !I no instil 7seinamy tparniratts-a .di ' stallisimitin ANINAMILUMMI. kir i ISMILIII ma'_ - ::- ;tea ��-,�4 _ „ �i°�r ; IQ ,21 3 5 w • 2 eJ=fsaim or.�fY%1kn.-soc_yu.l�:.. ��wA��� irAms �' � i r r�tdliti .fir r i�; OMal COUR Wail= 11110111d rafill gladiatereak1SIESVMPARMIMIll �O IO2 1111111111111 - I s i'4a. • - ;' ' ..7.:m nee! - area ....2.:•-t • 0 •• w .2 �1 : : 7 1 II a 15 17 1^ 21 j2 25 9.1 ivav Raw n.fn n ' C 27 7/ 31 v 3S h% I ; 4-1 RR>w 0: u • T _T 27 •I N 43 47 M Si — -: r- _ rye • om.. -,'��a •' riii._ ! �. .,,•i-- < S ..r .... -- ---+'7-1---- - - --i 4914. - -- I •.. I • C - _ • _. -•j'_`r-'�o•. ►R, •�1 1 . .1 •I' • • �\\ �a\ f• . ..� �i�•• •'gib M • • • i �`_ ;: .. ' •. • �. • .� /can .. -"_• - - :� a. :• } 1Tau L.,_- - _..r. .- • p 1.30 41 • 3 - ,s 3 -- �........ , i S » ir. is is is s7 Si 01 1'1 1s RIOr 107 +QY 107 Utility 8 Transport Field Report Applicant's Name _ Type of Permit �y Permit No. Date Issued 77 7 2-V egt-a • Expiration Date :Location and Damage Report:'.Date 4k117 Time (If no apparent damage at this time, so state) Inspection Date _b 1. 79" I WELD COUNTY, COLORADO • BOARD OP COUNTY COMMISSIONERS BYulti ' efi29 " Auth rized Agent PHONE (303) 353-2212 EXT. 221, 222 & 223 P.O. BOX 758 GREELEY, COLORADO 80631 t.6 , OFFICE OF BOARD OF COUNTY COMMISSIONERS 111k COLORADO August 12, 1974 A. E. Woodley Transcontinent Oil Company First National Bank Building Denver, Colorado 80202 Re: Acceptance of Road Repairs Dear Mr. Woodley: As per your request for acceptance of road repairs in Weld County, this letter will be a formal acceptance of all road repair and re -gravel of affected County Roads that were damaged in gas pipe- line installation along and across roads as described in Underground and Utility Permits No.778 dated October 2, 1973, No.797 dated October 12, 1973 and No. 798 dated October 12, 1973 and issued to Industrial Gas Services Inc., 4704 Harlan, Denver, Colorado 80212. Sincerely, Weld County Commissioners 6V (.4,1/cc, X414 CC: 'Mr. Lyle Bush -Adolph Coors Company Mr. Guy Stroud -Industrial Gas Services, Inc. Mr. Truman Clayton -Joyce Western Construction Co. WELD COUNTY COMMISSIONERS HARRY S. ASHLEY GLENN IC. BILLINGS ROY MOSER • a ,--:-.7.'".....----,---...C---.......-----.., - ORDER Weld County, Colorado . �,v,,,, , -▪ - 1 T nacontinent OiI Company--------,---- -- TRANSCONTINENT OIL COMPANYN®�- 21566 First NationalBank:Building �.. Denver'. CWorado9020.2,�--� _ � �-,..,�� ,�.�� • FIRST -NATIONAL BANK OF OEI%VER:. ; 23't - DENVER. .COLORADO'+'"1•-fo2r- PA Nine Hundred EEfteftrie--a 1` 2001 ._ • ^ ^^^ ' _ -.. i"i'�:�"stir`-'ti"""�n*�i".�i�'i\V^•'\/^'��""-.V"ti^�:,-y'4.iL fro: L"/^�/'�'�/"`� .��'. �-��A` �--.-.•-^..i--�.�---��--�..--•�-'=I0-75-73'•x^1$-955:40 ��. _ - •+..�.���•.. .. `� . v� . mot, w "". ` .. �.n.. .. -.1'.r ✓�"'.1`t Jam'^Mi'� M.•. 1 ..� • 10-210.<100 IC —74w000 74n• -.• �.. -'—w • _ .r� _.,.�.�Y`'� .I -..'mow r PAYEE- DETACH THIS STATEMENT9EROR! DEPOSITING CHECK ▪ , ' ~f - •^✓' _ ..Z: Tranacontinent OH Company - DATE INVOICE NO. - D CR...PTJON • AMOUNT. nm.�cr t - NET AMCHWT. 10-15-73 C-401 Consideration for County right of way . • PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE October 2 Industrial Gas Services. Inc. 4704 Harlan Street, Denver, Colorado 80212 19 73 cfr3 41 F r es for er sT to nets a ^ ,f/ "ne long or across County Highway No at 2 Miles 15 2rori'� 915 b�estu; 3/4 Miles Roil from RD 22 North; l* miles RD 11 from RD 4 North: mile_RD 17 from RD 8 South is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. 34 - The ilga-.2./ line shall be installed beneath the surface of the right of way at a minimum depth of 26 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of ',r be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within _ --ee414-- ) days from the above date_ No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right o way limits. s �7—SESO'S Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. suoery ting this per t the undyla�igned. representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has autffority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Industrial Gas Services, Inc. THE BOARD OF COUNTY COMMISSIONERS WELD CAVNIY, COLORADO 1. A"), ltit eaX °2O 4477! • • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility Installation will be removed' from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions: 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- s. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches In diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewedin the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground Installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed - 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as Der list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.°S Pipe Size 2" 3^ 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Sends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft- 5.9sq. ft 8.5sq.ft 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3sq. ft. 0.4 sq. ft 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft 9.3 sq. ft. 34.0 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu, yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dia- tnrbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway, Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County_ Theamount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond beless than 2100.00. +• • 6✓— • u s +A le t n. Y• ©- • ) o f• • T 1 ^t -V I ..,,....z....:„...--.....;-_-• � 4 ;-! o + _ �i - it t•a�, r // M, sr, . , + -r T + J �..> III 1 m7: j 1T .1:-.2..//.7:. r. • Le ��,y f.. y( )f tit .7 �t•, r / 'f " " p��v. r c/(:= 4 ety r A. -� )/yK /• aI� hf I-i •j..Jid'/,✓1 !l�ilU(O l! y �/•P , nw - J ,r/� ,..,. �U rs ✓ �. ��Ss Y�j • �� 1. 2 •.... _. 3 5 -a a.‘ b /Rib ( 1 b Cr,`, i.'li 67.,. -c :4 �. . R6Tw R 66'w ' L • 0 • X 5 .$ C 0:v k T T :`: �' - 7 9 1l 13 35 17 1^ 11 33 25 17 19 II 33 33 37 39 41 43 ♦3 47 49 5; Utility 8 Transport Field Report • 'Applicant's Name �2�i s�x�- a -- Type of Permit Permit No. 77F U Date Issued • Expiration Date _ c94± � :Location and Damage Reportx'-Date Time (If no apparent damage at this time, so state) • Inspection Date i[ ad-- 75" WELD COUNTY, COLORADO BOARD OF COUNTY COW{ISSIONERS BY: eh , Q�? p Au rized Agent WE�Yc COLORADO August 12, 1974 A. E. Woodley Transcontinent Oil Company First National Bank Building Denver, Colorado 80202 Re: Acceptance of Road Repairs Dear Mr. Woodley: OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (303) 353-2212 EXT. 221, 222 & 223 P.O. BOX 758 GREELEY, COLORADO 80631 As per your request for acceptance of road repairs in Weld County, this letter will be a formai acceptance of all road repair and re -gravel of affected County Roads that were damaged in gas pipe- line installation along and across roads as described in Underground and Utility Permits No.778 dated October 2, 1973, No.797 dated October 12, 1973 and No. 798 dated October 12, 1973 and issued to Industrial Gas Services Inc., 4704 Harlan, Denver, Colorado 80212. Sincerely, Weld County Commissioners - / /I i CC: r. Lyle Bush -Adolph Coors Company Mr. Guy Stroud -Industrial Gas Services, Inc. Mr. Truman Clayton -Joyce Western Construction Co. WELD COUNTY COMMISSIONERS HARRY S. ASHLEY GLENN K. BILLINGS ROY MOSER FIRST NATIONAL BANK BUILDING-'- -" DIWVQ. C.OLORADO 50202 - TRANSCONTINENY..OIL`COMPANY.'�"'�%r geld- -- --- - ,- Colorado �'. �_-_- :-� \�.�..�•�v...� .��.✓ „'vim^..%..`..+�-^ tin rzo=aoa i�M:4Qoa z�.!- 40. y_ ew ci a ito 30 Witilittiktitiiibza'AN-6 ttlt*t TtERN IT -1. C S'+O.max? :CC.; C.,7W eyAWI-.aJx DATE 19_ PER.MITTEE'S NAME .._ ADDRESS .. c,40 ?mot • - Your request for permission to install a ;/€*-1 - ' a V, linA along or across County Highway' No at is granted, provided that the Perminee-wiB owa'Snd ma" mtaintiie sameafter Mendla _ IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation.' The line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, "s'nd'the diaturbetpoition of the right of way' shall be restored to Ifs original condition.' The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, It, shall be encased in pipe of larger diameter and thecrossingshall rbe aa nearly perpendicular to the roadway as physicallypossible. This installation shall: be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed_, up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted' - " Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In nocase shall the flow of water ever be imparied or interrupted. This work must be accomplished in' accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such -statutes- as are applicable. - - -7,2� SPECIAL PROVISIONS: Attached' The Permittee shall maintain the installation's at all times and agree to hold Weld County. Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or beconnect- ed with the installation, maintenance. alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this Permit. This work shall be completed within ( - ) days from the above" date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be reanired _to shut', off line' an$di`yemove all combustible materials from the County right of way when re- quested to do so by Weld County Colorado; becanse'&"neeessary highway construction or maintenance operations. - Permittee shall mark this installation with markers, acceptable to Weld, County. Colorado. at., the Locations:designated- designated -by Weld County, Colorado. directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance Nifthi{iteixlbis.:,gliel hy? Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that .may result. In the maintenance of the highway or to the installation placed inside County right of way limits. - - - - i Maintenances' Man on this section of the highway, with headquarters at . - •• ' or -his successor, will represent Weld County, Colorado, In the construction of this installation and any directions' that he may make consistent with'the latent of this permit must be followed or this permit may be terminated forthwith. - THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO: By: -. Maintenance Supervisor In accepting this permit the undersigned, representing ;the Permittee, velfiez that he has readand, understands ail of the foregoing provisions; that he has authority to sign for and' bind the Permittee; and that by virtue of his signature thePermittee is bound by all the conditions set forth" -herein. - .>.. :_.-. 7z) SPEXMAL01PISTRUCTIONS REQUIREMENTS OOR-INSTALWtON-OF UyyT,Ese4 nom. etua'E OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface, EACP! DAY:. '. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to becovered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of elope to toe of slope under all highways and paved Countyroad intersec- tions and approaches. if lines are over two inches in diameter or. more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway, 10. All requests for Installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will berequired by the contractorthat material removed must be replaced in like kind and with same or better compaction. 1w segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado- The decision In regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13: All drainage facilities or siphons will be opened immediately upon completion Of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphons facilitywill be replaced. All. damaged sections "are to be inspected by Weld. County, Colorado, before,being. Concealed in any manner, Drainage ditches or borrow pits -are to be'restored to original -condi- tion immediately after backfilling is completed. .. _... - 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow. installation. . 15. Thrust blocks will be required on all vertical and horizontal bends in. water pipes as per list below. - THRUST BLOCK AREAS: AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO. R. O. W'5 Minimum Thrust Area Minimum Thrust Area Pipe Size for Tees and 900 Bends for 45° Bends 2" 0.3 eq. ft 8" 0.6 sq. ft. Y' 1.0 sq. ft 6^ 2.2 sq. ft. 8^ 3.8 sq. ft 10" 5.9 sq. ft. 12^ 8.5 sq. ft. 14^ ltO..sq. tt .. 16" 15.0 so ft 18^ 19.0 sq. Lt. 20" 24.0 sq. ft 24" 34.0 sq. ft. NOTE TO APPLICANT: This permit shall be made available at the site where' and when work Is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of theroadway maybe•:permitted at thee -discretion of: Weld County, Colorado, and only after the following provisions are met, 1. No open trenches or hazardous. ruts will be leftover night or on weekends." Excavations will be securely tamped to pre vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one Inch will bea dry select road base material. compacted: to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee." 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one ,;t1):year afterconstruction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification 2or7theerecationuof-said repairs; ?,-.- 5. If the Permittee has not TOifreb slid .operf .Cilf Or Cnts within the allowed seven (7) days, Weld County. Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 6. No puddling will be allowed. - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the ? Connry shall be'required in the name' of - the contractor or the person causing the hard surfaced roadwayto he :disturbed prior tothe: commencement of the work, said bond shall assurerecovery by. the County: of any expense incurred, within a period of one year following the completion and-.acceptanceof" the. restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die• turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of saidbondshall be set'by the' looard of County Commissioners and shall be reasonable; however. in no event shall the bond be less than $100.00. 0.2 sq. ft. 0.3 eq. ft. -.. 0.4 sq. -ft,. 0.9 nq. ft'' 1.6 sq. ft 2.6 sq. ft. 3.6 sq. ft. _._ 4:8 coq. ft: 6.3 -a9. it. ;..... 7.9 sq. ft. 14.0 et ft Minimum Volume of Concrete at 46^ Vertical Bends Down 0.06 en. yds. 0.11 cu. yds. 0:20 en. yds: 037 cc.'yds. 0.66 cu. yds- _.. 1.10 cu. yds. 1:50 "ca. yds.- ZOO 'cu yds. 2.70 en yds. 3.40 co. yd@... d-00 cu. yds.. 5.20 en yds. V 4 COW'1Tl, :7)i+'l,i 1"NI 'T _tti+,S.l11- ti ;� y.•i/ D,YI'S /$ June YS" Is 73 PE21tITTn:741•S NAME Industrial Gas Services, Inc. ADDRESS 4704 Harlan Street: Aenvex, Co7.c a¢o 80212 -., /O--f—G -3-. - ar . r 5/Ln s15.31 8 Your request for permission to install a �_. �-��--- bins nloug or across County Highway No. a__ at 41" 53 59,30,32,43, As shown on attached Weld County map. - v'l/ is granted, provided that the Permittee will own and maintain the saute after installation. soOk IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County- and that the' Permittee will own and maintain the sang after installation. - The gas gathering linesshali be installed beneath the surface of the right of way at a minimum depth of S, inches, and the disturbed portion of the right of way shall be restored to its original condition. The :sack filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or zravei. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the cussing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or -jack- ing- through and beneath tha road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road :way, No :rater shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through . and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case Shall the flow of water ever be imparied or interrapted. - • This work. must bs accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL, PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof. and their officers and employees harmless from any and all loss ands damage or any claims which may arise out of or be connect- ed with tilt instacation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. - ) days from the above date. No • This work shall be completed within „—�-- ( - work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. - - Permittee will be required to shift off lines and remove all combustible materials front the County right of way when rc- emssted to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall ='ark this installation with markers acceptable to Weld County, Colorado, at the loattious designated by - Weid County, Colorado), directly above such installations such as r-tanhotes and at section lines for -cable (phone,. power, wvz'ter Imes). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions giv.:n by Weld County, Colorado or by their agent. - - In the event auy changes aro made to this roadway- in the future that would necessitate removal for relocation of this in- stallation, I:_•rmittce wilt do so promptly at its own expense upon written request from Weld County. Colorado. Weld Cnrtnty, Colorado, will not be responsible for any damage that may result in the maintenance of. the highway or to the installation placed inside County right of way limits.. .. hl••intenarce 21an on this section of flue highway, with headquarters at r, hi• --successor, will represent Weld County, Colorado, iu the construction of then .. t-.uin Lion and any directions that he may make consistent with the intent of this permit must he followed or this permit . may be terminated forthwith. THE BOARD .01: COUNTY COMMISSIONERS WELIb,Cgtf1:`3TY, COLORADO $a9orv:a.. f+u thin I -m it the u ,r::i:n,d, reronrcrientittg the Permittee, verifies that he has read and n dersnlntt all of the fore:;: •i D:; •3.:-ovi sign?; that. l' 'as a:.:,ho it . to sign for and bind the Fermittee; and that by virtue of b : si rraturc the Pert.:itt: l u:u': :. alt the c0.^.rii'ions- ^-t forth i•ere.in. Industrial Gas Services, ,jnc. - By: lel 7 -z J SPECIAL 9N S1RUCalDN3 REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. n. Any --oriels front excavation as the result of utility installation will be removed from highway surface EACII DAY. Under no condition is an asphalt surface to be cut unless otherwise specified'in the special provisions. a. 3'.!:d -judging will be required where bores are larger than lines or encasements. 6., The ends of bored sections ARE NOT to be covered before being inspected.. - - 7. No plastic line is to be _installed without encasement under pavement regardless of pressure and size. S. Encasement of line will he required from toe of slope to toe of slope under all highways and paved County road interec- tioas and approaches. if lines are over two inches in diameter or more than 100 psi pressure, 9. Manholes and other points' of aeons to other 'underground utilities may be permitted within the right of way only when. they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The chestruction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before beipg concealed fa any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. - - - It. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. - - - 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below - THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W°'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends foe 4S° Sends at 450 Vertical Bends Down 2" - 0.3 sq. ft. 0.2 sq. ft 0-05 cu- yds- 2" 0:6 sq. ft. 0.3 sq. ft. - 011 cu. yds. 4" I,0 sq. ft. 0.4 sq. ft. - 0.20 ca. yds- . 6" - - 2.2 sq. ft. 0.9 sq. ft. - '0.37 cu. yds.-: 8" 3.S sq. ft- 1-6 sq. ft. - 046 cu. yds.. 10" E9 sq. ft. 2.5 sq. ft. 1-10 en_ y-ds- 12" 3.5 sq. ft. 3,5 sq. ft. - 1.50 cu. yds. 14" - - 12.0 sq. ft. 4.6 sq. ft. 2.00 cu. yds. 16" . 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds.. ' ° 1B" 19.0 sq. ft. - 7.9 sq. ft. - - 3.40 cu. yds: 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 at. yds. 24" - 34.0 sq. ft 14.0 sq. ft. 5.20 5._0 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Oren cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. • 1. No open trenches or hazardous ruts will be Ieft over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back fin and tamping operations wilt be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavatedmaterial is suitable for bsokfill. If :t is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. -. P,r!!!ittee assumes responsibility for the mamteaance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in heed of repairs, Permittee Is allowed seven (7) days sitar notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or outs within the allowed seven (7) days, Weld County, Colorado- will rr:',zi;' said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring Pavement parallel to the center lice of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines arc to be suitably, encased to allow for repair and/or maintenance, without further dis- turbing the roadway. S. No puddling will be. allowed. 9. That in all cases where existing black top or hard surfaced roads Must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person ceasing the hard surfaced roadway to -be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored ga°rtioa or portions of the h0,trd surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- b:rued portion of. the+ hard surfaced roadway. Said bond shall not he cancelled without thirty days notice to the County. Tee amount of said bond shall be set by the F.oard of County Commissioners and shall be reasonable; however, in no err mt shall the bond be less than $100.00. 4 /a -4/a707. 9141 ` " `gag Do 9'a a//,old `7961,Sra /02/190 li_____ 2;///,:1; t4•Ter/0a 71- 49 Qcty 7f- %3 /; •6's/?m Pcn i r It 7 xi r2c €d Gas ,"We; .5 Sxd, • f« 1?a, d b7 /riles co,t*',.se+t e, / C'a. deceotto4.7 Defied 7-/7_72 • .:+_%_: _.:tigers It IS strata t t Ls �rsn,i-s"3f3- ' „.n,.i. i. O t. t E E t a. 3 K • - 1 Pa -11--4,---1 ---C, - .-_YI' Q. L'-1 ; f p -. ETzanseonfcnenh pit Conzfzany. DENVER. COLORADO 80202 FIRST NATIONAL SANK BUILDING TELEPHONE 534-8108 July 24, 1974 The Board of County Commissioners Weld County Courthouse Greeley, Colorado 80631 Re: Request for Release;Road Repairs Adolph Coors Company - Industrial Gas Services, Inc. - Gas Gathering System, Weld County, Colorado Gentlemen: The initial phase of gas pipeline installation along and across various Weld County Roads has been completed. We believe that we have met all of your requirements to repair and re -gravel all affected County Roads, and have re- worked all borrow pits and culverts to your specifications. Please consider this letter as a formal request for a general release or letter of acceptance of all such repair work to date. The Release or Acceptance Letter should name Adolph Coors Company, Industrial Gas Services, Inc., and Joyce Western Construction Co. as having performed the necessary repair work in a satisfactory manner. We enclose copies of numerous releases of specific sections of Weld County roads that were obtained when the work had been completed on that particular seg- ment of road. However, we believe that a General Release or Letter of Acceptance would be of benefit to all parties concerned. We also enclose a set of "As Built" Engineering Drawings, showing exact details of the gas gathering system -pipeline as installed in Weld County. We do plan to tie in additional wells to the gas gathering system from time to time, and we will apply for the necessary permits as the need arises. We would like to express our appreciation for the excellent cooperation we have received from the County Commissioners and your Road Maintenance Supervisors on this project. Without this cooperation, we never would have been able to complete the installation in the near record time in which the work was accomplished. We trust that the income and royalty payments from the sale of gas to the gathering system will be beneficial, not only to the individual landowners who have production, but to Weld County in general. Yours very truly, '1RANSCONTINENT OIL COMPANY Right -of -Way Agents A. E. Woodley AEW:cp Enclosures cc: Mr. Lyle Bush - Adolph Coors Company Mr. Guy Stroud - Industrial Gas Services, Inc. Mr. Truman Clayton - Joyce Western Construction Co. Wilk COLORADO August 6, 1974 A. E. Woodley Transcontinent Oil Company First National Bank Building Denver, Colorado 80202 Re: Acceptance of Road Repairs Dear Mr. Woodley: OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (303) 353-2212 EXT. 221. 222 & 223 P.O. BOX 758 GREELEY, COLORADO 00631 As per your request for acceptance of road repairs in Weld County, this letter will be a formal acceptance of all road repair and re -gravel of affected County Roads that were damaged in gas pipe- line installation along and across roads as described and com- pleted;in Underground and Utility Permit No. 721 dated July 18, 1973 and issued to Industrial Gas Services Inc., 4704 Harlan, Denver, Colorado 80212 Sincerely, Weld County Commissioners nit(z: ,earc. 9 4.2 CC: Mr. Lyle Bush -Adolph Coors Company Mr. Guy Stroud -Industrial Gas Services, Inc. Mr. Truman Clayton - Joyce Western Construction Co. WELD COUNTY COMMISSIONERS HARRY S. ASHLEY GLENN K. BILLINGS ROY MOSER Wf�Oc COLORADO August 23, 1974 Lyle E. Bush Adolph Coors Company Department 309 Golden, Colorado 80401 Dear Mr. Bush: OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE (303) 353-2212 EXT. 221, 222 & 223 P.O. BOx 758 GREELEY, COLORADO 80631 Permission is granted to install a natural gas pipe line between between County Road # 30 and County Road # 32 on County Road # 43 approximately 15' East of the center line of County Road # 43 as mutually agreed by Mr. Jake Amen, Adolph Coor representative, and Mr. Roy Moser, Weld County Commissioner District # 3 on the 19th day of August on a field inspection. Work in this area is granted under Weld County Permit # 721 dated June 18, 1973. Sincerely, Roy Moser Weld County Commissioner District 3 mfm CC: A. E. Woodley-Transcontinent Oil Co. WELD COUNTY COMMISSIONERS HARRY S. ASHLEY GLENN IC, BILLINGS ROY MOSER TRANSCONTINENT OIL COMPANY !/,�/r �FIRST NATIONAL DANK BUILDING K 7 `emir PENVER. COLORADO eOAOR S20 '3 • PA •Twenty -One Thousand Eight Hundred Six and 40/100 9 TO THE ORDER Weld County OF N? 21069 THE FIRST NATIONAL BANK OF DENVER 23-1 DENVER. COLORADO 1020 I:10 20«.00011: 74w000?4u' C. , .. ,. .... ....i .., PAYEE: DETACH THIS STATEMENT BEFORE DEPOSITING CHECK DATE 7-19-73 INVOICE NO. C-401 DESCRIPTION OATc 7-19-73 AMOUNT 1$21,806.40 TRANSCONTINENT OIL COMPANY TRANSCONTINENT OIL COMPANY Consideration for county right-of-way (pipeline) PAYS DETACH THIS STATEMENT BEFORE DEPOSITING CHECK AMOUNT OIKOUNT OA O[OUCTION TRH OIL COMPANY NET AMOUNT $21,806-.40 • jam. Yao. /3z Soo•on jA. tDroo.oe 2 G 4C g n pg 'arty zvaoy Specific Ownership Tax, Auto Motor Vehicle, Add. Registration Fee saaa A1GD Xlano3 ON .lsutsiG icoPS Weld County General Hospital Fund xuy sales awnis 'oiOD C • a TREASURER'S OFFICE, WE A n c rd. oar Greeley, Colorado August 17, 1962 The request for permission to install tile sewage line beginning at the NE corner of Section 11, Township 1, Range 64 W, and going across State Highway 52 then continuing North approximately 2100' on County Road 586. is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this aighway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made bj any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement .will.be binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO �% LICENSEES �5 r Jp/M�C r«� e. cf/1t C6 Name �°i,i?esa/ 12. D to id/csr 5'Q ry ft - Address u/HenrR hGe GQLG Mr=l•-•Zya 21. o.. ..m _ <"t 0mn c et N $ ma' H A CACr III K73 tO y M roro R 9 w M9 to '-. 6M M . 888 E:.t`yz tttt 2-116 M > 69;46° C4 6 ai.4inctis'.43. Asa�t r , r i 933- zq -2 P33 -33W )1-fiL P/H/%/ WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT tJ DATE PERMITTEE'S NAME '• C. w7 " el,a0 ADDRESS Your request for permission to install a along or across County Highway No. 3/43 die at t' ('o pAirag a.7 %-heir East i:i 4ev/ec{! ?'t- 330' niece, O -z is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own }anddmaintain the �same after installation. The -4 / uy14 line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling eh all be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are apDltcahle...: SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees hart:ess from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( ) days from the above date_ No work shall be allowed on Saturdays or Sundays. No open trench permitted In traveled roadway after dark, unless otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintena-ce of the highway or to the installation placed inside County right of way limits. _s- 17 -in LA, STic.1.L,/ , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By! Maintenance ''r hoc T = •ARD OF COUNTY COMM7$$1ONER NTY, RA In acce. ng , permit the underai; . representing the Permittee, verifies that he has read and understands all of the foregoing provis .a: that he has author!+ to sign for and bind the Permittee; and that by virtue of his signature the Permittee fa bound by ail the conditions set forth herein. 4FIA7 SPECIAL "INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN: THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are tc be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Ender no condition Is an asphalt surface to be cut unless otherwise specified in the special provisions, 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope ender all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation oI underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after- backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Sire 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area Minimum Thrust Area for Tees and 90' Bends for 45• Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 3.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24,0 sq. ft 34.0 sq. ft. 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. it. 1.6 sq. ft.. 2.5, sq. ft 3.5 sq. It. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. Minimum Volume of Concrete at 45' Vertical Bends Clown 0-05 cu. yds. 0.11 cu. yds. 0.20 cm yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cm yds, 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 14.0 sq. ft. 5.20 cu,yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS_ General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfil. If it is de- termined unsuitable the material will be removedfrom the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not Sited -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut then In such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and -.acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, In no event shall the bond be less than $100.00. Signed 12/30/70 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME .4L S ADDRESS /9'3 /d1�4000,2A Your request for permission to install a DATE %2--a9 line along or across County Highway No. at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the Installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The CO 474 eie line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of ',table granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shallbe encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached �c v�r•? I Atext efe,.4 4, i o ee zvetreI lisp So`eaCZ/47-eg L - �'4 aargaini A54,� 2h'r oral Jay 72uL /, `-7j The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within Gf! ( ) days from the above data No work shall he allowed on Saturdays or Sundays. No open trench permitted is tra led roadway after dark, unless otherwise specified in special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with'-directfons_giveh by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of w$y limits. D esr- Maintenance Man on this section of the highway, with headquarters at �/1 /¢2<7` )'C tt 1 . , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Suoe tins this permit the undersign•., representing the Perm foregoin- .r• stens; that be has authoritto sign for and bind is bound by all the conditions set forth . =rein. ea • e has read and understands all of the nd that by virtue 11. is --.:y. attire the Permittee SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES ,WITHIN THE RIGHT Of WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without math- ?. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. I?nder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being Inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90* Bends for 45° Bends at 46° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu- yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft 0.9 sq. ft. 0.37 cu. yds. S" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1-10 cu- yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cn. yds. 14" 12.0 sq. ft. 4.9 sq. ft. - 2.00 cu. yds. 16" 15.0 sq. ft 6.3 sq- ft 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 2.40 cu. yds, 20" 24.0 sq. ft 9.3 sq. ft. 4.00 ca yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts acroes the driving surface of the roadway may bepermitted at the discretion of Weld County, Colorado, and only after the following provisions are met I. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then In such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100-00. GREELL�OLORA00 s,/?Z.7 THE REQUEST FOR PERMISSION TO INSTALL LOCATION DESCRIBED AS FOLLOWS: 6" cast iron pipe for domestic water SIZE TYPE approximately 100 feet south of the Northeast corner of Section 7, Township 4 North, Range 67 West, crossing County Road #15. (District #2) IS GRANTED SUBJECT TO THE FOLLOWING CONDITIONS AND RESTRICTIONS AND AGREEMENTS: THAT YOU RESTORE THE DISTURBED PORTIONS OF ALL OF THE RIGHT-OF-WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, AND ALL DIRT AND DEBRIS TO SE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL BE BURIED IN ACCORDANCE WITH THE COUNTY EN- GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN BE REPLACED IMMEDIATELY; THAT ALL TUBESBE MARK- ED AHEAD OF TRENCHER; THAT TRENCHING BE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, MOTTO EXCEED THREE AND ONE-HALF (3i) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUMEFLLL RESPONSIBILITY FOR ANY DAMAGE IT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO BE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BOND SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FOLLOWINGTHE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY. SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION or THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY DAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALLBE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL BE REASONABLE; HOWEVER, IN NO EVENT SHALL THE BOND BE LESS THAN $5CC.00. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAV- ELING PUBLIC DURING THE INSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES, BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES ARE MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL SO REMOVE OR RELOCATE AT YOUR OWN EXPENSE UPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS OF ANY NATURE WHATSOEVER WHICH MAY ARISE BY REASON OF GRANTING PERMISSION TO LAY THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION OF SAID PIPELINE AND THE MAINTENANCE THEREOF. WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY. THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS. THIS UNDERSTANDING AND AGREEMENT WILL BE BINDIN MINISTRATORS, SUCCESSORS AND ASSIGNS. LICENSEES ON YOUR RESPECTIVE AGENTS, HEIRS.EXECUTORS, AD- / // r /� Gil,,- //5E BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Town Hall ADDRESS Johnstown, Colorado Greeley, Colorado January 29, 1964 The request for permission to install 3 inch plastic pipeline for domestic water to be installed in the Southeast corner of Section 32, Township 1 Range 67 to be installed at least 4 inches deep is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trencher; that trenching be as close to outer edge of shoul- der as possible, not to exceed three and one-half (3Z) feet; that pipe be placed un- der all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and maintain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with pro- per warning signs and signals, i.e., flares, both day and night; that you assume full responsibilty for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the remo- val or relocation of this installation you will so remove or relocate at your own ex- pense upon written request from Weld County. That you save Weld .County harmless from any and all claims of any nature whatso- ever which may arise by reason of granting permission to lay the above mentioned pipe- line including costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BDARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 1ta.4 ��- LICENSEES r Address /3/Lc'? . 2 V 4 la di Greeley, Colorado May 24, 1962 The request ,for permission to install sewage line acress County road between Evanston and Frederick, Colorado, approximately two (2) blocks East of the main North and South Road: begcbM)t4 qoa tcxbibe is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and road- way to its original condition. The backfilling to be.well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular. material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engi- neers specifications. That you maintain this line et all times and assume full re- sponsibility for any damages it may cause. That you agree tctpay for any repairs: that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is started. That the travelling public be protected during the installation with proper warning signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation: you will do so at your own expense upon written requestIrow Weld County. Weld County will not be responsible for any damage they may cause in the main- tenance of the highway to installations placed inside the highway right-of-way. BOARD Of COUNTY COMMISSIONERS WELD COUNTY, COLORADO By�`--� ;Crlr✓ ` f -mod( . e Jan nen 1 / /-�z V y e4stle,c -r �a-�-� e p 1i //,/ / Ads es•4J�?� Chairman n .T- Greeley, Colorado The request for permission to install location described as follows: ib t)_c_c_./6 e/7 -/-67Awl - T VPE is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, net tc exceed three and ene-half (3•f:) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BDARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO . /.-4A-4-11052- LICENSEES N Address eV/Lac/ 1/01 Greeley, Colorado May 24, 1962 The requeit'Eor permission to install sewage line acress County road between Evanston and Frederick, Colorado, approximately two (2) blocks East of the main North and South Road: beginoingoakcxte is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and road- way to its original condition. The backfilling to be.well tamped and packed and the last 12 inches of backfill on crossings to be of stable granulor•mcterial, such as crushed rock or gravel. All dirt and debris to be removed from highway right -Of -way when work is completed. That this line shall be buried in accordance with the Engi- neers specifications. That ycu maintain this line at all times and assume full re- sponsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is started. That the travelling public be protected during the installation with proper warning for all made in of this County. tenance signs and signals, both day and night. That you assume 'full responsibility damages resulting from this installation. That in the event any changes are this highway in the future that would necessitate the removal or relocation installation; you Weld County will of the highway to will do so at your own expense upon written •request'from Weld not be responsible for any damage they may cause in the main - installations placed inside the highway right-of-way. BOARD OF COUNTY COMMISSIONERS WELD CCUNfY, COLORADO s�� Chairman lineal l'a'-"-a 7 ,C' G1sa-..ihc.�<tc.L� Ad ess Greeley, Colorado The request for permission to install location described as follows: /old ant, size TYPE z = .c„c-. /6 ce/ 7 -i�7 - Rc_�-z-{ `41-7( --ra'P pc is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to. exceed three and one-half (3) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES N Address 4���i r y Greeley, Colorado The request for permission to install location described asfollows; 41.24, tit44%% is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,. not tc exceed three and one-half (3.) feet; that pipe be placed under all tubes and bridges; that all lines under existintl black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the liiensee agrees_ta i.nstall.prnper markers for buried- Lines per -County speci- fications. This understanding and agreement will be binding upon your respective amts, heirs, executors, administrators, successors and assiIns. THE BOARD OF COUNTY COMMISSIONERS ;JELD COUNTY. COLORADO Asee .ratahiste LICENSEES JtcLi _ E 35-00 3 szX gefec. Add ress /{ ?.et— T • kinAOlta i sk ri/#- 3o L NINE, may.CS WIND OMNI 1 I ___4 1 t loss d0(24*.s. J:�.— G.G 9 76590,:e.e`z a �� 9N 'p tC (P n 3 ilF.-o 3 turn 3t 3.0 O 1 9'0 3 1 �cl a3n�T �oU3 rti Zn N mT ° a� 3n OnIt- �0 stn 3 -An 3�O n,t3 �3� 3o %Q D� Frt -rho_ 09� -Srt74DE rtpt - 0 - Z 4a �►-s, �o 1tT3Co O 3 3'�'-� n 2n �TD0l � IL,�3 V ►z -6`n'c3 �a3 7 F3 9 (h -r ajiflj33 13 �3 °�n3u nnfl "f'3 nm �Ta 3: 39 fr13 A<^ 3Td n3 n+ 1.fl° oso IT- 3T -11�' 3f DOE J� 43 �`A c0A TO a N D' "I en no �fl�-r °3n mn nn7 nD a o�T° n°� -� � cicn9 �Qr 3 -►�° 7C0 . 111-3, 3� ? 1 A 4 9-�3n I• AI, 3. Tn ` 7.0 n� �p003 t 3�° °� N*� oLa 3E aAp0 T�. T a 7-' nn+ 4 � 3 11 0 9 u_ ,4." r;� n` -t x "nom N • co J HiL • t it n �0 D k 11; ti .vvciecy Skien G.4nc. fl � 4;3 IiT.f43fl 11 Citrio n. lid..a a 3 a+ not, 0" £ A"a -- (p 6'0 � 0 ro 0n -41A fs'-r9. q. "fa --p ti-gi �0-1r fl_ R all Ion- s•3D1f 3n r DN. 3DT-.,sn cD.+4aro?105 -* c13 o(1 -t- {1 3 3 Cr-nt ILO D— fl_-t≤Da nn.4 p3-L,t�►dT�N9 f,A�39"3 (I fl sari Li .+1 0NQ31,1 noa- n n n "ir;cif.* 41 o is inewey O M: K rip ift CD -re 4.100 W N M O 0) TO -K o x amit TT 0 4 o-0- air la fl —o a 1 - n 300 7- of fl to T_ 0 n� "Cr -, (1u. . aCr O9 3 Cn 0 �-F �~ f i (p o- ft n -t.a t, El 0-0 l Cl F� r. n 3 A 9 11 t 0 N A D o . -41 (D '3 J o m 4) 3" r. N t!� X4,. 1 4)1 01 DOT -it ms)(- N�-• 9 1111 9 `4 fS'�n 3n El �9°L nL 3�< 4To fl 1_. :Lc(1-0Sri 3 n3 -a3 _ -t-9tp • _ LL (1n �3 tA0 6`_ F 6c:, oo c Jco fir 101rt7) Wi- ts 36 3 �1) D3 C 10 a0 -to 33 3'D -c D z 63_ 4d 3 Ti T� Or Cis° -4 D 3- t c -''s -h 9NF"Oo Dr:T0z n ft Ut ' STD -I 0 T�Cr flnn0 -0 03 30A4 TT) LI)fl-• Tr 0 of 3• 03 • 4' �ea� 1r n 3 O D 37 o T' n o 9a) • a (1 r AO 3C C) dG # /2 -/3 0 a , 4lo/Gii Line Sr`at 416,440 0lkk a • o 4 7' /7.' r'1 ♦. [1\-. [!\ Zi ;11 I pl r‘4''t y I. t r see r� Cye-) asts Iaa is ti ew .r L4 EN, tet ijt Sk 4k -I 1).,‘44-1H4 , % > k-i kil ) : tet) ? l \-. Nil 4 ni % i 'rJ e $Ci1II 'a fie: t I / k; t tL.. y ti t .04 ,4b -o %i t/c,4 Clore Gas, 1511 =49O4 ! 1 :•* Alaahe 1 74627 53.4;5 55. 52* -t 1 ,a Ut' Cire Sty l /r.3o ,cic -.r Circe ✓Ya, . >> n m m m m m �An%t7% # /2 . azi7fip/c 4t%rf4/231 9A104 - air,4it -/i-) Aerni 447/ 4Va6t4z4_ — - _Nonaf%- _ _ A ttt.):0't n.1 ij t bki. a u\O0 gi '. ois lot 4 � it tSP\ c g'V* a. :iamo uwusuu chk Fain; � �c1 00 b Y —r /7,sU :8- i oriii '' Froad' /S#- ne/) Z"..if<rreer 47 dir gee 4147741/2 dine Site i9-oia simasismaansivensisainense .std /cA L,re 9Ac i5 oo_ A fsp ctlk do -s 7,■ `l as ibktV tA.11 C t i I' :j • f • ,rrvrnfiok T;F:::;77 7. \ I I R SAa- .9t7 74- 520 G`� ' \ f$9O _ V I • S G,,i7e- + _ 5da. i74Qo r- ' \.' 4 a/Gf, at /ft \ • \ 7.4av 9,!.4459 Airy, ./e clq v,Vr 0's Y 4 4.14C, AOrZe 4°- S N Ater Ich Gilt s2, ! "Ott` so IT. A o . N qik 4401:774 5�a Aso. F. tern, tear ,Colcirado. Bear Sin nerewdtb executed copy of peatit for a water pipe Ilse. It will be airigbt to take sore than tea days, just so it is aaapieted in a reaaoaeble time. Tours very truly, tt ci° L _ N FARMING WEEDING MILLING ^,eld Co. Greeley, FEEDS SEEDS INSECTICIDES GEORGE F. KERN AND COMPANY OFFICE PHONE 150 Res. PHONE 236J WINDSOR, COLORADO Gommissi,ners, Cola. Gentlemen: T am ret pipe line of the C. half mile May 9, 1952 ning to you signed permit for a domestic water to be laid on the east side of the highway south &. S. Sy. ftr about one-half mile and about one - east of the town of Windsor. In reading this permit I notice you said this work must ue uone within 10 days. I would like to see it completed in this time but I do not know just how much time it will take to complete the job. It would please me if you would change 10 days fro 15 days and I will try very hard to complete the cork within that time. cl^K :” Yrs trey Geo. F. Kern c PERMIT Geo. F. Kern, Windsor, Colorado. Greeley, Colorado, May 8, 1952. Your request for permission to install a. 2k" water line, 5 feet depp close to the fence in the borrow pit on the east side of highway between Sections 21 & 22, Township 6 North, Range 67 West, commencing at a point just north of the C. & S. By. tracks, running south approximately 4 mile is granted under the following conditions and agreements: That this pipe line will be laid as near the fence line as possible and -five -feet in depth.- The -luntri 1sng_to..be_wa].l tamped.and packed._ani that all dirt and debris be removed from the highway right-of-way when this work is completed. That you maintain this line at all times and assume full responsibility for any damage it may cause. That you agree to pay for any repairs that must be made to this portion of road because of installation. That all labor and material be furnished by you with no expense to Weld County and this work be completed within 10 days after starting. No work to be allowed on Sundays. That the travelling public be protected during this installation with the proper warning signs and signals, both day and night. That you assume full responsibility for all dunages resulting from this installation. That inthe he event any changes are made tot his highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from the State Highway or Weld County. Weld County will not be responlible for any damage they may cause inthe maintenance of the highway to any installations placed inside the right- of-way limits. Board of County Commissioners, Weld County, Colorado. iiNtAt In accepting this permit, Geo. F. Kern', ees that he has read and understands all the foregoing provisions and that' by signing he agrees to all conditions set forth herein and this permit shall be binding heirs and assigns. Date G 747-1Y- 1 -1 r.., -- ,-. i ., 1 WELD COUNTY, COLORADO-- `.; UNDERGROUND AND UTILITY PERMIT DATE PERMITTEE'S NAME L e F J IMAM 4,4 /a-t_� storey Cc, ADDRESS 801{ /4'6 //tva Z 6/0- /]rel J`S•f yuJfSTCeu,,2YXwy 7 / IUD Your request for permission to Install a "Sett/ice— line along or across County Highway No. %.! It-- Ai2T /0 RAtic�1 E,13s i•stieo, v, `s,o•✓ is granted, provided that the Permit2'will own and maintain the same after installation. /r I9 77 IT IS UNDERSTOOD that the ',ermines will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The nett Set✓t line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and a disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or Sack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work mast be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Cbtf 841- 4 fck N"2/ -A 5•17e- Oc &'2 S 019 y Job The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connecU ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within " ) days from the above data No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shat off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signal both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance wi directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County righ y 1 tta. �t� /f Maintenance Man on this section of the highway, with headquarters at ./ �7 //tor or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Sy: Maintenance Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 7-1 or Jo 4/,, Aot eat 575-1 cat e' G A 7& (1e'r �/O2� SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -lacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado. before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backlilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO It. O. W.'S Pipe Size 2" 3^ 4" 6" 8" 10" 12^ 14" 16" 18" 20^ 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq- ft. 1.0 sq. ft 2-2 sq. ft 3.3sq- ft - 5.9 sq. ft. 8.5 sq. ft -. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft 34.0 sq. ft. Minimum Thrust Area for 450 Bends 0.2 sq. ft 0.3 sq. ft 0.4 sq. ft 0.9 sq. tt. 1.6 sq. ft. 2.5 sq. ft. 33 sq. ft 4.3 sq. ft. 6.3 sq. M. 7S sq. ft 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0-05 cu. yds. 0.11 en. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu- yds. 1.50 en. yds. 00 cu. yds. 2.70 en- yds. 3.40 cu- yds. 4.00 en. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. - 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit]. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5- If the Permittee has not repaired - said open cut or cats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name cf the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the bard surfaced roadway. Said' bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONS Ofina ge by FJ.4rsl4 WELD COUNTY ENGINEERING DEP!. INSPECTION REPORT DATER- 25 — 70 PROJECT: Jzr% %n?V lkFY2 S�i�f xy ( o LOCATION:S/p c2 -47m., PERMIT # f2Cr REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH le4 - 4;4 Tap 1037 -GrieD WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE June 17 19 74 PERMrrrEE'sNAME Little Thomason Valley :rater District ADDRESS 307 Welch Ave - Berthoud, Colorado 80513 Your request for permission to install a 3411 wa tP t' line along or across County Highway No. 46 at 300' west of intersection with Co. road 7o. 3 is granted, provided that the Permittee will own and maintain the same after Installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill stall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway. it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Sack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a Dive of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Perniittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within (_,r-eser 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld Comity, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County way its. /l ,/ Maintenance Man on this section of the highway, with headquarters at 4 /5_ c� , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO By: Mann a Suoevbar In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. en /' ...i2//77 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. .".. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 3. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway - 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced In like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will he borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. AR damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2^ 0.3 sq. ft. 3" 0.6 sq. ft. 4^ 1.0 sq. ft. 6^ 2.2 sq. ft. 8" 3.8 sq. ft. 10" 5.9 sq. It. 12" 8.5 sq. ft. 14" 12.0 sq. ft. 16^ 15.0 sq. ft. 18" 19.0 sq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1-6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0-05 cu. yds. 0.11 cu. yds. 0.20 cn. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six Inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 2. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Fermittee assumes responsibility for the maintenance of all open cats for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5- If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100-00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DGN O. ANDERDON LOUIS V. atmN al -ST N. aa/IERt NORMAN mast. D.v.M. DAVID Mean LOVIIA N. IAOAN Board of County Commissioners Weld County, Colorado Weld County Courthouse Greeley, Colorado 80631 Gentlemen: TELEINONE 3l2-2096 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 60613 June 17,1974 RE: Permit-Griep Tap 1637 We request a permit to excavate our existing water line on the South side of Weld County road No. 46 approximately 300 feet West of the Inter- section with County road 3 and to bore under the road to install a water service for Edmond Griep located in Section 7, Township 4, Range 68 West. Enclosed is the $5.00 permit fee together with the executed permit forms. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/bh cc; enc. WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONS A0-s.f . ua p• e -/Ja c2 — WELD COUNTY ENGINEERING DEP!. INSPECTION REPORT DATE c1 -2A PROJECT: /! !l/r /hou-it sore LOCATION: `-4:„; john 3 PERMIT # /d/C� &ex//Ey it,/fgrae V/5 7/cT REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH 4dJ1/ z2 „o-_r_a_ it -,o -ly- WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE PERMITTEE'S NAME r? ct V r c. J`1 P” f c n e COL - f'% Ha r r' na e II l ADDRESS (--,./A L. 11114•sf- G-cticj)r c..• \` / Your request for permission to install a /1>ahtfc —144i r 1iticoline along or across County Highway No. at �; r r r % a i/c_ f• o20+ • St. is granted, prdvided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will on and maintain the same after installation. The tr vtcr 'ins -shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit j� ( —O� p6�--10 This work shall be completed within ( 4.1D ) days from theo.above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request front Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ,&'s ribait L c,//c ,Jg y - I7RHI or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Maintenance Man on this section of the highway, with headquarters at THE BOARD OF COUNTY COMMISSIONERS WELD C UN , COLORADO JA%- 244 0-ertety—o-2 Li In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 73y SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4- Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARP: NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only whin they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14 No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, CCLORADO R. O. W.'S Pipe Size 2^ 3" 4" 6" S^ 10" 12^ 14" 16" 18" 20" 24" Minimum Thrust Area for Teas and 90° Bends 0.3 sq. ft. 0.6 sq. ft - 1.0 aq- ft 2.2 sq- ft - 3.8 sq. ft. 5.9 sq. ft. 8.5 sq- ft. 12.0 sq. ft. 15-0 sq. ft. 19.0 sq. ft 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1-6 sq. ft. 2.5 sq. ft. 3.6 sq. ft 4-8 sq. ft. 6.3 sq. ft. 7.9 sq. ft 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bonds Down 0-05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all eases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100-00. Kirby tan 1690 -4 44-3 WELD COUNTY, COLORADO UNDERGROUND AND •UTILITY PERMIT PERMITTEE'S NAME DATE Little Thompson Valley Water Distr'Ct- March 28 19 7d_ ADDRESS 307 1e1,n Avenue - Berthoud, Colorado 80513 Your request for permission to install a 7 /571 W141 -P" line along or across County Highway No. ARA , at lot 2j lock 2, North John 9 town is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The water line shall be Instance beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or graveL Where the installation crosses the roadway, It shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut sh all he allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - - - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the Installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the ezp enso of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado, will not be responsible for any damage that may result In the maintenance of the highway or to the installation placed inside County right of way limits. N„rs't Maintenance Man on this section of the highway, with headquarters at t '"A 7 - N50 S or his successor, will represent Weld County, ,�„ 6 � � �,� „ � Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS Ry: Ms- egnanoe In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; thatbe has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. ! 3 3 3 7 7cr 5.00 SPECIAL INSTRUCTIONS REQUIREMENTS FOR:INSTALLATION OF UTILITIES -,WITHIN- THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface' EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado. prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado. before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" Minimum Thrust Area for Tees and 90• Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.3 sq. ft - 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15-0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 450 Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1-6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 eq- ft 7.9 sq. ft. 9.3sq. ft 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds_ 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a ravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din, turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. /10 wow LuLNI r t usNtERING uLr i . INSPECTION REPORT DATE C>- l� -71/ PROJECT: LOCATION: ,g PERMIT # 9a25,1 7 1_zee- , GC?—g—tz REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH 6-7 County engineer Inspector crl r7+ --a1 `_i 3-27-7V WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT' ��/ DATE /5 Mt/RC /f is__4 PERMITTEE'S NAME LeeT AAA) 19 LA r✓e ADDRESS Pio /" / 4%4 Al, tot) / eo 60 g'b d V Your request for permission to install a 7 Is?O-. a&c_ line along o. cross County Highway No. 7 , at u)� SFC)('0 /S^ 77/14 RAF 10-10 coue4 Fog Qb4 i I„ 112crAf}c is gr me provided that the Permittee will own and maintain the same after ins talon. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The C' )ell 412 line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, /and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and plcted, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, It shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation creases any ditch, canal or water carrying strictures. wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as a/re� app if�c(ab le- SPECIAL PROVISIONS: Attached 43a-e-LC�^�'^' ecui,IA/- G The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions even by Weld County, Colorado or by their agent In the event any changes are made tothis roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at UZl: e CIT,ts n 547— a/KO8 or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he nay make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: t G IL& THE BOARD OF COUNTY COMMISSIONERS WELD U COLADO In accepting this permit the undersigned, representing the Permittee, verifies that • e has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of hissignature the Permittee is bound by all the conditions set forth herein.. 6)74:29 0A-)6( eig97, ?row 9a,0 r. SPECIAL INSTRUCTIONS REQUIREMENTS 'FOR INSTALLATION. OF UTILITIES WITHIN- THE :-RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- s. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road Intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites oI drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backffllfng is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 450 Bends at 459 Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft 0.11 cu. yds. 4" 1.0 sq. ft 0.4 sq. ft 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 eq. ft 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. MO cu. yds. If" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - - 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 aq. ft. 2.70 cn. yds. 1S" 19.0 sq. ft. 7.9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft - 4.00 en. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is•sultable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1). year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the execution. Of said repairs. 5. if the Permittee has not repaired said - open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such ease a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be.3ess than $100.00, -- - WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7-g-- %1. PROJECT: :tzcr /6-2-7 40' LOCATION: 7,7.,66 PERMIT # '4'? REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH County tngineer Inspector Fnrm el 6/1/74 t ©`43-4- rrt,eoU 3_3_7_79. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE /O Arn'rev 19�I PERMITTEE'S NAME lie ADDRESS 747. r"&e%LL' 6;). Your request for permission to haste a ?'�_a�- line along or across County Highway No. "5— at is granted. provided •' the Permittee will own maintain t • same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 'V �"'~� line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the di§tntbed portion oI the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to(such �,staat/tutes as s_,arse applicable.-,,�,r.� (/%���i.yf{ q.f,'��F///� SPECIAL PROVISIONS: Attached retrcte epe - e —�Nc �"'- e -"- D 6 - The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation. maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark. unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Ed f7o r S! Maintenance Man on this section of the highway, with headquarters at Ch L n rt ° w S7' ../' OS or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: rvhor In accepting this permit the undersigned, representing the Perm ttee, verifies that be has read and understands all of the foregoing provisions; that he has authority to situ for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD O COUNTY COMMISSIONERS N ,COLORADO 1 77 WELD CQ 4/0,00 nizes77 Knorr/ 9021 f SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 pet pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. AU damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pita are to be restored to original condi- tion immediately after beckfllling is completed. 14. No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Sends for 45° Benda at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 ca. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 en. gds. 8" 3.8 sq. ft, 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. It. 1.10 en. yds. 22" 8.5 aq- ft. 3.5 sq. ft 1.50 cn. yds. 14" 12.0 sq. ft. 4.8 eq. ft. 2.00 co. yds. 16" 15.0 eq. ft. 6.3 se. ft 2.70 cu, yds. 15" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu, yds. 20" 24.0 se. ft 9.3 sq. ft. 4,00 cu. yds.. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE To APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: Ceneral: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre. vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Pennittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6, No open cuts within paved roadway will be allowed without scoring pavement parallelto the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY ENGINEERING DEPT. • INSPECTION REPORT ' DATE - PROJECT: • a'7 & LOCATION: 5.0,/ l/ PERMIT # `/a/ REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH County engineer Inspector O 6/1/74 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE March 1 19 74 PERMITTEE'S NAME Longs Peak Water Association, Inc. ADDRESS 1515 Longs Peak Ave., Longmont, Colorado 80501 Your request for permission to install a 12" Casing A line SfeelgOI (across County Highway No. 1 , at 35' North of W 1/4 corner, Section 7, T3N, R68W, 6th P.M. and 12" Casing B across Mead Road Is granted, provided that the Permittee will own and maintain the same after installation. 35' East of West L ne, Vic_ 7. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 12" Steel Casings line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in sir -inch lifts and mechanically tamped and packed, and the last twelve inches oI back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut eh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath is a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Permission requested for open cut 1/2 traffic surface at a time because of rock in pipe zone aic-e -led 47 Ed /4,--S't The Permittee Ebel' maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. 4 ^= 'u This work shall be completed within thirty ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted, in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be Installed by and at the expense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ilo • ST , Maintenance Man on this section of the highway, with headquarters at +%e % e S7e..e n 5 R 7- H SA $ or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS W OU TY, COI.QR,DO _ By: lavic In accepting this permit the undersigned, representing the Permittee, verifies that be has read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 2A.fo1 1y,yC) s70 Angus lee, P.E. ft?qp SPECIAL INSTRUCTIONS REQUIREMENTS FOR -INSTALLATION OF UTILITIES WITHIN. THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado. prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately atter backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90^ Bends 2^ 0.3 sq. ft. 3^ 0.6 sq. ft. 4^ 1.0 sq. ft. 6" 2.2 sq. ft. 8" 3.8 sq. ft. 10^ 5.9 sq. ft 12" 8.5 sq. ft. 14" 12.0 sq. ft. 16" 15.0 eq. ft. 18" 19.0 sq. ft. 20" 24.0 sq. ft.. 24" 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45• Bends at 45° Vertical Bends Down 0.2 sq. ft. - 0.05 cu. yds, 0.3 sq. ft. 0.11 cu. yds. 0.4 sq. ft. - 0.20 cu. yds. 0.9 sq. ft. 0.37 cu- yds. 1.6 sq. ft - 0.66 cu. yds. 2.5 sq. ft. 1.10 cu. yds. 3.5 sq. ft. 1.50 cu. yds. 4.8 sq. ft. 2.00 cu. yds. 6.3 sq. ft 2.70 cu. yds. 7.9 sq. ft. .3.40 cu. yds. 9.3 sq. ft. :4.00 cu. yds,. 14.0 eq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions ate met I. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material Is suitable for backfill. If it is de. termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after totifitatfon.forthe. execution. of said-repairs. 5. If the Permittee has not repaired-tgid open -cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. -. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/ormaintenance without further dis- turbing the roadway. - S. No puddling will be allowed. '��=�` �, `�� • " 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and - acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. n /,‘)i�/,J L '�I A „it- I t / i•6 L..L. L G /i 7 0 Utility 8 Transport Field Report Applicant's Name 'and' c P , 'y✓a.7e r AS Sh. 1_,A7 C Type of Permit Rd C-, cs ., 1 _ Ll ,7„ 1 n t Permit No. R 9O Date Issued R- is- 7'/ Expiration Date -9 /1- 7 `i :Location and Damage Report:'. Date Time (If no apparent damage at this time, so state) Inspection Date /j,i 74 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: %.ad“ hoed Agent ..4t .Q&) a -4-7J' WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE PERMITTEE'S NAME Zr F T RAN d WA I -tale_ 5 U 41/01 y ADDRESS pin ,3n/ Rao Alta f, Pv CO Your request for permission to install a line along or across County Highway No 5-c is granted, provided that the Permittee will own and main f--1-50 $o s -d -ht the same after installation. 7 19 7 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. r �11�,J 7b The' "��" -t line shall be installed beneath the surface of the right of way at a minimum depth of )ti inches,7and a disturbed portion of the right of way shall be restored to its original condition. The back filling on the s oulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling sh all be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible It shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable- ByC SPECIAL PROVISIONS: Attached �y , - �"" "-" -- The Pernilttee shall maintain the installation at all times and agree to hold Weld County, Colorado. the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. t qz This work shall be completed within 3p ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified In special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this Installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be Installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed bef way inside County r ht FT"M"'ipltte. t! Maintenance Man on this section of the highway, with headquarters at �� — L ✓ " D or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent Of this permit mast be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO l}iL(.i,(i111 / %z • Ii seep . : this p the • . - lgned, representing the Permittee, verifies that he has read and understands all of the foregoing p • • that he has ar. ority to sign for and bind thettee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, S(0 3 /588 a SPECIAL INSTRUCTIONS REQUIREMENTS :FOR, INSTALLATION OF UTILITIES WITHIN - THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are Issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion Immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R O. W.'5 Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Rends foe 45° Bends at 45° Vertical Sends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 eq. ft- 0.11 ca yds. 4" 1.0 sq. ft 0.4 sq. ft.0.20 on yds_ 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 en. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 en. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cn. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 en. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 on. yds. 20" 24.0 sq. ft. 9.3 sq- ft. 4.00 on. yds, 24" 34.0 sq. ft. 14.0 Eq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely Lambed to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 9100.00. e c; 'q.Trit C N3 rn TIO'. .\t'"i- iZ:T;c)N Nn n 9 WATH. ._t?( . CC-MF\\Y Customer uii• n Crti:.; co 4, l',")/Iljt,a /. / y < "dx 2 f,./F2 .e lea/2cal Fsty. Office Use e Meier 'o. R tory DotePG-f (1—/17i I ep on3 r7e;is—J G's-' L.i:! "3 t n c k ^.brave destr._.... x m:,17).. Cr, :-`. ... �, •-f'c ... rat 1)C' tte 4+1:.. n' while12-LW(' DD,- LNesf yreaice '.icr)t-tied 1/ Sign ture nt Owner or A'athArizn_d \gent et. 4N4_' S. 4$ 44• 42 x 20 n 14 . - i51101 Rar« .ramp y 1 1 �ijddpppp��������61ggyy 11...y•t1 -011111101011 v IMIURRIN ..- ;fit �j initilISIN vipatifeateside- afals aa7 1x' •antes,.• �f L'I _ to: -�:. R- Q. A.. _ 11.C. " 54 .- ' -• _ � `� _ ` y � . i rev EEj2 ;1- Ai �� i-..milli e et r a�,triiii en prillin �l+lr� MU! do rtgarAP ••�• alga I • `i C��vRjj..•(ip�Sicli �I � Mira,P�IA.� t j in efin i !!a .'mo vinuarmaaIrtir t ti •tsminstmatanni �a ai �L lil��b w nt ItIL . +tI1 //I -l- j��.��IIIRRRjjxxxx 1 r_ IN t • r Y,�•,q`� ti� '"' ' i 1 o _ , _ - ix ��yy I 46 ''� r'.( ar a _ p �J" ra •;%'ti ..y. r. 1 4 - i Aga } ii • TIM •' • „ . • r 11 `1 1. y e1'�' iL a I 0 5 — is S 41 u R 0 • Y 6 :3 6 1 ] 5 1 1 11 13 to 16 11 2 66 '21 _... RI• ♦�_. C b is 27 11 it ]a a 37 6JM O V M T • H 4/ 43 43 47 41 $1 Date Issued Utility 8 Transport Field Report Applicant's Name `d Type of Permit t �t C/ il/� WI' Permit No. 7/ Expiration Date _ :Location and Damage Report:' Date _ (If no apparent damage at this time, so state) Inspection Date _ Time ac1:2 C- ��2 �✓zB d� 7cP c'1 d cam/ STA .... . - ss. COUNTY OF WELD Filed with the Cierk of the oocrdl of County Commissional* APRS 1974 A., aE6e WER WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS I Authorized Agent -xtti�lo Tap 1661-Dechant V a PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND, UTILITY PERMIT January 11 DATE Little Thompson Valley Water District 307 9e lc h Ave Berthoud, Colorado 80513 Your request for permission to install a 3/4" yrai$Z' line along or across County Highway No 47001 south of intersection with State Highwqy j56 is granted, provided that the Permittee will own and maintain the same atter installation. 5 19 '74 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to Its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically Doeaihle- This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut sh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. • SPECIAL PROVISIONS; Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or me sence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. a-7/ This work shall be completed within ( -60 - ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted In traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado- Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County t o way limits. f Maintenance Man on this section of the highway, with headquarters at n ! `f sa r or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed cr this permit may be terminated forthwith. By; Ma \ '' In ac this permit the nrycosigned, representing the Permittee, v es that be has read and understands all of the foregoing pro omit that he has au ority to sign for and bind the Permettee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE 90 - RD OF COUNTY COMMISSIONERS WELD BOUNTY, •LORADO • ei-7t 37? '47j$oc" R54 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES, WITHIN. THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1, No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway, 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralielin, highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. It. 0.37 cu, yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. LL 2.5 sq. ft. 1.10 en. yds. 12" 8.5 sq. ft 3.5 sq. ft 150 en. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds_ 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 act, ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut Is in need of repairs, Permittee is allowed seven (7) days after notification., for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway 'will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bondshall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway, Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIR[CTORSI DEAM O. AMDCRSON LOUIS F. MIN ALBERT M. JRIIrRs NORMAN Open, P.V.M. DAVID Maiti MAMACtRl LOVIIA M. PAGAN Mr. Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 TELEPHONE 532.2096 307 WELCH AVENUE DRAWER G BERTHOUD. COLORADO 6OSf3 January 11,1974 RE;Permit tap 1661-Dechant Dear Mr. Ewing: We request a permit to excavate our existing water line on the East side of Weld County road No. 5 approximately 4,700 feet South of the intersection wish State Highway 56 to install a water service for Ray Dechant located in Section 21, Township 4 N, Range 68 West. Enclosed is the $5.00 fee together with the executed permit form. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT - 77r Lovilo H. Pagan, Manager LHP/bh cc; Enc.; 2 411 34 20. 24 14 . c_ _n .Iatt sit �• i{.. y { �r L 3•I.3•L•1•� :. ia a*1$ l Y`lDralirims Rr $� ••'• M� v .. � .. b Anil c :.7, . �aX i4 Ealiim.A� •"0Ginst �fa �.oaav:.77i y.... Vtluat rats oia .� ' Eq.-A• 1 SDIt fir. o �.L,T! ice` ig � 1.' ill I. . lb, •1�Fr a.•Te.l lr...tilaltM ae4i, �La • ,.,a 1110" 'Lynx. sair9s441orltae.--,S.e..otikEtoray it.r, II _Ccislli:Clllf al, rl'�.,yre•/�-�%�Ril1.z_t�a ialtalleirteWarall , --- . ..„--#. `� ex , dig , �� tea[" r lat/Mn.• f in. IG� • pyi uass g v WirenilittiMNIMBI*Mit -1 ill !• C linIILFirAillMill if3IC 11...111$1401,62���jj�j�� J . _.& IIIII ��R1�iaCi `.` : , rill Hi yy }` t -. e" -! - kk i Ti .. r2 ..r ; • .:� r: t_ :_ :: S .: -V o 4 . i , - • r axr V� � 3 S A D 11 M $ 11 17 13 21 •641.. �. 2.2 clearn — ^, C rot 25 27 b 31 33 21 37 66]v O O N T 2 3, ai a 47 Applicant's Name Type of Permit Permit No. Date Issued Utility 8 Transport Field Report ger /-//-7 Expiration Date 3-/(-7,/ rly)g,t- DC -e -e -t7 ArE InCpIORAOP - COUNTY 02 WELD i Filed .. f,.. - C:erk of the Board of County Cpmmis.ione-s MAY 61974 COUNTY TX AND RCCO*D== k Deputy .Location and Damage Report: Date Time (If no apparent damage at this time, so state) i �� ./e'er z2e-- 9/9 Jpe7- Inspection Date _ 026 -7, sD 7 sG-7-1 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS orixed Agent a.7X Davis tap 1639 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME DATE Decenber 11 19 73 Little Thompson Valley ':Nate^ District ADDRESS 307 'Teich Avenue - Berthoud,. Colo 80513 Your request for permission to install a 3/4" water line along or across County Highway No. mile south of intersection with Co. road No. 36 is granted, provided that the Permittee will own and maintain the same after installation. 7 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made hi six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased In pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a Pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agendas thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. -,'- This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted In traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp case of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. s$ 7- (f.szl3 Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By' Supervisor In this peril t the Nidersigned, representing the Perm ttee, verifies tha he has read and ancient -ands all of the foregoing pro that he has authority to sign for and bind the Permittee; and that by virtue Of his signature the Perndttee Is bound by all the conditions set forth herein. THE BO - RD OF COUNTY COMMISSIONERS WELD u�J� , COLORADO rfil Tl 7 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of tight of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement oI line will be required from the of slope to the of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bands at 45• Vertical Bends Down 2^ 0.3 sq. ft 0.2 sq. ft- 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cn. yds. 6" 2.2 sq. ft. 0.9 sq- it. 0.37 cu, yds. 8" 3.8 sq. ft 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.6 sq. ft 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft 4.8 sq. ft. - 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. - 2.70 cu. yds. 1S" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds_ 20^ 24.0 sq. ft. 9.3 sq. ft 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are, met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required to the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completionand acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. 'Vr stir a. WC �r�*••••• .�.. �-%rU- kitaffettilitatitiliata ate e;��`'al mmr 45.Pitirtiltwriiiiirgialpagrar, ..eme tAIRCUEZOOMMiiiU0640 IL SIMINIEWPARirailltSralt 111'1 . � i . f°A ''`'° r ltii IMMIESCRONNIII couggranstroinuarzirmaranuni ii i _ ,' ttitt 0e loll VtislWWMMtwins EtrantiteritIMIRMINNIIIIIIININ ri -__ _ lai E- I iaff. r I Utilt 8 T_Lestp=Fiel• e Applicant's Name G���i Carew, Z Type of Permit Permit No. v77 :Location and Damage Reports' . Date Time - (If no apparent damage at this time, so state) Inspection Date WELD COUNTY, COLORADO - BOARD OF COUNTY COW4ISSIONaS BY: e` Q(9 -d© /� recte7K Au rized Agent 2 97.2-i9-73 0'?fieagher tap 1640 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE December 11 19 73 PERMITTEE'S NAME Little Thompson Valley :'.ester District ADDRESS 307 "Teich Ave- Berthoud, Colo 80513 Your request for permission to install a 3/4" water line along or across County Highway No. 15 2000t south of intersection with Co. road ',o. 50 is granted, provided that the Permittee will own and maintain the same after Installation. at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" 'cater line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made hi six -Inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel Where the Installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Sack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no cage shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable.. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to bold Weld County. Colorado. the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit, This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this Installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given b7 Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. gift -vet — Maintenance Man on this section of the highway, with headquarters at Cr7- - V ST, 8 or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD J , COLORADO f kc Is. this permit the and ; :u : ed, representing the Penalties, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 0_„4,V7ape tW2 F SPECIAL:: INSTRUCTIONS REQUIREMENTS FOR-INSTALL.TION OF UTILITIES: -WITHIN: THEE -RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way arc to be returned to original condition at a time designated by Weld County, Colorado, 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. a. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. liud-jacking wilt be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size - Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 pal pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced- All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends fa water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3^ 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 900 Bends 0.3 sq. ft. 0.6 sq. ft. 1,0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft 15-0 sq- ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 450 Benda 0.2 so. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 8Q. ft. 3.5 se ft. 4.8 sq. ft. 6-3 sG. ft. 7.9 8q.- ft. 9.3 sq. ft. 14.0 se, ft. Minimum Volume of Concrete at 450 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 2,40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on creekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no morethan six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6, No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said: bond shall assure recovery by the County of any expense incurred, within a period of one yearfollowing the completionand acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100-00. DIRECTORS' DUN a. ANDERSON LOUIS S. PtIN ALBERT N- JEPPERS NORMAN areas, D.Y.M. DAVID Mc5[t MANAGER, LOVILO M. PAGAN LITTLE THOMPSON VALhFFY WATER DISTRICT � A � r, C' U December 11;,1973 Mr. Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado, 80631 Dear Mr. Ewing: TELEPHONE 532.2096 307 WELCH AVENUE DRAWER C BERTHOUD. COLORADO 60513 RE;Permit Tap 1639 -Davis Permit tap 1640-0'Meagher We request a permit to bore under Weld County road No. 7 one- half mile North of Mead, or one-half mile South of intersection with County road No. 36 to install a water service for LeRoy Davis located in Section 9, Township 3 N, Range 68 West. Also a permit to excavate our existing line on Weld County road No. 15 approximately 2,000 feet South of intersection with County road Mo. 50 to install a water service for Michael 0'Meagher located in Section 5, Township 4 N, Range 67 W. Enclosed is our check for $10.00 for the fees together with the executed permit forms. Very truly yours, LITTLE TH0MPS0N VALLEY WATER DISTRICT Lovilo B. Fagan, Manager LHF/bh cc; enc.3 x. 4$ 46 M• Q war: a cemastrae. -.Ie.—a, ae-`ark r• a '.r'y9.•:.JM•i6d— •o..1 SS.:mine., ititteraiWili llitiONOtarguranufras t„....-r,...,,,,ii, .... :.. 1�► ., ..... GR$3% .'`_I[ mad ..„„..,5,,..,.... ° cM• • 1 rfrvi ., a writ...T-� �'o? i' ,"fit.. ll - ' .igr.------7fre4r vqr - si rums ,......... tur.,..__. _,. ,.. „,.., , niatanariatta Awe imagra- --11 misaingain . OM ./.radig : • 2i i��i rr�w iQ _ . ,fie+ ' gi • ' inn Win... � ili t. Iali 111111 all Lyra JR K. .�" �eiiWig V .i: . -- warm= lienNunn .. Tar 01111111Militaill raratairinsta - , � ktirE.�'Sl!'RIN if tilrliatamwa R �l � • -... •71 ` _ , ,.�+ a -`• �. ��'. �''� I .i ...! n , . � / . 1 11 2. "O i •I M 1 x - x 2° nj TOM a 10 13 12 • TIM • O • 2 'f E+ ( i 3 I •-5 • 0 ♦ M 3 SS °• 2•R ti 11 ' E 1+ 2 y= 25 40. c-. 1 f i ti i .i �h• .J t/4 RM. I• n .1 [ l �•f• ` C "IC" 27 to 33 35 27 \I RCN) J R63W 0 U R T1 3:191 47 • I • I • A •. Transport Field Report Applicant's Name , Rs 1. tn_ze^G �o cv v:C�Jcw Type of Permit Permit No_ Date Issued Expiration Date • / / o��G i T - _. :Location and Damage Reports' -Date Tics _ (If no apparent damage at this tims, so state) Inspection Date / Qaor i i- WELD COUNTY, COLORADO BOARD OF COUNTY COW4ISSIOd39S BY: 4/ Auth rized Agent ,fr.'d61 Soo •73 J WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT sy �/ % / ¢7 1 /DATE ia— 19/ T PERMITTEE^''S�NAME JETT f/444 (107rf 31-ifel y ce2n [-2�ty' ADDRESS P l ! (CJ o x /V 6, Anwo/J e°u/^co. / & ogV Your request for permission to install a A? tl4al'MME__ line along or across County Highway No. r+'`lei is gran provided that the Permittee mil own and maintain the same alter installation. at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will owns and maintain the same after installation. En The C--9914—• ' of Ct line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches oI back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which mFy arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. i2 This work shall be completed within 6)(9( ) dam from the above date. NO work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark. unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right or way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County ht o way limits. �^ Maintenance Man on this section of the highway, with headquarters at S�7 - �� v or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: MaSupmvior THE BOARD OF COUNTY COMMISSIONERS WELDQQcIMTY, COLORADO _ In a eptl,•'. this permit the . • .reigned, representing the Permittee, h erifies that he has read and understands all of the foregoing pro • • . ; that he has authority to sign for � and �//(bind the Permittee: and t}haattt by virtue of his signature the Permittee is bound by all the conditions set forth herein. C��`J"`_'i �C�f -49 �atie G3 �y„ac.�r �C 1 ,� eetai-67Oi edit/o/ gs-,00Sejolf aye ti SPECIAL INSTRUCTIONS REQUIREMENTS 'FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT Of WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size_ 8. Encasement of line will be required from toe of slope to toe of elope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All request for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 19..The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13, All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Ail damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vortical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 en. yds. 3^ 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 eq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. it 0.37 cu. yds, 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 ca. yds. 10^ 5.9 sq. ft. 2.5 sq. ft. 1.10 cv. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft 4.8 eq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 eq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit'. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the 'execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to he suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the wort, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. a .< to 44. a T 40 -a 3` 34 30. 20 20 24 22 u 2, .. 724 12 1D • Ti. O 'e 4 2 . 7:-Z : WA nil train INA MOMS Waal" 20 -kintilltrilliattiffilfraila = rat•rya � �i 1 1 _er:Gr"175.4 rial::‘ e. wiLessorg- -lm 62 .... - i A'" t4 11 jillinie agssima %isa tirea "9-m il.\1` ('.:',,rjI RKiialifOrr- aka 140141 74P I"'='taiwo�°1{9�1�S_�/il. �� `g fiLl=diti:-4-.-sisamitr NC !IMF - .6. wetwatapzemisiamisani mnatapromiarsavalranng MILDIIIIII1DraiThaVattallflal wournralimesimarranrsa aria WitiL14111Witearli WAIIIIIIIP Mk fir IIIMAIrgi WI SW 112ar as- REIM 2 5 .17 a , N S 15 17 I 21 .N. 1' n J R6ft IM((i al ) C 0.11 Y T 33 25 27 75 31 33 3$ 37 N 41 43 13 a a 3 Utilitv8Transnort Fie • eoo Applicant's Name _ Typa of Permit Permit No. Date Issued_-/ .4er -? . Expiration Date QC �vlr T Location and Damage Reports•.Date Tim* . (If no apparent damage at this time, so state) Inspection Date /3 3 7 i - ! - WELD COUNTY, COLORADO - - BOARD OF COUNtY COmtSSIOt(aS BY: tiaavie,..Z._ AgAed Ag r._.c.:1..�. ): ,. Mae (/-21-7: Tap 1636 —Rademacher WELD COUNTY, COLORADO UNDERGROUND AND i UTILIn PERMIT DATE November 19 19 PERMITTEE'S NAME Little Thompson Valley Vater District ADDRESS 307 ;'.etch Ave — Berthoud, Colorado 80513 Your request for permission to install a 3/4" yea ter line along or across County Highway Na. 13 at 1/8 mile north of intersection with Co read No. 28 is granted, provided that the Permittee will own and maintain the same after Installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made In six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall beencased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically passible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the Installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - - SPECIAL PROVISIONS: Attached _ ... The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance. alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines)- The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorad% will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County rightofway limits. 4<1 -'Viler Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that be may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Ry: this permit -,..- tinders. ., ed, representing the Permitt, verifies that he b$s read and understands all of the foregons; that he has auth• 'ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by :, the conditions set fo herein- - - - - - a-re7p 4(s;"o°%d ttcc1q �a � SPECIAL:- ]NSTRUCTWNS REQUIREMENTS FOR:INSTALLATION OF UTILITIES. WITHIN- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition Is an asphalt surface to be cut unless otherwise specified in the special provisions•. 5. Mud -tacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line Is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches indiameter or morethan 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. I0. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. ' 12. The construction of underground installations will generally requirethe services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspectionis reserved by Weld County. Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches orborrowpits are to be restored to original condi- tion immediately after backfllling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0:4 sq. ft. 0.20 cu. yds. 6" 2.2 eq. ft. OS sq. ft 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. it. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu- yds. 12" 8.5 sq. ft. 3,5 sq.. ft. 1:50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 1S^ 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. D. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped -lifts and the final one loch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway, If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for: the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of thee: work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion andacceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die• turbot portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. I LITTLE THOMPSON VALLEY WATER DISTRICT DIRSCTOflSi DEAN O. ANDERSON LOUIS V. REIN ALSERi N. JEFFERS NORMAN WRNS, O.V.M. DAVID WOES MANAGMI LOVILO M. FAGAN Mr. Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 332.2006 30T WELCH AVENUE DRAWER O BERTHOUD. COLORADO 80313 November 19,1973 RE;Permit Tap 1636 -Rademacher We request a permit to bore under Weld County road No.13 approximately 1/8th mile north of the intersection with county road KO. 28 to install a 3/4" water service for Louis Rademacher located in Section 30, Township 3 N, Range 67 West. Enclosed is our check for the $5.00 fee together with the permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lotilo H. Fagan, Manager LHF/bh cc; enc. I. I Zarb, 2tvaarr,..ava.--Jr.4.-7,spat:nietegel.=e_irrz. tillaillitagitainiggilli&- Welk Ornikrallikkgehlialtafi 1-119gegtrigglit-IL- 113.1M Itiessaapt*._ _ fie, mama. ear ir‘altbateWa-C.'44alianitte Parprawhiaronetancial knit� aiggInr artarW g'ad MffienadlatartiMela-OrPS- ty;:4"16,41 it 114101MAIIMPriiiiinalainilnal rWARRIFIUMintardefearialtarientain =MO MiarridierATAGICAWSPASIMIS Wag trZillingettgalleallattlifiraill swriatinuntaismitiammillaristwip mataiabrainmarairia cream illtl � air ��titit- ,._ IaaaLJnIan -11111111111111111 ionnuensismitim SIMMIWAILSOlair a Applicant's Name _ Typa of Permit Util 8 Transport Field Report :Location and Damage Report:' -Date - Time - (If no apparent damage at this time, so state) . Inspection Date _ i BY: f�. wan COUNTY, COLORADO - BOARDOF COUNTY COMMISSIONERS Au. orized Agent • ~LITTLE THOMPSDN VALLEY WATER DISTRICT. "- LOCK DRAWER G - 5fItrfoUO. Goo*AOo 50513 - • �, T17E bb(I P1WD NA110NAL 5ANR ��^ �� y i •n motto COLORADO,- '-----.3t--;1°21 - i fib _ �� - �..i• „,- PAY o .. ;:., .....a.. 1 t - &=00/I00 Dollars--»-3:-W-a. � �y �:.;; ,,x>. _ - -<----Z7--.'"----:--'--- ------------r- _ Okri- •`wMWtl-,L-`I-. -`- � � -.^ 410 zeID17er 13 _ J975 $55-:00 5 Count =00=isstoners:-.'_::::,4%.,-_,,,.._,,_,..--..,-.."...:(..---..o_f � ORDER - -:"'----/`L----- - —Z -`^ LI- TROMMOW VA• LLiN WAl ; DISTRICT:; „:-...."-"--,+-..-.-. ��../ ../•.-'ti-J-'/-vim' \- .r .`-...,nThI b at -°1 - -I:10210, 3 0i551:-05 03-iu' • 8079 - 4 l� i/-7-- ?S Project #90-73 PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Little Thompson Valley Water District ADDRESS 307 v;elch Avenue Berthoud, Colorado 80513 Your request for permission to install a 6" AC November 1, 19 7J line along or across County Highway No. 46 at 369Ci east of Co road '71 thence 15841 to County 3d / is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 6" AC rater line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made In six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no ease shall the flow of water over be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County of - / SS`7- tks-o g Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Supervisor this permit the . • - ., ed, representing the Permit ee, verifies that he has read and understands all of the foregoing pro - slots; that ,be has - thority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. &&6' R9s-a9 SPECIAL. INSTRUCTIONS REQUIREMENTS FORS:INSTALLATION OF UTILITIES. WITHIN -THE--RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated ox- track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado - 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- s. Encasement of line will be required from the of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway., 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will bo permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection- is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Alldamaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14, No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0-3 sq. ft. 0.2 eq. ft. 0.05 cu. yds. 3e 0.6 sq. ft. 0.3 eq. ft. 0.11 cu. yds. 4^ 1.0 aq. ft 0.4 sq. ft. 0.20 en. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. - 0.37 cu. yds. 8^ 3.8 sq. ft. 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.6 sq. ft. 1.50 Cu. yds. 14" 12.0 sq. 4.8 s'q. ft. 2.00 en. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq.. ft. _ 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq, ft. 4-00 cu. yds.. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site whereand when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification _for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith - 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bondshall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DRAM O. ANDERSON LOUIS ISEEN MOVERS NORMAN DIGS, O.V.M. DAVID M[OEE LOVILO N. RAGAN Mr.Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 TELEPHONE 532-2096 307 WELCH AVENUE DRAWER 0 BERTHOUD, COLORADO 80513 November 1,1973 RE;Permit Project #90-73 Dear W. Ewing: We request a permit to extend the footage on your permit #756 an add- itional 1584 feet. This will extend our line on County road /46 to the intersection with Weld County road no. 2. Enclosed is our check for $95.04 for the fee, together with a permit form I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT 0-7,4 7/7 Lovilo B. Fagan, Manager LHF/bh cc; enc; 2 34.Immo . A 2* r a :o u srai Egaimangt., . ,i;t74.4291.1artig,_151/11i • Fin a• Man•gy ► !'��'' � ��„ '. _ . / ... 1 MiltICIMMIAtgareitittimAfrarsi► ?iii I9 prriimiF try*?itittatermaisti A l gi an Eel isair"SiCilatil Ati--;tarra•---4" -isithitliitY L . "VittaleilififilailialMalaraintna:ripiwzgatin till Fantal . 012102Inel I (Marl ItIntifilliglaitlIMIllifiltaiiIIPPIIIIIIIIEN illi ClftNt�4j: .�IMIESII,F1� LIVair 1 •D j!_ J TBI ageMedirk �;� - MI iitiEMPanilik-lItactkit allati ell rn - .'n .i :°-angerannattienu nexatuttowires y tsweapiserwion ` of „ r ligeganevraIElI illsta leINIE 7111PefirrA SW 1iDj,r l r 1.1 / [mr T 43 Applicant's Name Utility & Transport Plaid Report a oZCr.fl -va4 Type of Permit l�fi1�.�•-�� Permit No. Date Issued Expiration Date :Location and Damage Reports`. Date Time - (If no apparent damage at this time, so state) Inspection Date _ WELD county, COLORADO BOARD OF COUNTY COMMISSIONERS • LITTLE THOMPSON VALLEY WATER_ DISTRICT' �V�T tom/ ..\ N° 8061= �OaTMouD; co4osAoo ,0813 - --� - ,. ;_; .. `_ THE BERTHOUD NATIONAL BANK A2=ts5-rte : B[RTMOUD_COLORADO - 502.1: t 1 PAY:::: Ninety Five' -8c (74/100 I oilars �: K"x.� r-�x--1r• -Ky t-rr).- /� �f County.. _ ommi33toneX` - r�.•� vv-'.iW...-`-.r mo'--%w_.......r... ` e-.Iib'V Y+' ^„ .,....^v" /.rµL''T[L[-tttOMtioM.:VALLXY WA7ut.Disrn1 ` _-_-vim"• �.,.`�.----`„----• c.-`- ✓�Y"-v-_- f •.. `..r•�.I�^•/ ------� of8'l.� LO i 551F-0 5.140 3' '' _._ C:Y: - }l.-�_ -..+ r� a:.;.: it .M:L - - .� ' - �•1; ,.. �,,,,y.� w^-,,,,�`t • PERMITTEE'S NAME WELD COUNTY, tot tr UNDERGROUND AND i#Li,7"f-_PEE MIT ',� /l` DATE/,,- e 7 19 7,q ADDRESS G�i1 Af 5A9 x/1t / �.� AM/id-rant L�,O� 1 AM/id-rantn/ Pi Your request for permission to install <' line along or across County Highway No. at of // G is granted, provided that t Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maiaintain the same after installation. The %"� ` line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway. it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. ,- - - - - SPECIAL PROVISIONS: Attached gee SAe t The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within - ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveledroadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. l, Maintenance Man on this section of the highway, with headquarters at •���-4 -S2 S -, or his successor, will represent Weld County. Colorado. in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By; Mainten In acre ng'$his permit the undyFaigned; representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS ( '_ .4.z7047 wet' k oog f SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES. WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size_ S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfiliing is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Bile 2" 3" 4" 6" 8" 10" 12" 14" 16" I3" 20" 24" Minimum Thrust Area for Tees and 90• Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9sq- ft. 3.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45' Bends at 45° Vertical Bends Down 0.2 sq. ft - 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. 1t. 1.6 sq. ft. 2.5 sq. ft. 3.5 eq-: ft. - 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 on. yds. 0.11 cu. yds. 0.20 cc. yds. 0.37 cu. yds. 0.66 cu. yds- 1.10 cu. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (1) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Hoard of County Commissioners and shall be reasonable; however, in no event shall the bond be less than ;100.00. • nntltnitYNYNMnnnf f--YNYMgtt1YMNMN ttMN MIIIIM nfNttf EMMI Mgt_NMM MgNNMNMYNtutt•NNNNMMNMttq --- p qua a=gNN aggNttlr�t wasnunttMMttlNts�MMMMggMMMMMq 1 MYMstna—MMMMNNnnNMMNttq_Mtt _ NNYnMNttlttlNY--nnflggNNqtt!#NNNNq NNNNNMw�Mflst_MM n9?Af7.artinamsuu—BNOO _. `-r MYM�N�Nt►,. aws+�flna must 4t flttfff�t�� N N 1sng ----nuntan'NYNN—susitn uM MNNNM NI! \MYNMMMMNNNMMMMMNMNOgNN =mans aMMNNssgnnMMMMNMMMMMMIIIM I =MOMS n.. NMNMNMgMN®gYNMMMM NNNtgtMMtalststtt ■annnnnnanaYNYtsttnNMMM Mali= MEW tNs MNYYNNusf-- MINIM sstaMMnANtr—Y MIu1MMNMMMEM MM IMI OMMNq MMMfl—fln N NNMINIMMIMI allasne N t" nNNNp'® YNppgptMEMIIIMMI ryryNSMss'/N tI- n !T MSS= WOE MNNMisMNtt1MMNNNMYMBNNNan tflNgsYstMpNMMNMYMtsNN gNNMMNNM .itilMMtt4% IYS MMMMNNNMO>l7NNMMMMMMttM l eO=t7gtantio.Anal MNNMNNMIRIZaWitt►a MIIII2 altnr. ;,+ L'.7Mttw,nnnnnnn_p2N Mt�t'rIanra4n!A iai t ssMNttt sTana gMMMMMMSMistrttltMMMltttiirM 9 sitab1ur wn.nsn=MISMMNggttnMMMttttMMMqttt- P MillI U'I�JNMs�7YMNMMNNttIMtt MMnnnMgriga r1: 1 nssnnttttMsgp usn—MMMMNnnfnnMYNMre1t e3 7i' MMNMMMesMINIM MOINI NMMMMMNNMNMMNNtig5GS NNNitltMOM NMMMttgNNBMgssqMNNNMtItN MMNMNMMtla= MMNMMNMn_____ MMNtThMM �{ N MMppnan MINI MNggsN NMM N MsunNYMIEWINInMMMNNMNNMMMMMM MNNNMMt tOM NMMNMNMNOn--aMMttMNan tNNMtt=MMutIM M MMMNNMNgMtttsMstffMMMMMMMNss NNMNMNNu WSW M NNNNttNMMMNtNtNNNNttttIMMM Ira=Err UflLI tarnatpttptuannaMMNNMttttfMMNMNttttl uannnnnn i3r7G�i WA = nnnNNMNMnnnnNNNMNMggqtttt ist�ts��MttINMNt`7YMMBevet.nn _._ INIM nMMMMINIII M NMNNMMMfMtnn tt. MNt,JMMNNMMMMstnfNMNYMMYgMq MMNMNNMIA\MM a NMINptn_-MNMNnMYNMtu nn a▪ nttttttl•ttINl �i a7nts MttltunMtttMNMMMBMNMMNNNMtttitgM nnnnnnnn.NNANannMnnn NNNNNNNNNNMNN M nauronnui MMNNMMn--nMMYNMMMMM t N_MNNMM/�\Mgp,YM,MMMMMMMn—MMNNNMNNM N▪ MNNON�q�NNnntM S JONn--nNMMNNNYnNNNY�N t ttsMMstNMMMN MtgtNNNMNMMMgpMINtuMNM . - -n..nannnn Is ant' NNNNNMMMNNggMNq "'7 N MMMMNNNttst'sttt—NMMOINI gNMYNNNMNMMM N NMNNMMYMti.i'®ttMNMYNMggMNNNNgNttNM N MNMNMNMNNMnMNNMNNNstnMNNNNNMMMMMMMO NpN MNMN NM NMANnn Mannuu®ANnnNNMNMttttttsttg�NttN� N NMtMpt�M�NNr aMM M MMMNMNYMn�NMNMMMMMMNNMMMtt—M gnnnnNNN_pgA\Nnnnpi g M—Mr%MNnntgtry�MypnnYMMNOnnn_L_-- NM rardaNNMMNMYYNYWMHM`MYafl, nfl 4 nwr7�.r/./nzzflMN l flMTa annnnWPM =MOM IMPEallnkfarnilMNIIIMIMIMP.dMMISIIIbllha suns =Inn= t n--nMNNof/.7JMN/./MMSMtlttnnNYMMM NNN—MqN Main Yn=MNMMn =BNq 4MNMNNMNNNMnNNgts�NY NgpNNMNtifssMNynn Npp Mwn—YNNNMNMNNM�MEM N Npp,MMMNMnn\ / =aaMitMtpNMpMMtttttq�� iun AttINMNMgNNNNNMNYM�IgMNNN�ti._�r� gqNMIpM®®innnnpnpnnNNpp�t'���NNMn®nsusuua. aN1trti�a:r as s &n &d/.petsp� a i NMSMIM pEMpUpMM�U�ESIMIlmanntl EyppNMELV®ApI®Y®M O IMepNNY tslanMNNNNWNMNMNNMttnnn-NNMNp L' MNNNNNAL=NNNNNNNN_ IIIMMIIIIIMMINIMMIUMIMUCEMILIENUIMULIMIUMUME NNN:ttMIMMIittEMnnnnnni"' tnwn'.LIEMOrn.TCan�� '� i IIIMMUNIUMEIME:i nn NNNNNNNnn NNNn t_MtM i gi r.-. pMnMtt�tNgNNMM�Ntgnpnn-MMnnnnnnnnNNNNNvaraf tsna ttqurrameannMNMgtntrannrYMtt1NNnan llei t_gnY NsUtflpffttUtgg�MNaaNMNnnnn..---nNN NNNNtq.a,w,, ~IIpnjwn i!!1: '•NApMptNptMNpaprpun�gN�pMpmuassapanpptuptuuuu�at�istpMYNMnNNNNMM3b agrift - NNNNNMYNMtt�t1YNYNNNMMM MMsgtftfffN��. ktiriggEMICEMAIISINIMIN a, =. - a =� m=;� s ANA P z:NrSSPIMM-wrt:ti�s'I 02 rat, '� RIMitiklOrleitiMIN- wasawariel iinattamstm 9411: w. (ems iirelliglizeatir nn h:.14q-Mt anemia" Ps !wen masit WIN ra nnis Stinlillillef.werMit � •: \! •� Eli a1 - \: :Ifipai' rraMnird�Nl�tunininir'lyl %i G . I MEI wasarmargui anianonnura otoutereputin aurnuratueut ailiumumpign 4 6 33 13 37 .66r r r 43 43 Vt11lty S Transport Fie -epa Applicant's Nara %s r nrrea,1 Typo of Permitl�ii Permit No. _ Date Issued Dapiraticn Date :Location and Damage Reports•• Data T3ss- (If no apparent damage at this tame, so state) Inspection Data Wan COUNTY, COLORAm - BOARD OF COUNTY COhttisstomas � BY: 1 � / OV Auth ized Agent -:_ > . Ca WELD"COUNTY, COLORADO' UNDERGROUND AND UTH.IT1f PERMIT DATE `7 ! 19 7a PERMITTEE'S NAME altAFT ySd u'017)7 ADDRESS Pa 430x /yG Your request for permission to install a iirte led, provided that the Permittee ,yet L.U!?/?fC/ 6Qn wyy line eise across County Highway No. /o own and maintain the same after installation. 7 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 21..t2 —r -'f. -t# P line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and pacl:ed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This -installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of aenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes a are applicable - SPECIAL PROVISIONS: Q; Attached ( , cu AL if≤E-,g- Bore- twele-C* 7 /9019r-7 The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. / ?3 30 This work shall be completed within ( O /� �' r ) days from the above. date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway atter dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or Signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. �--i. �1 Maintenance Man on this section of the highway, with headquarters at S A��7 `mod" or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: V' f In ac , .ti • . this permit the undersign- representing the Permittee, verities that he has read and understands all of the foregoing pro - o • s; that he has authority , sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 7 .,avieggageden, 77c-a4Q�� 070 • f SPECIAL INSTRUCTIONS REQUIREMENTS.:FOR--INSTALLATION OF UTILITIES WITHIN-; THE --RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions, .,. Mud.ja eking will be required where bores are larger than lines er encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches. if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, itwill be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately atter backfilling Is completed 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below_ THRUSTBLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Else for Tees and 90° Sends 2" 0.3 sq. ft. 3" 0.6 sq. ft. 4^ 1.0 sq. ft 6^ 2.2 sq. ft. 8" 3.8 sq. ft. 10" 5.9 sq. ft. 12^ 8.5 sq. ft. 14" 12.0 sq. ft 16" 16.0 sq. ft. 18" 19.0 sq. ft. 20" 24.0 sq- it 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 eq. ft. 0.4'sq. ft. 0.9 sq. it: 1.6 sq. ft. 2.5 eq. ft. 3.5 am ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft 9.3 sq. ft... 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cm yds. 0.11 en. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds.. 1.10 cu. yds. .130 en. yds. 2.00 -cu. yds. 2.70 cu. yds. 2.40 cu- yds. 4.00 cu. yds. 5.20 cn,yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back fill and tamping operations will be executed in no more than nix inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, -Colorado, will determine whether excavated material is suitable for baekfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1)'year alter construction whether in a gravelled surface or a paved roadway. If said cut is In need of repairs, Permittee is allowed seven (7) days after notification.. for the execution; of said repairs. 5. If the Permittee has not repaired said open cut or ants within the allowed seven (7) days, Weld County. Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches, 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following thecompletion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. !_• . METER CONSTRUCTION AUTHORIZATION LEFT HAND WATER. SUPPLY COMPANY )r_ No. (Y1 -k9 Customer Name \ t%$ \\r 1-\rDate Akkio &1/44)1M13 milling Address \ �C 1teeet..0 Sfc51lo Telephone Construction Location rb\5 \ . C\t\1\1E-I4 � CCt(q �� RglX) -SCh l Lot Block Subdivision \?EETER: Internal: Material S Ta x Labor Permits Other TOTAL Of frt a-A5s e` Size Meter No. .).-.ce Completed _ r_.zr5-es: Water $ c Permit No. Reason By Inventory Sales I (:.e) hereby authorize the above described work to be per c .E.?,,, .,,by Left hand Water Supply Company to -"the abve,named,Customer. 1_(We) also_ acknowledge that the site mist ire staked or ader --<bc-fore any work -will be-st"axted. Sig-:ature' . Owner nr 50. M 46 42 40 3$ .. Si 34 30 . 23 26 24 22 11 16 11 12 10 6 4 70.x. Z 69 ' F zurarl l: T. •.Fy.y�i. s Pr- @ Lip { 7 .r .t. 11 is • 4 C V 6 rr 7..,��� t 'r (moo •cii ,, f .r .- ! O};i • �'i - K.: , --.J ` _ T ' - I f ;_. " -`-., y' F a ; :-f 13.3 r / �i ¢ J ui c \5.•..'%.-jk% 1, 1 la i t - 1 1• r ,. - -� r/� •S 'I� t c�-" _ �1 • E �. )C r \\_ `'-' i o _ - ` {� . \_' i .4 rw --1--47:%-"2". t r J. a fi, d )� C✓ � d ro"e? // :% •' /' r ; i . ..L .v - / r t 1 .�� J 444 n 11 p: Ti .-• �f Irk !• / , • Jt� ' V /_ Y/ . C'IK—: ,O /� C�/ •`( •.�\\`' • 1 V\�- , % �_'fir` I L 1 1 1 C Yf(y, Jr.. r� .J r cJ �-...;?ii 1'';� yy 9� i.: i l,5 r _ 2 . 1 3 3 % 4 - f t i i jj""w/ .. ~'> p�1 1 f 1 S 1% 1 ,i461irt `\ /. �y \ f. r // % Jr . \ [ 66* F 6f M No..., .. 1 9 71 3 13 V 1, 2 23 2$ 25 29 31 33 33 37 19 41 0 45 47 49 $j Utility 8 Transport Field Report Applicant's Name _ Type of Permit Permit No. 942/4-- 7 S' Y Date Issued / ?):96,t- 2 Expiration Date _ :Location and Damage Reports -Date Time (If no apparent damage at this time, so state) • Inspection Date /7 Air 7 7 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: v e i% e---- Au orized Agent • rt GOA EMU IICNA I% ZIP fI ':0000-o i 19': -V • Tap 1C -Hicks WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE September 25, PERMITTEE'S NAME Little Thompson Valley Thter District ADDRESS 3 O 7 .7elch Ave --Berthoud, Colorado 80513 Your request for permission to install a 3/4n ti ter' line along or across County Highway No mile south of intersection with Colo Highway 60 is granted, provided that the Permittee will own and maintain the same after inetallatfon, 19 73 1 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The S/4" wOter line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case *hall the flow of water ever be Imparted or i-'terrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. _ This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open tren ch permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Reavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because oI necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County ht of way County c ?-4 sor Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, In the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. R THE BOARD OP COUNTY COMMISSIONERS WELF,4gUIMTV, COLORADO 1 ting this permit the deraigned, representing the Permittee, verifies that he has read and understands all of the forego • . • .. - stuns; that he has - uthority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. /e/g/73 �" s SPECIAL- "INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES.r ITNIN- THE:- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated _or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. a. Under no condition is an asphalt surface to be cut unless otherwise. specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado. prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado. before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2" 3^ 4" 6" 8" 10" 12" 14" 16" 18" 20" 24^ THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 aq. ft 1,0 sq. ft. 2.2 sq. ft. 3.3 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft 6.3 sq. ft - 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu.- yds. 2.70 cu. yds. 3.40 Cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense Incurred, within a period of one year following the completion and acceptance ofthe restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. 3, LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DEAN O. ANDERSON LOUIS F. REIN ALBERT M. JEMMIES NORMAN OIBRS. O-V.M- DAVID McGEE MANAGER, LOVILO N Mr. Byron Ewing, County Engineer 1500 Second St. Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 532-2055 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 50513 September 25,1973 We request a permit to excavate our existing water line on the West side of the Weld County road no. 1 approximately one-half mile South of Colorado Highway no. 60, and to bore under the road to install a water service for F. M. Hicks located in Section 6, T4N, R68 W. Enclosed is a permit form which I have executed together with the $5.00 permit fee. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT 1(7 roc Lovilo H. Fagan, Manager LHF/bh cc; enc. 2 riallitaNOUNtislOMMAAR MacTliMPANAEMONWEVAISAM rrtMawnlit Y � I, suriss liriLL:..iii a r 3itraini ii��11 ,� �-,Jeeite la :li• .►rOle-' Bbl an= roommaaragnainSit jA� � M �. tAILICIMIN tai naai "Iii;1 Iii \� 4. ) Fn. 4taw reantrantsmnorrarrarattomma smenatarimosiramihrantir snicommuatumpirreataingartla regtanntitmknamtztanagaseau aginumwasigaw.sitsmnicat stsin%,: =dam. DMINACIE AiltarritiliNfitilkl l_lz • 1L-: • :--H- a Mitgrarkilliglr ammlimma be, pumans atoms aagal: at"aw� l.�Irul �Mi`l�iEir FIEMIEla s rte. -) Applicant's Name Type of Permit Permit No. 76 -- Utility 8 Transport Field Report �Cicifif.CE?�ozzr.a. u hi - Date Issued O 3 4 7? Expiration Date 0 3 eUZ,3 :Location and Damage Report:'.Date Time (I£ no apparent damage at this time, so state) • no- ret.42-we Inspection Date 3% (a.21-7-7 73 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY:V&A Aed Agent LITTLE THOMPSON VALLEY WATER DISTRICT -N? 79S3 LOCKDRAWERG - ean�ouR:_.COR.oRwDo 80313-- ..; . -.,� - -- .--�r��� •-��.. - . _ .��.i ,,532-209G - _ .:: : :::::-.2----------:-r------C. .r'- _. __ . .... THE BER HOUD-NATIONAL BANK -.1 2-;,......; -- ----------------------z-------: .------z.,: � aER touoecotmtwpP -1:.1021% h' • ..— > - x ? -F1 ve Yi 0O/100 DaTYars ._..T_.r-..r.. - .PAY r• ..-. --�. ---� -�/"��J--..C/"' _ i"�./"^ti..„.V`FAT.4-` _.„..r^�-„,„ 0.b+'..V�Y ,-ice - L.. .s_ vet ,:z...,--------__,,,..„.„,_------ .../ �/"'i�/ N\-^�/^--/ /. c7 serree 1 ict-\�i.� P�.�4. rimer GonaIctiass L ---c-2-:—..-.;---- -,-------- --_-..:vriac �iO intrv.. LnE TNOMnon'Ywcicr,WwmaDrantw-r' .,.:.rte ,t • - r • •ct #90-73 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Sententber 13 PERMITTEE's NAME Little Thompson Valley 'later District is 73 ADDRESS 307 ':'+elch Ave -Berthoud, Colorado 80513 Your request for permission to Install a 6" water line along or across County Highway No. 46 at Co. road #1 then east a distance of 3696 feet is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The En Ar 3NRte'r line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six -Inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible_ This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit .1 /(rt 3'?✓ This work shall be completed within (_ 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at S'7 —174 Sob' or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Ry• THE BOARD OF COUNTY COMMISSIONERS WELTY, COLORADO. _0. pting this ,� - the and igned, representing the Permittee, verifies that he has read and understands all of the forego p - Mons: that he has an rity to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without math. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. a. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special prrovisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure_ 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee. at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion oI work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced- All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling la completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" Minimum Thrust Area for Tees and 90' Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15-0 sq- ft. 19.0 sq. ft. 24.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 450 Bends at 450 Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. It. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq.. ft - 7.9 aq. ft. 9.3 sq- ft. 24" 34.0 sq. ft. 14.0 sq. It. 0.05 cu. yds. 0.11 en. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 en. yda. 1.10 cu. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said Iepairs- 5- If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center lire of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond stall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however. in no event shall the bond be less than 9100.00. — 24 %Veld Cc. t-c:I t/ Icz->c • 41, &z \ • ..�y.\»_.�� \i \ x 1 Z." • « LITTLE TB PSON VALLEY WATERRISTRICT DIRECTORS, DEAN O. ANDERSON LOUIS F. REIN ALPERT N- HEIFERS NORMAN Gift. D.V.N. DAVID MCGEE MANAGERI LOVILO H. FAGAN Mr. Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 Dear Mr. Ewing: We request a permit to excavate our of Weld County road no. 1 and 46 and to South borrow area for a distance of 3696 class 150 AC pipe. A copper tracer wire Enclosed is our check for $221.76 for be 6c a lineal foot. Also inclosed is a rough drawing of the proposed project. LHF/bh cc; Enc. 3 TELEPHONE 392-2096 907 WELCH AVENUE DRAWER C BERTHOUD, COLORADO 80313 September 13,1973 RE;Permit project090-73 existing water line at the intersection continue East on County road 46 in the feet. We will be installing six-inch will be installed as required. the permit fee which we understand will executed permit form together with a Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager Zialki.hem,.r,7+S�x,.r��rG.,L'�t;fun* .. ...-.' ��4 kiitillifintintaliodEMINION { �a -A. fl !wi swuf1 alt s Z 3 a t ua p i maligtrotria :'r .. '' FIZIMUCTMlittriaitiOrlitrrorrati ratiNIZIAMINIPtcAMP44114115111 w . , �ii .i ,...a�i�f, ♦lga ��1� iieltilmismatimziiiiitirediaWIAMINEffiraPilleriptellIMIASAINNONTATI nub . , e ' a 33lc . ` at VrtleirMliarallirialinaltilligiattelial IfirdiallialiMMISEirifirallirliallitip EROVIEWMNSINairs3 emumnimmnitin Stititerstiliiildiratibilla- - 0IIIIIII11 ItiliNSEttiltriffellitillititallinitillIEFE aifflal MINS 43.MIN Ia I, - i isMIME waral 'a lir i!lc Z ■I/1�. '�rOINilloa fiEr"� t+�5'1I tS 9 °a t_ • Utility 8 Transport Field Report Applicant's Name Typa of Permit Permit No. Date Issued • / Expiration Date _ 72e-orfft-e-g-te ace -40_ :Location and Damage Reporti .Date Time . (If no apparent damage at this time, so state) • Inspection Date l l 73 i WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: Au •rized Agen t ma s LITTLE WONI VA e; T VALLEY'. • WATER DISTRICT NO LOCK DRAWER T.- -_ y .� • 9644 332 2096 ._.; BQtNOUD. Co�oRAoo60D13- ���~� `✓ ' �V-^..�/�`r-^+-.���`�� . � ---:7-THE _ t^ _ �V� � r ti- EBERTHOUD NATIONAL BANK. �r - `. eeRrt+oun covwRwno t oz — . PAY T"'O Hundred. / e�ci Ts^Rnt�n�1F .7F, TnO-1TnTlarq;rx • -'Y Moser d PERMITTEE'S NAME ADDRESS 307 Welch Avenue - Berthoud, Colorado 80513 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Little Thompson Valley 'dater District Sept 5 19 73 �t Your request for permission to install a 3/4" water "ins along or across County Highway No. 50 at 50t west of intersection with Co. road # 17 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permlttee will cause the installation El no expense whatsoever to Weld County and that the eermittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back tilling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be Installed by the method of boring or Jerk- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or Interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL. PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. 3 0- 5-1 This work shall be completed within ( 60 ) dam from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Q' Ca4i W�c'" s$' 7—qVert Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, In the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By; acce•ting this permit •. undersigne foregoing'pro ions; that he has . uthority • sign for and bind the Permittee; and that by virtue of his signature the Permittee Is bound by the conditions set forth her representing the Permittee, verifies that he has read and understands all of the xe/ai 9/x3/7- 3 L • • SPECIAL INSTRUCTIONS REQUIREMENTS FOR, INSTALLATION OF UTILITIES, -WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe oI slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 pal pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13, All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. AU damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6^ 8" 10" 12" 14" 16" 1S" 20" 24" Minimum Thrust Area for Tees and 900 Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq- ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq tt. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 46° Bends 0.2 sq. ft. 0.3 eq. ft. 0.4 eq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft. 9.3 eq. ft - 14.0 sq. ft Minimum Volume of Concrete at 450 Vertical Bends Down 0.05 cu. yds. 0.11 en. yds. 0.20 cn. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00' cu. yds. 2.70 cu. yds. 3.40 cu. yds_ 4.00 Cu. yds. 5.20 au.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. s. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be leas than $100.00. 7 LITTLE TALON VALLEY WATER tTRICT DIRECTOM, DEAN G. ANDERSON LOUIS P. NEIN ALBERT N. JEIPQE NORMAN anal, D.V.N. DAVID mars MANAGEII LOVII.0 M. PAGAN Mr. Byron Ewing, County Engineer 1500 Second St. Greeley, Co. 80631 TELEPHONE 332.2095 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 80313 Sept. 5,1973 RE;Permit Tap 1625 -Moser Dear Mr. Ewing: We request a permit to excavate our existing water line on the South side of Weld County road No. 50 approximately 50 feet West of the inter- section with County Road No.17 to install a water service for property owned by John Moser, Jr. located in Section 33, Township 5 N, Range 67 West. Enclosed is the $5.00 permit fee and an executed permit form. LHF/bh cc; Enc. 2 Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager wilsium=0,Abliweiiimmmimme. apassonmetwasszutrin ataMilorgatairtrimiimpals MOVMS4laWarainariP -an miiiriliasirs- ..-111 sinsm inu , - , aal,-,---,-- 4 VOmmEntell !MOW 740M sommonsit re 4" 4'14 Ar ', i illegrit/ gl' �1EO 3 3 �.+ Syjr��/ +�A� �' 1 P� ,n-� ,�� � Q c>�!! c -: fi r at ! 'Ii ram .�..� .....�� .rte s_. .-� . .. Mallititani'FE'tiY ... t; r 4 n vounnamerannmarismomunums mwmaammegismsuAmmilmnammir railitiffilWilirtallimmarts ..ttiit° L` ''' . taErstsisMtantrallEIRIME a �1 ire linagMat eta ,.;-ailiaiwil. 12 10TOY 33 33 77 39 41 43 Utility 8 Transport Field Report 76 Applicant's Name, Type of Permit Permit No. 797.: 7. Date Issued Expiration Date /Q 7z#1,--7.3 :Location and Damage Reports' -Elate Time (If no apparent damage at this time, so state) Inspection Date fly 73 WELD WUN1Y, COLORADO BOARD OF COUNTY COMMISSIONERS BY: •'`c ized/% ra Auth Agent S LITTLE THOMPSON VALLEY WATER DISTRICT LOCK DRAWER G Barmouc. COLORADO 80513 532-2096 .. - 7925: THE BERTHOUD NATIONAL BANK sates _ -:- SVVrHOuD: COLORADO_: _ - t t_ =PAY-,•--:i:':Fioe &-00/100-Dollars ,.�--*-+v: r-Y,�.;�- THE- ORDER,^ tOF ��i .:• .. �,� -, �September-'5'.>Y973- S`5 Board of County Commies Toners:= = _^ - of -Veld-Qonnty tHoRWMox:VALLEY' WATER* �,.'�.:_.�+��= u� la iota LS 5C-.0 5 `30 ./14.;,,;13 Je.--rsr, F 7 diA WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT / 1� �� �% _ DATE �/��QC 2CT - 19'73 PERMITTEE'S NAME �S L�,cr, J /N ���� '/�T_IP/C�f Za' .i �L )etc ADDRESS /l&2 7" `O/C4P * Your request for permission to install a o is granted, provided that the Permittee will own and maintain the same after installation. &YQre e line along et=latest County Highway No$ 1711 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The r4'e - line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion oI the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly Perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( '1 ) days from the above date. No work shall be allowed on Saturdays Cr Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads- Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense tip on written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County ri ht of way limits. S'B"-7'p e [G,oStirzt2,,ti Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must he followed or this permit may be terminated forthwith. Sy: THE BOARD OF COUNTY COMMISSIONERS WEL/ OUNTY, COLORADO Supervisor _ ting this permit the ereigned, representing the Permite, foregoing • • stone; that he has authority to sign for and bind the Pe Is bound by all the conditions set forth herein. erstands all of the the Permittee ea /7: 4/s /-/<// :2!'j S703 t SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. •1. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of au inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2^ 3^ 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90' Bends 0.3 sq. ft 0.6 sq. ft - 1.0 sq. ft. 2.2 sq. ft 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq- ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq: ft. 9.3 sq- ft. Minimum Volume of Concrete at 450 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0-66 cu- yds. 1.10 cu. yds. 1.50 cu. yds, 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original - 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the -execution, of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not he cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than ;100.00. 7:r7 7d it Ara 30 .3 44 C 40 23 x 3 32 - 30 24- 22 .... u. 2 •i 74 Tait I Iniligatilffiallil YJr I / "3 6x 1. _. i g\r_f''r .�i��.• y 1 �k•-; - Rr - ae..iiil sroTaiii I.1 `i atagi a — rlY f ! . . ` -111 rnt, : °~ _ 62 sti r m 6.n Otfm11 Velle„pisa.,Posigc " - rah Intl tr: %� W;1% NIII -J"." T la rsek r. ky....r -■�51 A� �r-• wity I c d ( ► /skis ,a, 6Rr sI liras s, .: �`' �•pi _ Iht ' ' c • ��v�lwatleagia �Y..s24j� r re-OpI A 1 ti OIHI APS4 taro rosinatipaietitrearArigtnrAii:Artrisfamm IXIII Vs ilnn.r I1 iv ss SEEM jrfj � •ir4iflMr lak ". . cilia,'" ,,, 11 i • . • "Mil1 Q ,rTs.. � it :��. • rl AFL F .. +},• • •� - �o • • ! FJ/y—_- .. r _ :� Si b- 1 L' ni '4%-lP0-IL � _ - • • r Nil r6Y• t: v , . , +sue � M M me'. . <.. -i - � s -stC * 1 . SIP+ l� "� , /; 1: l`, 9 • .. . n e ; , tw 6t ( t . f. .._• LT. �i. -?x 1-4:::4°-; --{. �_ _-. . ., .... 1. 665* ♦ -.t A 1 3 3 7 9 21 0 A 17 M 5 13 17 17 nw[• 27 29 T ,. 33 33 37 0 0 2i 6i 43 63 47 a 31 Utility 8 Transport Field Report Applicant's Name Type of Permit _ "eft _ "-'711 Permit No. 70 3 Date Issued Expiration Date 69raut73 0 r74- 7-3 :Location and Damage Report:' -Date Time (If no apparent damage at this time, so state) ro Inspection Date /at- V--73 • WELD COUNTY, COLORADO • BOARD OF COUNTY COMMISSIONERS BY: 7t 9A Au orized Agent • e 7372 Tap 1617 -Thomas • 1 1 WELD COUNTY, COLORADO ted! UNDERGROUND' AND- lutia Y`4-PERM1t DATE August 1, 1973 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave -Berthoud, Colorado 80513 Your request for permission to install a x/4,1. line along or across County Highway No. 48N at 1200+ east of intergectinn with Co. rnari Nn 17 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same alter installation, The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion ofthe right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically poeatffie. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut eh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water aver be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday workwould apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changesare made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance ofthe highway or to the installation placed inside County right of way limits. - - Maintenance Man on this section of the highway, with headquarters at s -t• [- $s -o S or his succeesor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD GOY, COLORADO Supervisor ng this permit the undersign eC ,, representing the Pennittee, verdfm that f(e bas read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. r .J2 47®6 C SPECIAL `INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES -WITHIN THE-, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or ,track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. $. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of- slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pr9MMire. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. - - 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. IL Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be' replaced. Ali damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 03 sq. ft 0.2 sq. ft. O 0$ cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 011 cu. yds. 4" 1.0 sq. ft. - 0A sq- ft. 0.20 ca: yds. 6" 2.2 sq- ft. 0.9 sq. it. - 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu- yds. 10" 5.9 84. ft. 2.5 sq. ft 1.10 cu. yds. 12" 8.5 sq. ft 3.5 sq- ft. 1.50 cu_ yds. 14" 12.0 se. ft 4.8 sq. ft. 2.00 cu. -yds. 16" 15.0 sq. ft. 6.3 se. ft. 2.70 en- yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3-40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft 4.00 cu. yds. 24" 34,0 sq. ft 14.0 sq. ft. 6.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated materiel is suitable for backfill- If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said tut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution, of said repairs. 5. If the Permittee has not repaired, said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. - 6. No open cuts within paved roadway will -be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. O. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbedprior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of saidbond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. , • 2 LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DEAN G. ANOCRSON LOUIS F. REIN JEeseRs WALTER RANEIN OCORCC A.WALNCR MA NAC ER: LO V ILO N. FACAN Mr. Byron Ewing, County Engineer 1500 Second St. Greeley, Colorado, 80631 TELEPHONE 53L2096 307 WELCH AVENUE DRAWER 6 BERTHOUD, COLORADO 80513 August 1,1973 RE;Permit tap 1617 Thomas Dear Mr. Ewing: We request a permit to excavate our existing water line on the north side of the Weld county road north of Johnstown (on half mile line) approximately 1200 feet east of intersection with county road No. 17 to install a water service for Gene Thomas located in Section 4, Township 4 N, Range 67 West. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan,hfhnager LHF/bh cc; Enc. 1 Uttility 8 Transport Field Report 72 Applicant's Name Type of Permit Permit No. �Q to Date Issued Expiration Date /5 ©c. 73 :Location and Damage Report:`.Date Time . (If no apparent damage at this time,,so state) GL' ,, te Inspection Date / j --D&73 ,F OUNTy"F y�, . • • Of RQh r17�• %1tth 9'Cmsr _ . ._oard • NOVA By ctrftr 4WD *EGO', WELD COUNTY, COLORADO - BOARD OF COUNTY COMMISSIONERS BY: Zr62fr` Au orized Agent • WELD COUNTY, COLORADO • UNDERGROUND AND UTILITY PERMIT /a) DATE July la PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Avenue - Berthoud, Colorado 80513 Your request for permission to install a a ys- PAl 1973 4 inch line along or across County Highway No 34 at la miles east of U$25 thence east a distance of 1300 feet. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 4" _VC water line shall be Installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut sh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. NO open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that, would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this i Ration and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. BY: Ma Supervisor In • ng this permit the tinders . . , representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has autho , to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. friez2/777e4( • • et I. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require theservices of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2" 3" 4^ 6" 8" 10" 12^ 14^ 16" 18^ 20" THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 aq. ft. 3.8 sq. ft. 5.9 sq. YL 8.6 sq. ft. 12.0 sq. ft. 15.0 sq- ft. 19.0 sq. ft. 24.0 sq. ft. 24" 34.0 sq. ft Minimum Thrust Area for 46° Bends 0.2 sq. ft. 0.3 sq. ft 0.4 sq. ft. 0.9 so. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 eq. ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 en. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 eu.yds. NOTE TO APPLICANT; This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backlit!. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. G. No open cute within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be In the amount necessary to repair or replace said d9 Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. A • LITTLE THOMPSON VALLEY WATEIRISTRICT DIRECTORO DEAN O. ANDRRROH LOUIS F. MIN ALBERT N. JEIFEM NORMAN MOM, O.V.Y. DAVID MCOEE YAMACRRI LOVILO N. FAGAN July 12, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 532.3095 3o7 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 50513 RE: Miles line modification We request a permit to install a four -inch PVC water line on Weld County road No. 34 comm9cing 1 1/4 miles ease of U.S. 25 and continuing east for a distance of 00 feet. This line would parallel and event- ually replace our existing line on the north side of county road No. 34. Enclosed is a permit form which I have executed. LHF/km cc: Enclosure Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager Utility & Transport Field Report � 70 Applicant's Name aLetnr.,e,n d,r+ at. 43.c.,2t Typa of Permit Permit No. 6 7/ Date Issued r 7/ .� Expiration Date ` 6 :Location and Damage Reporti .Date Time (If no apparent damage at this time, so state) Inspection Date / • 7 BY: WELD COUNTY, COLORADO BOARD OF COUNTY COW4ISSIONERS S OF .Gpnvrr• _. .1._ ss- COUNT DE WELD • rd _. filed vrth the Cied< of. -he of CountY Commisv "'C Y tE NOV 73 Au 4601 7872 Crane PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND. AND UTILITY PERMIT DATE Little Thompson Valley Water District July 16, 307 Welch Avenue — Berthoud, Colorado 80513 19 73 Your request for permission to install a 3/4" S,7atPr line along or across County Highway No. 36 at a mile east of intersection with Co. road :Jo. 7 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth or 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or *th- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case Shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the shove date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (Phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at Its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. s -r 7-9+-ro 8' Maintenance Man on this section of the highway, with headquarters at or bin. successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD C)i17JV,COLORADO � By: In 'y piing this • •. t the • • signed, representing the Permittee, vgrifes that he has read and understands all of the foregoing provisions; that he has an.. ority to sign for and bind the Permittee- and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 7, t SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES: -WITHIN THE. RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. n. Any materials from excavation as the result of utility installation will be removed from highway surface EACR DAY. ^.. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services ofan inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditcies cr borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. - THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3^ 4" 6" 8" 10" 12" 14^ 16" 18" 20^ 24^ Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft.. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft 3.8 eq. ft. 5a sq. ft. 8.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24_0 sq. ft_ 34.0 sq. ft Minimum Threat Area Minimum Volume of Concrete foe 45° Bends at 45* Vertical Bends Down 0.2 sq. ft. 0.3sq.ft 0.4 sq. ft 0.9 sq. It. 1.6 sq. ft - 2.5 sq. ft. 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 en. yds. 0.11 cu. yds. 0.20 Cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 Cu; yds_ 2.70 Cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 ca.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cats across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous nits will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the' execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and. acceptance .of therestored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dim turbed portion of the hard surfaced roadway. Said bond shall not becancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however. in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DEAN O. ANDERSON LOUIS P. nun ALRER7 N. JEFFERS NORMAN GIRu. D.V.M. DAVID MCGEE MANAGER' LOVILO M. PAGAN July 16, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 532.2096 307 WELCH AVENUE DRAWER O BERTNOUD, COLORADO 50513 RE: permit Tap 1609 - Crane We revyest a permit to excavate our existing water line ofi the South side of Weld County Road No. 36 approximately 1/2 mile east of intersection with County Road if 7 to install a water tap for Bill A. Carne located in the NW 1/4 of Section 10, Township 3 North, Range 68 West. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/I cc: Enclosure Utility 8 Transport Field Report Applicant's Name Type of Permit Permit No. 7,&1 Date Issued Expiration Date .43-42..t73 . :Location and Damage Report:'.Date Time • (if no apparent damage at this time, so state) Inspection Date l 52t7-� i �_eQU€VTYO ADO_,_ •5�_... .� o� Co�ntTilld4An Et rk Ot s!o oatd YComms_ NQV1 . 273- 8i WELD COUNTY, COLORADO BOARD OF COUNTY COMISSIONERS BY: Ac cg At orized Agent 4eicit -7 nn. PERMITTEE's NAME WELD _COUNTY. COLORADO - UNDERGROUND AND 'UTILITY` ` PERMI-`r DATE Little Thompson Valley. Water District ADDRESS 307 Welch Avenue Berthoud, Colorado S0513 Your request for permission to install a 3/4" water line along or across County Highway No. at mile South of intersection with Co_ road No_ 46 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4m rr PtPr line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall bo made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re. quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance withdirections given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may he terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD ,BIO.t1'ITV,:COLORADO. ` Supervisor this permit the unders - ed, representing the Permitter, verifies that he has read and understands all of the forego , „ sign; that he has arth, ' to Sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL - 1NSTRUCT!ONS REQUIREMENTS FOR INSTALLATION/ OF UTILITIES -.WITHIN:- THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavementregardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado. prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. Nc segregation of material 'will be permitted. 12. The construction of underground installations will generally require the services ofan inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection in reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Fermittes, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. MI damaged sections are to be inspected by Wad County, Colorado, before being concealed in any manner. Drainage ditches or borrow pith are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. • THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90" Bends 2" 0.3 sq. ft. 3" 0.6 sq. ft. 4" 1.0 sq. ft. 6" 2.2 sq. ft. 8" 3.8 sq. ft. 10" 5.9 sq. ft. 12" 8.5 sq. ft. 14" 12.0 sq. ft. 16" 16-0 sq- ft. 18" 19.0 sq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45" Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sQ. ft. 0.9 sq. ft. 1.6sq. ft, 2.5 sq. ft. 3.5 sq. ft. 4.8 eq, ft. 6.3 sq. ft. 7.9 sq- ft. 93 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 45" Vertical Bends Down e.05 cn. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 ca. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 ca. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only atter the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for b.:ckfill-If it is de. termined unsuitable the material will be ,removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year alter construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execation of said repairs. 5. If the Permittee has not repaired said Open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. C. No open cuts within -paved roadway will be.aflowed without scoring pavement parallel to the center line of the utility and perpendicular to\the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway_ S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person tanning the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recoveryby the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTOR(. DEAN 0. ANOCR(oH LODIB F. REIN ALBERT H. JETIERB NORMAN Dmos*. O.V.N. DAVID NCO(( LOVILO H. FADAN July 16, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 592.209( 907 WELCH AVENUE DRAWER O SERTHOUD, COLORADO 50519 RE: permit tap 1610 - Hayden We request a permit to excavate our existing water line on the east side of Weld County road No, 17 approximately 1/4 mile south of county road No. 46 to install a 3/4" water service for Ray Hayden located in Section 16, Township 4 North, Range 67 West. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT a/ 7a Lovilo H. Fagan, Manager LHF/kg cc: Enclosure Utility 8 Transport Feld Report Applicant's Name 7 ?Q �%�c; Type of Permit _ Permit No. Date Issued 707 Expiration Date / gym- 73 Location and Damage Reports' •Date (If no apparent damage at this time, • Inspection Date / �c9'"t L 3 • • Time . so state) O.c WELD sS. sled L CI rk f t!ie board• Jof County Conirn .' _ _ :1401; 1 1973 COUNT, anti! 4 D auctfr,rp��I WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: gel:64 64 Autho ed Agent Seymour tan 1602 WELD COUNTY, COLORADO UNDERGROUND AND UTtLITT PERMIT DATE June 22 19 73 PERMITTER'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave. - Berthoud, Colorado 80513 n Your request for permission to install a 3/4line along or across County Highway No. 7-3at 1/4 mile south of intersection with Colo highway 66 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld Ccnnty and that the Permittee will own and maintain the same after Installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the Shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut eh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the Installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof. and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( o0 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No Open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone. Power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this in ation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS W EL4, AOJ4NTY, COLORADO opting tlrn permit cosigned, representing the Permthat be link read aid understands all of the foregol, _ 'visions: that be authority to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein_ #4 es -7 r SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OP UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without math. 2. All disturbed portions or right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. It No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per ]let below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W°'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq- ft. 1.0 se- it 2.2 sq. ft - 3.8 sq. ft. 5.9 aq. ft 8.5 sq- ft. 12.0 sq. ft - 15.0 s9. ft. 19.0 sq. ft - 24,0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 eq. ft. 0.4 sq. ft. 0.9 sq. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.5 sc. ft. 6.3 se,. ft. 7.9 Sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 3.66 cu- yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 Cu- yds. 5.20 cb.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cute for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or eats within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non.caacellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than *100-00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS; DEAN G. ANDERSON LOWS R. ERIN ALSERT H. JEERERS NORMAN SIRES, D.V.N. DAVID NCGEE MANAGER, LOVILO H. PAGAN June 22, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: We request a west side of Weld to install a 3/4" tion 30, Township approximately 1/4 TELEPHONE 532-2096 907 WELCH AVENUE DRAWER O SERTHOUD. COLORADO SO513 RE: permit Seymour tap 1602 permit to excavate our existing water line on the County road No. 13 and to bore under the highway water service for Gregory Seymour located in Sec - 3 North, Range 67 West. The tap will be located of a mile south of Colorado Highway 66. Enclosed is a permit from which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/kg cc: Enclosure c .O - 2_3 Reichert tap 1041 WEIR:COUNTY, COLORADO - UNDERGROUND . AND 'print ` PERMIT • DATE June 14 1973 PERMITTER'S NAME Little Thorpson Valley Water District ADDRESS 307 Welch Ave - Berthoud, Colo 80513 You requ t rmiseio to instgll a ?n line o se e!:? Co my horsy No be ,innIlg, reef sou n of intersection er Goo. roe$ m -use;: 2" PAC line s,p to for 550 feet including bore for service cnnnerJt1nn is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cane the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 9n line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made In six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or leek- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be impelled or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. . - - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installation such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at —, or his successor, will represent Weld County, Colorado. ₹n the construction of this ins t ation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may be terminated forthwith. ay: THE SO- i - COUNTY COMMISSIONERS WEL' � i • I. COLORADO 1.. ,frizyi A a In cep • • : this permit the and -• gued, representing. the Permittee, verities that be has read and understands all of the foregoing p . •. •n; that he has auth• ty to sign for and bind the Permittee; and that byvirtue ofhis signature the Permittee is bound by all the conditions set forth herein. X677 4 SPECIAL ' INSTRUCTIONS REQUIREMENTS FOR ‘INSTALLATION, OF UTILITIES -WITHIN;' THE -:-RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is tome installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 pal pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services ofan inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4^ 6" 8" 10" 12^ 14^ 16" 18" 20" 24^ Minimum Thrust Area for tees and 90' Bends 0.3 eq. ft. 0.6 sq. ft.. 1.0 sq. ft. 2.2 sq. ft. 8.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. tt. 24.0 sq. ft. 34.0 eq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 SI. ft. 0.4 sq. ft. 0.9 sq. ft -. 1.6 sq. ft. 2.6 sq. ft 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft Minimum Volume of Concrete at 456 -Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 at. yds. 1.10 ca. yds. 1.50 en. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 en. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work Is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by 'Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of ono (1) year after construction whether in a gravelled surface or a paved roadway, If said cut is in need of repairs, Permittee is allowed seven (7) days after notification:for the execution; of said .repairs. 5. If the Permittee has not reyeired.'said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway tobe disturbed prior to the commencement of the work. said bond shall assurerecoveryby the. County of any expense incurred, within a period of one year following the completion and acceptance of the restoredportion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dim turbed portion of the bard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. a LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS' DEAN a. ANDERSON LOUIS R. REIN ALBERT N. JEFFERS NORMAN OIRBn, O.Y.Y. DAVID MCOEE MANAGER. LOVILO N. SAGAN June 16, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 5323096 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 80513 RE: permit Reichert tap 1041 We request a permit to extdnd our existing water line in the east borrow area of Weld County road No. 17 a distance fo 550 feet and to boe under the highway at that point to install a 3/411 copper service for Edward Reichert locatdd in the SE 1/4 of Section 29, Township 4 North, Range 67 Wgat. 00r existing water line is located in the east borrow are of county road No. 17 and presently terminates 3,250 feet south of the intersection with County road No. 42. The additional 550 feet wil be 2 inch class 200 PVC pipe. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT LHF/kg cc: Enclosure Lovilo H. Fagan, Manager Mayo Tap -1597 PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND- AND ' wintry -PERMTr DATE June 12, t2Rx ie Little Thompson Valley Water District 307 V!olch Ave- Berthoud& Colorado 80513 Your request for 3/4"permission to install a line along or across County Highway No. I at 5/8 of a mile south of Colo Highway 60. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4'i water Une shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code andto such statutes as are applicable. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Pernittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs Or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance will_ directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this instal on and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: In . tang this permit the undo igned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has auth ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee Is bound by all the conditions set forth herein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES % WITHIN. THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or' track equipment to work on or move over asphalt surfaces without mats_ 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. a. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. - 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee. at a rate specified by Weld County, 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainageor siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below_ THRUSTBLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete. Pipe Size for Tees and 90° Bends for -45° Bends - at 45 Vertical Bends Down 2" 0.3 eq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds, 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft-. 3-5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 HQ- ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 Cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select rata base material compacted to 90% of original. 3. Site inspections by Weld .County, Colorado, will determine whether excavated material is suitable far baekfill. If :t is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 1. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the' execation of said repairs. 5. If the Permittee has not r"epalied befd, open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith - 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair, and/or maintenance without further dis- turbing the roadway. S, No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut then in such case a non -cancellable cab or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bend shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100-00, LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS. DUN D. ANDERSON LOUIS I. REIN ALBERT M. JEmRS NORMAN GIRSS. D.Y.Y. DAVID MCGEE MANAGERI LOV140 M. FAGAN June 12, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 89531 Dear Mr. Ewing: TELEPHONE 582-2096 507 WELCH AVENUE DRAWER 0 BERTHOUD. COLORADO 80513 RE: permit Mayo tap 1597 We request a permit to excavate our existing water line on the west side of Weld County Road No. 1 and to bore under the road to install a 3/4" Water service for Mike Mayo located in Section 6, Town- ship 4 North, Range 68 West. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/kg cc: Enclosure -V2 O. 73 Beierle Tap 1598 WELD" COUNTY, COLORADO UNDERGROUND AND UTILITY= PE-RMtT' DATE June 12 n_73 PERMITTEE'S NAME Little Thompson Valley t.:'ater District ADDRESS 307 ::elch Ave — Berthoud, Colo 80513 Your request for permission to install a 3/4" water line along or across County Highway No. 5 at 500 feet south of intersection with Co. road No. 34 is granted, provided that the Permittee will own and maintain the same alter installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shell be installed beneath the surface of the right of way at a minimum depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition. The back tilling on the shoulders shall be made in six-inch lifts and mechanically tamped and pecked, and the last twelve inches of back fill shall be of stable granular material anch as crusted rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation stall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it stair be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be impeded or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to suck statutes as are applicable. - SPECIAL PR9VISIONS: Attached t.. ., i OZ`S L The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect, ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld Comity, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Ily: Ms THE -BOARD OF COUNTY COMMISSIONERS WEL,/ ' .' 'FY, COLORADO In ac. .. . this permit the nn' =. S. representing the Permutes, verifies thathe hasread and understands all of the foregoing provisions: that he has antho • + to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. crei SPACIAL: INSTRUCTIONS REQUIREMENTS FOR INSTALLATION' OF UTILITIES WITHIN THE. RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from" toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Comets Pipe Size for Tees and 906 Benda for 456 Bends at 456 Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft 0.9 sq. It. 0.37 cu. yds, 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - 2.00 cn. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 ea. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion oI Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3: Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backf111 If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for. the -execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all oxpenees connected therewith - 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must becut, then in such case a non -cancellable casb. or surety bond payable to the County shall be required in the name of the contractor or the person causing 'the hard surfaced roadway to be disturbed prior to the commencement of the work, self bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dia. Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS: DEAN C. ANDERSON Louts F. REIN K. .EEEERS J. WALTER RANKIN GEORGE A. WALKER MA NACKR: LO V ILO M. PAGAN June 13, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80531 Dear Mr. Ewing: TELEPHONE 531.1056 307 WELCH AVENUE DRAWER a BERTHOUD, COLORADO $0313 We request a permit to excavate our existing water line on the west side of Weld County road No. 5 approximately 500 feet south of the intersection with county road No. 34 to install a water service for Robert E. Beierle located in Section 17, Town- ship 3 North, Range 68 West. No bore will be required. Enclosed is a permit form which I have executed. LHF/ma cc: Very truly yours LITTLE THOMPSON VALLEY WATER DISTRICT 7 77101 Lovilo H, Fagan, Manager 4. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME ADDRESS Your request for permission to install a DATE e • ftQ / `,teLert4ii. Zl�d e ,1979 line along or across County Highway No is granted, provided that the Permittee wfCl own anaintaln the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 4f/ et --7:17,_ line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible- This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as aro applicable; - - - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 9e) ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in tray ed roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County Ht of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this fcttallation and any directions that be may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD, gtlfljiY, COLORADO e Supervisor In accs. ng this permit the under ned, representing the Permittee, ver3ffes that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and thfby virtue of his signature th e5itt is bound by all the conditions set forth herein. etii-7‘ 4P/9.so R q2.5- 'lz X73 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES V/ITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway - 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted_ 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee. at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. MI damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling la completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size Minimum Thrust Area Minimum Thrust Area for Tees and 90° Bends for 46° Bends Minimum Volume of Concrete at 450 Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0-05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 en. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq- ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20^ 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds- NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one Inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether In a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width oI 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Utility a Transpaxt Field Report Applicant's Name _ Type of Permit Permit No. Date Issued Expiration Date (P6P.- :Location and Damage Reports . Date O :529-4;.----2.3 Time (If no apparent damage at this time, so state) Inspection Date /Z a&c,73 WELD COUNTY, COLORADO - BOARD OF COUNTY COMMISSIONERS BY: Au erizad anent Au orized Agent 3697^n/` Tap 1593 �-C� Lie/ -&• 7 j Martin WELD COUNTY, COLORADO' UNDERGROUND AND 'UTILITY PERIYIIT DATE PERMITTEE'S NAME Little Thompson Valley '.;rater District ADDRESS 301 Welch Ave - - Berthoud, Colorado 80513 Your request for permission to install a 3/4n May 29 line along or across County Highway No. 3 1/4 mile south of intersection with Co. road #40. is granted, provided that the Permittee will own and maintain the same after installation. 19 73 at IT IS UNDERSTOOD that the Permutes will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back Oil shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut sh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying strictures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching_ In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached r • The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power. water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado_ Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. C --Q this Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this atallation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Stlpervilef In a'tr: ng this penal the nnd: _ ' ed, representing the Permitted, verifies that he has read and understands all of the foregoing provisions; that he has aority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE Sri, OF COUNTY COMMISSIONERS WELDi { TTY, COLORADO 1 �� 1 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to the of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure - 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. l0. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits ore to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Benda for 45° Benda - at 45° Vertical Bends Down 2^ 0.3 sq. it 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 eq. ft. 0.3 sq. ft. 0.11 Cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 en. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 eq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 16.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft 7.9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 en. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 eu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across: the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of originaL 3. Site Inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches - 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DEAN O. ANDERSON LOUIS I•. REIN ALBERT M. JEEIER, NORMAN OIRES, D.V.Y. DAVID WOKE NANAOERI LOVILO M. FAGAN May 29, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 592.2096 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 60513 RE: permit Martin -tap 1593 We request a permit to excavated our existing water line on the west side of Weld County road No. 3 approximately 1/4 mile south of the intersection with county road No. 40 to install a 3/4" water ser- vice for Brian Marlin located in Section 32, Township 4 North, Range 68 West. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LRF/kg cc: - 7 1 j Benton -Tap 1::"75 PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORA'DO: UNDERGROUND , AND UTILITY ` PERMIT DATE F71ay 7 19 73 Little Thompson Valley "later District 307 VIelch Ave - Berthoud, Colorado 80513 Your request for permission to install a 3/4" line along or across County Highway No. 38 at 100 feet east of intersection with Co. road No. 7 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" - line shall be installed beneath the surface of the right 0f way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six -Inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or graveL Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no ease shall the flow oI water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such etatates'-as are applicable. - - -- SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ._... ( 6C ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. _. THE BOARD OF COUNTY COMMISSIONERS WELDTV. COLORADOS SAC r,, r 2././7.d U By: ttee.�thaV9 has Ming this p t the igned, representing the Perms v he read and understands all of the forego ro dons; that be has a ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee Is bound by I the conditions set forth herein. 9- 1 SPECIAL INSTRUCTIONS REQUIREMENTS FOR, INSTALLATION OF UTILITIES -.WITHIN, THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. .>. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special previsions. 5, Mud -jacking will be required where bores are larger than line's or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size - S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameteror more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling, highways along the slope of the shoulder- In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. .. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2" 3^ 4^ 6^ 8" 10" 12" 14" 16" 18" 20" 0.3 sq. ft 0.6 sq. ft. 1.0 sq. ft. 2.2 eq. tt. 3.8 eq. ft. 5.9 sq. ft. 8.5 sq. ft. 12M sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft - Minimum Thrust Area for 45* Bonds 0.2 sq. ft. 0.3 ea. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 aq. ft. 4.2 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cn. yds. 0.11 cu. yds. 0.20 cu. yds_ 0.37 en. yds. 0.66 cu. yds. 1,10 cu. yds- 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 2.40 cu. yds. 4.00 cu. yds. 24^ 34.0 sq. ft 14.0 sq. ft. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met - 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for booklet. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee- 4, Permittee assumes responsibility for the maintenance of all open cuts for a period of one (I) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification forthe.- execution, of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway_ 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be In the amount necessary to repair or replace said dis- turbed portion of the hard surfaced. roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. • LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS, DEAN D. ANDERSON Loins I. MEIN ALBEIT N. JEIVER, NORMAN DM'S. D.V.N. DAVID M[OEE MANAGER, LOVILO N. IAGAN May 7, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 532.2096 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 80513 RE: permit tap 1575 - Benton We request a permit to excavate our existing water line on the north side of Weld County Road No. 38, 100 feet east of the inter- section with Weld County Road No. 7, and to bore under the oounty road to install a water service for Ernest Benton on Lot 21A - Fair- ways Living Estates located in Section 3, Township 3 North, Range 68 West. Enclosed is a permit form which I have executed. very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/kg cc: Enclosure PERMITTEE'S NAME ADDRESS age O S ✓i- 7cY WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE A 7 crl // 'E SONS Pr cSer v/ c &, Rio//n% Co/oredo IB 73 Your request for permission to install a if Stet I P! a line along or across County Highway No. Z / , at nohffj o f Poet✓ 4L' is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. e /J The O fe e / /' line shall be installed beneath the surface of the right of way at a minimum depth of 35 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in Six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted - This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable.. SPECIAL PROVISIONS:Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss anddamage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. 'CV Maintenance Man on this section of the highway, with headquarters at l �1�1 LL or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ms" L- Supervisor THE BOARD OF COUNTY COMMISSIONERS WELD CO/U' •LORAL f In a "*:i ting this permit the u ' ersigned, representing the Permlttee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL- INSTRUCTIONS REQUIREMENTS -FOR -INSTALLATION- OF UTILITIES --WITHIN- THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition Is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be Installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector tarnished by Weld County. Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected' by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46° Bends at 45* Vertical Benda Down 2" 0.3 sq. ft 0.2 sq. ft. 0.05 cu. yds. 3,, 0.6 sq. ft. 0.3 sq. ft 0.11 cu. yds. 40 1.0 sq. ft. 0.4 sq. ft. 0.20 ca. pds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 8.8 sQ. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3$ eq- ft 1.50 cu. yds. 14" 12.0 sq. ft. 4:8 sq. ft. - 2,00 en. yds. 16" 15.0 eq. ft 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq- ft. 3.40 cu- yds. 20" 24.0 sq. ft 9.3 sq. ft, 4.00 cu. yds. 24" 34.0 sq. ft 14.0 sq. ft. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determinewhether excavated material is suitable for backfill If it is de- termined unsuitable the material will. be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee Is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said - open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completionand acceptance of the restored portion or portions oI the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTN.ITY PERMIT DATE 08 Mar 19 72 PERMITTEE'S NAME ADDRESS Left Hand Water Supply Company Box 146 Niwot 80544 Your request for permission to install a 3/4" - line along oran County Highway No. T at Co Rd 4 Sec 28 TAX R68W is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The Y*++ line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or tack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the Installation crosses any ditch, canal or water e arrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be Imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable, SPECIAL. PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed. with the installation, maintenance, alteration, removal or presence of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations- Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated br Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning sign or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ED HORST Maintenance Man on this section of the highway, with headquarters at JOHNSTOWN or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO By: In cep +: this p' l it the nn' :. ed, representing the Permittee, verifies that he has read and understands all of the foregoing p . 'us; that he has an • •rite to sign forand bind the Permittee; and that by -virtue of his signature the Permittee is bound by all the conditions set forth herein_ Signed: See attached SPECIAL INSTRUCTIONS REQUIREMENTS -FOR INSTALLATION OF UTILITIES WITHIN THE. RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work oe or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions, 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pita are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90• Bends for 46• Bends at 45• Vertical Benda Down 2" 0.3 sq. ft 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0-9 sq. ft. 0.37 en. yds. 8" 3.8 sq. ft. 1.6 sq. ft 0.66 cu- yds. 10" 5.9 sq. ft. 2.5 sq. ft. LID cu. yds. 12" 8.5 sq. ft. 3-5 so. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 eq. ft. 2.00 on. yds. 16" 16.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 so. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft 9.3 eq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1- No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for back fill. If ft is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs_ 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LEFT HAND WATER SUPPLY COMPANY Box 146 Niwot, Colorado 80544 Phone 776-0242 March 10, 1972 Byron Ewing, Engineer Weld County 1500 Second Street Greeley, Colorado 80651 Dear Mr. Ewing: 7e wish to request a permit to install a 3/4 inch water service pipe on Road #7. The location will be approximately 20 feet North of the intersection of Road #4 and Road #7 in Section 23, TIN, R68 „ of the 6th P.M. 5;c propose cutting the East burrow ditch to expose our pipe and also cutting the west burrow ditch 2 feet wide by 10 feet long to set our boring machine in. le will make a bore. RJ/gm 5/4 inch Sincerely, CP ely1/2442 Robert Juhi Foreman AP- 353 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 16 19 71 PERMITTEE'S NAME LEFT HAND WATER SUPPLY C(PMK ADDRESS P.O. Box 146, Niwot, Colorado 80544 Your request for permission to install a _ .9 inch line along or Afitair County Highway No. 1/2" mile south of 44 for a diatanch_of1,OO feet _ is granted, provided that the Permittee will own and maintain the same after installation. at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Pormittee will own and maintain the same after installation. The 2 inch water line shall be installed beneath the surface of the right of way at a minimnm depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof. and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance. alteration, removal or pre cone of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 3 ( thirty ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result In the maintenance of the highway Or to the installation placed inside County right pf way limits. Cr"- , Maintenance Man on this section of the highway, with headquarters at C//RfTZ'-i*-' ✓ , or his successor,- will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent With the intent or this permit must be followed or this permit may be terminated forthwith. By: Ma THE '•ARD OF COUNTY COMMISSIONERS Wt TY, c JO7 In a eD• •: this permit the undersigne• representing the Permittee, verifies that he has read and understands all of the foregoing p -Mons; that he has anthorl . sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Left Hand Water Supply Company L•K. Brackenbury, Superintend t 2ge SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1`. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation `will' be removed from highway surface EACH DAY. i. Under no condition is an asphalt surface to be cut unless otherwise specified in the special yroyisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends -of bored sections ARE NOT to be covered before being; inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe'of slope to- toe of slope under all -highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the elope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Benda Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 on. yds. 12" 8.5 sq. ft. - 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.3 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18^ 19.0 sq. ft. 7.9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft. 9-3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut Is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din turbed portion of the hard surfaced roadway. Said - bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the boud,be less than $100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 15, 1971 ,1s _ PERMITTEE'S NAME ADDRESS Left Hand Water Supply Company P.O. Box 146, Niwot, Colorado 80544 Your request for permission to install a 3/4" 1/4"mile W. of Road #7 on Road #12 line along or across County Highway No. at is granted. provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the ins aillaUon crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath In a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted - This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to suchStatutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agendas thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. thirty This work shall be completed within 30 ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operatioaa- Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as =alleles and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent - In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way petits. Esc/ / Maintenance Man on this section of the highway, with headquarters at A/2' �' "." or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. TH- -OAR➢ OF COUNTY COMMA ERS TY, LORA Sy: Ms In accethis permit the undersign representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has autho to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Left Hand Water Supply Company L.R. Brackenbury, Superintend SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTtUTIES -WITHIN THE .: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or ltrack-equipment to work on or move over asphalt surfaces without math. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. tinder no condition is an asphalt surface to be cut unless otherwise specified in the -special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size.• 8. Encasement of line will he required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond tbo shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires Inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner Drainage ditches or borrow pits are to be restoredto original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipesas per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cn. yds. 6" 2.2 sq. ft 0.9 sq. it. 0-37 cu. yds. 8" 3.8 sq. It 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft. 23 sq. ft. 1.10 en. yds. 12" 8.5 sq. ft 3.5 sq- ft 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - 2.00 ` cu. yds. 16" 15.0 sq. ft 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft- 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for - the execution of' said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completionand acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dio turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by -the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. . PERMITTEE'S NAME ADDRESS P.O. Box 146, Niwot, Colorado 80544 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 15, Left Hand Water Supply Company 19 71 Your request for permission to install a line along or across County Highway No. at 1 mile North of Road#14 on Road #5 Is granted. provided that the Permittee will own and maintain the same after installation. IT IS IINDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4■ line shall be installed beneath the surface of the right oI way at a minimum depth of 36 inches, and the disturbed portion of the right oI way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. 30 This work shall be completed within ( thirty ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected daring this installation with proper warning signs or signals both day and night. 'Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way 1 . �' , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: al war THE RD OF COUNTY COMMISSIONERS WE TY, RADO L 4- Q4f1,��o In ac • •pti ' : this permit the undersigned epresenting the Permittee, verifies that he has read and understands all of the foregoing pro • ... e: that he has authority •• sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, Left Hand Water Supply C L.K. Brackenbury, Superinten ent X2)7 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. co'cleated or track 'equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition ata time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut unless otherwise specified In- the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to bo inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0-3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft 3.8 sq. ft. 5.9 sq. ft. 8.5 SQ. ft. 12.0 sq. ft - 15.0 sq. ft - 19.0 sQ. ft. 24.0 sq. ft. 34.0 sq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 aq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0-05 cu- yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General; Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1- No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5- If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 1100.00. #2 PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 15 19 71 P.O. Box 146, Niwot, Colorado 80544 Your request for permission to install a 3/4 line along or across County Highway No. 1 mile Nlorth of Coup y Road #14 on County Road #5 at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 line shall be installed beneath the surface of the right of way at a minimum depth of 26 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of largerdiameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however- open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable- . . . SPECIAL PROVISIONS:Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 ( 'Phi rty ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this Installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way its. �—crf/ f✓ r Maintenance Man on this section of the highway, with headquarters at �P I U C7 CflX) , or hie successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. BY: Ma In accep rvtsor this permit the undersigned, r foregoing provisions: that he has authority to is bound by all the conditions set forth herein. ARD OF COUNTY COMMISSIONERS esentiug the Permittee, verifies that he has read and understands all of the for and bind the Permittee: and that by virtue of his signature the Permittee Left Hand Water Supply Comenf/ L.K. Brackenbury, Superint ent SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALtATION-OF UTILITIES WITHINTHE:: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation wine removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 3. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected - 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of- slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed In the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Fermittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Alldamagedsections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion Immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15, Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45' Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft 0.11 cu- yds. 4" 1.0 sq. ft 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft 0.9 sq. ft. 037 cu- yds. 8" 3.8 sq. ft. 1.6 sq. ft 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft 1-W Cu- yds, 14" 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq- ft 6.3 sq- ft- 2.70 cu. yds. 18" 19.0 sq. ft. 7,9 sq- ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft 4.00 cu. yds. 24" 34.0 aq• ft. 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done - SPECIAL PROVISIONS: Gcnenal: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back rill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. Site inspections by Weld County. Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. if said cut is in need of repairs, Permittee is allowed seven (7) days after notification-tor,the - execntion. of said repairs. 5. If the Permittee has not reyeired-oafd-Open cut or eats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith - 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person ` causing the hard surfaced roadway tie be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored. portion or portions of the hard surfaced roadway- Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall thebond be less than $100.00. , 3. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE J'y 1 5 19? 1 PERMITTER'S NAME Left Hand Water Suup1y gapsnv ADDRESS P.O. Box 146, Niwot, Colorado 80544 j)s Your request for permission to install a 3/ line IOWA/ across County Highway No. at z mile E. $ County Road #7 on Road #6 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in sin -Inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Pack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way- No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable_ - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado. the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 (_thirty ) dais from the above data No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations- Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning sign and signals shall be installed by and at the exp enso of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at `/ t'L7 ifS ,,L. or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. TH ARD OP COUNTY comma:So1 NS NTY, cOi,.0RAD0„ tie” - By: Caoizeda In sergdling this permit the under& ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that be has anth to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. LEFT HAND WATER SUPPLY COMPANY L.K. Brackenbury, Superintendel X21 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN- THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. do cleated or track equipment to work on or move over asphalt surfaces without math. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be:removed from -highway surface EACH DAY. f. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. ;rind -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 6. Encasement of line will be required from toe of slope to toe of slope under all highways and 5avell County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Slue 2" 3" 4" 6" S" 10" 12" 14" 16" 18" 20" Minimum Thrust Area Minimum Thrust Area for Tees and 90° Benda for 45° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq- ft_ 5.9sq. ft. 8.5 sq. ft - 12.0 eq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 aq. ft. 1-6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. Minimum Volume of Concrete at 45, Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 en. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 ca. yds- 3.40 Cu- yds. 4.00 cu. yds. 24" 34-0 sq. ft 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work Is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are net. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavatoa is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for baekfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway, S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din. turbed portion of the hard surfaced roadway- Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 2100.'00. WELD COUNTY, COLORADO UNDERGROUND AND UTILiTY PERMIT DATE July 15, 1971 PERMITTEE'S NAME reft. nand Water Supply _ 19 _ ADDRESS P.O. Boa 146, Niffot, Colorado 80544 Your request for permission to install a tine along or across County Highway No. at 1/4 mile south of County Road #6 on County Road fl is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. n The _ j/4line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe oI larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code andtosuch statutes as are applicable. :_ .. - - -- SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 ( thirty ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as nianboles and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right gf way jimite. Cr- , / Maintenance Man on this section of the highway, with headquarters at C;#3 4J c f 0'-" i✓ , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. 13y: Ma Maar In ac epti this permit the undersign , representing the Permittee, verifies that he has read and understands all of the foregoing pro s; that he has author' sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE ARC OF COUNTY COMMISS1O RS WEi. NTY. a/a 169 Left Hand Water Supply C L.K. Brackenbury, Superintends t as SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALI:ATION•OF UTILITIES.WITHtN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or thack equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will' be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. mud -.jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and. size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road Intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Alt damaged sections are to be inspected by Weld County. Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling iv completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends In water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft 5.9 sq. ft 8.5 sq. ft 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area foe 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft - 1.6 aq. ft. 2.6 sq. ft. 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cn- yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are: met - 1. No open trenches or hazardous rats will be left over night or on weekends. Excavations will be securely tamped to pre. vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more 'than six inch mechanically tamped lifts and the final one Inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1.) year after construction whether in a gravelled surface or a paved roadway. If said cut is In need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5, If the Permittee has not repaired said open cut or cats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred. within a period of one year following the completion and: acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bend shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. J 'STATE Or COLORADO COUNTY OF WELD sS. ' i"0 ,•?1 ;: =.Lie Clerk of the Board of Co .y Comm ssin-...s KENNETH L. BRUNS & ASSOCIATESIN1 APR 19 1371 CONSULTING ENCINEERS LAND SURVEYOR$ 1035 COFFMAN ST. LONGMONT, COLORADO 80501 April 15, 1971 Board of County Commissioners Weld County Weld County Courthouse 9 Avenue and 9th Street Greeteyy Colorado 80631 Gentlemen: COIiwiv a nN AND 5[m4ECR BY Deputy 776-8610 Construction work has been substantially completed on the Left Hand Water Supply Company water line proejct from Rinn to Del Camino (Job No. 694.13) and it is our desire to obtain your approval of the restoration of the job site. If the site is approved, please acknowledge at the bottom of this letter and return one copy to this office. Very truly yours, KENNETH L. BRUNS & ASSOCIATES, INC. Kenneth L. Bruns, P.E. & L.S. President ACKNOWLEDGED By Baro County ommissioners Weld County, Colorado Title Chairman Date April 28, 1971 Enc. KLB:ks ADDRESS • Your request for permission to install a 3 service line along or across County Highway No. 13 at il/2 mile South _o_f_ Road i 10 is granted, provided that the Permittee will own and maintain the same after installation. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE March 3 19 71 PERMITTEE'S NAME Left Hand Water Supply Company P. 0. Box 146, Niwot, Colorado 80544 IT IS UNDERSTOOD that the Permittee will causethe installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" Servi ce line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill ahall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling eh all be permitted Where the Installation crosses any ditch, canal or water carrying strnetures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 30 (thlrtY) ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMM(SSIQNERS WE 'll-mil! BY: aa5FI,J/J E- In Dung this permit the and.. . ed, representing the Permittee, verifies that he has read and understands all of the is ouvisions; t he has f.au• , er to sign for and bindthe ,R tree; and by virtue of his signature the flee is bound by all the conditions set t, herein. i /1/2 --ezi-Z+:~^C� cam- -r¢ego SPECIAL INSTRUCTIONS REQUIREMENTS FOR:INSTALLATION- OF UTILITIES WITHINTHU RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. 'No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway, surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -lacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being -inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits .are to be restored to original condi- tion immediately after backftlling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Benda at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft. 0.4 sq. ft '.20 cu. yds. 6" 2.2 sq. ft O.9 sq, ft. - 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. Lt. 2.5 sq. ft. 1.10 cu- yds. 12" 5.5 sq. ft 3.5 sq. ift - 1-50 en. yds, 14^ 12.0 sq. ft 4.8 sq. ft. 2.00 en. yds. 16" 16.0 sq. ft. 6.8 sq. ft 2.70 cu. yds. 18" 19.0 eq. ft. 7S sq. ft 3.40 cu. yds. 20" 24,0 sq. ft. 9.3 sq. ft 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5-20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done - SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed In no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the 'execution. of said repairs. 5. If the Permittee has not repaired -aid open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cat then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completionand acceptance ofthe restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. SIGNED: FEB 10, 1971 WELD COUNTY, COLORADO UNDERGROUND AND ' UTILITY PERMIT DATE PERMIT TEE'S NAME ' "- l / 4 ADDRESS tit t U'Gf , 6/0 4-1 19 / Your request for permission to install a -s,�( line along or across County Highway No. C . at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at ao expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The �line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six -Inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, ft shall be encased In pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted_ This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISION : Attached (i",rvc.c,7 /oe!4'r ,c?' l/J/tY Cl 4-71/17 ArCr,,=.% u ? L.73 ---no (/ ivy? The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. z This work shall be completed within 4 f//'`1 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open french permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County rriighht of wfgy limits. 4 /E -eS-%— Maintenance Man on this section of the highway, with headquataz tern at -To 4 ,c, s r c -1 S] or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO c $y: X24{� ( 1 � Maba In cepting this permit the and ed, representing the Permittee, verifies that he has road and understands all of the foregoing provisions; that he has an ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is boned by all the conditions set forth herein. {'F 12e� Co<ti� SG —n75>‘ SPECIAL = INSTRUCTIONS REQUIREMENTS FOR INSTALLATION. OF UTILITIES.. WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Ender no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backrilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3^ 4" 6" 8" 10" 12" 14^ 16" 18" 20" 24^ Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. S.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 450 Vertical Bends Down 0.2 sq. ft. 0.3 eq. ft. 0.4 sq. ft 0.9 sq- ft. 1.6 sq. ft - 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. 0-05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cm yds. 5.20 cmyds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre. vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4, Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification.. for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6 No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without farther dis- turbing the roadway. 8. No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the.. restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. Signed 12/9/70 WELD COUNTY, COLORADO UNDERGROUND AND -`UTILITY PERMIT DATE Nov. 19 19_0 PERMITTEE'S NAME Left Hand Water Supply Company ADDRESS P. 0. Box 146, Niwot, Colorado 80544 Your request for permission to install a 3/4" water line along or across County Highway No, 7 lj4 mile South of County Highway #14 is granted, provided that the Permitted will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation, at The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Road bore from 8" pipe line on West side of #7 tQ East side of #7 The road bore will be apppoximateiy 5O feet-- 2x4x6 hole cut on nest side of #7 -to locate 8" ma.,.l. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within Fifteen days ( 15 ) days from the above date- No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County rift pff„i,n Jifnits. - .mac a,vc nto,J , maintenance Man on this section of the highway, with headquarters at or his successor, will r.present Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By Mal — Sam/ In 4•ting this permit the undersigned, foregoing provisions; that he has authority to is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 7 outing the Permittee, verifies that he has read and understands all of the for and bind the Permittee; and that by virtue of his signature the Permittee Left Hand yater Supply Comp ny say K. Bz-acAenburr SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES_ WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected, _ 7. No plastic line is to be installed without encasement under.. pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure_ 0. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. - 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilitiesparalleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permutes, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility, will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum- Thrust Area Minimum Thrust Area :- Minimum Volume of Concrete Pipe Size for Tees and 90, Bends for 45° Bends at 45• Vertical Bends Down 2" 0.3 sq. ft. - 0.2 sq. ft 0-05 cu. yds.. 3" 0.6 sq. ft.0.3 sq. LL 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6^ 2.2 aq. ft. 0-9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. it. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" - 8.5 sq. ft:-- 3.5 sQ. ft. 1.50 cu. yds. 14^ - 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 13" 19.0 sq- ft- 7.9 sq. it. .3.40 cu. yds. 20^ 24.0 sq. ft. 9.3 sq. ft. 4.00 en. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met i. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit]. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway_ S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period ofone year following the completion and acceptance of the restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. • .Wf D Co. c0n!ssioN=r: QREELV COLO. ER EC E✓ED PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND ' AND -UTILITY PERMIT Left Hand Water Supply Company AUG a)1970 DATE - August 17 j19 70 xd & at, t? i ADDRESS P. 0. Box 146. Ntwot, C.- loracin 80544 Your request for permission to install a Water - line along or across County Highway No. at West of Washington Mine -West of Interstate #25 (George E. JCeil) is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The Water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible.. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up tothe edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such .statutes 'as are appUcahle- -... , SPECIAL PROVISIONS: Attache3... "... ..-. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within Thirty ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specifies in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the 1orR.Uons designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the eat) ens° of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: 5eoeMsor Incepting this permit the undersigned. . .resenting the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has authority sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth • _ :in THE BOARD OF COUNTY COMMISSIONERS WELD COUNJ,Y, COLORADO . - lez-elL-t-,,,e-97._147 V SPECIAL - INSTRUCTIONS REQUIREMENTS. FOR JNSTAUATION OF UTILITIES --WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line Rill be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued.. it will be required by the contractor that material removed must be replaced in like kind and withsame or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by WeId County. 13- All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfillfng is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water Dips as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 34 4^ 6^ 8" 10" 12" 14" 16" IS" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft 0.6 sq. _. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft 5.9 sq. ft. 8.6 sq. ft 12.0 eq. ft. 15.0 sq. ft 19.0 sq. ft. 24.0 eq. ft. 34.0 eq. ft Minimum Thrust Area for 46° Bends 0.2 sq. ft. 0.3 sq. ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft_ 3.5 sq. ft. 4.8 eq. ft. 6.3 sq. ft 7.9sq- ft 9.3 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 46° Vertical Bends Down 0.05 en. yds. 0.11 en. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 en. yds_ 1.10 cu. yds. 1.50 Cu. yds. 2.00 cu. yds- 2.70 en. yds. 3.40 cu. yds. 4.00 en. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Col--krado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material ie suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4- Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or eats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year followink. the completion and acceptance of the restoredportion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dile turbed portion of the bard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board 'of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Arid: 7/v/7o WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 211 197.0 , 19 PERMITTEE'S NAME Left Hand Water Supply Company ADDRESS P.Q. Rog 146, Niwnt, Cnlnrarin 8(1544 Your request for permission to install a 3/4" cooper line or across County Highway No. i 1 at 2 mile South of County Road 12 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same atter installation. The 3/ To .c opper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition_ The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation Crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within '0 days ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shot off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected daring this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: supervisor In a ng this the es that he has read and s all of the foregoing Dp ons; thapermit has authority undersigned sign for and bind theermittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD pt)U)ITY, COLORADO SPECIAL INSTRUCTIONS REQUIREMENTS: FOR INSTALLATION -OF UTILITIES WITHIN THE•, RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1, No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation Will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. `y 6. The ends of bored sections ARE NOT to be covered before being inspected. \ 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. y _ S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued,it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90" Bends Minimum Thrust Area Minimum Volume of Concrete for 45' Bends at 45• Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft - 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq- ft- 1.6 eq. ft- 0.66 cu. yds- 10" 5.9 sq. ft. 2.5 sq- ft 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 en. yds. 16" 15.0 eq. ft 6.3 sq. ft 2-70 cu. yds. 18^ 19.0 sq. ft. 7.9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft 4.00 cu. yds. 24" 34,0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site whore and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution' of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. 741/20 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 21 1970 PERMITTEE'S NAME Left Hand Water Supply Company ADDREss p• 0. Box 146, Niwot, Colorado 80544 Your request for permission to install a n/4 crtppPr ,l —,_mile South of County Road 10 is granted, provided that the Permittee will own and maintain the same after installation. line 44Pf or across County Highway No. 9 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve Inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible It shall be pushed through and beneath in a pipo of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith. within the area covered by this permit. This work shall be completed within 30 days ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be Installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: SupervLnr THE BOARD OF COUNTY COMMISSIONERS WELD COU, COLORADO S. -. _ A In cce ' • ng this permit the undersigned, :presenting the Permittee, verifies that he has read and understands all of the foregoing p •visions; that he has authority , sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth he SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise 'specified in the -special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7, No plastic line is to be installed without encasement under pavement,.regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. _ - 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are Issued, It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will -be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 900 Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft 3.8 sq- ft - 5.9 sq. ft. 8.5 sq. ft 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45• Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft. 1-6 sq. ft 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cm yds. 2.00 cu. yds. 2.70 en. yds. 3.40 cn. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway- If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00- WELD CO, COMM,__. ,•,s: GRE��EY. COG. WELD COUNTY, COLORADO RECF-'\•`/ED JUN 1 11970 UNDERGROUND AND UTILITY PERMIT PERMITTEE'SNAME Left hand Water Supply Company ADDRESS P.O. Box 146, Niwot, Colorado 805114 DATE June 9, 1970 Your request for permission to install a 2 Inch water_ line along pp scoop'' County Highway No. the Intersection of County Road #5 and #14 5 19 _ is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 2 inch water line shall be installed beneath the surface of the right of way at a minimum depth of 36 Inches. and the disturbed portion of the right of way shall be restored to Its original condition, The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed op to the edge of the shoulder portion of the road- way- No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - SPECIAL PROVISIONS: Attached The Permittee shall maintain the inatellatton at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all lose and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within 90 days ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits, Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County, Colorado, in the construction of this installation anany directions that he may make consistent with the intent of this permit must be followed or this permit may bo terminated forthwith. By: Sex In c9pti • : this permit the undersignrepresenting the Permittee, verifies that he has read and understands all of the foregoing I) : •• one; that he has autho . to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUDFJ'V, COLORADO. C SPECIAL .- INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES•-- WITHIN -THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO I. No cleated or track equipment, to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado" 3. Any materials from excavation as the result of utility installation will be -removed from highway -surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the speelal provision 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends,of bored sections ARE 16T\tqcovered before being- inspectetj 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highway&'andpaved-"ConntS road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleiing highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee. at a rate specified by Weld County, 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected - by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 0.3 sq. ft 3^ 0.6 sq. ft 4^ 1.0 sq. ft. 6^ 2.2 sq. ft. 8^ 3.8 sq. ft. 10" 5.9 sq. ft. 12^ 8.5 sq. ft. 14" 12.0 sq. ft. 16" 15.0 sq. ft. 18" 19.0 eq. ft. 20" 24.0 sq. ft. 24^ 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete foe 45° Bends at 46° Vertical Bends Down 0.2 sq. ft 0.3 eq. ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft' 7.9 sq.. ft. 9.3 sq. ft,. 14.0 eq- ft 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0-37 ccyds 0.66 cu. yds.. 1.10 cu. yds. 1:50 cu. yds;. 2.00' cii. yds. 2.70 cu. yds. 3.40 en. yds. 400 on. yds.... 5.20 cu.yds. NOTE TO APPLICANT; This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backlit. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for period of one. (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said Open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, saidbond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be leas than $100.00. WELD COUNTY, COLORADO /y ,11: ci „(�fi�- .?� /no UNDERGROUND AND UTILITY PERMIT Date £ / 192___2 PERMITTEE'S NAMDe ti Address .% tG /S<a i'f.�,��r .-eo TOcv`>` Your request for permission to install a iV-.rw County Highway No , at line along d or across is grants subjeft to the Permittee will ./n and maintain the same after lstallation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever and that the Permittee will own and maintain the same after installation. The ( .v line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on shoulders shall be made in six-inch lifts and mechanically tamped and packed, and th last twelve inches of back fill shall be of stable granular material such as crushe. rock or gravel. Where the installation crossed the roadway, it shall be incased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadwa; as physically possible. This installation shall be installed by the method of boring or jacking through beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the roadway. No water shall be used in the boring and no tunneling shall be permitted. Where the installation crosses any ditch, canal or water carrying structures, whereever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the slaw of water ever be impaired or interrupted. This work must be accomplished in accordance with accepted good practioe.s and conform to the recommendations of the National Electric Safety Code and to such statutes as are apnlicabe. SPECIAL Psavi5_rCNS_ Attached The Permittee shall maintain the installation at all times and agrees to hol.: ld 0otnty, Colorado, the agencies thereof, and their officers and employees harmless from any and all '_os and damage or any claims which may arise out of or be connected ,vith the installation, maintenance, alteration, removal, or presence of the installatior herein referred to or any wor:c Cr facility connected therewith, within the area covered by this This work shall be completed within ( ,30 ) Jays from the above data. No work shall be allowed on urdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee r'i'c he required to shut off lines and remove all combustible materials from the County right of way when requested to do so by Weld County, Co:arado, bece,r.c of r.?Ceessary highway construction or maintenance operations. WELD CO. COMMISSIONERS ELEY, Colo. RECEIVED APR i •0 1970 A.M. 9171?iPt?ofIRAnzlai4igi. L -2- Permittee shall mark this installation with markers acceptable to Weld County, Colorado at the locations designated by Weld County, Colorado, directly above such installations such as manholes - at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this installation, Permittee will do so promptly at its own expense upon written request froa Weld County, Colorado. Weld County, Colorado will not be responsible for any damage that may result in the Maintenance of the highway to installation placed inside County Right of Way limits. the highway, with headquarters at successor, will represent Weld Cour.Yy, Colorado in the construction of this installation and any directions that he may make consistent with the intent of this Permit must be followed or this Permit may be terminated forthwith. Maintenance Man on this section of or his THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ance Supervisor In accepting this Permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set folk¢ herein. 4/a" REgUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to organic condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified conditions of this permit. 5. Mud -jacking will be required where bores are larger that lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. . 8. Encasement of line will be required from toe of slope to tow of slope under all highways and paved county road intersections and approaches, if lines are over 2" diameter or more than 100 psi pressure. elcr -079.7J WELD COUNTY; COLORADO UNDERGROUND AND UTILITY PERMIT DATE ',larch 19 n73 `,oyes -tap 1570 PERMITTEE'SNAME Little Thompson Valley 'later District ADDRESS 307 Welch Ave --Berthoud, Colorado 80513 Your request for permission to install a 3/4u line along or across County Highway No. 1 at Section 31, Township 4 North, Range 68 West is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway. it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or lack- ing through and beneath the road surface; however, open art shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - :. .. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone. Dower, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. pm Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this inAanation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO In ' !V. ; this permit `a a ' .. ._ ' ed, representing the Pennittee, verifies that he has read and understands all of the foregoing provisions; that he has an , My to sign for and bind the Pormittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL. INSTRUCTIONS REQUIREMENTS FOIL -INSTALLATION OF UTILITIES,I-WITHIN- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special 'revisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope -ender all highways and paved. County road intersec- tions and approaches, if lines are over two inches in diameter ormore than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction- No segregation of material will be permuted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility Will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original -condi- tion immediately after backfilling is completed. .. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S PJpe Size 2" 3^ 4" 6" 8" 10^ 12" 14^ 16" 18^ 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft 1.0 sq. ft. 2.2 eq. ft. 3.8 sq. ft. 5.9 sq. ft - 8.5 sq. ft 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft 9.3 sq. ft 14.0 eq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu- yds. 0.20 cu. yds. 0.37 cu. yda. 0.66 cu. yds. 1.10 cu. yds. 1.50 Cu. yds. 2.00 on. yds. 2.70 cu. yds. 3.40 cu. yds_ 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may bepermitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operation will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cute for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut Is in need of repairs, Permittee is allowed seven (7) days after notification for: the -execution: of said repairs. 5. If the Permittee has not repeiredlnid open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be reenired In the name of the contractor or the person causing. the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County_ The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORSI DEAN O. ANDERSON LOUIS F. REIN MST N. JEFFERS NORMAN Ca D.V.M. DAVID MCGEE MANAGERi LOVILO M. FAGAN March 20, 1973 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 532-2096 307 WELCH AVENUE DRAWER O BERTHOUD. COLORADO 80613 RE: permit Mayes Tap 1570 We request a permit to excavate our existing water line on the east side of Weld County Road No. 1 to install a 3/4" water service for John Mayes located in Section 31, Township 4 North, Range 68 West. Enclosed is a permit form which I have executed. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/kg cc: Enclosure PERMITTER'S NAME L/7 '.€ ADDRESS Your r quest for permission to install a -�� � line along eassoas County Highway No. at /7 is granted, provided that the Permittee will own and maintain the same after installation. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE !(id ter% Li ref c sett - 197?? IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee willow, own and maintain the same after installation. / The fC #2T - line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted - This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable., - SPECIAL PROVISIONS- Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. L% 1 This work shall be completed within 9) ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in aveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. 4c - Maintenance Man on this section of the 'lighway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: nce Supervhcr In ting this perm the and • signed, representing the Permlttee,. veriKes that he has read and understands all of the foregoing p • signs; that he has au •. ority to sign for and bind the Permittee; and that fry virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD Cpj)N�T?', COLORADO L64 -✓j qtr,_ �C c SPECIAL = INSTRUCTIONS REQUIREMENTS -FOR -:INSTALLATION OF UTILITIESe.WITHM4- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility Installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below_ THRUSTBLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds_ 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft 0.4 sq. ft 0.20 cu. yds. 6" 2.2 sq, ft. 0.9 sq. ft. 027 cu. yds. 8" 3.8 sq. ft 1.6 eq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2,5 sq. ft. 1.10 cu. yds. 12" 8.6 sq. ft 3.5 sq. ft. 1.50 en_ yds. 14" 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 16.0 sq. ft - 6.3 sq. ft 2.70 cu. yds_ 18" 19.0 sq. ft, 7.9 sq. ft. 3.40 cu_ yds. 20^ 24.0 sq. ft. 9.3 sq, ft. 4.00 cu. yds. 24" 34.0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back rill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill, If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee, 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is In need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. if the Permittee has not repaired said open ant or cats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will he allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width oI 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. / WELDtOUPf % COLWtwwa' UNDERGROUND AND I Gt!. 1ttPnMfT DATE February 14 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Aven i , Berthoud.,._ Colorado 80513 Your request for permission to install a 10 -inch water line along or across County Highway No. See attached drawings No. 1 and 2 Is granted, provided that the Permittee will Own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld Permittee will own and maintain the same aver installation. The 10 -inch water line shall be installed beneath the surface of the right of way of 3G inches, and the disturbed portion of the right of way shall be restored to its original condition. The shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of stable granular material such as crashed rock or gravel. at County and that the at a minimum depth back filling on the hack fill shall be of Where the installation crosses the roadway, it shall be encased inpipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of tar, National Electric Safety Code and to egea statutes tut aPe applicable, - - SPECIAL PROVISIONS: Attached Water line to be installed by open trench across Couhty Road as-sji on attached drawings. Ril har.r•ica ns and/or other warning devices used :in any construction within public iiiilhts-•of 7ay.shall conform to the Manual on Uniforms Traffic Control Devices for Streets Z. Highways 1971, and any state or federal revision thereto. No pole guy wires or any support structures are to be located closer than -l00 feet from the center line of'any county road. Permittee will be requirea to e..,... quested to do so by Weld County, Colorado, because of necessary highway constructionormaintenance operations. Permittee shall mark this Installation with marker's acceptable to Weld County,- Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County g of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this ins tion and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Main THE BOARD 'OF COUNTY COMMISSIONERS WELD CORADO In acce)ttagi this permit the unniigaed, representing- the Permittee, v lea that he has read and understands all of the foregoing provisions; that be has as witty to sign for and k Permittee- and that by virtue of his signature the ermittee is bound by all the conditions set forth herein. Dale D. Olhausen Hogan & Olhausen, P.C. Agent for Little Thompson Valley Water District SPECIAL_ 'INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES V/ITHIN-- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO I. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY_ 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being Inspected. 7. No plastic line is to be Installed without encasement under pavement regardless of pressure and size. 3. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. MI damaged sections are to be inspected. by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pita are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft 1,0 sq. ft. 22 sq. ft 3.8 sq. ft. 5.9 sq. ft 8.6 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0-9 sq. ft. 1.6 sq. ft 2.5 sq. ft. 3.5 sq. ft. 4.8 au. ft 6.3 sq. ft. 7.9sq- ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 46° Vertical Bends Down 0.05 eu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.I0 en. yds. 1.50. Cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 en. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically.. tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the- execution of said repairs. 5. If the Permittee has not repaired. said open cut or mats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for, all expenses connected therewith. 6. No open -cuts within paved roadway be -allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 3. No puddling will be allowed. 9. That in all cases whore existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencementof the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said di& turbed portion of the hard surfaced roadway. Said,bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be setby the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. 1-25 I US. 87 v R68W R67W woo - m m w < K - 0 0 0 D 1 N m m m 0 0 IT m CA VI nn 22 0 9 H H O Lel n H 00 0 Z Z Z r A FIN K_ N 0 z 411 N et s r n O AOdddV 0 v 0 Z m D Z 0 Sb33NION3 'JNiilf1SNO) 0 0 O O O O D Z 2° D U) N O rn N TO LONGMONT /0 M/L ES C U. S. '" 22 w Q) 287 v y TO DENVER a SW!! A1/11/10M F) n 14314 n1 8/04il3S311 Tm m 0 Co Z Z Z 0 0 0 CU ro V co I A /-25 IN- tr U. 8 87 4,3 y ro wn I I W ti N Ca. 0 40 M/LES -4- R 68W _ R67 ti v m W rn rn 2 ti 8/0483S3& O O O It. co Z N rv1 N (O 4 a G CN • ti 3001 /17L OS/IV 91347V1 N rn /-25 ti A `9N/1;OOd `7 7V41 `SAVV O OS/!N 9 80071 so N a 0 SN/d /d 9 0 Viz S0 fit -' 0 P 11 12OOOO' - - /50 'Mi.i C/r. 20000 7 Hon Easement Ere /0/on and /4-013/e c5'hee/ nos*. e /''r Oe/oi/s off' /2 Groin /ip. 316'5 NBG'2S44E GJ _O8- 5166 4 _ /e i' &hurray O y o w 1). O o a \ / / o o I ' Q' , Q GI � / y� ♦S 1 i p `4 \ C r.• ‘ � 0 3• AO s� o h u� k),& o p y� ♦ o T �10��� "D0N. ♦\ N. o ��y ao `-`° \• •♦ \,.:0„ \ j 1 \ \ I \ ♦ \• c♦ r'6— l \ �e "j \\ • \ p S• C O • \\\ \\\ \\\ 11 C O (, \\\ \\• \\\ :A U♦• •\ ` \C. \\♦ \\♦ Nib \ a N N \ N. N. ` N N. N. \ \ ♦ \ \ v ♦ \• \ \ \ \ • \ ♦ • ♦ N. \ \ \ N• - ♦ • ♦ N. N. \. \ \ N \N \ N N \ \ N a N. NN N. ♦ N. SO \' N N \ \ N. N. \ N \ N. \ \ \ \ \ • \ \ \ \ ♦\ �\ • N N N.•\ ♦ ♦ S ♦♦♦ \ •\\\ \\ \\ ♦\ • \ \ •\ ♦• ♦♦\\ ♦♦ ♦ N. X • 'N. \♦ SB6'2.5afif/\ \ \ ♦ N @ � ‘..IN Segal - 2G97.52- c. K < K 0 0 O D D ti H ti IT IT m v0 m m N A A b C 444 OO z z NOI1d IdDS30 et O' r NMOHS Sb' N v Z ON I17flSNO) zm z n z n w` 0 0 D Z 90 to N O n D rn N 19/81S10 831 VM A377t'A NOSdkNOHI ON/d/d V 1POAV7 31/S 1 O Al. G. CONC. WATER STORAGE RESERVO/R T m m O m z z z O O p a N Z xo In In ti O N O nstruction Easement S r 2O? 37VOS ON 37VOS ON 7/b130 ON/OD21S GRAVEL DR/VEWAY DETA/L S?!O{ad 404 O n re y to O - .dal�d Asphalt 4.4 4.c Ns, c• • • 0 Qs Cb I qt c Cr) N 0 /2--h- PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND -UTILITY PERMIT DATE 29 Nov Longs Peak Water Assn 19 72 Your request for permission to install a 6" water line along or across County Highway No. at Co Rd 3 at 30 to 30.75 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The ti" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the Installation crosses the roadway, it shall be encased In pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or ;ack- iag through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used In the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shaft be bushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such. statues as Are appitmildn_- -- ' SPECIAL PROVISIONS: Attached All barricades and/or other warning devices used in any construction within public — Richts-of-Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. s 4.4 asamnat, OWSBA...was,._„_........,_ ..all 'Awes aim agree to nom weiq county, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation. maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 210 days ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, anlees otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be Installed by and at the expense of the Permittee and In accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallatioa, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Ed Horst Maintenance Man on this section of the highway, with headquarters at Johnstown or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Superviaar ng this permit the unde, : • ad, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his stare the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COU. - , COLORADO z, 04O 1 Rr 73 67- SPECIAL' =INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES. -WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1- No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be 'removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure, 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the Installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado. before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 8^ 4^ 6^ 8" 10" 12" 14" 16" 18^ 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 46° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft - 0.4 sq. fk 0.9 sq. ft. 1-6 sq- ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft - 7.9 sq. it 9$ sq- ft. 14.0 sq. ft 0.05 en. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cn. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu- yds. 5.20 ca.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site Inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the execution of said repairs. - 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. G. -72 WELD COUNTY; COLORADO UNDERGROUND AND UTILITY PERMIT DATE 29 Nov 19 72 PERMITTER'S NAME ADDRESS Longs Peak Water Assn 1515 IEkb Longs Peak Ayer Longmont Your request for permission to install a 6" water line along or across County Highway No. Co Rd 1 at 30.75 and 32.25 at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 6" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneathin a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and. to such statutes as are applicable. - SPECIAL PROVISIONS: Attached". All barricades and/or other warning devices used in any construction within public Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for _ Streets & Highways 1971 and any state or federal revision thereto. _. and their officers and employees harmless from any and arias and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence oI the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within 210 days ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines, and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations_ Permitteeshall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance withdirections given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Ed Hoist , Maintenance Man on this section of the highway, with headquarters at Johnstos.n or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ma In ac this permit the and igned, representing the Permittee, verifies that he has read and understands all of the foregoing provls ; that he has authority to sign for and bind the Permittee; andthat by virtue of his signature the Permittee inbound by all the conditions set forth herein. 17.1(g1/5:41 THE BOARD OF COUNTY COMMISSIONERS WELD COUN , COLORADO SPtCIAL I INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES -WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in thaspecial provisions. 5, Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being lnipeeted. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and. size_ S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed In the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires Inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Sire 2" 3' 4" 6^ 8^ 10^ 12" 14" 16" 18^ 20" 24^ Minimum Thant Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. It. 8.6 sq. ft. 12.0 sq. ft 16.0 sq. ft. 19.0 sq. ft. 24.0. sq. ft, Minimum Thrust Area for 46° Bond; 0.2 sq. ft 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft 3.5eq:ft' 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft 93 sq. ft. 34.0 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 en. yds. 0.11 cm yds. 0.20 cu. yds. 0.37 en. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cm yds. 2.40 cu. yds. 4.00 Cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backftlf. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after constraction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notifieatkm_for the eirecntlom of said repairs. 6. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced reads must be cut, then in such case a noncancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall Sure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. 1 .-7 Graybill WELD COUNTY, COLORADO UNDERGROUND AND DIMITY = PERMIT DATE November 28 19 72 PERMITTEE'S NAME Little Thompson Valley Water Di ctrl rt ADDRESS 307 Welch Avenue - Bertho'td. Colorado 80513 Your request for 3 4" permission to install a line along or across County Highway No. 5 at 1/4 mile south of intersection mit _C_o1o_T-Tijorray 60 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permutes will own and maintain the same after installation. The 3/4" line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway. it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code ant to Silk' AIWA'S as .are applicable. -: SPECIAL PROVISIONS: Attached All barricades and/or other warning devices used in any construction within public _'Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. erect and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 50 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified In special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove a 11 combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this Installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the Installation placed inside County right f way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this -installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ma yifsN4y Supervisor THE BOARD OP COUNTY COMMISSIONERS WELD CrO9NTY, COLORADO , dal !C In s Ung this permit the rsigned, reDreaentittg the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 5-37 SEAL" INSTRUCTIONS REQUIREMENTS `FOR7 NSTALI:ATION OF UTILITIESeWITHMt: THE7R1GHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3, Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition Is an asphalt surface to be cut unless otherwise specified in the special ln•ovisione. 5. Mud -jacking wilt be required where bores are larger 'than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line Is to be installed without encasement under pavement regardless of pressure and size. s. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require theservices of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by' the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility win be replaced. All damaged sections are to be Inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfllling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow Installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90• Bends for 45• Bends at 45" Vertical Bends Down 2" 0.3 sq. ft 0.2 sq. It. 0-05 cu. yds. 8^ 0.6 sq. ft. 0.3 eq. ft. 0.11 en. yds. 4" 1.0 sq. ft. 6^ 2.2 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 0.9 sq. ft. 0.37 Cu- yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 110 en. yds. 12^ 8.6 sq. ft 3.5 sq. ft 1.50 cu. yds. 14^ 12.0 eq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft 6.3 sq. ft 2.70 cu. yds. 13" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20^ 24.0 sq. ft.. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across, the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch *111 be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL It it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said aepairra. 5. If the Permittee has not repaired said open- cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the 'contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be In the amount necessary to repair or replace said dfs turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the board of County Commissioners and shall be reasonable; however, in no event shall the bond be leas than $100.00. • • es DIRECTORS. DEAN G, ANDERSON LOUIS B. BEIN AL.LBT M. *RIMERS J. WALTER RANKIN GEORGE A. WALKER MANAGER: LOVILO N.FAGAN LITTLE THOMPSON VALLEY WATER DISTRICT November 28, 1972' Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 80631 Dear Mr, Ewing: TELEPHONE 532-2096 307 WELCH AVENUE DRAWER a BERTHOUD. COLORADO 30513 RE: permit - Tap 1536-Graybill We request a permit to excavate our existing water line on the west side of Weld County road No. 5 approximately 1/4 mile south of intersection with Colorado Highway 60 to install a water service for Buck Graybill located in Section 5, Township 4 North, Range 68 West. Enclosed is a permit form which I have executed. LHF/kg cc: Enclosure Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager Daniels WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE OCWober 24 19 72 PERMITTEE'S NAME Little Thompson Valley Water Districk ADDRESS 307 Welch Avenue —Berthoud, Colorado 80513 Your request for permission to install a 3/4n line along or across County Highway `To at N of Section 8, T$N, R6671 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will314" own / and maintain the same after installation. 3 The 4 ii S er v i_C e line shall be installed beneath the surface of the right of way at a minimum depth of 3G inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or pack- ing through and beneath the road surface: however, open cut shall be allowed tip to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are appltattds. SPECIAL PROVISIONS: Attached — All barricades and/or other warning devices used in any construction within public — Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. 'The rermxaee amm--n:u.amau wo samarra..on--raeranc -agreewnoia wets coutarroIorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within (— 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shot off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected daring this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way, Drafts. Dr- to vin s r W-SQQ+.Q -►J , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith_ THESOARID OF COUNTY COMMISSIONERS WELD_GOUNTY. COLORADO. By Ma In acceptTSg this permit the undersignrepresenting the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority {o sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will he removed from highway surface EACII DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size - 8. Encasement of line will be required from toe of slope to toe of slope under all highways and -paved County road intersec- tions and approaches, if linen are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 11. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12^ 14" 16" 18^ 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 eq. ft. 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft. 3,8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft, 16.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft Minimum Thrust Area for 46° Bends 0.2 sq. ft. 0.3 eq. ft. 0,4 sq. ft 0.9 sq. it. 1.6 eq. ft 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 027 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 Cu. yds. 2.00 cu. yds. 2.70 cn. yds. 3.40 Cu, yds. 4,00 cn. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed, 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit). If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the executionof said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00, • LITTLE THOMPSON VALLEY WATER DISTRICT DIRECTORS; DEAN G. ANDERSON LOUIS I. REIN N. .v.ERs WALTER RANKIN GEORGE A_WALKER MANAGER; LOVILO N.FAGAN October 24, 1972 Mr. Byron Ewing, County Engineer 7500 Second Street Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 332.2036 307 WELCH AVEKKIE DRAWER G BERTHOUD, COLORADO 60313 RE: permit Tap 1525 -Daniels We request a permit to extend our existing water line on the Weld County road 2I miles east of Milliken a distance of 240 feet and to bore under the highway to install a 3/4" water service for Harold Daniels located in Section 8, Township 4[N, Range 66 West. Approximate location of our present line is 400 feet notthaf the intersection with Colorado Highway 60. I am not certain of the Weld County road number, as this road is not located on a Section line. Enclosed is a permit form which I have executed. Very truly yours LITTLE HTOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/ma cc: Beers PERMITTEE'S NAME ADDRESS 307 ''elch Avenue --Berthoud, Colorado 80513 WELD COUNTY, COLORADO UNDERGROUND AND ' UTILITY PERMIT DATE Little Thompson Valley '.later District Your request for permission to install a 3/4i} October 12 line along or across County Highway No. 19 72 at 30001 south of intersection with Co. road No. 34. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The 3/4n service line shall be installed beneath the surface of the right of way at a minimum depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to sash- statutes -as are applicable=. - SPECIAL PROVISIONS: -'Attached . -. '... _ ... .. All barricades and/or other warning devices used in any construction within public Rights -of -Way shall.conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 'run renusatm nuau u+a.h,.ow, ...... .bacaw uvunom wuur.l, cAvrornnO, ire agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration. removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads- Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this Installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of Llfib'installation and any directions that he may make consistent with the intent Of this permit must be followed or this permit may be terminated forthwith. By Me Supervisor In accepting this permit the uireigned, representing the Permittee, verities that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO \. SPECIAL INSTRUCTIONS REQUIREMENTS .FOR, INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO I. No cleated or track equipment to 'work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way aretobe returned to original condition at a time designated by Weld County, Colorado. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the .special provisions: 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected- 7- No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required froth toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure, 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 1L Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches orborrow pits are to be restored to original condi- tion immediately after backfilling is completed, 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0, W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46' Bends at 45° Vertical Bends Down 2" 0-3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 eq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft 0.4 sq. ft. 0.20 cc. yds. 6" 2.2 sq. ft 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq- ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.6 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft 3.5 sq. ft. 1.50 cu. yds. 14^ 12.0 SQ. ft 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq- ft. 6.3 sq. ft. 2.70 cu- yds, 18" 19.0 sq. ft. 7-9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft, 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether In a gravelled surface or a paved roadway. If said cut is In need of repairs, Permittee is allowed seven (7) days after notification for the execution- of said repairs. 5. If the Permittee has not repaired -said open cut or cats within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to thecommencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than *100-00. O+RECTOR5 OCAS C.ANOERson LOUIS F. RUN J. WALTER RANKIN GEORGE A. WALKER NANACCR' LO V ILO N. FACAN LITTLE THOMPSON VALLEY WATER DISTRICT October 12, 1972 Mr. Byron Ewing, County Engineer 1500 Second Street Greeley, Colorado 86631 Dear Mr. Ewing: TELEPHONE 5322056 307 WELCH AVENUE DRAWER a BERTHOUD. COLORADO 60513 RE: tap 1522 -Beers We request a permit to excavate our existing water line on the west side of Weld County road No. 5, 3000 feet south of the inter- section with County road No. 34 to install a 3/4" water service for John Beers located in Section 17, Township 3 N, Range 68 West. Enclosed is a permit form which I have executed. LHF/kg cc: Enclosure Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager r yr'_ -702 Sekich WELD COUNTY, COLORADO UNDERGROUND AND HTILrTY PERMIT DATE Sept 5 l9 72 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave. --Berthoud, Colorado 80513 Your request for permission to install a 3/4" Sec Vice line along or across County Highway No. 32 at 3/4 mile east Qf Highway 25 is granted, provided that the Permittee Will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" cervi ee line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall Uo of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and, to each statutes ae are applicahiw.-:. . ... -. -. - SPECIAL PROVISIONS: Attached - — All barricades and/or other warning devices used in any construction within public — Ri :Sts -of -Play shall conform, to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. - ___ .... » ....p.w .., aunt wera County, Colorado. the agencies thereof. and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. t./ Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of th etallation and any directions that be may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: supervisor In sec: Ming this permit th; undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he , . authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Me -a\ U' SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES: -WITHIN. THE RIGHT Of WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result oI utility installation will be removed from highway surface EACH DAY - 4, Under no condition is an asphalt surface to be cut unless otherwise specified -in the special provision®, 5, Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered befoe being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling Is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 1S" 20^ 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft 3.8 sq. ft. 5.9 sq. ft 8.5 sq. ft 12,0 sq. ft 15.0 sq. ft 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq, tt 0.9 sq. it. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft, 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu- yds. 1.50 cu- yds. 2.00 en. yds. 2,70 cu. yds. 3.40 cu. yds_ 4,00 en. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work la being done SPECIALPROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed_ 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill, If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1). year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days atter notification for the execution of said repairs. 5, If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period.. of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dim. Curbed portion of the bard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the Minty. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. `�-��iCC!6 ��Z Sterkel WELD COUNTY, COLORADO UNDERGROUND AND ' UTtlf 'Y PERMIT PERMITTEE'S NAME ADDRESS DATE Little Thompson Valley :"rater District 307 '.Welch Ave. --Berthoud, Colorado 80513 Your request for permission to install a Auzust 25 19 72 211 water line along or across County Highway No 36 at co. road No 7, thence east ¢ mile along south road shoulder. is granted, provided that the Pennines will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installationat no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The 277 Stater line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation creases the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the Sow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - SPECIAL PROVISIONS `"Atta'ebgd. All barricades and/or other warning devices used in any construction within public _ Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 3 Highways 1971 and any state or federal revision thereto. „ .,..,..ems- sae agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within — (_ 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions: Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the eap ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the Installation placed inside County right gf way limits, `•- `"� `� Maintenance Man on this section of the highway, with headquarters at rap-a.„.-a.„.or his successor, will represent Weld County, Colorado, in the construction of installation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may be terminated forthwith. By: Mat ens a Super.' In :c opting this strait the and: :igaed, representing the Permittee, verifies that he has read and understands all of the foregoing .visions; that he has a ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee Is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO • 4 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size_ 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved' County road inter9ec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material -will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. It All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspectedby Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pips Size for Tees and 90° Bends for 46° Bends at 46° Vertical Bends Down 2^ 0.3 sq. ft 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 nq. ft 0.11 et yds. 4" 1.0 sq. ft. 0.4 sq. ft 0.20 cu. yds. 6^ 2.2 sq. ft 0.9 sq. ft. 027 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14^ 12.0 aq. ft. 4.8 sq. ft. 2.00 en. yds. 16" 15.0 sq. ft 6-3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft 7.9 sq, ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met . 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed, 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backup. if it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) clays after notification for the execution of said repairs. 6. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions oI the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace saiG din turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. -2/9A -2 - Paulson WELD COUNTY, COLORADO UNDERGROUND AND tUTt1ITYPERMIT DATE PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave --Berthoud, Colorado 80513 Your request for permission to install a 3/4" July 17 line along or across County Highway No. 13 19 72 at appr9ximatedly 300? north of intersection with Co. road No. 34 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" service line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel_ Wherethe installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This. installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable:.. - - SPECIAL PROVISIONS: Attached All barricades and/or other warning devices used in any construction within public --- Rights-of-:'lay shall conform to the Manual on Uniform Traffic Control Devices for Streets -8. Highways 1971 and any state or .ederal reviblun thereto. .......... .....n.,.,..� ..�.� ne u auonuty, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within (-- 60 ) days from the above date, No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordancewith directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of thnstallation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: MaSupervisor THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO O�lT/�fJL�% / In acceiltf this permit the and ivied, representing the Permittee, verifiesthat he bae3. read and understands all of the foregoing provisions; that he ban au ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL INSTRUCTIONS REQUIREMENTS -FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines`or encasements. 6. The ends of bored sections ARE NOT to be covered before being Inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will -be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any' Issuance of any permit 11. Where special cases warrant Weld County will permit the Installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project regcires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installationwill be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced- All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner- Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling Is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6^ 8" 10" 12" 14" 16" 18^ 20- 24" Minimum Thrust Area for Tees and 90° Bends 0-3 sq. ft 0.6 sq. ft. 1.0 sq. ft. 2.2 aq. ft. 8.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area foe 45' Bends 0.2 Eq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 456 Vertical Bends Down 0.05 eu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu- yds- 5.20 cu.yds. NOTE TO APPLICANT: This permit Shall be made available at the site where and when work fa being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met I- No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit'. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period oI one (1) year after construction whether in a ravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for, all expenses connected therewith. 6. No open cuts, within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis. Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. A !, ,•/t Y Wulf WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE June 26, 19 72 PERMITTEE'S NAME Littlehomps Ton ValleyteDistrict ADDRESS 307 Welch Avenue -Berthoud, Colorado 80513 Your request for permission to install a 2" line along or across County Highway No. 2l at beginning 200' South of intersection with Co. road 46,south 750' is granted, provided that the Permittee will own and maintain the same after Installation. ITIS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 2't water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way sha II be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased In pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe oI larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: - -. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration. removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside CyAight,tlf way limits. , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado. in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: M In .. ng this perm t the u. - -reigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that be has thority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Supenfi THE BOARD OF COUNTY COMMISSIONERS WELD COUPJTY, COLORADO 4H3‘ SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES ,WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified- in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line- is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced In like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon Installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15, Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3^ 4^ 6^ 8" 10" 12" 14^ 16" 18" 20" 24" Minimum Thrust Area Minimum Thrust Area for Tees and 90° Bends for 45° Bends 0.3 sq. ft 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft - 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft 19.0 sq. ft 24.0 art- ft. 34.0 sq. ft 0.2 sq. ft. 0.3eq.ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 46* Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds, 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1-10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back rill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material Is suitable for barblill If it -is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. -. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed -without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8, No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. Riggs WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Avenue -Berthoud, Colorado 80513 Your request for permission to install a 3/4 VI line along or across County Highway No. 34 _1/4 mile west of intersection with Co. road No. 13 is granted, provided that the Permittee will own and maintain the same after installation. May 31, 19 72 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4ti S, ervi CP line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - -- - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date, No work shall be allowed on Saturdays or Sunday& No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of w limits. {�to•�",te2 , Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County. Colorado, in the construction of this i fellation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: emu . . Supervi In a =pting this permit the under: - • ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has auth ty to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO arn- 4* Lin • • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move ever asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition is an asphalt surface to be cut unless otherwise specified In the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to tde of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the Yield by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County. Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 13. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6- 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bonds 0.3 sq- ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 se. ft. 12.0 sq. ft. 15.0 eq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. It. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft 0.05 en. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 en. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year atter construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repairedSaid0pen cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will -be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 3100.00. Camenisch PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE May 12, le 72 Little Thompson Valley 'later District ADDRESS 307 Welch Ave -- Berthoud, Colorado 80513 Your request for permission to install a 3/4" _ line along or across County Highway No. 17 , at 1/4 mile south of intersection with Co. road No. 38. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: - .. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agendas thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect, ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above data No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permitter)shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permlttee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at c�^—Q�fa-s-•>+'✓ or his successor, will represent Weld County, Colorado, in the construction of this nstallation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Ry: Supervisor� In : - e • ' : this a ermit the : . ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that be .:: - uthority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COU TY, COLORADO J SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES :WITHIN THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track cequipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3, Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being Inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit, 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13, All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46° Bends at 46° Vertical Benda Down 2^ 0.3 sq. ft. 0.2 sq. ft. 0.05 at. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4^ 1.0 sq. ft. 0.4 sq. ft 0.20 cu, yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 en. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15-0 sq. ft 6.3 sq. ft 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cit. yds. 29" 24.0 sq. ft. 9.3 sq. ft 4-00 cu. yds. 24" 34.0 sq. ft 14-0 sq, ft. 5.20 cu,yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions ere mat. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original, 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period oI one. (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification forthe executionofsaid repairs - 5. If the Permittee has not repaired -said open- cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing, the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond • shall assure' recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of . the restoredportion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway- Saki bond shall not be Cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Eberhardt PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Little Thompson Valley 'rater District ADDRESS 307 Welch Ave - Berthoud. Colorado 80513 Your request for permission to install a 3/4" April 13 line along or across County Highway No. is 72 r7 at 550t south of intersection with Co. road No. 46. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/rr 4 line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall bo restored to Its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROMS NS: Attached aaacuPl /�i�4aif.C l id md-.sQC ��¢�.�. /�d'm[.��`i`ati .r-4- The Permittee shall maintain the installation at all times and agree to hold Weld County. Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or fatuity connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. o—' c 7 By: Suorssor In'ae Sting this permit the an lgned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he base ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO rn SPECIAL - INSTRUCTIONS REQUIREMENTS :-POR-,1NSTALLATPOit OF UTILITIES c 'W1THtN THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from hoe of -slope to toe of 'slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must he replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. Al damaged sections are to be inspected by Weld County, Colorado. before being concealed In any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2^ 0-3 sq. ft. 3" 0.6 sq. ft. 4" 1.0 sq. ft. 6" 2.2 sq. ft. 3" 3.8 sq. ft. 10" 5.9 sq- ft. 12^ 8.5 sq. ft. 14" 12.0 sq. ft. 16" 15.0 sq. ft. 18" 19.0 aq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.05 ca. yds. 0.3 sq. ft 0.11 cu. yds. 0.4 sq- ft. 0.20 cu. yds. 0.9 sq. ft. 0.37 cu. yds. 1.6 sq. ft 0.66 cu. yds. - 2.5 sq. ft. 1.10 cu. yds. 3.5 sq. ft 1.50 cu. yds. 4.8 sq. ft. 2.00 cu. yds. 6.3 sq. ft. 2.70 cu. yds. 7.9 sq. ft. 3.40 cu. yds. 9.3 sq. ft. 4.00 cu. yds. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done - SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night Or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution- of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non-eancellable cash or surety bond payable to the County shall -be required in the name of the- contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hnrd surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 3100-00. Rockwell Uf4 :- WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE :arch 31, 19 72 PERMITTER•S NAME ADDRESS Little Thompson Valley Water District 307 Welch Ave--3erthoud, Colorido 80513 Your request for permission to install a 3/4't line along or across County Highway No. 3 - at aptroximately 2100 feet north of intersection with Co. road 40 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" line shall be Installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed rip to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the now of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations oI the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof. and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( rn ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at Its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. �D fume S T e� -s- Maintenance Man on this section of the highway, with headquarters at v/ ",*4'& ` 0a'A' or hie successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO //rd.:cigar In cspnng this permit the igaed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has thority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. a-z--.4),77ffr 370 SPECIAL: INSTRUCTIONS REQUIREMENTS FOR;7NSTALLATIOPt OF UTILITIES. WITHIN THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to he covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. _ 3. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two Inches In diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12, The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling Is completed. 11. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO It. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Sire for Tees and 90° Bends for 46° Bends at 45° Vertical Benda Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 8" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0-20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.6 sq. ft. 1.10 cu. yds. 12^ 8.5 sq. ft 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds. 18" 19.0 sq. ft 7.9 sq. ft. 3.40 cu, yds. 20" 24.0 eq. ft. 9,3 sq. it. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill, If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification. for: the' elecntion, of -said repairs. 5. If the Permittee has not reyafreil-eaid- Owe -on -cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance -of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County_ Theamount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however. in no event shall the bond be less than $100.00. Beers PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE March 17p 19 72 Little Thompson Valley ':later District ADDRESS :307 17r-1 eh Aver __Rct thnwvl, enlOre,in 80513 Your request for permission to install a 3/4" line along or across County Highway No 5- at mile South of inters.rtion with Co. roRSl No_ 34 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, end the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall he as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge oL the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable_ SPECIAL PROVISIONS: Attached _- - - The Permittee shall maintain the installation at all times and agree to hold Weld County. Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ffo, C 70Mars ThWir Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD CO TY, COLORADO coning permit a undersigned, representing the Permittee, verities that he has read and understands all of the foregoing provisions: that h authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 0 -u -a /17. %,,V.-e-st SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIESa'WITHIN YHEi RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe -of slope to toe' of slope under an highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit, 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material zemoved must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require theservices of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfliling is completed 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12- 14" 16" 18^ 20" Minimum Thrust Area for Tees and 90* Bends 0.3 sq. ft - 0.6 sq. ft, 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft 8.5 aq. ft. 12.0sq.ft 15.0 sq. ft. 19.0 sq_ ft. 24.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 24" 34.0 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 450 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu.. yds... 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 400 cu. yds.. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work Is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification :for: the execution.' of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. - S. No puddling will be allowed - 9. That in all cases where existing black top or bard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion andacceptance of the restored portion or portions of the bard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Biddle Project PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE March 9, Little Thompson Valley Water District 1972 19 _ ADDRESS 307 Welch Avenue - Berthoud, Colorado 80513 Your request for 6" permission to install a line along or across County Highway No. 42 at start intersection with #7 -then West 16501 -south side of #42 is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 6" line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut sh all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. "-.. SPECIAL PROVISIONS: Attached _Gkfi EL 3-4sta_ SE .garb# 7m ©f osr ' -car OF "en 73 ex- pit/ 1 #bD' us�NG r fi°A £ICK,ti1h, S Thfinael Canilnidt, ' &-piiient The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within ( 60 ) days from the above date. No work shall be allowed On Saturdays or Sundays, No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. �D Ner::sT Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Supevisor THE BOARD OF COUNTY COMMISSIONERS In ai tepfiag this permit the and ed, representing. the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has a ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. s4 -75 -0-Z aPICIAL= INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES F WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut unless otherwise specified to _the special provisions. 3. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9, Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction- No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backbiting is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3^ 4^ 6" 8^ 10" 12" 14^ 16" 18" 20" 24" Minimum Thrust Ares for Tees and 90• Bends 0.3 sq. ft 0.6 sq. ft 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft 8.6 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Threat Area for 45° Bends 02 sq. ft. 0.3 sq. ft 0.4 sq. ft 0,9 sq. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3sq. ft - 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 on. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 at yds. 0.66 cu. yds. 1.10 cu- yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely Lumped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tampedlifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification -for the'esecutiou.= of said repairs. 5. If the Permittee has not repaired -said open- cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptanceof the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. . e1 Amundson PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE January 19, Little Thompson Valley `slater District ADDRESS 307 'welch Avenue -- Berthoud, Colorado 80513 Your request for permission to install a 3/4" Nw j Sec 29-TSN-R67W 19 71 line along or across County Highway No. 54 at is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This Installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached & &, h' - cr t -t -co ., /Crigea� i' s- r7-- %a r The Permittee shall maintain the installation at all times and agree to hold Weld County. Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be conned ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ‘425 days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance withdirections given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. E.9 //vies 7- -n, ,/.r�S t 2 '* ./ Maintenance Man On this section of the highway, with headquarters at , 1 19#4 or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. oaEbf 25-52a,...7R By: wineSupervisor In eating this permit a unde,„/fined, representing the Permittee, verifies that he has read and understands all of the foregoing p vi ions; that he has a to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set fo herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO � 3ar SPreirAL INSTRUCTIONS REQUIREMENTS FOR_iNSTALGTWMOF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions, 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The end;; of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion, Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow bits are to be restored to original condi- tion immediately after backfilling is completed. - - 14, No meters are to be placed within the highway right oI way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45• Vertical Bends Down 2^ 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3^ 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu, yds, 8" 3.8 sq. ft. 1-6 sq. ft. 0.66 cu. yds. 10^ 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 aq. ft. 3.5 sq. it. 1.50 cu. yds. 14^ 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 35-0 so_ ft. 6.3 sq. ft- 2.70 cu. yds. 18^ 19.0 sq. ft. 7.9 sq. ft. 2.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from thesite at the expense of the Permittee. 4, Permittee assumes responsibility for the maintenance of all open cuts for a period of one - (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification Yoe theexecntfot. of- said repairs. 5. If the Permittee has not repaired -said open -cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. . 8. No puddling will be allowed. _. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the -County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. William Franek WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Dec 9, PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave - Berthoud, Colorado 60513 Your request for permission to Install a 3J4 Copper line along or across County Highway No. 46 19 71 at Northeast quarter of Section 16, Township 4 N, Range 68 West is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shell be of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. _ SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Fermittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. E•� L.e.S"T Maintenance Man on this section of the highway, with headquarters at -TO Acer roa'.. / or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: 7��� G ioitentsnaore superviearo, Ay iv ea/ In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to alga for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. d THE II RD OF COUNTY COMMISSION WELD � .• �r jDo H e 313 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES 'WiTHiN WE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track .equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way ate to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the- special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec. tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through-traffle roadway. 10. AU requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation, 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft 12.0 sq. ft. 15.0 sq. ft 19.0 sq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft 1.6 sq. ft 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 Cu- yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds_ 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado,will determine whether excavated material is suitable for Dackfill If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution: of said repairs. 5. If the Permittee has not repaired said open - cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the roadwith a minimum width oI 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Carlson WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Nov 12, is 71 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave ---Berthoud, Colorado 80513 Your request for permission to install a 3/4" s4 -,section 7. T4N. R67W line along or across County Highway No. 46 is granted, provided that the Permittee will own and maintain the same after installation. at J.S IT IS UNDERSTOOD that the Permittee will cause the installation at no expense 'whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4tt line shall be installed beneath the surface of the right Of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Sack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark. unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado. at the locationsdesignated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. -s Naesr Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. o4.' 3 ///7/ By: ✓ 1 / TN B ARD OF COUNTY COMM •' • • RS OUN )24 Ma Supervise. - In accep this permit the tindersi ed, representing the Permittee, verifies that he has read and understands all of the foregoing pro ions; that he has autho to sign for and bind the Permittee; and that by virtue of his signature the Permittee bound by all the conditions set forth herein. 1/7, X30 SPIL(CIAL INSTRUCTIONS REQUIREMENTS F0R)PISTAttkTI0II•OF UTILITIES.^'WlTH1N. THE7RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition Is an asphalt surface to be cut unless otherwise specified in -the -special provisions. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and Paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the Inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area Minimum Thrust Area for Tees and 90° Bends for 450 Bends 0.3 sq. ft 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft 3.8 sq. ft - 5.9 sq. ft 8.5 sq. ft. 12.0 sq. ft 15.0 sq. ft 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. 0.2 sq. ft - 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft 1.6 sq. ft. 2.5 sq. ft. 3.6 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 92 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 46° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 Cu. yds. 2.00 cu. yds. 2.70 cu. yds- 3.49 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit]. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution: of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the herd surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the Cou- of any expense incurred. within a period of one year following the completion and acceptance :of . the' restored g or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace r turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to 1' The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; hr event shall the bond be less than $100.00. Frank WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Nov 10. 19 71 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave -Berthoud, Colorado 80513 Your request for permission to install a 3/4" copper line along or across County Highway No. 46 at NE3,Sec 16-T4N-R68W is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permutes will own and maintain the same after installation. The 3/4" copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way sba II be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, It shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. .. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith. within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. EO fiviasr Mews ZM<.c/ Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith_ ok et 4, is -4w 7/ By: Malotvunce Supervisor In accariting this permit the unders ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that be has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. r-ier 1 SPECIALINSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES _WITHIN THE: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be -returned to original condition at a time designated by weld County. Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the_special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where s.*.ecial cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed_ 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2^ 3" 4^ 6^ 8" 10^ 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft 5.9 sq. ft. 8.5 sq. ft. 12.0 54- ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 eq. ft 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft 6.3 sq. ft. 7S sq. ft. 9.3 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0-06 cu. yds. 0.11 en. yds. 0.20 cu. yds. 0.37 en. yds. 0.66 cu- yds- 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 400 en. yds. 34.0 sq. ft 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work isbeing done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely. tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of ones -(1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the "executon of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. r WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE n �+ l PERMITTEE'S NAME ADDRESS afase tcn is granted, provided that the Permittee will wn and maintain the same after installation. 19 / Your request for permi sion to install a %'e Wes) line along or across County Highway No. at � t IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will and and maintain the same after installation. The .<�.�v line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition- The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case Shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. -aftThis work shall be completed within / ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open U-ch permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. �c /T 4!t v '�/ , Maintenance Man on this section of the highway, with headquarters at 7.49/79./St �! or his successor, will represent Weld County. Colorado, In the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: - _ MalMahenee Supervisor THE OARD OF COUNTY COMMISSIONERS WENTY L RA ae“Di In accepting this permit the under ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has auth ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. `f %% • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 5. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches. if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14, No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2^ 3" 4^ 6" 8^ 10" 12" 14" 16" 18" 20^ 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6sq. ft. 1.059. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.589. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. It. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft - 7,9 sq. ft. 9.3 sq. ft. 14.0 sq. ft Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 Cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 Cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year alter construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a- minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. • '` 77/0-1:1" ' ' I Marvin Sterkel PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE October 21 Iy 71 Little Thompson Valley Water District ADDRESS 307 Welch Ave --Berthoud, Colorado 80513 Your request for permission to Install a _ 3/4 copper line along or across County Highway No. 7 , at NTl -1-see 16-T4N-86814--service for Marvin Sterkel is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the Installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 n COPpQr line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. "tchere the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be impelled or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable::.. SPECIAL PROVISIONS: -Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut oft lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected daring this installation with proper warning signs or signals both day and night Warning signs and Signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- staIlation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of ,py limits. • T1 h / T" %` S Maintenance Man on this section of the highway, with headquarters at / /Fr ' ` (SW r , or hie successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith THE BOARD OF COUNTY CO ._ 1881ONERS W 'OUN-,CO By' �1�� __, _ti Me �upe.ivier In aceeptlhg this permit the undersign °presenting the Permittee, verifies that he has read and understands all of the foregoing pro eloua; that he has authori sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set fo erein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES -V/ITHIN Tilt: RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats- ?. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions: 3. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, If lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. ti. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permitter, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches orborrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.`S Pipe Size 2" 3" 4" 6" s^ 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. I.0 sq. ft. 2.2 sq. ft. 3.S sq. ft- 5.9sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1-6 sq- ft_ 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft.. 6.3 sq. ft - 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu- yds- 1.10 cu. yds. 1.50 cu. yds. 2.00 Cu: yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation Is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If A is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permitter assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, win repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall' assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. Lacey 91/4 /-i WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE August 30 fs�1 PERMITTEE'S NAME Little Thompson Valley Water District ADDRESS 307 tfelch Avenue --Berthoud, Colorado 80513 Your request for permission to install a 3/4" NE —Sec 31, T4N, X68`.^ tap for Mark Lacey is granted, provided that the Permittee will own and maintain the same after installation. line along. air County Highway No. 3 at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4 copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and pocked, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be lmparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, be-- ause of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of thin in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. EO , e4rr Maintenance Man on this section of the highway, with headquarters at n).11-trinToVie or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THEW WEL• , •!'N ARD OF COUNTYCONyM81QNER8 6DO In ce this permit the dereigned, representing the Permittee, verifies that he has read and understands all of the foregoing p sions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permutes is bound by all the conditions set forth herein. SPECIAL" INSTRUCTIONS REQUIREMENTS, =FOR '.INSTALLATION OF UTILITIES>•WITHIN THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to. be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and. size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County r^ad intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance oI any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County. Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites 'of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed, 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY', COLORADO. R. 0. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2" 3•' 4" 6^ 8" 10" 12" 14" 16" 18" 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. it. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 aq. ft 15.0 sq. ft - 19.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3sq. ft, 0.4 sq. ft. 0.9 sq. ft. 1-6 sq- ft 2.5 sq. ft. 3.5 sq. ft. 4.5 sq. ft. 6.3 sq. ft. 7.9 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu- yds. 3.40 cu. yds. 20" 24.0 sq. ft. 9,3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds- NOTE TO APPLICANT: This permit shall be made available at the sitewhere and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion ofWeld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped.. lifts and the final one inch will be a dry select road base material compacted to 90% of original. - 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill- Hf it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notificationfor the' execution' of said repairs_ 5. If the Permittee has not repaired-9nid open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion .andacceptance of the' restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. Reynolds Cattle Co. PERMITTEE'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE August 17, 19 71 Little Thompson Valley Water District 307 Welch Ave --Berthoud, Colo 80513 Your request for permission to install a 3/4" copper line along or across County Highway No 32 at T 3/4 miles east of U. S. 25 in Sec 24-T3N-R 4W is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4tt copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible tt shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within ( 40 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ones of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at Its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE ARD OF COUNTY M ONERS W L ar iA By: _ / r !/1 pting this permit the • • ersigned, representing the Permittee, verifies that he has read and understands all oI the foregoing • rovisions; that he has authority to sign for and bind the Permittee>..and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 777(7',,X ,X SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES. WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado - 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected_ 7, No plastic line is to be installed without tecasement under pavement regardless of pressure and size. 8. Encasement of line will be required from tee of slope to toe of slope under all tighxtays and paved County road intersec- tions and approaches, if lines are over two Inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12, The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner, Drainage ditches or borrow pits are to be restored to original condi- tion immediately after baekfilling is completed. 11. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size n„ 3" 4" 6" 8" 10" 12^ 14" 16" 18^ 20- 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft 0.6 sq. ft. 1.0 sq- ft. 2.2 sq. ft. 3.8 sq. ft 5.9 sq. ft 8.5 sq. ft. 12.05. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq, ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft 2.5 sq- ft. 3.5 sq. ft 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cats for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut Is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6- No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond -shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE PERMITTEE'SNAME T,itt]e mihomTlgon valley water T)ictrirt ADDRESS 307 Welch Ave - Berthoud, Colorado Your request for permission to install a water line along or across County Highway No. 15 arrnrMrg to mils attached Is granted, provided that the Permittee will own and maintain the same after installation. August 16 is 71 ,atS IT IS IINDEBSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The water, line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to Its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be Of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith. within the area covered by this permit. This work shall be completed within ( 90 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re - Quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By. supervisor pting this permit the ' . • ersigned, representing the Permittee, verifies that he has read and understands all of the forego • : ' , visions; that he has - 'thority to sign for and bind the Permittee; 4 that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BO ' , OF COUNTY COMMISSIONERS WELD Ca_• , •LO de 77 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE_ RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. -1. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or'encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7, No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, If lines are over two inches in diameter or more than 100 psi pressure. 9, Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the Installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County, Colorado- The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the Inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINE INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area for Tees and 90* Bends 0-3 sq. ft 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8 sq. ft. 5.9 se. ft 8.5 sq. ft. 12.0 sq. ft. 15.0 sq- ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 450 Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft - 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 46° Vertical sends Down 0.05 cu. yds. 0.11 cu: yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds- 4.00 cu. yds, 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original - 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill- If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 1. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired Saidopencut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway, 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prier to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway: -Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. -Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. E,Y.:STi./G4't-O - 4C-7 t ".;,.iv O.rc i S o Via_ '14!(:-.7 -4r; Ca"c�iirr .4-7o -.7 0 ,'c.er,are c.�c/RFSJCc' y, rc \/ - ('toss Aso CZ) c /r,- EJo4c 1t a OGr c c-'sfl- ' /cEc.00 ZAk k 41 t ti i J 1 - 'Cr c-'___ 7l ckt No `V w - 1 r \ G n 1` • c Z q r) o0 T T m CO N (n nn', AY JO A 0 . y -4 -4 H 00o zzz - 4 RI Sim > n v o x xi v T n n O < T 2 T O 13 t m r z 0 C) D Z A O Z Qp N C z If) zo 0 ^� D o Cr) r . • O D z v O N N `C H oSC k Z= N t.� W a Z a 1 Rnsi -n Z O W O z O N z r lot "a It Cr a-PtELr Y- 4 necc•-J//.o 4/ N Nic N � 0 kg 4 (4 w r �E c1 t r.) Wit C.7' /1444,- vc is/.vc.- - O4/ .E/sr S.o- .-2.'--'° ' �S'✓.^. c-a=;TELL TO Ex.'s r ,wc'• r died[ 2'. cZVE %,,i/a IS "Ea G- .. 4c4cz D/rc.v �a G {t/v.-,a4.7\ z.a� a .> re "4.4. 7e Y C Q n • 78 ///STAG c G 'free U t f�/S r NG EAST - ,44„.. „7„ . 0 M . I G'06Z". • - ..4,-4-Jsse, 6G }/ - 11 /&'c vriaa T 6r 4 i,tiffc .6Y'4 / ,•4-c.C (={Z," Ctsna4ucF I - / fll 44.1 -. It t t7.7s til ni L. T" i x/it 4 cL- GS.c'cetn: }t•,eiocE -t- ` ,t I 4 Jorro44 4 6s ' 1 / 1./.42-.e..,--.46:0 awe ': 'l �. t I kkl • 4J1if/i.V G'o rr'.2 t ,44 SJs 57 C unrr,eO /GG>-Gre NI • 07 Qs Off K K OOO m m m Cr N N nn n '' JV r Q O O H -4 - 00 0 zzz NMOHS St, 311°35 U3AOff6dV O m z Cd 0 1 ors V n o S A m n m z 0 k n O Z a C r N z O a z Q Z RI a a n 0 r JD D O O 'S31VI)OSSV '8 NVOOH Z n ` rirlN vJ 7 tit l N N 431 Sot O w 4a • F' IZ- D' /4*C 39 enqer, 2/.Os - G. C:et N////I `TPo,- euc /nit- / ii�'C,rr� ,tom 6/OC4.7-1O.4, o c -4d5-, 5nhen L.,YE To to !/E#is',FP a; lt/cs, ec' tea- Cos !ivy /2-1C 4.5-"s - sere -e-;/41 BCd1c` O// 4 'sr $. p Corr/ty .Poao -� S //gt. ,.7S/ /4/47-war- Coiw'scr %O Cx sr/.vv' C.110 to i*L 44c, /%SE / /.7.0-22,/,-;.5 41c,&a v_ + \--Ew,-s' G'i✓.trE4'ie,VE r5:: G -AYE' 4*c ✓fr LG w I /737 78 /.vrrocc G. N. IN t ESL fl's - /44.c.,-.44.ti 8e OW ''Fr" /ssam',Se/ N. c..047 -Ma /ac, '.r o v. r • Fiechtner WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 160 1971 19 PERMITTEE'sNAME Little Thompson Valley Water District ADDRESS 307 Welch Avenue --Berthoud, Colo 80513 Your request for permission to install a 3/4tt Copper line along or across County Highway No 7 at NEI of Section 9, T3N1, R68W. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will /own and maintain the same after installation. The 314 " copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion of the road- way- No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such Statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence o.", the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days, from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway atter dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the Inr'tions designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this Installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense-of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado Weld County, Colorado, will not be responsible for any damage that may result In the maintenance of the highway or to the installation placed inside County right oj: way Jlmita. Jen- Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the Intent of this permit must be followed or this permit may be terminated forthwith. By: Main Ia ac tp • : this permit the undersign:- representing the Pero ittee, verifies that be has read and understands all of the foregoing pro sions; that he has authority to sign for and bind the Pormittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE -' ARD OF COUNTY COMMISSIONERS WE d TY, J..' . . aiz,dJ224 O-za SP'FtIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION`, OF UTILITIES 'WITHIN THE'. RiGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cw. unless otherwise specifiedinthe, special provisions. - c 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before- being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressureand size. . S. Encasement of line will be required from toe of slope to toe of slope nnaer all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. :manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. - - 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. - 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. - THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Benda Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 03 eq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. - 0.20 cu. yds. 6" 2.2 sq. ft. - 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft- 1.6 sq. ft. 0.66 cn. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 13" 19.0 sq. ft.. - 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3- sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired laid open cut or cuts within the allowed seven (7) days, Weld County Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7, All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the bard surfaced roadway to be disturbed prior to the commencement of the work, said bond shallassurerecovery by the County of any expense incurred, within a period of one year following the completionand---acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the bard surfaced roadway- Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. 4c,rttn -30- 7/ WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE June 21, PERMITTEE'S NAME Little Thompson Valley :later District ADDRESS 307 Welch Avenue -Berthoud, Coloralo 80513 Your request for permission to install a - 3/4i1 r•Ci )per line along or across County Highway No. 3 19 71 at Sl`7 of Section 29, T4, R68 --service for Clint Rockwell 111 is granted, provided that the Permittee will own and maintain the same atter installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4fI rnprer line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such ascrushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no ease shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such ..statutes as are Malleable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the ageadee thereof, and their officers and employees harmless from any and all bass and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unlaas otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado, at the locations designated by Weld County. Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and to accordance with: directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. ,esr - , Maintenance Man on this section of the highway, with headquarters at AAtcS?+0.l1 , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Sy: Supervisor a opting this permit the and ed. representing the Permittee, verifies that he has read and understands all of the foregoing revisions; that he has a ty to sign for and bind the. Permittee; and that by virtue of his signature the Pennittee is bound by all the conditions set f herein. THE AHD O%F CC/OODUUNNTY COMMISiworieRsJ SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTAL -Lk_ OF UTILITIES; WITHHt THE- RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO I. No cleated or traejc equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are tp be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise. specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two Inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway - 10. Ail requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an Inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backftlling is, completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tea and 90° Bends for 45° Bends at 46° Vertical Bends Down 2^ 0-3 sq. ft. 0.2 sq. ft. 0.05 cu. yds- 3" 0.6 sq. ft 0.3 sq. ft. 0.11 en. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft 0.9 sq. ft. 0.37 cu. yds. 8" 3-8 sq. ft 1.6 sq. ft. 0.66 cu. yds. 10^ 5.9 sq. ft 2.5 aq. ft. 1.10 cu. yds. 12^ 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4,3 sq. ft. 2.00 cu. yds. 16" 15,0 sq. ft. 6.3 sq- ft. 2.70 cu. yds- 18" 19,0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 en. yds. 24" 34,0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work fs being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1- No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed In no more than six Inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original_ 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be .removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired saidopencut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense Incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however. in no event shall the bond be less than 3100.00. Jere -Q1 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME DATE Little Thompson Valley Water District ADDRESS 307 Welch Ave -Berthoud, Colorado 80513 June 14, is 71 Your request for permission to install a 3/4n enppnr line along or across County Highway No, 38 at SW of $ection32, Township 4 N, Range 68 'N for W. R. Cooper is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will ownand maintain the same after installation. The 3/4" copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crashed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be Installed by the method of boring or jack- ing through and beneath the road surface; however, open cut ah all be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be conne@- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. €d r Q0-4, sty -n.4. tj Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: M. THE if ARD OF COUNTY COMMISS10 8 WEL9SU34TY, COLORADO i ,_1 Ce In ac . this permit the undersign'., representing the Pennittee, verifies that he has read and understands all of the foregoing pro • sio. ; that he has author! . sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all t•e conditions set forth . =rein a -z.,; gz7rfre f?6 SPECIAL INSTRUCTIONS REQUIREMENTS, FOR -INSTALLATION -OF UTILITIES -WITHIN. THE. RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to, be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. x 5. Mud -jacking will be required where bores are larger than lines or encasements. G. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from the of slope to toe of elopetunder all highways and pared County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities "paralleling -highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Toes and 90' Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft 0.20 cu. yds. 6" 2.2 sq- ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 006 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. - - 1.50 cu. yds. 14^ - 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 15:0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 eq. ft. 7.9 sq. ft 3.40 cu. yds. 20" 24.0 eq. ft. 9.3 sq. ft 4.00 en. yds. 24" 34.0 sq. ft. 14.0 sq. ft 5.20 cu.yds- NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done - SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material i, suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a ravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the 'execution.; of said repairs. 5. If the Permittee has not reyaired-said open -cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bondshallassure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be In the amount necessary to repair or replace said die - Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be lees than $100.00. Ratashak -1-crifie,2 PERMITTER'S NAME ADDRESS WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE Little Thompson Valley Water District 307 Welch Avenue -Berthoud, Colorado 80513 May 17, 19 71 Your request for permission to install a 3�" copper lire along or across County Highway No. at I1 of Section 16, Township 4 North, Range 68 West is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installationat no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" cponer line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the Installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, Dower, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ease of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of 7,y limits. 4C-01.�Maintenance Man on this section of the highway, with headquarters at ty-�,tlrrcnvJ or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Hy: Supervisor jaziatte,i_744-72 pting this permit the unders _ representing the Permittee, verifies that he has read and understands all of the foregoing ,visions; that be has authto sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set fo • herein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be.returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the. -special provisions_ 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- s. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two Inches in diameter or more than 100 pat pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they aro located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted - 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires Inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately neon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backtilling Is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Sends 2" 0.3 sq. ft. 3" 0.6 sq. ft. 4" 1.0 sq. ft. 6" 2.2 sq. ft. 8" 3.8 sq. ft. 10" L9 sq. ft. 12^ 8.5 sq. ft. 14" 12.0 sq. ft. 16" 15.0 sq. ft - 18" 19.0 sq. ft. 20^ 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. OS sq. it. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 se, ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. Yds- 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cn. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 at. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General; Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back rill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4, Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the (execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line or the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required In the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. -44:41;,z6 -Vi WELD COUNTY, COLORADO von Bernmuth UNDERGROUND AND UTILITY PERMIT DATE May 17, 19%, PERMITTEWS NAME Little Thompson Valley Water District ADDRESS 307 Welch Avenue- Berthpud, Colorado 80513 Your request for permission to install a 3/4n copper line along or across County Highway No. 5r at 3 sw3 d Section 32, Township 4 North, Range 68 West is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4'i copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible It shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished In accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such Statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance. alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within J ( ( U ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark. unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado- Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the tnstanarton placed inside County right of way limits. «' =� or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. c y\ I By: Z -j - , - s-'-*✓-. M, Maintenance Man on this section of the highway, with headquarters at BOARD OF COUNTY COMMISSIONERS UNTY,ORA In accepting is permit the undersign: •, representing the Permittee, verifies that he has read and understands all of the foregoing p1�sIQa that he has author! . to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth erein. 4-/ra_ SPECIAL INSTRUCTIONS REQUIREMENTS. FOR INSTALLATION OF UTILITIES V/ITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County rozd intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway - 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S Pipe Size 2" 3" 4" 6" 8" 10^ 12^ 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90' Bends 0.3 sq. ft. 0.6 sq- ft 1.0 sq. ft. 2.2 sq. ft. 3,8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft - 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft Minimum Thrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft. 1-6 sq. ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft 9.3 sq- ft - 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 en. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu-yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2, Final back run and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6, No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and Sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. • 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. �i Hed Cr/y_ 7/ WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME DATE Little Thompson Valley Water District ADDRESS 307 Welch Ave --Berthoud, Colorado 80513 May 13, Is 71 Your request for permission to install a 3/4" cooper line along or across pop ty ghway No. ` - at yg L OT' 27001 south of NW corner of Section 4, T3N, R 68 W.- Henry Minch. Jr. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same atter installation. The 3/411 Copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be need in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. Inno case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL. PROVISIONS: Attached The Permittee shall maintain the Installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result In the maintenance Of the highway or to the installation placed inside County right of way limits. r� /f-LY/efr' Maintenance Man on this section of the highway, with headquarters at C/44/0r( Vet or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ma .. Isar iTH BOARD OFCOLIN COUNTY COMMISSIONERS In , step' ' : this permit the undersign: representing the Permittee, verifies that be has read and understands all of the foregoing provisions; that he has authority sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth • . : n. Erz,:z7r SPECIAL - INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES -WITHIN TIHE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work oa or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be,returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cat unless otherwise specified in the, special provisions- ,. Med-jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required'from toe of Slope to toe oI slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches indiameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives oI Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted, 12. The construction of underground installations will generally require the services ofan inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. IN.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Sends for 45" Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 eq. ft. 0.05 en. yds. 3" 0.6 sq. ft 0.3 eq. ft. 0.11 cu. yds, 4" 1.0 sq. ft. 0.4 tic- ft .0.20 ca, yds, 6" 2.2 sq. ft. 0.9 sq. It 0.37 cu- yds. 3" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq- ft 1,10 en. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 2.50 en. yds. 14" 12.0 SQ. ft. 4.3 sq. ft 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. . 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 eq. ft. 3.40 cu. yds. 20" 24.0 sq. ft 9.3 sq. ft. - 4.00 en. yds. 24" 34.0 sq. ft 14.0 sq. ft. 5.20 cu-yds. NOTE. TO APPLICANT: This permit shall he made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cats across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material Is suitable for backlit!. If Itis de- termined unsuitable the material will be removed from the site at the expense of the Permittee- 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one. (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution. of said repairs. 5. If the Permittee has not repairedsaid -open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9, That in all cases where existing black top or hard surfaced roads must be cut, then in such case a nonerancellable cash or Surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway_ Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME ADDRESS DATE Little Thompson Valley Water Districg 307 Welch Ave --Berthoud, Colorado 80513 May 12 is 71 Your request for permission to install a 2"t watery. line along or across County Highway No. at ge NE corner Sec 15, T4N, R67W, thence south 690 feet in west borrow area is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 2" water line shall be installed beneath the surface of the right of way at a miuimnm depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back tilling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway es physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and tosuchstatutes as are applicable.- -. SPECTATE PROVISIONS' Attached W 2ZecT rue T crT44ar L i c2ox .O The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays, No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut oft lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated oy Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and In accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible y�for any damage that may result in the maintenance of the highway or to the installation placed inside Counf wa limits. I Maintenance Man on this section of the highway, with headquarters at -+1 O &A. S % 77r( A. , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. B Ma Supervisor Ina • : this permit the and: , •: • ed, representing the Permittee, verifies that he has read and understands all of the forego _ •visions; that he has an -- • rity to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set t• rth herein. THE BOARD OF COUNTY COMMISSIONERS UN u iitaLy spit 17t SPACIAL c INSTRUCTIONS REQUIREMENTS FOR INSTALLATION -OF UTILITIES: WITHIN- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to.. be -returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation win be removed from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under 'all highways and Paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permlttee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45* Vertical Bends Down 2" 0.3 eq. ft. 0.2 sq. ft. 0.05 en. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft 0.4 sq. ft. - ' 0.20 cu. yds. 6" 2.2 sq. ft 0.9 sq. it. 0.37 cu. yds. 8^ 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.6 sq. ft 1.50 cu, yds, 14" 12.0 sq. ft. 4.3 sq- ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 Cu, yds. 20" 24.0 sq. ft. 9.3 sq. ft 4.00 cn. yds. 24" 34.0 sq. ft 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of onea(1) year after construction whether in a gravelled surface or a paved roadway- If said cut is in need of repairs, Permittee is allowed seven (7) days after notification -. for the execution ' of said repairs. 5. If the Permittee has not repaired -said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assurerecoveryby the County of any expense incurred, within a period of one year following the completion and .acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. WELD COUNTY, COLORADO PERMITTEE'S NAME UNDERGROUND AND UTILITY PERMIT SIGNED: NOVEMBER 4, 1970 DATE October 27 2970 Little Thompson Valley Water District ADDRESS Berthoud, Colorado 80513 Your request for permission to install a 3L4" Water line along or across County Highway No. at sEix40 acres of the NEE of Section 241_ Township 4 N, Range 68 V. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 3/4" copper line shall be installed beneath the surface of the right of way at a minimum depth of 36 Inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made In six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be fmparied or interrupted This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS; Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( H() ) clays from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above each installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside Countyrit of.wpy limits. �1,.i4L7 Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUJ'ITY, COLORADO By: Ma Ia ace: ring this permit the undersign representing the Permittee, verifies that he has read and understands all of the foregoing • , visions; that he has authori sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth rein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 6. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- S. Encasement 'of line will be required from toe of slope to`toe of elope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation 'will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. It will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened Immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion Immediately after backfilling is completed. 14, No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4" 6" 9" 10" 12" 14" 16" 1S" 20" 24" Minimum Thrust for Tees and 90° 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.5 sq. ft. 6.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq- ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Area Benda Minimum Thrust Area for 46° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. it 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4-g sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1, No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by 'Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway- s. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must he cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT D RDTORSI LOUIS L RUR .1.41. Vt. . D[• ALTCR RANCIN OCORD[ A. MALRCR .LO`�OH. October 16, 1970 Mr. Bryon Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 Dear Mr. Ewing, We request a permit to side of the County Road an install a 3/4" service fo Acres of the N.S. 1/4 of TELEPHONE 532-2096 309 WELCH AVCNOC DRAWER 0 BERTHOUD. COLORADO BOSI3 water line on the east r the county road to located in the S.E. 40 , Township 4 North, Range 65 West. Enclosed is a permit form which LHF/ma cc:encl. I have executed. Very truly yours LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT SIGNED: NOVEMBER 4, 1970 DATE October 19, 197019 PEaMITTER•s NAME Little Thompson Valley Water District ADDRESS 307 Welch Ave -Berthoud, Colorado 80513 Your request for permission to install a 4ii water line along or across County Highway No. at SR4 of Section 18, T4N, R68W. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation, The 4" water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Water line to be located approximately 5 feet east of west R -O -W. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise oat of or be connect- ed with the Installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right o way limits. Maintenance Man on this section of the highway, with headquarters at 'Cr 4,1,70 .4) or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: M, In a ep • this permit the tinders representing the Permlttee. verifies that he has read and understands all of the foregoing p - • slims; that he has antio. + to Sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment Ito work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are; ttebe .roturned,.ta origins.; pon4Ition at a time designated, l?y Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed' from highway surface EACH DAY. 1. Under no condition is an asphalt surface to be cut, unfelis otherwie6ppeci Qd in th&syecial-2p-ovisioa®. - 5. Mud -jacking will he required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected= 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of elope unde4 all highways and paved County road intersec- tions and approaches, it lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway, 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Whore special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will he required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is, completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area - Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 46° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu- yds. 10• 5.9 sq. ft 2.5 sq. ft. 1,10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft, 1.50 cu. yds. 14" 12.0 sq. ft 4.8 sq. ft. 2.00 cu. yds. 16" 16.0 sq. ft. 6-3 sq. It, 2.70 en. yds. 18" 19.0 sq. ft. 7-9 sq. ft. 3.40 en. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds_ 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is iu need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. S. If the Permittee has not repaired —aid open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County oI any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the Chanty. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. LITTLE THOMPSON VALLEY WATER DISTRICT DIRKCTORAI LOUIS r. nth. RAN' W. •ILNDKR ALBERT N WALTER RANKIN OCORDE A. WALKER .ANAs.R. LOvILO N. October 20, 1970 Mr. Byron Ewing, County Engineer Weld County Courthouse Greeley, Colorado 80631 Dear Mr. Ewing: TELEPHONE 5]Z-2096 307 WELCH AN/Crude DRAWER 0 BERTHOUD, COLORADO Sost3 We request a permit to install either a 4 inch Class 150 AC pipe water line or Class 200 PVC in the west borrow area of the County Road beginning at the S.E. Corner of Section 18, Town- ship 4 North, Range 68 West and thence north approximately 2300 feet. At present we have a 1" water line extending north appro- ximately 1000 feet located in the west road shoulder. We propose to locate the 4" line approximately 5 feet east of the existing west line fence. Both lines will ben service for the time being. Enclosed is a rough sketch of our plans. Also enclosed are blank Weld County permits which I have executed. LHF/ma cc:encl. Very turly yours LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager _p4;ze_ec, f 7 4 WELD ;COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE June 15. 19 70 PERMITTEE'S NAME T.ITTLt THOMPSON V f T.£Y WATiIR T17STRTGT _ _ ADDRESS 307 Welch Avenue Berthoitlt, Colorado 80513 Your request for permission to install a Watar line along or across County Highway No. at is granted, provided that the Permlttee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The water line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: :. - - - SPECIAL PROVISIONS: Attached Letter of June 11. 1970 attached:CBy Phone from office of County Commissioners) The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within June 30, 197f ( 15 ) days from the above date- No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be Installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 4. qtr /ce .7}re Mai �! Supervisor opting this permit the undersignsrepresenting the Permittee, verifies that he has read and understands an of the forego • rovisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 417.8 777 QMPSCW ca- GATER � DISTRICT 4/"/n SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTiLiTIES,W►THiN THE; RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. • 3. Any materials from excavation as the result of utility, Installation will be removed from highway' surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in, the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for Installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction oI underground installations will generally require the services of an inspector tarnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility Installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to crigival condi- tion Immediately after backflliing Is completed. 14. No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2^ 3" 4" 6" 8" 10" 12" 14" 16^ 18" 20^ 24" Minimum Thrust Area - for Tees and 90° Bends 0.3 sq. ft 0.6 sq. ft. 1,0 sq. ft. 2.2 sq. ft 3.8 sq. ft 5.9 sq. ft 8.5 sq. ft 12.0 sq. ft 15.0 sq. ft. 19,0 sq. ft 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust. Area. for 45^ Bends 0.2 sq. ft. 0.3sq. ft 0.4 sq. ft 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft - 3.5 sq. ft;.` 4.8 sq. ft 6.3 sq. ft 7.9 sq ft 9.3 sq. ft. 14.0 sq. ft MinImum.- Volume of Concrete at 46' Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 ca. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. ZOO cu. yds. 2.70 cu. yds. 3.40 en. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 80% of original - 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut Is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cat or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement derelict to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfa ced roads must be cut, then in such case a non -cancellable cash or earety bond payable to the County shall be required in the name of the contractor or the person ,easing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. turbed portion of the hard -surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 8100.00_ LITTLE THOMPSON VALLEY WATER DISTRICT - DIRECTORS; DEAN G. ANQ(RSON LOUIS R. REIN ALERT N. JEFFERS J. WALTER RANKIN GEORGE A. WALKER MANAGER LEAJILO N. FACAN June 11, 1970 Board of County Cominiassioners Weld County Courthouse Greeley, Colorado 80631 Gentlemen: TELEPHONE 3333096 307 WELCH AVENUE DRAWER D BERTHOUD, COLORADO 80513 Enclosed is a request for a permit to install 480 feet of 2" PVC pipe on the County road east of Mead, Colorado. We propose to extend our existing line in the north road shoulder from the George Owen tap to serve property owned by Martin Quimby located in Section 14, Township 3 NOrth, Range 68 West of the 6th P.M. LHF/ma cc: Very.trd#y yours LITTLE THOMPSON VALLEY WATER DISTRICT LOvilo H. Fagan, Manager Greeley, Colorado The request for permission to install 2" PVC Pipe SIZE YYPE location described as follows: On north road shoulder on Weld County road east of Mead, Colorado one-half mile east of US 25 - an extension of 480 feet. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of beet:fill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken dcwn be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (3--) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-cf-way. That the licensee agrees la i.nstaLL'roper rrrkers for buried- Lines per- County speci- fications. This understanding and agreement will be binding upon .tour respective agents, heirs, executors, administrators, successors and assigns.- THE BOARD OF COUNTY CONVISSIONERS WELD COUNTY. COLORADO LICENSEES Little Thomason Valley Water District Name 307 Welch Ave -Berthoud, Colorado 80513 Address Greeley, Colorado The request for permission to install ^e.^ SIZE PVC Pipe TYPE location described as follows: On north road shoulder on Feld County road east of Woad, Colorado one-half mile east of rs 25 - an extension of 480 feet. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs' taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (3-,-',,-) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees -to_-Instal)-.prmper. markers for- buried- lines per -County speci- fications. This understanding and agreement will be binding upon your respective dIents, heirs, executors, administrators, successors and assigns. - THE BOARD OF COUNTY COWISSIONERS :JELD COUNTY. COLORADO ;e -f `led i LICENSEES tittle Thompson Valley Water District Name 307 Welch Ave -2erthouds Colorado 80513 Address WELD COUNTY, COLORADO 3s23d j,//mod War -4-r_ UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME Aare 'arena DATE 3- f ADDRESS--a25?_4CS a1 / (CC ` across County Highway No. 4.g. , at Sec Your request for permission to install a e�j i�Q� -- line along or fig/ 509 -Sr /t - l " re`t/� is granted, provieed that the P"ermittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever and that the Permittee will own and maintain the same after installation.�,�Q The --.9;e7 4'�, . — line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jacking through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the roadway. No water shall be used in the boring and no tunneling shall be permitted. Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be impaired or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connected with the installation, maintenances alteration, removal, or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise e Heavy in special provisions. Saturday and Sunday work would apply t Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when requested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Y -2- Permittee shall mark this installation with markers acceptable to Weld County, Colorado at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by Their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this installation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. , Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County, Colorado in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORAD9L . /' tip Main enance Supery s In accepting this pit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all t e conditions set forthin• REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to organic condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersections and.approaches, if lines are over two inches in diameter or more than 100 psi pressure. -3- 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado prior to any issuance of any permit. 11. Where special cases warrant the Department will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relating to the inspection of such utility installation will be borne by the Permittee. 13. All drainage facilities or siphons will he opened immediately upon completion of work at. sites of drainage or siphon installation. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits to be restored to origin,' condition immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulation allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S Pipe Size Minimum Thrust Area for Tees and 90°Bends Minimum Thrust Area for 45° Bends Minimum Volume of Concrete at 45° Vertical Bends Down 2" 0.3 sq. ft. 3" 0.6 sq. ft. 4" 1.0 Sq. ft. 6" 2.2 sq. ft. 8" 3.8 sq. ft. 10" 5.9 sq. ft. 12" 8.5 sq. ft. 14" 12.0 sq. ft. 16" 15.0 sq. ft. 18" 19.0 sq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu. yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to prevent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will bexecuoneted n no more than six inch mechanically tamped lifts and the fiinch will be a dry select road base material compacted to 9G% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is determined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts with the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and or maintenance without further disturbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety •bond payable to the County shall be required in the name of the contractor or the person causingthehard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said disturbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. ,7 WELT: COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT Date Feb 4/70 IC PERMITTEE'S NAM: Left Hand Water Sunrly Company Address P.O. Box 146, Niwot, Colorado 82,44 Your request for permission to install a 3/4" Copper line along or County Highway No at about 1000' west of intersection at Binn (Service for Robert L. Baker) is grante subject to the Permittee will own and maintain the same after installation. across IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever and that the Permittee will own and maintain the same after installation. The service line shall be installed beneath the surface of the right of way at a :minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on shoulders shall be made in six-inch lifts and mechanically tamped and packed, and th. last twelve inches of back fill shall be of stable granular material such as crushe. rock or gravel. where the installation crossed the roadway, it shall be incased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadwa as physically possible. This installation shall be installed by the method of boring or jacking through beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the roadway, No water shall be used in the boring and no tunneling shall be permitted. Where the installation crosses any dit_h, canal or water carrying structures, whereever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the slow of water ever be impaired or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached tallation to be made by boring under pavement The Permittee shall maintain the installation at all times and agrees to holy. weld County, Colorado, t`e agencies thereof, and their officers and employees harmless fc'?m any and all loss and damage or any claims which may arise out of or be connected .i. the installation, maintenance, alteration, removal, or presence of the installatior . .ein referred to or any work or facility connected therewith, within the area covered by this per,tit. This work shall be completed within Thirty ( 30 ) days om the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when requested tc do so by Weld County, Colorado, becau.e of necessary highway construction or maintenance operations. WELD Co, COMMISSIONERS GREELEY COLo RECEIVED FEB 5197Q -2- Permittee shall mark this installation with markers acceptable to Weld County, Colorado at the locations designated by Weld County, Colorado, directly above such installations such as manholes - at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this installation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado will net be responsible for any damage that may result in the Maintenance of the highway to installation placed inside County Right of Nay limits. , Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County, Colorado in the Construction of this installation and any directions that he may make consistent with the intent of this Permit must be followed or this Permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO By: In accepting this Permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Left Hand Water,Supply Compat�y^ j&LJ ??4A0 risr. REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2, All disturbed portions of right of way are to be returned to organic condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be conditions of this permit. 5. Mud -jacking will be required where bores are larger that lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to tow of slope under all highways and paved county road intersections and approaches, if lines are over 2" diameter or more than 100 psi pressure. utility installation will be cut unless otherwise specified 4 ?ELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT Date PERMITTEE'S NAME i Pft Hand,Pater Supply Company ,address P.O. Box 146, Niwot, Colorado 80544 Your request for permission to install a 3/4" copper line County Highway No , at about milk east.of Boulder -Weld road west of Rinn (service to Ray Olander) is grante subject to the reLmittee will awn and maintain the same 2/4 19_20 ,along or across County line after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever and that the Permittee will own and maintain the same after installation. The service line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on shoulders shall be made in six-inch lifts and mechanically tamped and packed, and tt last twelve inches of back fill shall be of stable granular material such as crusher rock or gravel. There the installation crossed the roadway, it shall be incased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadwa' as physically possible. This installation shall be installed by the method of boring or jacking through beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the roadway. No water shall be used in the boring and no tunneling shall be permitted. Where the installation crosses any ditch, canal or water carrying structures, whereever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the slrw of water ever be impaired or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PPOVISIONS_ Attached Instellrtioe to be made by boring under pavement The Permittee shall maintain the installation at ail times and agrees to hol:` Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connectea with the installations maintenance, alteration, removal, or presence of the installatior herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within thirty ( 30 ) days from the above late. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when requested to do so by Weld County, Colorado, because c" necessary h gfway construction or maintenance operations. WELD CO, COMMISSIONERR GREELEY, COLO, RECEIVW'W FE !SECT A V 2- Permittee shell mark this installation with markers acceptable to Weld County, Colorado at the locations designated by Weld County, Colorado, directly above such installations such as manholes - at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this installation, Permittee will do so promptly at its own expense upon written request fro,, Weld County, Colorado. Weld County, Colorado will not be responsible for any damage that may result in the Maintenance of the highway to installation placed inside County Right of Way limits. , Maintenance Man on this section of the highway, with headquarters at , or ctihis successor, will represent Weld County, Colorado in the construction of this installation and any directions that he may make consistent with the intent of this Permit must be followed or this Permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO �- By M. n enance Supervisor Pt In accepting this Permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Left Hand Water Sipply Co. r i :viler'. REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work mats. on or move over asphalt surfaces without 2. All disturbed portions of right of way are to be returned to organic condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified conditions of this permit. 5. Mud -jacking will be required where bores are larger that lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to tow of slope under all highways and paved county road intersections and approaches, if lines are over 2" diameter or more than 100 psi pressure. Y WELD COUNTY, COLORADO U NDERGRCUNDAND UTILITY PERMIT Date January 26 19 70 a P ERMITTE 'S NAME Left Hand eater upply Company Address P.C. Box 145, Niwot, Colorado 80544 You: request for permission to install a 3" water line along or across County tiehway No___ 7 , at from county road J6 south for approx matoly 5200' then west across county road #7 into Ranch Eggs Subdivie pn is grante subject to the ?erciteee will own and maintain the same after installation. IT IS UNDERSTCO^ that the Permittee will cause the installation at no expense whatsoever and that the Permittee will own and maintain the same after installation. The 3" water line shall be installed beneath the surface of the right of way at a miniru.m depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on shoulders shall be made in six-inch lifts and mechanically tamped and packed, and t3 12st twelve inches of back fill shall be of stable granular material such as crushes reek or gravel. Where the installation crossed the roadway, it shall be incased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadwa_ as physically possible. This installation shall be installed by the method of boring or jacking through beneath the read surface; however, open cut shall be allowed up to the edge of the shoulder portion of the roadway. No water shall be used in the boring and no tunneling shall be permitted. Where the installation crosses any ditch, canal or water carrying structures, whereever possible it shell be pushed through and beneath in a pipe of larger diameter thereby eli::rnating the necessity of trenching. In no case shall the slew of water ever be ir7aired or interrupted. This work must be ecco'plished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes es are applicable. S'ECIAL r 3vTSTCNS: n _z e,d wish to install the water line 6' west of the east ROW fence in the barrow pit. The Permittee shall maintain the installation at ail times and agrees to hold F;;=d County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connectea . . the installation, maintenance, alteration, removal, or presence of the installatior ein referred to or any work cr facility connected therewith, within the area covered by this permit. This work shall be completed within thirty ( 30 2 days from the above date. No pork shall be allowed on Saturdays or Sundays. No open trench permitted In traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will he required to shut off lines and remove all combustible materials from the County right of way when requested to do so by Weld County, ._'do, 6ecauee cf necc,ssary highway construction or maintenance operations. WELD CO; COMMISSIONERS GREELEY. COLA RECE!VED JAN ? "970 Qiti$iceilP i PP11R Ot ii -2- Permittee shall mark this installation with markers acceptable to Weld County, Colorado at the locations designated by Weld County, Colorado, directly above such installations such as manholes - at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this installation, Permittee will do so promptly at its own expense upon written request frow Weld County, Colorado. Weld County, Colorado will not be responsible for any damage that may result in the Maintenance of the highway to installation placed inside County Right of Way limits. , Maintenance Man on this section of the highway, with headquarters at , or his successor, will represent Weld County, Colorado in the construction of this installation and any directions that he may make consistent with the intent of this Permit must be followed or this Permit may be terminated forthwith. By: nance Supervisor THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO( (-MC %7eacstetai In accepting this Permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Left Hand '::ester Supply Company REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to organic condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified conditions of this permit. 5. Mud -jacking will be required where bores are larger that lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to tow of slope under all highways and paved county road intersections and approaches, if lines are over 2" diameter or more than 100 psi pressure. -3 - SPECIAL PROVISIONS; Generals Open Cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado and only after the following provisions are met. 1. No open trenchs or hazardous ruts will be left over night on or weekends. Excavations will be securely tamped to prevent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than 6" mechanically tamped lifts and the final 1" will be a dry select road base material compacted to 9G of original. 3 Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is determined unsuitable the material will be removed from the site at the expense of the permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the permittee has not repaired said open cut or cuts with the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the' utility and perpendicular to the center line of the road with a minimum width of 12". 7. All water lines and sewer lines are to be suitably encased to allow for repair and or maintenance without further distributing roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the same of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said distrubed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than 8100.00. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way of only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado prior to any issuance of any permit. 11. Where special cases warrant the Department will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregration of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado, All costs relating to the inspection of such utility installation will be borne by the permittee. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installation. Damaged portion of drainage or siphon facility will be replaced. All damaged sections to be inspected by Weld County, Colorado, inspector before bein concealed in any manner. Drainage ditches or borrow pits to be restored to original condition immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulation allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipers as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTAITED ON WELD COUNTY, COLORADO R. 0. KVS PioeSize 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 0.11 0.20 0.37 0.66 1.10 1.50 2.00 2.70 3.40 4.00 5.20 cu. cu. Cu. cu. cu. cu. cu. 8u. cu. cu. cu. Cu. yds. yds. yds. yds. yds. yds. yds. yds. yds. yds. yds. yds. NOTE TO APPLICANTS This permit shall be made available at the site where and when work is being done. THE REQUEST FOR PERMISSION TO INSTALL GREELEY, COLORADO November 26, 1959 3/4" K Type copper water service line SIZE TYPE LOCATION DESCRIBED AS FOLLOWS: Across Weld County Read #12, approximately 500' west of it's intersection with Weld County Road n7. IS GRANTED SUBJECT TO THE FOLLOWING CONDITIONS AND RESTRICTIONS AND AGREEMENTS: THAT YOU RESTORE THE DISTURBED PORTIONS OF ALL OF THE RIGHT-OF-WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, AND ALL DIRT AND DEBRIS TO SE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL BE BURIED IN ACCORDANCE WITH THE COUNTY EN- GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN BE REPLACED IMMEDIATELY; THAT ALL TUBES BE MARK- ED AHEAD OF TRENCHER; THAT TRENCHING BE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, NOTTO EXCEED THREE AND ONE-HALF (33) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUME FILL RESPONSIBILITY FOR ANY DAMAGE tT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO BE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BOND SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FQLLOWINGTHE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY. SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION OF THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY DAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALLBE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL BE REASONABLE; HOWEVER, IN NO EVENT SHALL THE 80ND BE LESS THAN $50.00. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAV- ELING PUBLIC DURING THE ;NSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES, BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES ARE MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL 50 REMOVE OR RELOCATE AT YOUR OWN EXPENSE UPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS OF ANY NATURE WHATSOEVER WHICH MAY ARISE BY REASON OF GRANTING PERMISSION TO LAN, THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION OF SAID PIPELINE AND THE MAINTENANCE THEREOF. WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY. THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS. THIS UNDERSTANDING AND AGREEMENT WILL BE BINDING UPON YOUR RESPECTIVE AGENTS, HEIRS, EXECUTORS, AD- MINISTRATORS, SUCCESSORS AND ASSIGNS. /7.`///"47/4/ THE BOARD or COUNTY CO4IiSSIONERS LICENSEES / WELD COUNTY, COLORADO Left Hand Water Supply Company NAME by: 42 ADDRESS P-9 Boc146. Niwot. Colorado $Q544 WELD CO. COMMISSIONERS GREELEY, COLO. RECEIVED N0V231969 3! 4 39UOt11112iI$1$14151® • Greeley, Colorado The request for permission to install 8 -inch Asbestos Cement Pipe SIZE TYPE location described as follows: In the east borrow ditch along the graded County road between Sections 27 and 28 and between Sections 33 and 34, T4N, R68W. Included is a valve vault in the northwest corner of Section 27, T4N, R68W. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all cf the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (3--k) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the li,c.ensee agrees. -td in'stalLprvper markers for buried -Lines per -County speci- fications. This understanding and agreement will be binding upon your respective a "gents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS GELD Cy14NTY. COLORADO e LICENSEES Little Thompson Valley Water District Name 307 Welch Avenue (P. 0. Drawer G) Address Berthoud, Colorado 80513 4 ,53O1=it N f N 3 -- orm n • • .I4 -N • • CC: ooi N • rt f N O S 7../k19/ >7. 3 "GCrfe 6o/ve _3 tte v- se y 44< , . L -4 -re- r 'rot, se i/a,! CO W CO ! ! I � ( 1 D°ag 1 -I -I P1mm O D O P) �n N n 0 9 Z a A C N 111 y1)1‘ kk khkt da 11)� .C11-))4 ON k N S sni •-..f w • �SP•V 74 a• l .� • .A - to Im S -w 0 e 4 1.1 rks4NchN lA c 0 b 4 39± -a • rck kct' �w. y d' • 33O1 -.Le 3 d 5crr`e /b." 4-e q 3 f4&r ey W/n i/ O t4-'i7r_ r W w .< { II i I O 013 • > > —i-i-a m m m I • (11 O D r 0 D - 4 z 2 m 9 A3133210 z 'i^i V! O z 2 z D z zm M Z -p A Z N• m - �° •z 0 (nZ oovao-1o0 z 0 A C A N 111 �y ^111jkk �o a kkk t\ �a y b�C , U) 2 m Cl) /LlE,4G% Li p rk to I. • • 1/4 00 N • :f 9 • r c. 3X2" 3 3< $a�roirrC 3"'lam.A_ 25-0 3 ~M -r- Ayer 3„- Gseeley, Colorad �3i'9Z9 The request for permission to install 4T x ST Concrete valve vault 6I ZE location described as follows: TYPE South borrow area county road east of Hartford Reservoir, Section 30, PAIN, R67W. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs. taken down be replaced immediately; that all tubes be marked ahead oftrench- Cr; that trenching be as close to outer edge of shoulder as possible,- net tc exceed three and one-half (3--) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the•roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees -to i.rrstaLL.proper markers for -buried Lines per.C.ounty speci- fications. This understanding and agreement will be binding upon your respective &tents, heirs, executors, administrators, successors and assigns . - LICENSEES Little Thompson Valley Water District Name 307 Welch Avenue Address Berthoud, Colorado 80513 THE BOARD OF COUNTY COMMISSIONERS saELD COUNTY. COLORADO No co, COMMFSSION!R* GREELEY, COL& RECFt VEO APR 211969 4 • .w1,4RT,0Rv RESEavo/R r c\ a Iv x 39'io�, c\ i N • O ;N I (11 ky j y N /6' 30 ' te- 60 4O /4 T /toL .47 by. =/q 7e/ r�< l% N 049.°767,- Y LITTLE THOMPSON VALLEY WATER DISTRICT R RCCTORSI LOUIS F. REIN PAY WE[NOER H J. WALT RANKIN CCOROC A. WALKER MANAORRI LOvlLC M. FAOAN dinL April 18, 1969 Board of County Commissioners Weld County, Colorado Courthouse Greeley, Colorado 80631 Gentlemen: TELEPHONE S32-2096 309 WELCH AVENUE ORAWER O BERTHOUD. COLORADO 00513 We request a permit to construct a 4' X 8' concrete valve vault in the south borrow area immediately east of the curve in the county road as it turns again east going around Hartford Reservoir. The property immediately south of this location is owned by Irving Brown located in Section 30, Township 4, Range 67. Mr. Brown has given us permission to locate the vault partly on his property. The -vault will be completely buried, with a man- hole located approximately 6 inches underground. Enclosed are plans showing the site although we now plan to locate the south side of the vault approximately even with the telephone pole line shown. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/ma 60,.E i-c /9e 9 GREELEY, COLORADO THE REQUEST FOR PERMISSION TO LOCATION DESCRIBED AS FOLLOWS: INSTALL mac/ GL it d� � -�IZL !et 12-eAkel TYPE )4 iv, / i anr lo -9 274 IS GRANTED SUBJECT TO THE FOLLOWING CONDITIONS AND RESTRICTIONS AND AGREEMENTS: THAT YOU RESTORE THE DISTURBED PORTIONS OF ALL of THE RIGHT-OF-WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, AND ALL DIRT AND DEBRIS TO BE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL SE BURIED IN ACCORDANCE WITH THE COUNTY EN,• GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN BE REPLACED IMMEDIATELY; THAT ALL TUBESBE MARK- ED AHEAD OF TRENCHER; THAT TRENCHING BE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, NOTTO EXCEED THREE AND ONE-HALF (3i) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUME flit RESPONSIBILITY FOR ANY DAMAGE IT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO GE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BOND SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FOLLOWINGTHE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY. SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION OF THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY DAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALLBE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL GE REASONABLE; HOWEVER, IN NO EVENT SHALL THE BOND BE LESS THAN $5c'.ef. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAY - CLING PUBLIC DURING THE INSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES, BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES ARB MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL SO REMOVE OR RELOCATE AT YOUR OWN EXPENSE UPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS Of ANY NATURE WHATSOEVER WHICH MAY ARISE BY REASON OF GRANTING PERMISSION TO LAY THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION OF SAID PIPELINE AND THE MAINTENANCE THEREOF. WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY, THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS, THIS UNDERSTANDING AND AGREEMENT WILL BE BINDING UP.N YOUR RESPECTIVE AGENTS, HEIRS, EXECUTORS, AD- MINISTRATORS, SUCCESSORS AND ASSIGNS. LICENSEES 112/1.24-4,49 ADDRESS THE BOARD OF COUNTY CONP1tSSIONERS WELD COUNTY, COLORADO WED CO. CLERK A RrR24 it Lam. GREEI_r; COLA Greeley, Colorado The request for permission to install 2" Schedule 40 PVC water ptpe SIZE TYPE location described as follows; Along the North side of Section 13, Township 4 No rth, Range 67 West of the 6th P.P.Q. Approximately 3,000 feet of 2" pipe is to be installed along the north shoulder of the County Road to interconnect existing lines. (to serve property owned by Ben Bernhardt) is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubas be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not t; exceed three and one-half (3-) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the 1itcensee agrees -to.in'staLt_proper markers for -buried- lines per,County speci- fications. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assists. THE BOARD OF COUNTY CCNJ:i1SSIONERS LICENSEES /C/ e Little Thompson Valley Water District Name 307 Welch Avenue Address Berthoud, Colorado 80513 E - COUNTY. COLORADO WELD CO, COMMISSIONEES GREELEY, COLO. RECEIVED FEB 28 1969 81718191101111211181$14161A A LITTLE THOMPSON VALLEY WATER DISTRICT CIetOTOw•r LOUIS F. •KIN MAY W. •KNOKe J. WALrle e OEOP OE A.WALKKS LOVILO H. February 27, 1969 Board of County Commisssioners Weld County Weld County Courthouse Greeley, CO 80631 Gentlemen: TELEPHONE 532-2096 307 WELCH AVENUE ORAwER O 9ERTNOLID. COLORADO 80513 We request permission to install approxi, ately 3,000 feet of 2 inch Schedule 40 PVC water pipe along the north shoulder of the county road on the north side of Section 13, Township 4 North, Range 67, West of the 6th P.M. to serve property owned by Ben Bernhardt. It is our intention to interconnect our existing lines along the road. Very truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager LHF/cm Enclosure .: i4, /747 MINISTRATORS, SUCCESSORS AND ASSIGNS. LICENSEES Left Hand Water Supply Company THE REQUEST FOR PERMISSION TO INSTALL GREELEY, COLORADO Three-quarter inch (3/4N k., Copper sinTYPE LOCATION DESCRIBED AS FOLLOWS: We plan to install a water meter approximately 1500 feet north of the instereection north of Rinn Store for Ward Burrett. Line location is fourteen (14) feet west of right-of-way which would include two or three feet of payement. We might have to cut the whole rood and then we would repair with gravel and cold mix IS GRANTED SUBJECT TO THE FOLLOWING CONDITIONS AND RESTRICTIONS AND AGREEMENTS; THAT YOU RESTORE THE DISTURBED PORTIONS OF ALL OF THE RIGHT-OF-WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, AND ALL DIRT AND DEBRIS TO BE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL BE BURIED IN ACCORDANCE WITH THE COUNTY EN- GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN BE REPLACED IMMEDIATELY; THAT ALL TUBESBE MARK- ED AHEAD OF TRENCHER; THAT TRENCHING SE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, NOTTO EXCEED THREE AND ONE-HALF (33) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUME FILL RESPONSIBILITY FOR ANY DAMAGE IT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO BE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BOND SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FOLLOWING THE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY. SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION OF THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY DAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALL BE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL BE REASONABLE; HOWEVER, IN NO EVENT SHALL THE BOND BE LESS THAN $5P.N. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAV- ELING PUBLIC DURING THE INSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES, BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES APR MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL SO REMOVE OR RELOCATE AT YOUR OWN EXPENSE UPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS OF ANY NATURE WHATSOEVER WHICH MAY ARISE BY REASON OF GRANTING PERMISSION TO LAY THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION OF SAID PIPELINE AND THE MAINTENANCE THEREOF, WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY. THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS. THIS UNDERSTANDING AND AGREEMENT WILL BE BINDING UP N YOUR RESPECTIVE AGENTS, HEIRS, EXECUTORS, AD - 1 ,4;4-14/ O17 i/ G //THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO NAME P. O. Box 146 ADDRESS Niwot, Colorado 80544 WELD CO. COMMISSIONERS GREELEY, COLO. RECEIVED FEB 10 1969 Y.M. ITIMPAIPIA Greeley, Colorado December 11, 1968 The request for permission to install a two (2) inch PVC water line extension to serve property owned by 1.169E Stotts tagxakad TYPE location described as follows: In Section 10, Township 3 North, Range 68 West of the 6th F. M. thence north approximately 1070 feet to connect with our existing water line. We propose to construct this line in the east barrow area of the county road, but request permission to use approximately 75-100 feet of road shoulder to by-pass a swampy area. We can construct our line in this area without damage to the oil surface of the road and will restore the road shoulder upon completion. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs. taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,- not to exceed three and one-half (3-) feet; that pipe be placed under all tubes and bridges; that all lines under existinh black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save +Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the liiensee agrees to.I -ta1L_prvper markers for -buried -lines per County speci- fications. This understanding and agreement will be binding- upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMSSIONERS ;:ELD COUNTY. COLORADO LICENSEES Little Thompson Valley Water District Name 407 Welch Avenue Address Ber 1tud. Colorado 80513 WILD co. COMIMISSIONfgj GREELEY. COL 0. RECEIVED fEl3 196P 01914:4422410471 Our Superintendent, Lloyd C. Conder, has conferred with Mr. Ed Horst on location regarding this extension. Mr. Horst has given his approval. Gree1'ey, oIo`rado 1r1A-v / 7, 9C 8 The request for permission to install 2" P.V.C. Plastic water Line s I zt location described as follows: Township 7N ; Range 65W; North Side of Section 6 The 2" water line will start at a manhole on the south side of old Colo. highway 5 at the intersection of Colo. 5 and Sugar Factory Road. The line will extend East from that point approximently 1800 ' to the Eaton Sewer Plant . The line will be in the South borrow pit all the way. S YPE is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead oftrench- Cr: that trenching be as close to outer edge of shoulder as possible, nct to exceed three ,,:d one-half (34:) feet; that pipe be placed under all tubes and bridges; that all lines unuc_ existing black top or hard surfaced roads must be bored or pushed under the surfaced potion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE HJARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO L LICENSEES To Aa71 k Snnc fnr 'T'ho Tnyy of F..atnn Name 22 Oak St. Eaton, Colorado Address _ 7a-fe//77rat-- WELD CO, COMMISSIONERS ORcntY, COLO. RECEIVED N0V 61968 AM. P.M. 'I7;8;9?1011I,1?fl1$18141516 Greedy, Colorado October 3, 1968 The request for permission to install 1 inch line PVC SIZE TYPE location described as follows: Approximately 280 feet along the east road shoulder of the Southwest Quarter of Section 32, Township 4 North, Range 67 West of the 6th P. M. Weld County Cordinates 15 & 38 is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,. net tc exceed three and one-half (3) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. Mat you save Weld County harmless from any and all claims of 'any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm, or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees -ta-install-,proper markers for -buried- lines, per- County speci- fications. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns, THE BOARD OF COUNTY COPo"'.1ISSIONERS ;JELD COUNTY. COLORADO LICENSEES i.irtle Thn'njspit Valley :Jator nictrirt Name 307 We] ch Avenue Address Berthoud, Colorado 80513 WELD CO. CQMMISS!pNERS GREEDY. CC LO. RECIVaD 00T 3 1968 A.M. 8;;E�9PIMA 1;M. *5i I Gre ley, Colorado } �, Mi/faI � The request for permission to install /O" l/ C. n sin TYPE location described as follows; 2c2. .. nj 7-‘c ✓/ 4 Oa..i /d•!` a///'c S. E, Gr, Sri pri�y: CrScc. (0 r 7-4e. Avert /ter .? Sa -,.c cc n& Pod J/77/1,/e /On ralic Co,. la" ✓ cP 0 is gran-ed subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs'taken down be replaced immediately; that all tubes be marked ahead oftrench er; that trenching be as close to outer edge of shoulder as possible,. not tc exceed three and one-half (sk) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill•after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees to install...proper markers for buried lines per County speci- fications. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES Addres/ / J Greeley, Colorado February 14, 1965 location described as follows: The request for permission to install 4 Inch drain line 312E TYPE Between. Sections 33 and 4 Township 3, Range 68 approximately - mile east of the Southwest quarter of Section 33 Cutting County Road Number 94 ?.s granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of bacl;fill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all • :ay signs taken gown be replaced immediately; that all tubes be marked ahead of trench - t t;: aching be as close to outer edge of shoulder as possible, not to exceed three -.half (s-0 feet; that pipe be placed under all tubes and bridges; that all lines g black top or hard surfaced roads must be bored or pushed under the surfaced of t:.= roadway; that you maintain this line at all times; that you check and main - after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and t et this work will be completed within a reasonable time after construction is started; tint you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever ti,5 h may arise by reason of granting permission to lay the above mentioned pipeline in- c'_ud.i:ig costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance therecf. v' Id County will not be responsible for any damages caused in the maintenance of the .ys to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, administrators, successors and assigns. Address, THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO fi /Pi 7?-74,8ci s2 Dist. PEA Gree_ey, Colorado 9/ May 22, 1964 0Q," aZ The request for permission to install location described as follows_ cross County Road No. 68 approximately 450 feet west of the Intersection of County Road No. 98 in Section 9, Township 3, Range 68 In Section 10 Township 3 Range 68 150 feet east of intersection of County Road No. 68 and west in barrow pit to intersection, then south approximately 100 feet crossing County Road No. 98 8 inch sewer line SIZE TYPE is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3,-) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Wield County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. LICENSEES Address THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO 5;4- — 2— er Ra — S3 3,3 Die f /1/0 z CP nd Greeley, olorado April 22, 196a The request for permission to install location described as follows: ����jj > � >��i � to 'Scar, X80 f I� .0 rW,-"C/n e��K /, u esd 4- oi � NE-: 35-6-65 fib's/Ins 2E TYPE t is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3r) feet; that pipe be placed under all tubes and bridges; ththe t under existing black top or hard surfaced roads must be bored or pushed under _ ti elines e surfaced portion of the'roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO .�� 64-44 LICENSEES Name L`iSTER . EVANS AVE. Address UENV±± IL• LuLURADU Yd Greeley, Colorado Fenruary 24, 1964 The request for permission to install 8" glazed tile drainage pipeline, to cross road (#131) between Sections 7 and 8, Township 4 North, Range 68 about 2600 feet south of the NW corner of Section 71 District #2i is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trencher; that trenching be as close to outer edge of shoul- der as possible, not to exceed three and one-half (3-z) feet; that pipe be placed un- der all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and maintain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense toWeld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with pro- per warning signs and signals, i.e., flares, both day and night; that you assume full responsibilty for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the remo- val or relocation of this installation you will so remove or relocate at your own ex- pense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatso- ever which may arise by reason of granting permission to lay the above mentioned pipe- line including costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. LICENSEES •-C�l`�2�et-��L Name'/ Address THE HOARD OF COUNTY COMMISSIONERS WELL) COUNTY, COLORADO J! i; , l *dam Greeley, Colorado _March 11, 1963 The request for permission to install a Gl- '"` %9ClLre- ' r beginning at theCn t P 4; K (Iry eafet4,„ CtiLp • ..�,C�Gc.y o<<"C=: ,!_k <<�r !/ i /_?_f_'If Q-i /C -or /an --t C.! s.-i a 1: hl i1 f//. r toeQtt „[l�/:tC- ✓ -y , ..t [ti.�.(a ".Ll ! is granted subject to the following conditions and agreements: (Dist #1 Hwy 85 _) That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfromWeldCounty. County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will. be binding upon your respective heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO LICENSEES * .' Name Address ti` O • District #2; Road #39 Sec 31.E Tin 3 N., Rge 68 W. L[Y/oar c,c, Greeley, Colorado December 8, 1962 The request for permission to install a water pipeline with mains and service connection lines beneath roadways where necessary on "County Line" highway between Weld County and Boulder County south of Colorado State Highway No. 65 as listed and described on attached map marked Exhibit "B" attached hereto and by reference made a part hereof, is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right- of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the right of way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all lines under existing black -top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times and assume full responsibility for any damage it may cause; that you pay for any repairs that must be made to this portion of the road because of this installa- tion. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started. That you will protect the traveling public, during the installation with proper warning sins and signals/Li-both day and night. That you assume full resonsibility for all damages resulting from this installation. That in the event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highways to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting per- mission to lay the above mentioned pipeline including costs if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding upon your respectibe agents, heirs executors administrators, success- ors and assigns. BOARD OF COUNTY CO 'l IS• ONERS i�fE`L�Y, COLA BY: LICENSEE LONGS PEAK WATER ASSOCIATION Approved and accepted upon the terms and conditions herein above set forth. LONGS _PRA BY: Secretary- WATER ASSOCIATION 25 36 • - ' l.c•t,.,.., • * wa'cic c'9e Unt Ccocc,•nL / / 7 Greeley, Colorado JANUAR10, 1962 � Y); The request for permission to instalipipe line to carry domestic water IRRkRR*R2xflx kl in barrow pits or road shoulders along various County Roads as shown on the attched map. However, if it becomes necessary to deviate from said map, same will be done at the discretion of the Commissioner of the District, his Overseer and the Contractor, is granted subject to the following conditions and agreements= That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written requestfrom Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding upon your respective heirs, executors, administrators and assigns. 80ARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO_--� LICENSEES 34/3 , e,,d Address L Greeley, Colorado The request for permission to install a water pine line with mains and beginning -at -Us service connection lines beneath roadways where necessary on Weld County highway rights -of -way as listed and described on Exhibit "A" which is hereto annexed and by reference made a part hereof, is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers spec- ifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any repairsthat must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is start- ed. That the traveling public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature what- soever which may arise by reason of granting permission to lay the above mentioned pipeline, including costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement .will. be binding upon your respective heirs, executors, administrators and assigns. L4CENSEEA LONGS PRAK WATER ASOCTATO$ Name rLn Mr Bey R Take Secretary Address Route 1. IAnW99PLt. Cq ordo BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO By LONGS ATER ASSOCIATION y R. Lake, Secretary EXHIBIT "A" DESCRIPTION OF PIPELINE RIGHTS OF WAY, LONGS PEAK WATER ASSOCIATION IN WELD COUNTY, COLORADO 1. County Road commencing at Colorado State Highway No. 66 running North one-half (0) mile between Sections 19 and 20, T. 3N., R. 68W. 2. County Road commencing at Colorado State Highway No. 66 running north three-quarter (3/411+ mile between Sections 20 and 21, T. 3N., R. 68W. 3. County Road commencing at Colorado State Highway No. 66 running South two (2) miles between Sections 28 and 29 and Sections 32 and 33, T. 3N., R. 69W; also running West one-half (1) mile between Section 29 and 32, T. 3N., $. 68W; also running East one -quarter (4) mile between Sections 28 and 33, T. 3N., R. 68W; also running west three-quarter (3/4) mile be- tween along the South section line of Section 32, T. 3N., R. 68W, also running South one-half (I) mile between Sections 4 and 5, T. 2N., R. 68W; also running East one-half ('D) mile along the South section line of Section 33, T. 3N., R. 68W thence South one-half (0) mile on the half -section line in Section 4, T. 2N., R. 68W. 4. County Road commencing at Colorado Highway 66 running North one-half (0) mile between Sections 21 and 22, T. 3N., R. 68W. 5. County Road commencing at Colorado Highway No. 66 running South one and one-half (11) miles between Sections 27 and 28 and Sections 33 and 34, T. 3N., $. 68W; also running West one-half ('i) mile between Sections 28 and 33, T. 3N., R. 68W} also running East one (1) mile between Sections 27 and 34, T. 3N., R. 68W. ) ) mo),e § otnc m to to1 _(§§�§ m ]tke§m-N kflu) Z ■ ®§2k ka »m§§m~$' 2-Sm§2� Xoo A_ SAM =�00 in =Z4N 7§@2/71. 2q& tG 1 le r c� {T t I -1 A cc TERRY LAKE ov O1 co O1 Ti Ld D,^? xR' ! z U'• O N IL. -w. Ove.aNOLr L. F- HAN& Loa MfLLrte rgvrr Z � I- ND X z ffc,i 3?, 1.._1 30 zaxl `C r -- —� 1 i btnC kll An a i :I tk '' 41t Ck 2t is- ti, Ar' 0 �2, x ; '. 7r yd a� . oti v . A h �n N( 1V d C c1 'S D 1 -: =t, G 'yJ � � i1 I;)0�' “ ' 1}—'' m� ^ i\:' __" ii i �6a�z' � t A , 1 Mr -. 1 b "�G• I ca C!1 1 . ND ..w ✓ �� L V ' _ - _- a tike •v � 41t4--1 '+ ' (A n t t, tZ =—y °' ar t I. 'ht. , i ii C. - '4 !Olt nz A - '3 3 • 'i j d Z.), 'I, ' i 2 pi v m A �-'r't 2 >" N , a u0 i • �;I� z °0 ; - _ --- V + n.e `ln, p� nom- 1 N2C1 na yn io `1 kC Co ��r nn. �,k ..i N� z --> S i i d, k Cl' Z D w ZzI 1• etilt~' U�,1 it I z � < •fqr 9 : ..- ;I In y t� J 'raA . oe Cr e. 0 : n3 fi Hirt:: . 7" of D E y G rt ��: x hi!_c_.§. 7.- r. , ` - { `a ._.F is ,+> NN . 1 ! �1 µr ante - n 7r) 00 2 N O N° 2 Oa A� Lq� c TtC yr � "- ' 33 Ji; R kC1/4I o 1, 1 V 1 CD NO`Zi ID� • A7 / • k l , 1 tt ( - a� { ' \ T fi I -'}3 v,v & NIV �n2 li kII L 1 O� Th t 'n 2� - 0. '''5 �'.� N pct o i — i ' , •i- 'QA•Zr 1 - �' CH R t Db )C It G t`,1 a A u�_ Z m =I a < r. .t x03' • z� �, �' ; ! D A \ rn N r ii m •J a .. \u, N c,; r 1 c` D T ;v. Uw 7 1— nit r 0 G7 CO 13 fri 0> z z G D n 0m 0 073 r ow oN 0 gYt°i I. Z. Greeley, Colorado p_ ?Pe »- .. tori t at Y' city' of The request for permission to install a line begaway south Gity tatty 6d` EamsIrs$ tato, Mao Sal mine nut 4aw mid is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way arid roadway to its original condition. The backfilling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the •:ineers specifications That you maintain this line at all times and R assume full responsibility for any damages it may cause. That you agree to pay for any repairs that must be made to this portion of the road because of this installa- tion. That all labor and material be furnished by you with no expense to Weld County and that this work be comnleted within a reasonable time after construction is started. That the travelling public be protected during the installation with proper warning signs and signals, both day and night. That you assume full respon- sibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the high- way right-of-way. BOARD OF COMMISSIONERS WELD NT I,ORADO pp BY �(' ��4�I4-YA/Y cai rSnn z rr #' .3y 'L. L. co • 2 /2 I Zia' I" U -- 9- r/4" m 2 tie ro /4 0 0 A a 0 O ,z 0 a a f 4 IA ! "4 - Ur IN' cci , !; 2 I/ I z 0 z _ c, co 1 II U. S. HIGHWAY NO, m U, 2 o+ m Ly U.S. HIGHWAY32f!%BZ _ T :x 10 JOHN S. HOUGH PHONE PR 6.5676 ATTORNEY AT LAW WOOLWOnK BUILDING LONGMONT, COLORADO April 11, 1962 Board of County Commissioners Weld County Greeley, Colorado Gentlemen: P. O. BOX 337 Re: Longs Peak Water Association proposed extension. The Longs Peak Water Association installed a domestic water system in Weld County under permit issued July 5, 1960. The Association now proposes to construct an extension of the pipeline on the same terms as before. Please find enclosed a proposed permit for your signature, description of the extension as it affects W ld County roads, and a map showing in red, the new construction on Weld County road rights of way. I can assure you that the construction of the new portion will be carried out with all due speed and will be carefully done, in accordance with the terms of the permit. The engineers for this project are Whitney and Schleppen- back, 835 Main Street, Longmont, Colorado. They can be reached by telephone at PRospect 6-6472. The Association's Secretary is Mrs. Joanna Macy of Longmont. Thank you for your assistance in this matter. We have appreciated your cooperation in similar projects in the past. JSH/ab Encis. Very truly yours, n S. Hough ttorney for the A' ociation W.,, SS�.2S CsC-•� E;.EY. COLD VED : PRi ',.962 0{t:".tt;91i°31#LZili?OritdM., Greeley, Colorado March 13, 1962 The request for permission to install a water pipeline with mains and service connection lines beneath roadways where necessary on Weld County highway rights -of -way, as listed and described on Exhibit "A" and as shown on maps marked Exhibit "B", both of which are hereto attached and by reference made a part hereof, is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right- of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill on crossings to be of stable granular meterial, such as crushed rock or gravel, and all dirt and bebris to be removed from all the right-of-way when work is completed. That this line shall be buried in accordance with the County Engineer's specifications. That you maintain this line at all times and assume full responsibility for any damage it may cause. That you pay for any repairs that must be made to this portion of the road because of this installation. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started. That you will protect the traveling public during the installation with proper warning signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in these highways in the future that would necessitate the removal or relocation of this in- stallation, you will so remove or relocate at your own expense upcn written request from Weld County. Weld County will not be respons- ible for any damage they may cause in the maintenance of the high- ways to installations placed inside the highway right-of-way. That you save weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting per- mission to lay the above mentioned pipeline, including costs, if any, are incurred in the defense of any claims made by any person, firm, or corporation by reason of the installation of said pipeline and the maintenance thereof. That this understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, success- ors and assigns. LICENSEE LONGS TER ASSOCIATION ecretar BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO i /77 V EXHIBIT "A" 1. The pipeline is to cross the Weld County -Boulder County line road at a point 2640 feet, more or less, North of the South- west corner of Section 19, T. 3N., R. 68W. 2. The pipeline is to run West on the Weld County road on the South line of Section 29, T. 3N., R. 68W. a distance of 3400 feet, more or less, commencing at the Southwest corner of said Section 29. I p Greeley, Colorado The request for permission to install I' Lvt2r "`f~ SIZE WE (7_, location described as follows: '7% G = ! dyj°c'g"^' 3G " 7 Z-21 L 7 1, •. �_.�.- �2d.�G /--� ;z ;07C `/9{' dr' '2 474e �fvs eiCc<- 02 ' r (aj 2 d ego l tau / cCA is granted subject to the following conditions and restrictions and agreements; That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead oftrench- sr: that trenching be as close to outer edge of shoulder as possible, not to exceed three rod one-half (3-i) feet; that pipe be placed under all tubes and bridges; that all lines u -,k r existing black top or hard surfaced roads must be bored or pushed under the surfaced pon:i on of the roadway; that you maintain this line at all times; that you check and main- t“,in backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility fcr all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld Ccunty harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES Name c �/7 dT' / , • Address Greeley, Colorado The request for permission to install location described as follows: 6" AC Pipe cl 150 SIZE TYPE Three county road crossings: two located at the intersection three miles east of Mead, Colorado. 0-e located three miles east and one-half mile south of Mead, Colorado. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs -taken down be replaced immediately; that all tubas be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (3--) feet; that pipe be placed under all tubes and bridges; that all lines under existinh black top or hard surfaced roads rust be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the' licensee agrees±a install .roper maskers for -buried -lines pex County speci- fications. This understanding and agreement will be binding upon your retpective agents, heirs, executors, administrators, successors and assi4ns.- THE BOARD OF COUNTY C0W.USSIONERS ;WELCOUNTY. COLORADO LICENSEES Little Thompson Valley Water District Name 307 `,oloh Ave -Berthoud, Colorado 80513 Address Greeley, Colorado The request for permission to install location described as follows: 2inch PVC pipe SI ZE TYPE South shoulder of County Road 91 at approximately 1500 feet west of Interstate No 25, then west approximately 1100 feet to serve property owned by Clayton Claus located in Section 10, Township 3 North, Range 68 West of'the 6th P. M. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the -last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signstaken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,. not to exceed three and one-half (3-2) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill-after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full respons:..':_y for all damages resulting from this installation; that in any event any changes are mane in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees to irrstall.proper markers for buried lines per County speci- fications. - This understanding and agreement will be binding upon your respective a -gents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY CO#2$ISSIONERS WELD COUNTY, COLORADO LICENSEES Name' l4/-r 2�c�l- -77 S" -r91 frf' 32/$ i ni I ;tj/ /74/ ZGce- Address' Ll_,-.4frizla-1 i 17CS/3 Greeley, Colorado' The request for permission to install c„ ff/c (Novi- c) SIZE TYPE location described as follows: ff-, % e Nor:/, ,fl u"n - d, fc ke o -. Cec 0, i Y RC/ AS21,L,de9/ )"I/tat a! /4e .fo i4 4eov..Tec. t6', %S"N,/i'b7W T/I e A.'PI I a. O/s/O ce of !i Oe v let/Lfrnc•s.c n 4. j. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not tc exceed three and one-half (3-Z) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the -roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this Installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE HOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES tee %/idni rd Vo//{r 4fo/eP i7 / Name Ber/faov.d/ Goro, Address ire/.rdM /44 /3rsd t Go/./c /=s� c c&Jr ea tb z It m 1 0) �w Pa Rh tb INa)Ne 2s' 1.-90 9O °F/. n° 3 _ r1 Greeley, Colorado The request for permission to install location described as follows: IA' elr -6 l..Ctavi S ZE Pve- TYPE 7% 2,57 ad is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, act to exceed three and one-half (3-1) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES7 ,`- MAI 3i3 !�/,e-cnat e. Address %i e LITTLE THOMPSON VALLEY WATER DISTRICT LOUIS EER. PRESIDENT AlniCRT VICE PRERIDENT a. WALTER RANKIN. DIRECTOR DEOROE A. WALKER. DIRECTOR vcera DN IRLNCH. DIRECTOR L.OVD.O PAGAN. MANAGER Weld County, Colorado Board of Commissioners Greeley, Colorado Centlemen: September 22, 1965 TELEPHONE 532.2096 J43 MOUNTAIN AVENUE DRAWER O BERTHOUD, COLORADO SO6+a Enclosed is the form requesting permission to make a road bore to install a 2" water service line to the May Snedden property, for your consideration. Would it be possible for you to furnish. us with some more forms which request permission to install water service lines in County Road right-of-way as we have used all the forms sent earlier. Thank you. LHF:ba Enc. 2 Very' truly yours, LITTLE THOMPSON VALLEY WATER DISTRICT Lovilo H. Fagan, Manager Greeley, Colorado The request for permission to install 3/4't SIZE location described as follows: Copper TYPE Pronerty o':med b;* Gilbert L. Tolfe located In the SE1/4 of Section Three, Township 4 North, Range 67 -.Jest of the 6th P.i''. ':7eld COI ntv, Colorado is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3-.34.) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BDARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO / j\ LICENSEES LITTLE HO --SON VALLEY .::TEE DISTRICT ,s-� , , < emu, ':lounta_n Avenue Address Tert'oud, Colorado i Greeley, Colorado The request for permission to install location described as follows: irr r r SIZE ��TYPE Three miles south and approximately 1000 feet west of Johnstown to serve the Albert Stroh tan located in Section 20, Township 4 North, Range 67 Zest of the 6t , Told County, Colorado is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3-) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assure full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. LICENSEES LITTLE - O.!PS0N ;TALL ' .ti_+R DTSTRTC7 Avenne Address THE 30ARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO thon3, nolorado Greeley, Colorado e The request for permission to install 5/e,.tr Cooper SIZE TYPE location described as follows: Property o•:�^�: ' by Yarie Olin located in the SE 1/4 of Section 3, Towhehip 4 :North, Panr3e 07 of of the 6th P.N. eldCounty Colorado. ;old County Fora No SS. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of bacfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3-y) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES Kittle Thorpson Valle,* :ate 343 Sountain :..venue Address 7erthou_d, Colorado rte,. Greeley, Colorado The request for permission to install Cotter SIZE TYPE location described as follows: Tea:. Co -- � oa_: _... S7 - --. ^,o::a,.e1,__ 2 1/2 .1lcs cast oa CQ1ora:lo 1^a7 to 3.^....'o p2O'JC 't„ o'.. od by 7.2c-ios tA'.. ,. �l.t '‘,117.1)4-`:-'‘,117.1)I oca T „?C GiOn , rt07, s ?:'?^' _;0. 1, 57 t:710 3-h3th Yold Cov Colorado is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge o: shoulder as possible, not to exceed three and one-half (3z) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsitility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES . ._tt C 1 o:::pson Name Va11^- ?ateei' Dist lot jan.Lin V. 34: 7oulatein 1venro Address fir:: t- oud, Co1ora::o Greeley, Colorado The request for permission to install 3/4 " Copper Line SIZE TYPE location described as follows: 1320 feet West of Intersection of Colorado Highway 257 and Weld County Road No. 280, County Road 280 lies between Section 27, Township 5 North, Range 69 West of the 6th F. M. and Section 34, Township 5 North, 'Range 69 West of the 6th P. M. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken dcwn be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3-D feet; that pipe be placed under all tubes and bridges; that all linos under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the'roadway; that you maintain this line at all times; that you check and me=n- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is start,; that you will protect the traveling public during the installation with proper warni;:g signs and signals, i.e., flares, both day and night; that you assume full respons`ti= y for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipelic:a in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE 8)ARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES �y4fifName Address tat- 4.artal . 3'/31i1�. (anti. J, L er �4✓�eh 6eC a7 7s- r? -4q11/ a R'p lifle _County 2` lO, - y Open cot Gravel pelil }lave ,E--/ O- Rep000d ThP 4d4m He //ey sec 8'/ Ts RL9lit/ /3W 14Lweat r ?e ° ..2.574 Cal ro , n 0 v • • Ati& 5 PERMITTEE'S NAME WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE April 30, Morgan County Rural Electric Association 19 74 ADDRESS P,C. Box 738, Fort Morgan. Colorado 80701 Your request for permission to install at ugderrnund line r across County Highway No 89 at a location 2625[ North of the SW Corner of Section 9, T8N. P.61W of 6th P.M, or Read Ne. 94 is granted, provided that the Permittee will own and maintain the same after installation. rr IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The direct burial power line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge oI the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such Statutes as are applicable. SPECIAL PROVISIONS: Attached: Since this road has a gravel surface, permittee requests approval to hake an open cut across the driving surface and to lay in direct —burial cable without being put in pipe or conduit and then backfil.led. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. 0 This work shall be completed within stinity ( '.'% ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense npon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. "vim L if Ira H - 'l 3 C or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. sy: .N �1 do r n4tor.were ri,A, _ dux Maintenance Man on this section of the highway, with headquarters at THE SOARD�l!OF COUNTY COMMISSIONERS WELD-CQUgITY, COLO...._r_ r In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of Id.r�ignature the Permittee is bound by all the conditions set forth herein. W.O. 74-177 Comp IeIfoK UaTC CAfcul®d * Zidyi3,/fyL Everett B. Chesney, General Manager 775. eat- �bt«1 rat /3 19 • • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected_ 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 46° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 on. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 en. yds. 6" 2-2 sq. ft 0.9 sq. ft. 0.37 cu. yds, 8" 3.8 sq. ft 1.6 sq. ft. - 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. ---, 8.5 sq. ft. _ 5.6 s4- ft, 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft.. 14.0 sq. ft. 5.20 cu-yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. It said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cots within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith_ 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further die. turbine the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. MORGAN COUNTY MORGAN COUNTY RURAL ELECTRIC ASSOCIATION P. O. BOX 738 FORT MORGAN, COLORADO 80701 ASSOCIATION June 11, 1974 Board of County Commissioners Weld County Colorado P.O. Box 758 Greeley, Colorado 80631 Gentlemen: PHONE 867.5688 This association has Weld County Underground and Utility Permit No. 978 as signed on May 8, 1974; a t of st-''i rh i- „ttanhad .te lbis latter. At the time that this form was submitted to your office on April 30, 1974 it was requested that ninety (90) days be allowed to complete this work. This period was reduced to 30 days on the approved copy of the permit, and the 30 days have passed and this work has not yet been started. This association requests a 30 -day extension of permit No. 978 in order to start and complete the work as proposed. The heavy demand on spring irrigation Work has forced us to set the subject construction back more than we anticipated. Please advise if a 30 -day extension can be granted, or if a new application should be submitted. Very truly yours, MORGAN COUNTY RURAL ELECTRIC ASSOCIATION . Zambo,('ngineer JWZ/ksl Attachment — None P.S. - The blue carbon typing and writing on the pink copy of Permit No. 978 did not reproduce on the Xerox Copier here, so we cannot send the attachment. Please refer to your white original. CLEAN COMFORTABLE LIVING WITH ELECTRICITY WILD COUNTY LNG[W1ttRUNG Utr t . s. INSPECTION REPORT DATE E'-28 7c1 PROJECT: frne1 /.7 1/O6O7-711-7 £PR( t /C. LOCATION: 575'9 9 PERMIT # Asiz REPORT: Due to this permit being more than 30 days past inspection date, • we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH .'£a _ 4 & as -4 .eL. 3 -2 7- 79- WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE �)0W 10 e I9 /7``, PERMITTER'S NAME ADDRESS Your request for permission to install a lin r across County Highway No. / 3 s is granted, prov(L6d that the ermittee will o . and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld Permittee will own and maintain the same after installation. t The a�� � � � �+:>� line shall be installed beneath the surface of the right of way of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of stable granular material such as crushed rock or gravel. County and that the at a minimum depth back filling on the back fill shall be of Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or Interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation. maintenance, alteration, removal or presence of the installation herein referred to or any work Or facility connected therewith, within the area covered by this permit. This work shall be completed within -7 6 ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County ii ht of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. MaW,t n.ace 6uperviw THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ��)- In accepting this permit the undersigned, representing the Permittee, verifies that he bas read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. Tr / 7'rJ 5 mane 1 .I `2/7 7r jfC6 r /`a Le SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 1. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions, 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches to diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14, No meters are to be placed within the highway right of way. excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends 2" 0.3 sq. ft 3" 0.6 sq. ft. 4^ 1.0 sq. ft. 6^ 2,2 sq. ft 8" 3.8 sq. ft. 10" 5.9 sq. ft. 12" 5,5 sq. ft. 14" 12,0 sq. ft 16" 15.0 sq. ft. 1S" 19.0 sq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 eq. ft. 0.3 eq. ft. 0.4 sq. ft 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8 Eq. ft. 6.3eq.ft- 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County. Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely taped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4, Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. C. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. - S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 1U L /'I/942 - PROJECT: '/ k2w77'2 hive LOCATION: ,q4/ 44 PERMIT # 9071 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH a County �ngineer Inspector WELD COUNTY, COLORADO • UNDERGROUND ` ` AND UTILITY PERMIT DATE January 30, PERMITTEE's NAME Morgan County Rural flectric Association ADDRESS P.O. BOX 738, Fort Morgan, Colorado 80701 Your request for permission to install an underground - line utettansor across County Highway No. a -location ]175' 'Last of the West C1iarter yozngnof Sec. 36, T3N, P61iv, 6th P.N. is granted, provided that the Permittee will own and maintain the same after installation. 19 74 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatscever to Weld County and that the Permittee will own and maintain the same after installation. The direct burial power line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of largerdiameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. .. SPECIAL PROVISIONS: Attached: Since this road has a gravel surface, permittee requests approval to make an open cut across the driving surface and to lay in -direct —burial "able wrtheiit bpi nE r" t 1n pipe or cnrrhat, and the hark£ill °a_ The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be conned- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ninety ( 90 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway alter dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable. to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so -promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right yf way limits. Maintenance Maron this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELpc_QaDjyY, COLOR DO / f: Dg: In seep this per: t the wade igned, representing the Permittee, verifies that he has read and understands all of the foregoing • •,vial ns; that he has au • • rity to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by a - : conditions set forth herein. sett B. Chesney, GdneralN+sinager N..C.R. A. W.0. 74-30 Btij acct 0 gee Y Q ces o 12 58% *776 /,6 • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES -WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection Is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backftutng is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft 0.4 sq. ft. 0.20 cu. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. 0.37 ca. yds. 3" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 en. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 ca. yds. 14^ 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 en. yds. Is" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu.. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 eq. ft. 14.0 sq. ft. 5.20 cn.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with -a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shallassure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of therestored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. . NUMBER POLES ON SKETCH AT TOP, CORNERS, TRANSFORMERS AND DEADENDS INDICATE RETIRED UNITS WITH ', REPLACED UNITS WITH RESET METERS-TRANSFORMR n' O cI- S 1 ill' L SKETCH OF WORK 1 NO. OF CONSUMERS' POLE LINE FT. SEC. POLE LINE FT. SER. �LE LtNEFT, PRL__ -; — Y-4- /J Ron"/ % /� I I i , •z' -a -- I= xt; ,k� ;I " Is • -. o ii 1 I\ ‘ k I i . I I Pr - EXISTING yOz I^ Zr. ^ L [' ,EE kepNN, I'J,X -niet 3 Sv cO H- _It STAKING SHEET MORGAN COUNTY RURAL ELECTRIC ASSOCIATION ------ - i (� z; y rS -m ZTP OD`c n { I I Zr rm w,./..t G F -I.-, 1 H ' .p 0 Z in '6 TWP -- - I `I i = O 11 I i\ i iN I 1 r I n S RY NO.I N '� i i `�^I H a I , r '� t4 Iry Fr", '° h, I I I I i '� �L 2 z c1 > t,_ , I t V C E"A t1 f NO _--- __ sr', U E FAIL MAPjQ iN I` a I \ \` . . N N 1 r ` tIA n I e i I + i RD E tUT �1 ` RELEASED F' f%_f/• 36 n m. Ir _. i . Nee •1 ` ti the P ,� I_ tA 10 f1 jS ' o > > F `� I I M N H t S Is, t 1 F E 1 ,S I� Ia ;c4 5\ r c.-- I! I 1 b i I„ l '� I I I I i i' C ` n • • c c c � Q :•v Cos L— //1-___�_..____. - I 37' - :-' : - • a ... u"A vraaa • At aliilailafi • 17 0; 101 , .;-4. • ':fl a -•L,.:_ -•a as as : a- -� -:..MIRWRI .a - a' ..- °A n., k as as 1 iuiuln - as �iRalit: as - V ' Ill' as MEOW - a, • - a •as•• �•.•` wy�1 a �, - . . • . . . . u ril a a i: S •1:1:. i = « ... 1 Tu. -:mow J k'i \ - i as ' 'jig" ig"lit �-,,, •l` aaa - .. \� is Wait ,� � a��� p ".� b ' Pm FA 32 it • . _ « �a� �2 linpr 44 •FraliP"detitrrrl, � ��.C�1f sF "` n I a "Qtr. a ama a alIli I! IS arrit - aaaoaa : WM•''4iiipt fl'' x T)w a a a u . 44 al Nt I " • �' . s - Pen .. mi f _ . a -.,,ddim A r t- - - - \ E" j , - - - . I. ` r- ' -r, ...... a � �IaatuiY 14 aanffinaa' 1 . .• I i :. .• to 1 . �.�� • . ' ' • fro 1: ' Y � 1C•L `7• N -v . .... J� r. 1 C �S O e ems. • 2 T 31 33 33 31 SiA b 63 47 N 71 73 )% » » in n a at. n •Y A ss ti WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT ' DATE 710-751 PROJECT: Mav7,4h &hti /?eAL /icrreic .14rrah LOCATION: 5c- 7aen , r PERMIT # 876 REPORT: Due to this permit being more than. 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH Lounty tng neer Fort -3 Inpecto;41,474/2 ..,e"i''' 6/1/74 r . S 137-.3-2.1 • WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME 2/ `L / a/lre }. ADDRESS /rte .✓ /P6 GC ems !'t ) !/�CAiY�—. 0642 2 ed 70/ / p if/ Clour.�rrequu�est(f000rr/�perrmmissio%n t-0� install a/ yJ line S. or across County Highway No. f� at F�dS/ i/= ea-Re/Si [lf7Gtt [/ a -i'a' is granted, prtox'~Wed that the Permittee will own and maintain the same after installation. DATE IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own Land maintain �the same after installation. Thee-C/21_0j Ai d fcr line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a. pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever he imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to bold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. ? 3 7/ This work shall be completed within (— v ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to !Veld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning sigaa or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. d 3' --a3 , or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: nee Supervisor Maintenance Man on this section of the highway, with headquarters at MC BOARD OF COUNTY COMMISSIONERS WELW%PANTY, COLORADO C _ r -1n sec_pting this permit ,e un ersigned, representing the Permittee, verifies that he has read and understands all of the foregoing-, ,visions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. /t/S 4-1-7f • SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO L No cleated or tract( equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. Z. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. - 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will De permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities Or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations - allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.`S Minimum Thrust Area for Tees and 90• Bends 0.3 sq. ft. 0.6 eq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 eq. ft. 5.9 sq. ft. 8.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45' Benda 0.2 sq- ft. 0.3 sq. ft. 0.4 sq. ft 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft - 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft 7.9 sq. ft. 9.3 sq. ft - 14.0 sq. ft Minimum Volume of Concrete at 460 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu- yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 Cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu-yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County. Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cats within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din. Curbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be lees than $100.00. -:r N E 8 / • la 111 113 113 117 119 131 131 133 n :. 1: Y W :. L A]fW ma ..• •••..4 re •/ • •/ • 72a P.,,.r7 16 R A S K A' lf7 139 131 133 133 137 133 111 143 RMW. - afl� I •• 143 747 149 131 133 133 in o .• y aut:' •t1.1 .. 7 140 131 134 34 11 I. ..... • . ' `7 +, 130 • \I i. •• �= s.: - ._i _ I 1 : I ' b I• . - -K,K=• r = tu• -1 M 74 .I f 1T I 1 J' ••• ; .>� �%� +y"'Pf`"r�'-� 1�"i� �' r"" -"rte ;:.1x s`f 'i S•i\, i �. i .� S . i • 1 37S'1," ; • 7 �.`S.�• I • •V- IV 1 • • '1 • 1 4 •-1-._ti \Ai •"1-4.. i ' VIP.\ ! 4 7 1. k" l' - _ - - - •ti •• i, 1 -1�. Jr,. : X`� ` v -_ ill_ N -..t.:::......„-. �,:...Y 7 4.5" s ,;,• Ar-2 i ;9 I .. . - - id 7 P/ - HfW 101 1 whir 1 113 115 117 119 131 123 1331 171 • a.... 1 �..3..�..s.a3....w1..�� }fsl n 4 Q Y 11 7 151 132 131 117 133 111 1 a 119 141 143 143 IC 1st 1 I' - • . -',1. --j.i . • • .i 11. 11°a.. 116 Tea Tit• 112 iQt 101 10* 113 101 n 90 :.a 24 a 30 -n 79 74 f� r1•c. 4 MR. or MRS. RALPH MARKE NORTH STAR ROUTE FORT MORGAN,. COLORADO 80701 PAY �l TO THE / co. ORDER OF , "-0 1476 ezaaa x. ' 1973 1070 - I 5 er ea /at P73 WELD COUNTY, COLORADO UNDERGROUM MD UTILITY PERMIT DATE July 25, PERMITTEE'S NAME Morgan County Rural Electric Association 19� ADDRESS P.O. Box 738, Fort Morgan, Colorado 80701 Your request for permission to install an Ina ereround ripe ]®9COtbcacross County Highway No. `C G at a a location 2220 feet North of the Southwest Corner of Section 24, T1N; R64W, 6th P.M., is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no esDense whatsoever to Weld County and that the Permittee will own and maintain the same atter installation. The direct burial cable line shall be installed beneath the surface of the right of way at a minimum depth of $6 inches, and the disturbed portion of the right of way shall be restored to .its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted_ Thiswork must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Since this road has a nyel snrfpc i", a l i r _rrF /Fhr* if r�rr G _ r* d two �e nMn cut across the driving surface and to lay in direct -burial cable without being put in pipe or conduit, u s3 ba+.rillsd. The Permittee shall maintain the installation at all times and agree to bold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to cr any work or facility connected therewith, within the area covered by this permit. This work shall be completed within testy ( 30 ) days trout the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut oft lines and remove all combnstibio materials from the County right of way when re - Canted to d0 so by Weld County. Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County. Colorado. at the locations designated by Weld County, Colorado, directly above.such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp enso of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do sopromptlyat its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. 3luibLenaacc Man on this section of tire with aeadquartets at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must he followed or this permit may be terminated forthwith. Ey: THE BOARD OF COUNTY COMMISSIONERS WELD ii9JfpljFY, COLORADO ing this permi the-und- signed, representing the Per::i ttee. vttfifics that he has read and understands all of the foregoing pray sion.<: that he has authority to sign for and bind the Perm tee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. g 746. 63 8/17/73 !EREA W.O. 73 - 262 Everett D. Chesney,, Cenral i .rlages� 7740 f � SPECIAL I11S IT. IIR ONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO I. No cleated or track equipment to work on or move over asphalt surfaces without mats. Z. All disturbed portions of tight of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under -no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be. required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9- Manholes and other points of access to other underground utilities may be permitted within the right of way only when. they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where. special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed -•must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon instaIla- .. tion. Damaged portion of drainage or siphon facility will .be replaced. All damaged sections are to be inspected by Weld County, Colorado. before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. • 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below_ Pipe Size 2" 8" . 4w 6" 8' 10" 12' 14" 16" 18",. 20" .24° THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.°S Minimum Thrust Area for Tees and 90° Sends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft 2.2 sq. ft. 3.8Sq. ft. 5.9 eq. ft. 8.6 sq. ft 12.0 sq. ft. 16.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft. 34.0 sq. ft. MinimumThrust Area Minimum Volume of Concrete for 45° Bends at 45° Vertical Bends Down 0.2 sq. ft. 0.3 sq. ft 0.4 sq. ft. 0.9 sq. ft 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.8sq. ft 6.3 sq. ft 7,9 sq. ft. 9.3SQ. ft. - 14.0 sq. ft. 0.05 cu. yds. 0.11 cu. yds. 0.20 ca. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 eu. yds. 1.50 cu. yds. 2.00 en. yds. 2.70 cu. yds. 3.40 en. yds. .4.00 cu. yds. 5.20 vu,yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. - - 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 904'0 of original. 3. Site inspections by Weld County. Colorado. will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. . 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the cuulnlencement of the work, said head shall assure recover: by the County - . of any expense incurred. within a period of one year roliowinz the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amoaat necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty day's notice to the County. - The amount of said hood shalt be set by the Board of Count- (`n:•:, is;io:s:: at•J shall be reasonable; however, in no event shall the bend be le than $1''0.00. • NUM9ER POLES ON SKETCH AT TOR, CORNERS, TRANSFORMERS AND DEADENDS INDICATE RETIRED UNITS WITH •. REPLACED UNITS WITH RESET METERS-TRANSFORMRS WITH a -WEIGH OF WORK NO OF CONSUMERS POLE LINE FT, SER. POLE LINE FT. SW. m r z A ill P Je!>y 1 , I _ - --> I 4— Z,ZZO -- ' yN • Q `f in -,-1 VI • J n I I I 1 RETIRED 1 4 �lfi �1 Om , a :II,t t u i ~ 1 AN n`^ tom\ m O T m ilk r$ I C Vs 114- I: -_.--a)J)Vy (Th, of eirn.I?S - aotan 9:i!�S // di/Rey STAKING SHEET MORGAN COUNTY RURAL ELECTRIC ASSOCIATION JOB DESCRIPTION ;' >\' • N ' IA 'Se e `�(� . - C ,747L 13 I b ' zmi I L_ GUY LINE TRANS. GR. --{{ AN- ANGL ^G" "M2" NO. UNIT LEADI CHOR 7 —_-- --- -- —— COUNTY/ LINE SEC. z TWP, /1 SCE. 4.4h/ Weld 3;G. [WIRE SIZE ,KIND \L O 6\ 4. fa x ti LY O x xi x 1 SERVICE O1 Let_MAP L KEY MAP DETAIL MAP RULING SPAN r R > o-4 CREW YEAR I WORK ORDER NO CONTRACT SHEET NO. - ,/, \ +' 0'3 t i �� t i (A Z I' Iv vim. k. a Z O C cn kfl W • LI n • I h '^fmOM I NA A mon; mm ) RELEASED FT See 4/Q —/it-2' zz ENGINEERING / 1 1 DATE/ _ .. STAKED /recite 7-17- >' CHECKED m %1)c ' 1 T - O rill � q '� N �� "� r� w• - ,1 - a a - I.; Nt , , z „DJ, ,,, ',;\ re-- ,r, ,,, ... i; .,, Q 7_ 2 \ o L, IJ I\ +I a J' ,L. •t L MORGAN COUNTY MORGAN COUNTY RURAL ELECTRIC ASSOCIATION ASSOCIATION P. O. BOX 738 PHONE 867-5688 FORT MORGAN, COLORADO 80701 August 9, 1973 Office of Board of County Commissioners P. O. Box 758 Greeley, Colorado 80631 Gentlemen: On July 25, 1973, this office mailed xerox copies of underground and utility permit forms requesting a permit to trench through the county road at a location 2,220 feet north of the southwest corner of Section 24, Township 1 North, Range 64 West of the 6th P. M., Weld County. No reply has been received as yet, but we believe this is due to the initiation of the new fee schedule as announced by your letter of August 3, 1973. This proposed crossing will come under Item 1 of Exhibit "A." We propose to install 3 No. 4/0 insulated conductors, direct burial, in order to provide a three -wire 120/240 volt single-phase supply to Mr. Kenneth Schreibvogel. Each conductor is .668 inches in diameter or 2.1 inches in circumference. Since there will be three separate conductors, the cost per lineal foot should be $.063, according to our interpretation of the fee schedule. Since the county road right of way is 60 feet here, it appears the fee will be 60 x $.063, or $3.78. Mr. O'Donahue just called and advised that there is a minimum fee of $5 per right-of-way permit. Mr. Schreibvogel has called this office several times this week asking why we do not install the service to his new improvements, as he requested. In order to attempt to obtain the permit without further delay by having a check processed by this association, I am enclosing my personal Check No. BJ in the amount of $5 as the minimum charge. If this fee is not correct, or if further information is needed, please let us know. An early reply will help to pacify this potential consumer. Another copy of the original form is enclosed. JWZ/sh Enc. Very truly yours, MORGAN COUNTY RURAL ELECTRIC ASSOCIATION CLEAN COMFORTABLE LIVING WITH ELECTRICITY Utility 8 Transport Field Report Applicant's Name/,ea-, Type of Permit Permit No. 7/ 6 Date Issued Expiration Date :Location and Damage Report:.Date Time . (If no apparent damage at this time, so state) Inspection Date /.3 73 waD COUNTY, COLORADO - BOARD OF COUNTY COMMISSIONERS BY:�, Au orized Agent C, WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE July 19 73 PERMITTEE'S NAME Medsker and Overton Farm Ventures ADDRESS 333 Vest Hampden Ave., St. 1011, Englewood, coloredo, 80110 road Your request for permission to install a Steel Trri gat! an line QOl across county mspismgy No. 19 between Sect. 6, t1N, R6L,Sd and Sect. 1, T1N, R65W, Immediately north of Ireland Reservoir issggranted ejrovviidaedtthat the PSerrmllittee0 willown wn a wwUwi and maintain the same after Installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The 10^ 3rTigatinn line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches. and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed. and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface: however, open cut shall be allowed up to the edge of the shoulder portion oI the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within Rj x4.7 ( 60 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of quay limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE WAR WELD D OF COUNTY COMMISSIONERS TYY,, COLORADO ` 7 /K,S," �1t`� opting this •it the • dersigned, representing the Permittee, verifies that he has read and understands all of the forego : • ovisions: that he • :: authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 2;x`7 -C3 R.3 '(OO ni-y Sia SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RiGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. 8. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted_ 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 12. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size Minimum Thrust Area for Tees and 90° Bends 2" 0.3 sq. ft 3^ 0.6 sq. ft 4" 1.0 sq. ft. 6" 2.2 sq. ft. 8" 3.8 sq. ft. 10" 5.9 sq. ft. 12" 8.5 sq. ft. 14" 12.0 sq. ft 16" 15.0 eq. ft 18" 19.0 sq. ft. 20" 24.0 sq. ft. 24" 34.0 sq. ft. Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 sq. ft. 0.4 ea- ft 0.9 sq. ft 1.6 sq. ft. 2.5 sq. ft 3.5 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq.. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down 0-05 cu. yds_ 0.11 cu. yds. 0.20 en. yds. 0.37. cu. yds. 0.66 cu. yds. 1.10 cn. yds. 1.50 en. yds. 2.00 Cu. yds. 2.70 cu. yds. 3.40 on yds. 4.00 cm yds. 5.20 cu.yds- NGTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final ono inch will be a dry select road basematerial compacted to 90% of original. . 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee- 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired Said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work. said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery 'to be in the amount necessary to repair or replace said dis- turbed -portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. ti -/01-73 WELD COUNTY, COLORADO UNDERGROUND MID UTILITY PERMIT DATE Mt* 30 19 73 PERMITTEE'S NAME Morgan bounty Rural Electric Association ADDRESS P.O. Box 738, Fort Morgan, Colorado 80701 Your request for permission to install an underground line magoe across County Highway No. at 342 feet west of the East Section line, in the SEe of the NEj of Section 33, 18N, R59W of is granted, provl ed that the Permittee will own and maintain the same .. er {nstallation.aU7 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The dirnt hurl wl romp line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface: however, open cut shall be allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached Since this road has a gravel surface, applicant requests permit to make open cut across the driving surface and to lay in direct burial cable without being put in pipe or conduit. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to cr any work or facility connected therewith, within the area covered by this permit_ This work shall be completed within thirty ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be -protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so'promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside Count right of ay limit � �/CyMaintenance Man on this section of the highway, with headquarters at `'Gfweit' or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. Ey: foregoin is bound by I th a e nc$ii� f(dFswnaIIlth he.: i6R ..ri wdh the Clerk of the Board of County Commissioners JUN 9 1973 THE BOARD OF COUNTY COMMISSIONERS WEL)a',Y,OYNTY, COLORADO ed. representing the Permitt-e, v: 'Des that be has read and understands all of the for and bind the Permittee; and that by virtue of his signature the Permittee LaEverett B. Chesney, Genera]/Nstnager IR MEA W.O. CLERK AND RECOR04 0(6 64 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise- specified in the special provisions. . • 5. tiud-jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to -be ccnered before being Inspected. 7. -No plastic line is to be installed 'without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved Cotidty 'road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure - 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County. Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado- All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installs.- ' Lion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County. Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. 0. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Ripe Size for Tees and 90° Sends- -for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. ' 0.20 en. yds. 6" 2.2 sq. ft. 0.9 sq. ft. 037 cu. yds. S" 3.8 sq- ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 Q. ft. 1-10 cu. yds. 12" 8.6 sq. ft. 3.5 sq. ft- 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. - 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds_ 18" 15.0 sq. ft. 7.9 sq. ft. - 3.40 en. yds. 20" 24.0 so. ft. 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County. Colorado. will determine whether excavated material Is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches- • 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. - - - 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work,said bond shall assure recovery by the County of any expense incurred. within a period of one year, following the completion and acceptance of the restored portion or portions of the. hard surfaced roadway. Saidrecovery to be in the amount necessary to repair or replace said dis- turbed portion. of : the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less, than $100.00: - - NUMBER POLES ON SKETCH AT TOP. CORNERS, TRANSFORMERS AND DEADEN0S INDICATE RETIRED UNITS WITH •. REPLACED UNITS WITH RESET METERS•TRANSFORMRS WITH r k x nI O O n om m x POLE LINE FT. SEC pAEe'LJNNE`FT, SEAM m w b _ o 7 N 44 I Y !" N In ' 0 A I 1 A RETIRED • F~1 a KIN �I W —• t-sL n ~ n f Fa m m R -W CLEAR- INC zr rm N 1 0r -p4 OD Vn ' N >O • _COUNNlY LII P. $N RGE.-f lie Ld // ,IZE KIND -� JG SHEET rCREW ----- AL ELECTRIC ASSOCIATION CONTRACT LOCATION NO. z O c 'AZ -y GUY E r n mxi SECONDARY SERVICE SPAN UNIT UNIT UNDER -I SEC.4 BUILD ONLY NO..1 OR K SPAN NO. K • ISRC' 9 �[J l KEY MAP��l-I D 6� o e h Its Is w ZZ f. CAI Cu ~ 7 `�o≥� h r� N. r 3 CI M Q ?J c. r 1 y y ^� V l p o ,. '�_ t _ t -\, 7 RELEASED FOR CONS i it m m 0,� O EM# J 71 o'.\ t t :01'1 I\\(��74. . Lm C ri\ WELD COUNTY, COLORADO UNDERGROUND = ANDtom-try- PERMIT DATE October 16 19 72 PERMITTEE'S NAME Morgan County Rural Electric Association ADDRESS P. O. Box 738, Fort Morgan, Colorado, 80701 Your request for permission to install ji underground line along or across County Highway No. , at 2,848 feet south of B.N.R.R. in the S 1/2 of Section 5, Township 2N, Range 62W of the 6th. Is granted, provided that the Permit -tee will own and maintain the same after installation. P- IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permlttee will own and maintain the same after installation. The direct burial cable line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically, possible. This installation shall be installed by the method of boring or jack- ing through and beneath the read surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to each statutes as are appn®bltc- - -.. SPECIAL PROVISIONS: 'Attached This underground conductor was not encased. in a pipe as svecified above since the. road is not asphalt surfaced. All barricades and/or other Rights!of-Way shall conform t Streets & Highways 1971 and warning devices used in any construction within public's to the Manual on Uniform Traffic Control Devices for :aeinty any state or federal revision thereto This work shall be completed within Jwas completed 10^T-72) ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions- Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permitteeshall mark this installation with markers acceptable. to Weld County,. Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directionsgiven by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: �� ��Saoen y In aceapnng this permit the wade igned, representing. the Permlttee, verifies that he has read and understands all of the foregoing provisions; that he has au t ty to sign for and bind the Pe ittee; and that by ture the Permittee Is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD CO I1 ,'COLORADO (' �rr .t9/ ,_\ Everett B. Cbngney, a. Manag W. O. 72-376 SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES. WITHIN- THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats - 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Under no condition is an asphalt surface to be cut unless otherwise specified inthe special provisions. .,. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be Installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10, All requests for installation will be reviewed in the field by representatives of Weld County, Colorado. Prior to any issuance of any permit 11. where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costa relat- ing to the Inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced_ All damaged sections are to be inspectedbyWeld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilllng is completed 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.°S Pipe Size 2" 3" 4" 6" 8^ 10" 12" 14" 16" 18^ 20" 24" Minimum Thrust Area for Tees and 90° Benda 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3-8 sq. ft 5.9 sq. ft. 3.5 sq. ft 12.0 sq. ft. 15.0 sq_ ft. 19.0 sq. ft. 24.0 sq. ft 34.0 sq. ft Minimum Thrust Area for 43° Bends 0.2 sq. ft. 0.2eq. ft 0:4 sq. ft. 0.8 Sq. ft 1.6 sq. ft 2.6 sq. ft, 3.5sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq_ ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical Bends Down - - - 0.05 cu. yds. 0.11 cu. yds. 0.20 en. yds. 0.37 cu. yds. 0.66 en. yds. 1.10 cu. yds. 1.50 en. yds. 2.00 cu. yds. 2.70 en. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one Inch will be a dry select road base material compacted to 9C% of original. 3. Site inspections by Weld County, Colorado, will determine, whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1):: year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notifie-atton/or the execution of said repairs. 5. If the Permittee has not repaired -said, open cut or cuts within. the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 Inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and- acceptanceof the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, In no event shall the bond be less than 1100.00. A NUMBER POLES ON SKETCH AT TOP: CORNERS, TRANSFORMERS AN0 DEADENDS INDICATE RETIRED UNITS WITH •. REPLACED UNITS WITH RESET METERS-TRANSFORMRS WITH 1 L1_O jex NO. OF CONSUMERS 1 POLE LINE Fr. PRi OW { r t/ T ~ E Fr. SEC. I I 1 O F A _ ^C o ' Em 41 4.I O rp ii• je 4. TC i I { H I I I 1 P m —I P SOX II 1 I�' x • I z3 r�'S, ,4 H o �b z X `I CO O O.6 CA 4� !�V I p O_ I C. a �., j +vmay" w .1/4,L,..Znx.p 9r9 `rp ` J I I �' —.�.n. grd'' ,n y h i ��y ()St i i > 1 I £ h ' p G� G� (13 ;Al Ca SZ 6Z }S or; fly' z Ol yC_ I' T STAKING SHEET MORGAN COUNTY RURAL ELECTRIC ASSOCIATION PHASE 1 it anon w _Crn4C e �',� acJ i ��f>Y: rr• 1 —COUNTY LINE a Zr^A OpF t zL- m� ? a m n g 0 y ('I . 0>> am y. O.. .ti .`J "y ..y --A '-.% NS \ N1 il • kr 4-1 C NO. UNIT LEAD HUI t. (1 e2 ' & \ x O %,1 v t W \ W 'i> -7pz r n TI\ W 1_ Irttri W \ et= Cz O=tril. O (� rt A ib"O'^ , r. > Zn rn O o t CO CU o c > < Z O z ; C‘ ^ n C Ion o KEY MAP LOCATION NO. r, CREW CONTRACT \s IC ti I_: —SERVICE r z a r, n 6, O, Gi la 477 v I , 9 1 O C b n z 1 y n e� ` ` - 1R4. `� b 114 .. T- & I `nFQ fl Nm2)Arl 1 n \w -Ti W N TIN Lv f\�s II{.'iJl F > b` ` R. �, CI4 o !� N T �J I b 5\ Cl r iJ G 1* �• 4, i "J 'U It 6\ is ;I1 9.t r ' pl v1t LktU RELEASED FOR CON MISC, CI Gnn 1.1.11. nh /a o \ x Z-1 ml` r m m y O NI ' O < I I 11 m C rt it. �\� I' nrW� bC 1 1Lt.. ; 1 L 11 \ O 0 - - Cy s r• i IIQ V 11: I I I • • IE II - `T 7 7 T —7- --- i— — 1 V 7?S 4 ti >.7g<. -ell tire' p *1 pored GPsR [era / / a • x y WELD COUNTY, COLORADO S ✓ £G" UNDERGROUND AND UTILITY PERMIT DATE October 13 19_71_ • PERMITTEE'S NAME Morgan County Rural Electric Association ADDRESS P,O._ Boos 738, Fort Morgan, Colorado 80701 Your request for permission to install arLIADILIetS;z ICI 1 line along or across County Highway No. — , at 379' south of Intersection of Sections 27-28-33-34, MIT, R63W of 6th P.M. is granted, provided that the Permittee will own and maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The direct -burial cable line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back tilling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be oI stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation ehall be installed by the method of boring or lack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way- No water shall be used in the boring and no tunneling shall be permitted Where the Installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. -- SPECIAL PROVISIONS: Attached This underground conductor was not encased in a pipe as specified above. The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within _( Was ccimpleted 15/70) ) days from the above date- No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE BOARD OF COUNTY COMMISSIONERS WELD CAUJ4TY. COLORADO Supervisor ng this permit the undersigned, epresenting the Permittee, verifies that he has read and understands all of the foregoing • isions: that he has authority - sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. SPECIAL -INSTRUCTIONS REQUIREMENTS ,FOR INSTALLATION, OF UTILITIES WITHIN : THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. S. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected.. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 16. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area - Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Benda for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft 0.2 sq. it. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft, 0.20 cu. yds. 6^ 2.2 sq. ft. 0.9 sq. ft. 0.37 cu. yds. 8" 3.8 sq. ft. 1.6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 3.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 eq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft. 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft. 4.00 cu. yds. 24" 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than aix inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of•12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8, No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencementofthe work, -said bond shall assure recovery by the County of any expense incurred, within a period of one year following the Completion andacceptance of the restored portion or portions oI the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, is no event shall the bond be less than $1110.00. S -2/--7c Lzi 4 )44 rilti—_a F A'w--�-. `�ar•.94i.:' Y �`T.'��.+*��..•5�Ta�+`. or al ru l.�ura TELEPHONE 867-5688 AREA Coot 303 Weld County Court House Greeley, Colorado 80631 Fort Morgan, L :1 soetthica POST OFFICE BOX 738 orado 80701 September 15, 1970 Attention: County Engineer and Commissioners Gentlemen: We have been requested by Charles Blood to serve an elevator facility with 220 volts seconday voltage. This facility is in the Northeast Quarter (NE 1/4) of Section Thirty Three (33), Town- ship One North (IN), Range Sixty Three West (63W), Weld County, Colorado. The power line is on the east side of the county road in the Northwest Quarter (NW 1/4) of Section Thirty Four (34). Mr. Blood requested power to be furnished by buried cable. This will mean that the REA will have to cross the county road at 379 feet south of the intersection of the road between Sections 27 and 34 with a trench four (4) feet deep. This letter will be attached with a sketch of the proposed location of the buried line. We have a verbal go ahead to do this job from the Weld County Engineer's Office on 8/18/70 at 10:15 A.M. Wish this to be the agreement in writing with your office. Very truly yours, MORGAN COUNTY RURAL ELECTRIC ASSOCIATION Harley D. Endsley, Field Engineer HDE/cem Enc. -tr • 7. '75i 9-Zi- 7° .04 roe/ 379 1. C-74 47pc SiLo ?£A Lint U 0 n -a O CS to J GREELEY, COLORADO ,:&c 7 / (?76; THE REQUEST FOR pERMISSION TO INSTALL LOCATION DESCRIBED AS FOLLOWS: RAILROAD GRADE CROSSING IZE TYPE OIL ROAD BOUNDING EAST BOUNDRY OF SECTION 4 TOWNSHIP 4 NORTH RANGE 66 WEST APPROXIMATELY 1 mile SOUTH OF EXSISTING UNION PACIFIC RAILROAD IS GRANTED SUBJECT TO THE FOLLOWING CONDITIONS AND RESTRICTIONS AND AGREEMENTS: THAT YOU RESTORE THE ADI STURBED PORTIONS or ALL OF THE RIGHT-OF-WAY AND ROADWAY TO ITS ORIGINAL CON- DITION, BACKFILLING TO BE WELL TAMPED AND PACKED, AND THE LAST 12 INCHES OF BACKFILL ON CROSSINGS TO BE STABLE GRANULAR MATERIAL, SUCH AS CRUSHED ROCK OR GRAVEL, AND ALL DIRT AND DEBRIS TO SE REMOVED FROM ALL THE RIGHTS -OF -WAY WHEN WORK IS COMPLETED; THAT THIS LINE SHALL BE BURIED IN ACCORDANCE WITH THE COUNTY EN- GINEER'S SPECIFICATIONS; THAT ALL ROADWAY SIGNS TAKEN DOWN BE REPLACED IMMEDIATELY; THAT ALL TUBESBE MARK- ED AHEAD or TRENCHER; THAT TRENCHING OE AS CLOSE TO OUTER EDGE OF SHOULDER AS POSSIBLE, NOT W EXCEED THREE ANO ONE-HALF (33) FEET; THAT PIPE BE PLACED UNDER ALL TUBES AND BRIDGES; THAT ALL LINES UNDER EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE BORED OR PUSHED UNDER THE SURFACED PORTION OF THE ROADWAY; THAT YOU MAINTAIN THIS LINE AT ALL TIMES; THAT YOU CHECK AND MAINTAIN BACKFILL AFTER ALL STORMS AND ASSUME FILL RESPONSIBILITY FOR ANy DAMAGE IT MAY CAUSE. THAT IN ALL CASES WHERE EXISTING BLACK TOP OR HARD SURFACED ROADS MUST BE CUT, THEN IN SUCH CASE A NON -CANCELLABLE CASH OR SURETY BOND PAYABLE TO THE COUNTY SHALL BE REQUIRED IN THE NAME OF THE CONTRACTOR OR THE PERSON CAUSING THE HARD SURFACED ROADWAY TO BE DISTURBED PRIOR TO THE COMMENCEMENT OF THE WORK. SAID BONO SHALL ASSURE RECOVERY BY THE COUNTY OF ANY EXPENSE INCURRED, WITHIN A PERIOD OF ONE YEAR FOLLOWINGTHE COMPLETION AND ACCEPTANCE OF THE RESTORED PORTION OR PORTIONS OF THE HARD SURFACED ROADWAY, SAID RECOVERY TO BE THE AMOUNT NECESSARY TO REPAIR OR REPLACE SAID DISTURBED PORTION OF THE HARD SURFACED ROADWAY. SAID BOND SHALL NOT BE CANCELLED WITHOUT THIRTY DAYS NOTICE TO THE COUNTY. THE AMOUNT OF SAID BOND SHALLBE SET BY THE BOARD OF COUNTY COMMISSIONERS AND SHALL BE REASONABLE; HOWEVER, IN NO EVENT SHALL THE BOND BE LESS THAN $50.00. THAT ALL LABOR AND MATERIAL WILL BE FURNISHED BY YOU AT NO EXPENSE TO WELD COUNTY AND THAT THIS WORK WILL BE COMPLETED WITHIN A REASONABLE TIME AFTER CONSTRUCTION IS STARTED; THAT YOU WILL PROTECT THE TRAV- ELING PUBLIC DURING THE INSTALLATION WITH PROPER WARNING SIGNS AND SIGNALS, I.E., FLARES, BOTH DAY AND NIGHT; THAT YOU ASSUME FULL RESPONSIBILITY FOR ALL DAMAGES RESULTING FROM THIS INSTALLATION; THAT IN ANY EVENT ANY CHANGES ARE MADE IN THESE HIGHWAYS IN THE FUTURE THAT WOULD NECESSITATE THE REMOVAL OR RELOCATIO OF THIS INSTALLATION YOU WILL SO REMOVE OR RELOCATE AT YOUR OWN EXPENSE UPON WRITTEN REQUEST FROM WELD COUNTY. THAT YOU SAVE WELD COUNTY HARMLESS FROM ANY AND ALL CLAIMS OF ANY NATURE WHATSOEVER WHICH MAY ARISE BY REASON OF GRANTING PERMISSION TO LAY THE ABOVE MENTIONED PIPELINE INCLUDING COSTS, IF ANY ARE INCURRED, IN THE DEFENSE OF ANY CLAIMS MADE BY ANY PERSON, FIRM OR CORPORATION BY REASON OF THE INSTALLATION OF SAID PIPELINE AND THE MAINTENANCE THEREOF. WELD COUNTY WILL NOT BE RESPONSIBLE FOR ANY DAMAGES CAUSED IN THE MAINTENANCE OF THE HIGHWAYS TO IN- STALLATIONS PLACED INSIDE THE HIGHWAY RIGHT-OF-WAY, THAT THE LICENSEE AGREES TO INSTALL PROPER MARKERS FOR BURIED LINES PER COUNTY SPECIFICATIONS. THIS UNDERSTANDING AND AGREEMENT WILL BE BINDING UPON YOUR RESPECTIVE AGENTS, HEIRS, EXECUTORS, AD- MINISTRATORS, SUCCESSORS ANO ASSIGNS. LICENSEES j THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO MO.NFORT FEED LOTS. INC. GILCREST DIVISION NAME P.O. BOX 159 GILCREST, ADDRESS COLORADO 80623 Greeley, Colorado 2" PVC Water Pipe 8" Asbestos Cement Sewer Pipe The request for permission to install 12" Vit. Clay Sewer Pipe SIZE TYPE location described as follows: (See Attached Map) In Alice Street in Milliken from Cherry Street North to the Sewage Treatment Plant near the Big Thompson River. Also a 12" VCP Sewer Pipe in Cherry Street from Alice Street West to Kathelene. Also to install a sewage pumping station on the West side of Alice Street on the South side of the Thompson and Platte Ditch. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs' taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,. not to exceed three and one-half (3k) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the'roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County aarmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the licensee agrees:ta-in all proper markers for buried -lines per -County speci- fications. -- This understanding and agreement will be binding upon your respective a -Tents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY. COLORADO LICENSEES Milliken Sanitation District Name Towp Hall Address 77,/%," Milliken. Colorado 80543 E]TERM Milliken dew i�N\ Nz-i • C \c G y1/L L //CFA/ w �J SS`YAGE T.4E.4TiteSNT u, nioI7gfriaExr /9c & { // \ /\) j rm bay \ =;J ' 15 /vELs 4/-,,iier-oA77-rASONi"QV/,4K n °' - &'n9' neeriia ansu/X,n/s ) De ` � Grre/ie Ce `or -ado ( ✓v6lo2GB z ^G B n/� Utiv r! 717.1- c.1WA (2444t/ The request for permission to install Greeley, Colorado J/, f i7 c 19 As 7.-1-c_ 512E TYPE location / described as follows: '4Y- ("/ raionj re>ock huhnj /Vorfh /torri EoCfc1-Pso1 4W/j l 37-,/NCo. Elie d u » o� `l it'b -Pro cite,5 S I Yl e Yot 4 To 100/ P h 7-0 447;;,,-- l/.tr' is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs -taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ not tc exceed three and one-half (3k) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the 14Ccensee agrees -tLidirstaLL:praper markers for- buried- Lines. pe County speci- fications. This understanding and agreement will be binding upon your_' respective a9nts, heirs, executors, administrators, successors and assigns._ THE BOARD Of COUNTY COMMISSIONERS WELD COUNTY. COLORADO LICENSEES Jc/In f7 tS�J4/ Name p 2Q;igyzi Addr ss p 14 i, 5 155n reed ( ZV Za.cd si xi. e o / Greeley, Colorado 724_4; O � / ?hi b The request for permission to install 1dc:tic described as follows: c SIZE S3P-/d-G 7W Poi t •. _ ire not TYPE -'f ,$'33-/N-G7W is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the .last 12 inches of backfill cn crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible,_ net tc exceed three and one-half (3r) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. That the -licensee agrees _ta-i.rrstaiL:pra'per markers for- buried- lines, per -County speci- fications. This understanding and agreement will be binding upon 'Lour respective a2lents, heirs, executors, administrators, successors and assigns.- THE BOARD OF COUNTY CO?4ISSIONERS ',VELD COUNTY. COLORADO n LICENSEES ame Address • • .7611:74c..)✓✓ice.' AUTHORIZING THE CHAIRMAN TO SIGN AN UNDERGROUND INSTALLATION PERMIT: WHEREAS, the Mountain View Water Users Association, Adams County, a Colorado corporation has requested an underground installa- tion permit along Weld County roads described as follows Sections 24, 25 and 36, Town ship 1 North, Range 68 West of the 6th Principal Meridian, Weld County, Colorado and Sections 18, 19, 20, 27, 28, 29, 30, 31, 32, 33, 34, 35 and 36 Township 1 North, Range 67 Nest of the 6th Principal Meridian, Weld County, Colorado More particularly located on attached map, and WHEREAS, the Board believes it to be to the best interests of the county to sign said permit THEREFORE, BE IT RESOLVED, that the Chairman of the Board of County Commissioners, Weld County, Colorado, be and he is hereby authorized to sign the underground installation permit requested by the Mountain View Water Users Association. The above and foregoing resolution was, on motion duly made and seconded, adopted by the following vote: AYES: DATED: June 28, 1961 PO C. 1- 0 N. NO r^ •. O' UNDERGROUND INSTALLATION PERMIT (continued) That this understanding and agreement will be binding upon your respective: heirs, executors, administrators and assigns. BOARD OF COUNTY COMMISSIONERS, Weld County, Colorado ATTEST: COUNTY K & RECORDER Deputy County Clerk ( S E A L ) By: f�,� , C �[ hai In accepting this Permit the undersigned, representing the Permittee, verifies that they have read and understand all of the foregoing provisions; that they have authority to sign for and bind the Permittee; and that by virtue of their signatures, the Permittee is bound by all the conditions set forth herein. MOUNTAIN VIEW WATER USERS ASSOCIATION Weld County By: ATTEST: 4x Secretary • UNDERGROUND INSTALLATION PERMIT WELD COUNTY BOARD OP COMMISSIONERS Date: JUNE 28, 1961 PERMITTEE'S NAME: Mountain View Water Users Association, Adams County, a Colorado Corporation Address: c/o R. Jerry Russell, Attorney at Law Garden Office Center, Broomfield, Colorado Your request to install a 1" to 3" water line along the County roads situate in the following described real property is granted, subject to the terms and conditions hereinafter set fortis to -wit: Sections 24, 25 and 36, Township 1 North, Range 68 West of the 6th Principal Meridian, Weld County, Colorado and Sections 18, 19, 20, 27, 28, 29, 30, 31, 32, 33, 34, 35 and 36 Township 1 North, Range 67 West of the 6th.Principal Meridian, Weld County, ._Colorado. That you restore the disturbed portions of all of the right-of-way and roadway to its original condition. The back - filling to be well tamped and packed and the last 12 inches of backfill on crossings to be of stable granular material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be buried in accordance with the Engineers specifications. That you maintain this line at all times and assume full responsibility for any damages it may cause. That you agree to pay for any re- pairs that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is started. That the travel- ing public be protected during the installation with proper warn- ing signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written re- quest from Weld County. Weld County will not be responsible for any damage they may cause in the maintenance of the highway to installations placed inside the highway right-of-way. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline, includinig costs, if any are incurred in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. I. 1 7 IJ CS i 4"i \/ i , a `� N l t CD O -- J 1 C .� O L (J -t- cD C Z Cl 0 Zs,. - ._, r • rif c' Cr CO r < C1 L* L A rre z s c? ,i 1 .mot- ,•' ti L•, y in G C1 ti 1 a eq ASSOCIATE DAVID JERRY KING R. %TERRY RUSSELL ATTORNEY AT LAW GARDEN OFFICE CENTER BROOMFIELD, COLORADO June 29, 1961 Mr. Elmer L. Shultz, Chairman Board of County Commissioners, Weld County Greeley, Colorado RE: Mountain View Water Users Assn. TEL -CONCHES INGERSOLL 8-2343 INGERSOLL 6-2344 Pursuant to your request I have enclosed herewith a map of the water distribution system pertaining to the above association. I trust that you may now take action on this matter as previously requested. Thank you for your prompt reply. Scerely yours, Jerry Russell RJR:Ss 1 encl. v�/ 0/, June 33, 1//, Mr. R. Jerry Russell Attorney -at -law Carden Office Center Broomfield, Colorado Dear Mr. Russells We are.in receipt of your letter of June 22, 1961 in regard to the proposed Underground Installation Permit pertaining to mountain view Water Users Association. However, before we can take any action on this matters it'will be necessary for you to submit a drawing to us showing the exact location of the proposed pipe. Thank you. Very truly yours, THE BOARD Of COtMtY COMMISSD3NERS WELD count, COLORADO Elmer L. Shultz Chairman ELSsf ASSOCIATC DAVID JERRY KING R. 'JERRY RUSSELL ATTORNEY AT LAW GARDEN OFFICE CENTER EROOMFJELD, COLORADO June 22, 1961 Board of County Commissioners Weld County Greeley, Colorado Attention: County Attorney Dear Sir: TCLCPRONES INGERSOLL. 6-2343 INGERSOLL 6-2344 Enclosed herewith you will find the original and two copies of the proposed Underground Installation Permit pertaining to Mountain View Water Users Association. This Permit was prepared from a form which was obtained from the County Commissioners Office and, as such, I trust it will meet with your approval, Please have this Permit dated and signed by the commissioners and return the original and one copy to my office. The other copy is for your records. If you need any additional infor- mation pertaining to this matter, Please contact me at any time. Thank you for your prompt attention to this matter. Sincerely yours, erry R ssell RJR:ss 3 ends. o z zr'7 CD 71 • mA w 4 O '-3 -co 7J �0•N • •�pp .-1 .• *tH ffi • -3IX3 O Greeley, Colorado March 11, 1959 The request for permission to install an 8 inch pipe line beginning at the Mead Reservoir located in Section 8, Township 3 North, Range 68 North, Weld County, line in County Road $68 going East approximately 1'} mile to town of Mead. is granted subject to the following conditions and agreements: That you restore the disturbed portions of all of the right-of-way and road- way to its original condition. The backfiliing to be.well tamped and -packed and the last 12 inches of backfill on crossings to be of stable granular -material, such as crushed rock or gravel. All dirt and debris to be removed from highway right-of-way when work is completed. That this line shall be burled in accordance with the Engi- neers specifications. That you maintain this line at all times and assume full re- sponsibility for any damages it may cause. That you agree to pay for any repairs: that must be made to this portion of the road because of this installation. That all labor and material be furnished by you with no expense to Weld County and that this work be completed within a reasonable time after construction is started. That the travelling public be protected during the installation with proper warning signs and signals, both day and night. That you assume full responsibility for all damages resulting from this installation. That in the event any changes are made in this highway in the future that would necessitate the removal or relocation of this installation, you will do so at your own expense upon written request'fromileid County. Weld County will not be responsible for any damage they may cause in the main- tenance of the highway to installations placed inside the highway right-of-way. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO BY �///L Z t%ri .te'' ChaiQan e C. Varner f ontracto* Name Agent for Town of Mead _2826 Paton St _ T)enver 14, enl nrstdl) Address teleatral. %or See Letter to Town of Mead Also apart of this agreement. ROW 2826 Eaton Street DENVER 14, COLORADO obert C. Warnerr,Inc. Pipe Sews C0A 0o a , ,. Town of Mead Mead, Colorado Dear Mr. Markham: March 3, 1959 Subject: Road Cut Permit BElmont 7-0411 BEtmont 7-0412 In 3oing over in detail the items listed on the road cut permit we find that there is considerable variance with the contract, and of course some of thejtipulations included in the road cut permit were not included in the contract, and to perform the work and obligations listed under the road permit would entail considerable expense if the County Commissioners so desired to put this expense upon the contractor. We are therefore taking the liberty of signing the contract as the agent for the Town which we have done in the past, and is acceptable, and further advising you that we have furnished to you a certificate of insurance dated November 30th, 1958 being the effective date that we have coverage under Public Liability and Property Damge in the amount of $50,000 per person and $100,000.00 per accident which should be suffi- cient for any accident that migit happen due to neglect or some other circumstance during the installing of the 8n line along the county road. For example in the road permit there is a statement that we maintain the line at all times, and assume full responsi- bility for any damages it may cause. This of course is covered under our performance and maintenance bond in the contract, and is good for 1 years time. We therefore would not want to assume the obligation of maintaining the line at all times as indicated herein. An other example in the road cut permit is that in the event of any changes made in this highway in the future that would necessitate the removal or relocation of this install- ation that we would do so at our own expense upon written request from Weld County. We of course could not be held responsible for a statement like this, and I am sure that you do not intend this to be part of our obligation. In my conversation with you I gathered that you were mostly concerned about protecting the public, and that this had been conveyed to you from the Commissioners, and of course that is a basic obligation on any public Construction, and we are well aware of our responsibilities since we work in public streets and roads contineously. In addition we have the necessary WATER MAIN 9 O14 LIN E6- f OAS LINES '--,�—OANWARYL1T7EZs"`�"�j, • Page #d, Letter to Town of r!Tead Cont'd insurance protection for any such occasion that might arise. I am sure that this letter along with our signature and being made a part of the road permit contract will be acceptable to you and I am sure with the County. If the county insists on all of their provisions being applied to us then it will be necessary for us to get together and negotiate a proper fee for assuming certain obligations. Very truly you Roberti Warner �u✓ Robert C. Warner President RCW/hs 1-Ehcl / /71..->44ti Greeley, Cc'loradp 921/ V 2 ?O The request for permission to install location described as follows: Stetting at north 90 ft. along eget aide of county road Carl F. Johnson. Range 68 and township 3 l ingp SIZE PVC Plastic,/ TYPE 4,Catt S. W. corner of section 3 and proceeding to install water meter for is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway sians taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3:) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion cf the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Meld County harmless from any and all claims of -any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES M & M Service Inc. Name Box 519 Address Berthoud Colorado 2/1 21 Greeley, Colorado r --e The request for permission to install location described as follows: /71!U /� _ /or jazib u e._t 772E 'I ge,AACt-,,t Q c—ie . t2 7/ S �ZE TYPE 74,4 is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, net to exceed three and one-half (3-•',-) feet; that pipe be placed under all tubes and bridges; that all lies under existing black top or hard surfaced roads must be bored or pushed under the surfatcd portion of the -roadway; that you maintain this line at all times; that you check and m H tain backfill after all storms and assume full responsibility for any damage it may ca':,. That all labor and material will be furnished by you at no expense to Weld County r:"d that this work will be completed within a reasonable time after construction is st.-:. ; that you will protect the traveling public during the installation with proper warn'..,, signs and signals, i.e., flares, both day and night; that you assume full respon:"' . for all damages resulting from this installation; that in any event any changes are r..ac'e in these highways in the future that would necessitate the removal or relocation of tn's installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of -any nature whatsrcvsr which may arise by reason of granting permission to lay the above mentioned pipeli__ j -- eluding costs, if any are incurred, in the defense of any claims made by any person, fir., or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. LICENSEES Name Address THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO r4z, 'c�as�-�fll //� a e -5 1g-- %i,Q/� -7217:7,1 aelai Greeley, Colorado The request for permission to install is granted adbject to the fallowing conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trencher; that trenching be as close to outer edge of shoul- der as possible, not to exceed three and one-half (3L) feet; that pipe be placed un- der all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and maintain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with pro- per warning signs and signals, i.e., flares, both day and night; that you assume full responsibilty for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the remo- val or relocation of this installation you will so remove or relocate at your own ex- pense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatso- ever which may arise by reason of granting permission to lay the above mentioned pipe- line including costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO <41211,/ LICENSEES Name 5o ./o 9 5 Address At -454 &, rat Greele , Colorado The request for permission to install 4" Cl. 150 Asbestos Cement 2ipe SIZE TYPE location described as follows: __etroxi::ately fifty (50) feet East cf corner of sections 30 and 31, T6`:, n65 r. Extending across county road from _North to South, See sketch on reverse side. is granted subject to the following conditions and restrictions and agreements: That you restore the disturbed portions of all of the right-of-way and roadway to its original condition, backfilling to be well tamped and packed, and the last 12 inches of backfill on crossings to be stable granular material, such as crushed rock or gravel, and all dirt and debris to -be removed from all the rights -of -way when work is completed; that this line shall be buried in accordance with the County Engineer's specifications; that all roadway signs taken down be replaced immediately; that all tubes be marked ahead of trench- er; that trenching be as close to outer edge of shoulder as possible, not to exceed three and one-half (3:':) feet; that pipe be placed under all tubes and bridges; that all lines under existing black top or hard surfaced roads must be bored or pushed under the surfaced portion of the roadway; that you maintain this line at all times; that you check and main- tain backfill after all storms and assume full responsibility for any damage it may cause. That all labor and material will be furnished by you at no expense to Weld County and that this work will be completed within a reasonable time after construction is started; that you will protect the traveling public during the installation with proper warning signs and signals, i.e., flares, both day and night; that you assume full responsibility for all damages resulting from this installation; that in any event any changes are made in these highways in the future that would necessitate the removal or relocation of this installation you will so remove or relocate at your own expense upon written request from Weld County. That you save Weld County harmless from any and all claims of any nature whatsoever which may arise by reason of granting permission to lay the above mentioned pipeline in- cluding costs, if any are incurred, in the defense of any claims made by any person, firm or corporation by reason of the installation of said pipeline and the maintenance thereof. Weld County will not be responsible for any damages caused in the maintenance of the highways to installations placed inside the highway right-of-way. This understanding and agreement will be binding upon your respective agents, heirs, executors, administrators, successors and assigns. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO LICENSEES .'rn'nnrt, Iced Tats Tnr Greeley, Colorado Name Address 1 5E C 0267 Ye A) R 66 bt,) 5EC3� T-6 Ai' R66W 50� SEC. 30 T6 Air R 65 Vv� Permit No. Date CONSTRUCTION PERMIT 1. Type of installation g .c ra ` HA1c c t5lp rl 1- n 2. Location and description of work t"(A[FirtesAT �4s o CABLS- 3r%ro-2 "4.p Ac2acS �.urtt QA"35 I Ride t.)f yet 3. Estimated construction schedule: Start• Permittee: 4. District: Address• F. Telephone No. 6. Project 'co JC"WCi 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8- Special conditions: Complete: 9. Applicant- Ma 1 Rg.4t-'Fl , Coen By: !!! L/-�. MG_�� Date A, f • /2n_ m „puma and Title 10. Issued by /M/5R 35a •52)98 Date: an Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construct ion performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ..kic • • en a S -5910 0 2. Division construction manager - (Ac.ic rRet 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation_ 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permlttee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from theeonstrncUon and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: foregol is bound by Midst see Sno.riisor sting this p- mit the un •isions: that he has a 1 the conditions set THE BOARD OF COUNTY COMMISSIONERS WELD ,CQ.¢'NTY, COLORADO et Gleaya, igned, representing the Permittee. verifies that he has read and understands all of the ority to sign for and bind the Permittee; and that by virtue of his signature the Permittee rth herein. CPS_ VPE CC's'''. VANE pt.. ALLL 4120 4.00 OR. ILIDHi00♦ LO I- 700 r It. Intl-HKbL . our l //4. /-Y°O 102-+ a—ONNA SO ll IN.LOl-Zt0 tn-a.- o --BI DA 1114.251.300 us P 120 a cc 1 _ I-1WY R6IoW br— 7 � AS O Jr, 0 ¢ N 2 -J TD ORLY CO r ar 70-4-- RL4& P120 -TAS-1--1b'LN - — ID' ONAA•I-.67 1114. LOL. J0O - a4 IML' LIMP -I.49 1114. 701- 400 — C - ZS' MAR -1+47 I I I V ..b01 -R0O 1 O J 43 06 rd a • -� oho 3 � T ea RE .L+ W aim 3 PL 35' 2'BIP 4C 2 2 W to 2 2 19 in X l'IOKDI r 2 is k X !L1 70 Riflki-E I] 1576-1500L 0 sp12A 2 -11>Q ❑,Jril-LOOL• h 601-700 A A, IOI-20O ( ''34 BY- PASS atApw FOR .PHYc DMA PL (I) 134RJA-25 Ater tdbrw (I) 13102 C. Tun Saer (2) 4102 G.Tun St= Fi14(I) WWM1-25 Cal Sup (I) 193RI Brcv. BowD ZLC- 15'P•5 25 /,\ BONL WEER VET CLINIC q5C• RJAWZB IlUTRENCH I(o0•' 5PL t COMAS t 0' TOTAL. I70' 2ZC• RJRW fl -- 11]' F • 5' �o-rEs IF JELLY FILLED CABLE IS NOT RUAILABL ti217. 1USt. W111\ at1Re•z5 AND ._ PLSICE MOISTURE PLUGS ACOUIRE COUNTY PERV1i1 BEFORE STRP.ZING CMS-TR. CONTRCT LITN OF GRLY t3RTER-DEPTA SEWER DEPT a- (ORLY GAS CO. MR 1ACRT1ON_ OF FADRI-ED P1PEt]t1FS BEFORE ..1BUX. 11& HAZER DEPT 353-10123 `319 ALEX FROMM SEWER -DEPT 353-10123 *Mb BOB MOORE GRS COMPANY 1052.1111 PRY FOUT5 cunt CO TWO —RS RR 0 DROPCY •_ 0 DE^ • VW* _ 0 66W/466A EOUP' D CABLE. URBAN OF1E COPY Te COUNTY COMMISSIONERS CATEGORY EC7 CLP OI-1 SERVICE T)RTE 5.2&T3 > �I MOUNTAIN STATES TELEPHONE COMPANY FOAM 31$ a:cw.NO*-_1O ELEs_-_CCLCI /OS No -3E -'+2Q__ -.J_ DISTRICT I `rG�REELEY COUSTV WELT] ISLAMTO ljLITr. _ c9145,- LOCAneN,DtapL 3572Ail EZY JO CO. HAZARDS.. ___-_ �y 0. _____OAT[ _�9• a MI[N VOLTAOS ESIGROTIV_''//,, p .5; +LL+JIJ year l cm aT J_v.-_— --- APPROVED �fL�'.-_--YIYL.Z EA E-�pcROI�ATA7= Z ittAPPROVAL __-3�7� wO[R MCYO" co t OATS _3.1_R-7' wR _-i--_ _ CNOT. R[c• , Caro NTCS.C CP. a. uK R4 NSCaswrr a NORM WAS 1.1. .ftD Sg toP3i011ILZE-U}sUtC£ 4 Cc7ir+.de-.•Oio t•Y3 -s t, /7-7 Permit No. Date g 3 CONSTRUCTION PERMIT 1. Type of installation -x` 2-'... % Awl kc t Zap. Z F L.' i 9_ S 2. Location and description of work 77-1 Ili re:'.d' cec7fDR1 o7 Cod jrY 1-7:- c &cOfl F/ 77 I/ rC'5`C -o.c i1S4" 3. Estimated construction schedule: Start- - 2 Permittee: '-' aN 7-t- i' - . - Complete: -Y — • • 4. District: �J Address•n" 6. Telephone No. , < _ 6. Project No - 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: \ev N.) it,) i3eLL- eO6I e /116 By: 72-1,2�!r-c &Ant S. ---z: Date• Name and Title , 10. Issued by1:-/F:uJ e /JG. -T'-'ce4r . • 4%Z -7/-7 3 Date Name and Title 11. Final Inspection by - Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman �'. • •��'• �'' :? -77 2. Division construction manager P•- • - - - - 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment wad operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be In accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be 'started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit. except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: THE BOARD OF COUNTY COMMISSIONERS WEL' ' OJ TY, COLORADO Main a e Supervisor pting this pe it the un signed, representing the Pe • ttee. N - es that •e has read and understands all of the foregoing isions; that he has a ority to sign for and bind the ' ermitti .; and that by virtue of his signature the Permittee is bound by all the conditions set rth herein. 4 I 1 'S.1 A 1' _ SW..P Z¢. ja Da`3 DR. 6 an 1/5 c A Q4f 0 I. 5 060 iSo'�� Fen tad-LP75 9t-E�0 3+� Ic c 5-57 tn.c- i. G.t Ct.R IS ON -Go kcs-si t'D- G/ n k00 -r7 E oLOP.G1 *D. 4N! -c5 er.0 r• c7 kcs-37 ro ,N OP • QS Eu F D isca rc5-3r 060 P,73 Inc Lb De 4 1 1 % U n R i P F1-5 • oc p p 4 Az<St o' Ter< n 4,a. Zec. net DR. 2-1-} t iK eN n? n� Y P;m9 ).R �M Rand nm O ca nr`N W✓ Y ' 0 r m t N LX pr r o a 0 N N N Pe.441 Ge.tNTY 2C '57 t%fl* YOl Mgili '_/7-75_ Permit No. Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation Buried Gable 2. Location and description of work See attached print 3. Estimated construction schedule: Start- MAT 3, 1973 Permittee: Mgrmtain Bell Complete: Jima 3, 1973 4. District: r'.reel_ey Address- 2701 9th Avenue E. Telephone No 353-8160 6. Project No. C-3-0920 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• See attached print 9. Applicant- Mbmltain Pelt By: Bob papish Foreman %/ Nay and Title 10. Issued by LfV�`(,'�'Nanie and Date' Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. _Martin - Greeley 352-5801 2. Division construction manager A —T_ Farl - Denver 266-44'79 3. Colorado plant manager We Mort.. - Denver 266-7/x55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code - 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees. bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date' May 3, 1973 BY' ltaintenam,. 2 Inaccep ng this permit they 'undersi�bed, representing the Perm ;e •e 3r; that e has read and understands all of the foregoing provHions; that he has authoy to sign for and bind the Per••'t and that by virtue of s signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD ;}t,,,� , COLORADO z 1° N A 2 P a 0Z .. I A g Z fro 1••M Y,, IP .i[ b n Oi, Y T m P; m P 0 P A I ON Ale y o A P•7 a FD S ` R ( j T Z r N P y Z u • F h 2 a. pS�Y eCS; 2 Y g St t R 422; it 7 r E". �i �kliCkr conT. PRO.. a00Vt 0.Knt -5TA 5474- P.41115 S14. 8 Z� tea 4. (1425/2.7) PLLCC$* Parr73/► PloP(Ch7) f2.5 '1A 494 Pt22-4 zux rc / — 4�4ID�— i.— Gre 141o.• wgovc I aC T I STA./14L7 STA. Ur 17 pro *e 6) *3 Use' F I!r/nb Ctn6. PICO-. IC41 —Kan PL. CDC, /VC CONrrr Rd.YL 57144/7,44 1 PCD#(9. a) 10.3 1/SE tx/srn(d CLOS, P SYR 0+0O i G---. X11? I LC -0546C. _ coµt CSC 1.0•••• .t PT 10 P.SOI R,+.caAE'R Pro.r1"o.7) 11.5 a.t (J(urlt Cus. 3rn.O+OO +I N r 1 44 ZI :7k 21 •41 A \4L viz), ?p4 1> a • n —_.a •'2 NN Pops�b r r Az J 1 1 .574.•♦4, Pro. to 6./ .s-PL.sO'r SI► twat Sit". Nine?, (SIIAi4) F,46 aR,yO IR" Prc.*S,/ P4.. Lb'/4R aCLow 6.c PT r- (rrn. is.4) .. £.i. ccd/J7 A- fa'AkI' rrrrr< 4++#tuft## IIiII'iiIII xt#4444t4## 00 0 0 0 0 0 0 0 0& it #+444#1444+ IIIIIIIIIII 4}}}}t1441t I_ II I1 +I I II'u 'twin I n t i i i I i p 44144}4444 II11111111 444144#444 IIIIIIIIII 144;4}4444 111111IIii 4444#444+4 1111111111 4444444#44 t l$t �I& 13kil l l€t#t�IFf�fcF Nr!tl* -4f 4444#t4# #+4#4+###t4 I�#+4#314141444+#44#4+ 44$$111IIIIIIIIiIIIIIi 1144tt4444144$t444#4## #41IIiIlilll!I11!11 II 114444144##44444##414+ #41IIii1111IIIIIIIIIII It 4114443444444ift4#4# �4IIIIIIIIIIIIIIIIIIII #"It4#4444441#414#4414+ I N B d i o E➢ iG N i e V P yN - f i f U p> 14#14414#444t44t4$4+44 41 IitlillllltIII 11311 14441#t44444144414#114 4111111IIIIIIIIIII111 L#4+4#4444H 444444+44 +4.1444++4414+1'41#4#44 H II IIIIIIIIIIIIIIIII tt$tt*444#1#111#4#441 Ittfi*e#44444+4t#4+44 4 O It t lx tt li ii It 1$ Ii i4 1F 1< F4 k — P Jr" 51014 &o" 21.2 pC. 7o2AA1-ICU( EIw 7L+ev.z L.4 KS6.M /- 7S s-sa. DXAa•.p0 a' (7 t3 I -���&qqq) 7-2L21750 X -HO 7SP RL 7-2b2 PL.C z • SALK' a0 !-CLH1 S4Gb. 4.5 tote 74 -BBL • Ala! -too Dur: 7-2/.21 I -SO couT. aftree Len 23ror 100-0 OD * - /J DO Y 3 - A,seM, E0-woL.S NH hp chLit v RZZ*Rafi C yL= 'o'e7' o° Qa R 4 ay.r T aD t � aiy 11't a 0 0 O 0 0 F t" *1/4.4. co 720 R. L. 74 - fay oa 0 N • a N X vfee /�y Le_ K -c( ft' Te • Soo' 4 /e' ryVTTONa3�15 yyy , lA% _�a.o, rPl•l25 V V r a N S A (Pc1) 7WgL -4 A (P71) PSAL 5 T i V y ,w IN it e ▪ v- r1 b o- yNr tom ?3 01 0- e4, I ' by. N.4n• ? 0 • O VN 7l O 't W STA 1372.1 X P4 SS'JLA027 PL.LOG/42 •� 0 0 PetYJtr le - •I b BNAS-25 � 7-3.2.4,471-1.75 L. 11'e�y !G51 X 200' /-� rL.G.0072O /2L. 7C noire Ot. STA./34129 E<N•3T C. to33 $TP, :66! 64 AW Ta DR. 1344 2.7 Sri. �•'STA./OAK& I. 0 72.1524.55 r'1ec0 Dv., 5... Ixt154 5,7.121IH Corr: h.a o Amur A—ry� —r — — — fir a IC I 0 0 2 C D ,a n C } 0 Iµr�L5 +a5' M 0? • PZ 3_e• Io PLO 4.7 1•GI. 4. 5k I-&1 1T5 Ce.vry 1�{ Ira , .7a- $ ..93+57 1. oe. d—te. *trod 5ra. 12/17/ Sin..11441 ©fin 26 GCOAS `C• ccoa. 2- °* /t2otbo Sm.,2 -t 76 IL —A Cohn<bong Le Fr r'ac0 Lear • Sra.tit 444 rl N po to P 14+3C!e yl I Imo.AJ 2474/w 7 r FetD Lot `�fSi-L23S�i . DA ,re Sr. Sr.,. no Y45 A° G/42 Poo. ••• 27.2 L I-" 927•F Sra. SrP, 1044.00 Ste. laJ. Ls K Fro.:: Nc5t3 Y.•/OL1lI Sax Pf�t�5t f41.veLJ • r2_CeA,Caer CrGNCCl -L. rrecO Da. N rL&-.I a Se e. Circa,, s_s__ I!..- 3/a.3 PuMV Ysu4.4 "fact n.013 PL. aco.Rac e era am O. WIC 6 Ps GGN'LY(-/LV L.ry. i YY/•n' - y 54ep u≥L.Yy''F2n �.�.-A.1(i-1 1-32.0)1110•5‘.. _ r - Z-cM4'SNN-xrc/7'4$MS •� RJPM-/ Iry Th'cn n. ?9 .. - r1AS/I2C• 40• V' Cr z'r °SS' S// Pens . SO' p Or P..c r 2s' �L Src K.a.e.& uNace • ' >erns_ /2d04 •. c ® AL -rata a 35 _it.. 3,52_X r_ eh/ 3428JCm- GM- VC +C-i 111 173 i�A1ALLtl:- 7.3[.O.BS/OO /de 1L • 3to. +u riva 7-33,5, .a, 6- SS /OO Z r[:n // - S fen so FIAN• SO 7N 117 NC.N - /LO' G[OSUGc- /OO• SPLTGC- ter .grr_of'ci77a 1. Type of installation 2. Location and description of work Cc . 9e e 3. Estimated construction schedule: Start' Permittee: CONSTRUCTION PERMIT S'-3-71 4. District: - ,�i'-t -C._ S. Telephone No. B r1 I l'_tNc e 6. Project No. Permit No, Date 6 is -a es. Mg �s Complete: Address • /i O 3 s-3/- ,3 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant: ame and Toud 10. Issued by 4 Or` Date: Namc itle 11. Final Inspection by Date: Name and Tice NOTE: If dissatisfied with construct- y perfo jed on i8 Sob, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction manager 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code, 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: THE BOARD OF COUNTY COMMISSIONERS WE LINTY, COLORA .,t intenante Super.. In acce ing th s permit the undersigned, resenting the Permitted, ye foregoing prov n that he has authority to gn for and bind theittee �aryijthat),v virtueedf is signature the Permittee is bound by all the conditions set forth her has read and understands all of the _Ue. Ro _ _Alt Ar3 (-7 2,' Permit No. We Date May 24-t 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Bury telephone cable on North side of W. 20th St. 59th Ave to 63rd Ave. 3. Estimated construction schedule: Start' 9 5-26-72 Permittee: Mountain Bell Complete• 6-26-72 4. District: Greeley Address• 2701 9th Ave 6. Telephone No. 352-5800 6. Project No. C-2-5061 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special condltions- 9. Applicant: Mountain Bell By: John Goswwii�ck-Foreman Date: CYe�/ l ` me and Title 10. Issued by Date• Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry -Greeley 352-5800 2. Division construction manager H. Boatrig)ht-Denver 266-7444 3. C. Phelps -Denver 266-7455 Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5- Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours to advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By' Mnintc.:q.' uveevisne In acchg this permit the unde .. - ed, representing the Permit ee. verifies that he has read and understands all of the foregoing provisions: that he has auth, y to sign for and bind th`P mjltp.C; and t Cbyvirtue of his signature the Permittee is bound by all the conditions set So - .. herein. /J/1 j THE BOARD OF COUNTY COMMISSIONERS WELD COl6NTY. COLORAADDOO,, tiara s'a r"` A9ewuir I t t t r 32' t /LY v 1101 ,/t1'JLTi f> Eod/UL-' Z w i v z r p• r x 7 O A Qj A ' r ▪ O-'i p >_ O a t I I t P +t H Mi-H1r I ro )�I t t .} 'i b tf.YI 1 { � :l _x'14 P" t 1 1 1 -, w 1 ,1D t ill, t i r t ttst t i I I I A-1 tit I t 14 t r o t lc o t El - r {d�F`) I S o (A -4 t i { i ,1 tl � t 1.;� i t -t A P \ F t `37y-1 i i . ; ._, i t 1- . 0 X I t t iig ik� Q . I I t I 1 f I t��. j � t i -i V' \t.i tips N. iv f 0 r ;7 O -D 0 C- I' s P u i ') fGI > O� . -se 21 0 '1 o i`i i1 +,i < 1� hd t 1 i .It. w 1 ; it_ I Fi v Tr"i 1 N Permit No. 7j7 Date Mar 12. 1922 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Place Cable east of state Hiway #257 out of Windsor along County Rd.. #66 for new Motel and Resteaaan 3. Estimated construction schedule: start' ?4sy 15, 1.9 2 Mt. Hell Tele. Co. Permittee: 4. District: Greeley 6. Telephone No. 352-5800 6. Project No. C2-5085 Complete: June 15. 1972 Address• 2201 9th Ave Pere& Py 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions: 3. Applicant: Mt. Bell Tell, Co. By: John f.nsrwiriL - Live jt`orame Date' Naote and Title =� 10. Issued by _ Date• Name and Title 11. Final Inspection by _ Date: N.nu end Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, 1. Supervising foreman J. Henry — Greeley 352-5800 2. Division construction manager C. Phelps—_Denyer 266-7444 3. Colorado plant manager W. Horton — Denver 24 7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans, 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's Installation will be In accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee Shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS By: Maini Supervisor In reeepfing this permit the under ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has auth ty to sign for and bind the Fe itte • an that by virt of his signature the Permittee is bound by all the conditions set fo herein. /f -- WELD Y, COLORADO / lY �l c �6` �l iii in the following order: N PL ots i. S! Zo Ca'c3 C . a,ga3 la:06,+ DfSo7 Bc>$- s 3 i*0 -.• . W r rr 6 a, 1-7SL4- 4rS) 1OC? i- a)7b-rso 4- tps., rst-2.00 f' z., 15 1-Zoa as914 171,4 '41 13 •to r r-- r 7 )c- a r. vI 3 wit r to :1 r to — 13-G114- -utPre alP00-4 M R 4 '4 tk- .z•- . iR la 4i 21 rib ?y 5 i 4 3. FY.:747 ifrr a •-' w 'tfn t � & N. -. Tr H s t x l ; rm 1- I r [t, � a 1 s it i I C iv,- Kt = ; toP I x'r :� r x to sal p ti i I „ a� 1 t 1 -1 t, _s t t t j ,cam i C I 41. • i t ��[i P t r• 0 is 0, 1 tvK I 1 0 _� I Itt I t i 1 I In 1 :i 01 [ • I t It F�1 .o . PI_ it q C A In F' a PiQ 1 Q.1 I f Q Q j I, w1 I: 5 i. c t ...;rye} +#-S3 t �� I r 1 rs [ '� ..- r. 1 c 1 1 r =4> i t 1 I AD i aa ° o .w ••- r t i t �t °As I' II r _r 1 r„' # 1 1. x 1 t _`t •g'..4. 1 - 2, S3 -1S OR: .c r .r. {iNa14-3. SY Sri I - Dv3P'tz 13.Y. fl3 { -_- 34C. - t4 - MC -' I Cl K C_ GS;;J -' ' :Nt rvc r.c MC. S rum A, 2.57-2904- I zd rout -r 74. Si zo mod 4i izto 1SaDP Permit No. CUS Date Hay 12. 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Place urban cable along R. L.#31 out of Greeley see attached print for exact location. 3. Estimated construction schedule: Start•Sy 15. 1972 Permittee: 4. District: L Telephone No. 352-5800 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: p+ ail1 TPIR- (To. Greeley 2P-109 Complete. Address: June 15, 1972 2701 9th Ave. Greeley 9. Applicant Mt. Bell Tele. Co. By: - •.. 10. Issued by tine Foreman Title Name and Title IL Final Inspectio.' by Date: Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order; 1. Supervising foreman J.16Henry - Feeley 352-5800 2. Division construction manager C • .PhglPS •� Delver 266-71{14• 3. Colorado plant manager 1inrt^n —__Jlerrirtar 266-7455 Tate: Late: May 12. 19?2 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilised and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OP COUNTY COMMISSIONERS WELD C93Jt V, COLORADO By: foregoin is bound by M'aintenanc`e gervisor ng this permit . e undere' • . ed, representing the Permittee, verifies that he has read and understands all of the ions: that he has authori to sign for and bind the Pitte - and at by virtue his signature the Permittee the conditions set forth herein. // 1 SIMMS N ..7 O warm* . 7 N_ r > -. I i.0= g a a o y o- s I !�+ i II'*- 4 f f .'" Z I t o L.O 1 �J(.t , }xf In I I a. v Ix ' La 1x l r II I D Ir.) 1X3 rr< 1� I t24 f Jz`�r-�C GI a ir, l I °I Iat I ,, m I i I lii i I I 'r- 1 "n r g 7 j . I 1 .I I .1 1 .I;< rn 1 IZI I I I 1 I ; 1 IfiI I z v I I An, I I I rU in i s lei I I T ILA ), 1. 1 r- in 1 I� I I, I x en z" I I ;'I ,° I[, I #ml C)) 7 I'rl 1 I c I > I l_ p lti ' I y I -< I In, 1 4,n® ; I 1 i°-1 � 1 I A I A 1 I Ii' I _ I Z, I tr I J +d I-, I I. mf J It Iz 1 I Jc I I I �J hp? 1 Id -I MCA ° ti ti I _. I r J ICI L':0 A 4 N1 .I -o I 11Z) ,. ' J\i.. IN -,I4 I 2 1,r 1 rz I 14J I I IsI '':' I n 1 I p I 1 • JN I .�, I I I� I (*1 I I --IF, r a ,i A 9; I.. I $ 2 o 1 ; i ° i "a a c ha tI v I J nr Ia. I I 0 I, r l o f I 1:., IT' I -.I I ,-.I m I -IL i , ya I3n o a 1 I I' 2 laa 1 I w J 1 z P I I; I I— I I I 1 ta ° C) I Y I f l Jx i- 1 ; I l t I !ail I 1 ..a_ Iq- : t -t I - , i - I°3 I Permit No. /3 Date Mav 12. 1972 CONSTRUCTION PERMIT 1. Type of installation Burled Cah1a 2. Location and description of work Southwest of Gilcrest on H.L. 17 on County Rd. #40 acrtsq Aounty Rd. #15 23, 25, 27, 29, see attached print for exact location. 3. Estimated construction schedule: Start' May 15, 1972 Permittee: Mt. Bell Tele Co. Complete• May 31, 1972 4. District: _ Greeley Address• 2701 9th Ave. Greeley F. Telephone No. 352"5600 6. Protect No. CG -536B 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: Mt_ Sell Tole-. Co. By: John Goswick - Line Foreman Da^e• May 12, 1972 .Name and Title 10. Issued by ^"`�""�" �'^"n� Date• Name and Title 11. Final Inspection by Dare• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction J. H. Henry freeley -352=5801 C. Phelps Denver - 266-7444manager 3. Colorado plant manager V. Bnrtnn Denver - 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9, Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD 1 Y, COLORADO By' �' f?? Siatatcasatt Sulfe v r In accep Ithis permit the undersiggw , representing the Permittee, verifies that he has read and understands all of the foregoing provisio ; that he has authority o sign for and bind the Re itt s; an that by virtue his signature the Permittee is bound by all the conditions set forth herein. /�i 17ot C:12C-J SPN `pED. I1) P'�D• a1..97 (FED 7) F. c. ' (PeD.3) l'1.1" P. l9.8(0 1 4 71 Z V 7 G .i 1 7) n ti Q r c r v D 0 r M u �i -i r r c 4:19,443 f k {tp� tt9 es' C I 7O j 32.34' v s 0 A N 0 C 7_ i A \ N r- ZIP r r R It C t nPal D, lG'o Pa C� Nv c C / prd 40 tX-19 VA Go,fV- 'Vac. StJ• 1 4.owEfi iCFT • C41 V9 c4 ti < z? :e 4{.C..] a 0 9 FB,C2.C� _ K -6P y cL i 7 I : j - a °O 2 - §x2m rI 2z I ,; , | L . I*/. ° ' ®/ t _ \ � .!. .it ri-| 1 R 2 I , \ II \ / l \If / tl | I it,* \ ) p « k | j (|�,| r| I ! { * 0 § , ,ijr . 2 r]!r ) ||a I I i{ A I j in III 0f ! P4 | 0 ( 2 n / 0 k a I '2' ,0 A <' k|/` /I . 2.;\[, •i■ I .rn{f | j� / / { I i� . || \. |; I •I I II I . t i I I 1 II | RI -Is -3- or &.i-=ctcsr S L. soC. 5 TA. 1.O11%.7t), 17*4 .1 - pL'ttto:-324: C'.G srafe1 i :! Permit No. c" Date May t9, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried (Sable 2. Location and description of work Sec. T4N R68 W. Spe attached print for 3. Estimated construction schedule: Start- May 15, 1972 Permittee: Mt. Bell Tele Co. 4. District: Greeley F. Telephone No. 352- 5800 6- Project No. Cl —5011 exact location.. Complete • June 15. 1972 Address- 9701 9th Ave_ Greeley 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: Mt. Bell TAIn• f'.'h• 10. Issued by By: John Goswick Line Foreman N t and Title None and Title Date• May 12, 1972 Date: 11. Final Inspection by Date' Name and Title NOTE: It dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J, Henry . Greeley 352.5Bon 2. Division construction manager _ `.,-.,$gels — Tienwar-266.-71444 3. Colorado plant manager V. Horton - Denver 266-7455 PROVISIONS: L Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4- Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Br Maintenance ueervisor In acc�ptng this permit the under fined, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has auto ty to sign for and bind the Perrittey aybt that byyfrtue of -his signature the Permittee is bound by all the conditions set fo herein. - THE BOARD OF COUNTY COMMISSIONERS WELD C919NJ�/, COLORADO urn ciC n &kTh pr - ; IT ,Y.{ sl4 AyariTh at '.: ;cct4 E_j L C cG' b: ii.r- ""k • tAt - f l4 CF .I 0' '176.-i-p-i.D!I " w, V.B • WAG 7i.&O lik - a' ..'f l4... ID F4y-ii-.#OLJ'`,.. 2U A 1_- j`-c�'� tt.'% +)it rib elid,1:$7 Pik 24-50 1 yip - Permit No. 77 ` Date April 13, 1972 Mountain Bell Greeley 352-5800 1E767 1, Supervising foreman 2. Division construction manager 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3- Permittee shall Inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance With accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shalt notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return tho right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. CONSTRUCTION PERMIT 1. Typo of installation Buried cable Place buried wire along County Road #46 2. Location and description of work 3. Estimated construction schedule: Start Permittee: 4. District: r,. Telephone No 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions: April 14, 1972 Complete' May 14, 1972 2701 9th Ave, Greeley Colorado Address• 9. Applicant 10. Issued by Mountain Bell By: John Ramsey-Inspecter 2 ma and Title Name and Title 11. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: J. Hey - Greeley 352-5800 Date' Date • Date: April 13, 1972 77 4 -7.,R H. Boatright - Denver 266-7444 W. Horton - Denver 266-7455 By: Mainten In ca jug this permit the under foregoing provisions; that he has autho is bound by all the conditions set for herein, THE BOARD OF COUNTY COMMISSIONERS ed, representing the Permittee, verifies that he has read and understands all of the y to sign for and bind the-Ptitm(ttee; p d that by e . his signature the Permittee J c� c, T1 Pi z 7 i n N IN a I- CI 0, 2 dX2•g011Y 0,163 «O > A z r o w 9 9= > 0 w X p A a A > > n= 9 O O 9 -1 > r A- A m m = 4 a y ; 1 I (L F4 i. Lc` 11— '' `a t1 It 1 I It, I i�'j t ,,-IZ to..., It i I 1 ,jV I r-" a II —I l I I—.�.I ; I x t is,{ I,- • I I 1 �I I � I it ' I r1- 'mW I I IC i m i-_ i i i I➢ Pi (mot, n I a IN 14 C I o c I i I o 9 ' IL' ` , i co sr- I i I 1` , It 1 I I-' I.,; III, l I-, IIfi IN i r I'\' > X ri' I .,-4 I 4- r I'i, A O 1 O iV m IQ i m r I1It) �<i I!1 z t 1 Ins l ICI I r I D O 0 umi i I 0 I n II I 0 A > o i6 11 I n 1 o tv o I C I I 1 I (:'1 .7 O U `I.n:1`( RD#' \3 ExkSTING �2ua Permit No. Date 377 April 13, 1972 CONSTRUCTION PERMIT Buried Cable 1. Type of installation 2. Location and description of work Place buried wire on county road #25 and #62 3. Estimated construction schedule: Start Permittee: Mountain Bell Complete: May 17, 1972 Greeley 2701 9th Ave, Greeley Colorado 4. District: Address• 5. Telephone No. 352-5800 6. Project No 113 904 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld Cou t . April 17, 1972 8. Special co,dona- 9. Applicant. By: 10. Issued by ountain Bell John Ramsey -Splicer Name and Title Name and Title 11. Final Inspection by NOTE: Date' April 13, 1972 Date: Date • Name and Title If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry - Greeley 352-5801 2. Division construction manager H. Boat -right — Denver 766 7444 3. Colorado plant manager W. Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement. location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans 3- Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By Mainte,-.c liver THE BOARD OF COUNTY COMMISSIONERS WELD COyj:IJ�Y, COLORADO 07 ..‘29.-4t In - ccepting this permit the u: - • rsigned, representing the Permittee, verifies that he has read and understands all of the foregoing p : • sions; that he has ,, ority to sign for and bind the etm$(ee: an at by virtpe-tT)tis signature the Permittee is bound by all the conditions set forth herein. 'XC A3—J3� 111 serr7ivaer. �--� vi a7(YiwP 1 •m•c7� SE/ CI VOL z ✓/ cr&cy N 1 m r m X 0 Z m (7 iy !sr LGrcAvc-} n Permit No. 7.7C C Date April 13, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Place buried wire along County Road #16 and North on County Road #21 3. Estimated construction schedule: Start• April 17, 1972 Permittee: Mountain Bell Complete. May 15, 1972 4. District: Greeley Address• 2701 9th Ave., Greeley Colorado 5. Telephone No. 352-5800 6. Project No. 2E219 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant' alUkthrWklll$f Mountain Bell John Ramsey -Splicer B and Title 10. Issued by � Name and Title 11, Final Inspection by Name end Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry - Greeley 352-5800 2. Division construction manager H. Boatright - Denver 266-7444 3. Colorado plant manager W. Horton — Denver Z66-7455 April 13. 1972 /79_;\ ?a Date: Date: Date • PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before fin correctiveon by the County measures shall in t and initiated me.within al joinand co If final m- pleted inspection on determines additional corrective measures necessary, s by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof-way limits. By. Mainten a Supervise In ccep ing this pe it the unde gned, representing the Permittee, verifies that he ba d and understands of the foregoing , . • sions; that he has au .rlty to sign for and bind the Permittee; nd that by rune his signature a Permittee is bound by all the conditions set • th herein, v -' THE BOARD OF COUNTY COMMISSIONERS WELD CO=LOR O O • REASON FOR REISSUE I ISSUE _<, ec. 2. 7 LOCATION: 6'4 ifi..:rV •' T _ i F3N Nc' rjr ON CoJ> Rd a1 IYa/l/Liss. N Co2-,tvrY .°L) r/C (C2.avcc.) t w ice_ P210/ 11 r $ ,e S .- EGG _3389 _ I i a r ` cTf No. 1 Pr_ -'D. 7 -a- I in t C1 r t • C Iy V = v i .y v: } 5 SC. 4 t..1 0 `c- a C. - C o p es n. c- Le F T f4,%! %O VAT s c Svpt_y C 776- (>2.4-2-) Fcca, A A.c_r L-Qc A'�I'J tJ OF /ATGft I -I MC. - 20.4.0 Rt." IT- FCG'D_ - CONJ-DA .T- Ch!v (7.. post S. L?Ia\/S Pr OCC, -o STrA DATE 3-24--72 N Q G \/ Ci 4> NMAR 28 WI MOUNTAIN STATES TELEPHONE COMPANY rc Cr - " - I FORM 3050 11 1p EXCHANGE L"'Q_�� _Diltt _ _Co - Joe NO. _� _J - -'-f ---- - - -- - — DISTRICT -<C . rc'/-----COUNTY \ CJ.&,ti-- _____ LOCATION31'21 LG S _\,12E1L sr. 1./y?/C�,��=?_1 �i_2Fi4_Q_ JU.CO. HAZARDS_ -DATE _. - POWER VOLTAGE -------------- ENGRO. BY- IK:1--' =- PHONE -- 1S2•- DWG. BY-1:-CKD. BYF=hL _ APPROVED r_-LEAr2/i. CL% -C1_ DATE : 2; FCC APPROVAL --S ORDER MEMO_3: - _-_/Q- - _SRV- DATE -�- --L___ OPM/=%�-2�r _CA.REG_T-�- +-- EST'D COST__=-.--STR. EXCH ------.TOLL ----- RLO - .---CNDT. REG. EST'D MTCE.EXP.----- ------ - LC •Q1- _Q --LINE NO. 1�----F NECESSITY OF YORK (3140) -'1 r' �".�' •' "'� _SHEET_ __OF -'--SHEETS ISSUED TO WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTED'S NAME DATE 4e,t13 II re 14) g2LZ ADDRESS O .. Q2, c7G�,,, / �1 `/ Your nest permission to install aNtIsi �14�(,4. line County Highway No. �o d6. is granted, provided that the Permittee will on and maintain the same after installation. 19 -7 /q at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after Installation. The line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or graveL Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed np to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no ease shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable: - - - SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County. Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be Connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within 9 ( 30 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public mast be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right qT way te. *,C04 , Maintenance Man on this section of the highway, with headquarters at "'LAU-*/ 1 rS2Q Or his successor, will represOnt Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Suo ntiew In `*TSB this permit the undersigned, re ::: ,ng the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bowl by all tpe cotdticayi set THE BOARD OF COUNTY COMMISSIONERS WELD i9USITY, COLORADO S 4 heW t,e0c SPECIAL= NSTRUCTIONS REQUIREMENTS „POR-I$STA Ae 104.OF UTIILIXIESa A41TH II: 1FIE�RIGMT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County. Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. .. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. a. Muff -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected - 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size- s. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines, are over two inches in diameter or mare than 100 psi pressure- 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyondthe shoulder of the through -traffic roadway.; - 10. All requests for installation will be reviewed in thefieldby representatives of Weld County. Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such, permits are issued. it will berequired by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require. the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by a Weld rate oCo County, Colorado. o County. sts relat- ing to the inspection of such utility installation will be borne by the Permittee.. at 13. All drainage facilities or siphons will be opened immediatelyupon completion of -work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will beireplaced. Alt damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 11. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O.W.'S Minimum Thrust Area Minimum Thrust Area Minimum Vollume VorticaBends of Concret Pipe Size for Tees and 900 Bends for 46° Bends n 2" 0.3 sq. ft 0.2 sq. ft. 0.05 cu. yds. 3" 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 sq. ft. 0.4 sq. ft. 0.20 Cu;' yds. 6" 2.2 sq. ft 0.9 -sq. ft 0.37. cu. yds. 8" 3-8 sq. ft. 1.6 sq. ft 0.66 cu.. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 en. yds. 12" 8.6 sq. ft. 33 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft 4.8 sq. ft. 2.00 ca. yds. 16" 15.0 sq. ft. 6.3 Nq. ft. 2.70 cu. yds. 18^. 19.0 sq. ft. 7.9 sq ft _ 3.40 cu..yds. 20" 24.0 sq.. ft . 9.3 sq. it - 4.00 ca yds.' 24" 34.0 sq. ft. 14.0 sq. ft. 5,20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be -permitted at the discretion of Weld County, Colorado, and only after the following provisions are met - - 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3, Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfilL If it is de- termined unsuitable the material will be removedfrom the site at the expense of the Permittee. . 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one, (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee Is allowed seven (7) days after notiflcatiiatCtot:' Lheeestecution DC said repairs. 5. If the Fermittee has not 1e4etria-said-open cut or cats within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. 8. No puddling will be allowed. < 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the bard surfaced roadway to be disturbed prior to the commencement of the work, said- bond shall assure.recovery recovery by thetonnty of any expense incurred, within a period of one year following the completionand acceptance of the restored' portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din- turbed portion of the hard surfaced roadway. Said bond shall. not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable: however, in no event shall the bond be less than $100.00. 0 0 DG t34- ?, 36 -45-F sa, 11-as- CQUN7y Irt ¢5C 3S'Vflc> 13HEM -.5° DG 1344, 1-35+ r'.,3c-sa Fa�.s KC S/37 ctoS 7RP/t . pc ±fl 466= 7S.V+/0. - ?OC Co.At'LL\tl,Ir ^ COMTAc.-1 aNc,'R.,Poa srntccS I D• REASON FOR R -Fitt_30 EISSUE ISSUE -<—j2ti~ 3 D� O. GATE 13-Z7-7 O;‘: c -D-07/ I S '• 1sc V'u'-`••`�"i�T�C�'l'���-OLIO , ... •-•L. J. .:,rr.. v ri... .•.Y. x '••l7-�CJia-J V•: - ... i': ."•.r.rl-:' DC= I34Cp, 1-5O 0 >1 I - z 0 - for-_ r^nn: --u c.WCcr rrs;z o,-1-1 P- 7.::• 0 r-• UrtL.Irl C % BCrorC roRC /acr�sS • RO• 24, CHP2t-CS a VANS New $o64c BoSC 30' UNDER AS PFb 12o4D, 2IN MOUNTAIN STATES TELEPHONE COMPANY E G O L O 1 0 -ca FORM 3060 EXCHANGE fl -I ryVI.1_1—k__—_ JOB NO. aL_2--O7 J DISTRICT L=.LCy _ _ _ —COUNTY-1oLG.) fl ISSUED TO _ .cL1J-C-agS.- LOCATIONS\N^ ?S C. .J... JU.CO. HAZARDS-_ _ DATE - ENGRO. BY- JELL -.t 3P~ONEa L52- DWG. BY'?.L0.-c KO. BY Lint R/�y-C•n U�/�� r r7�_��a�,A APPROVED_r.1 .t•/1�_-.TITLE/�f-C='1C2LDATE 3-2.7-22. FCC APPROVAL _14 =-Y_���� •--- ORDER MEMO;J it, -V.-'kYL 3_---SRV.DATE --'�-=��--Z----fP?AM=�7 P CA.RECI8-11 S' -c≥ EST'D COST_ '1 _STR. - -- EXCH L�= C? —TOLL _—_-- RLO - _CNDT. REC. EST'D MTGE. EXP. t- ---------- LC -Q•Q'3 Qf —LINE NO. p-1 NECESSITY OF WORK (3160) �.L:J?.Yl.S.C,1=�1`.rScljl:��'.at.^.:z..L'1�r'S $ _r_S3 CAIL v Permit No. 37 Date April 11, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable Place buried cable across County Road #23. See attached print. 2. Location and description of work 3. Estimated construction schedule: Permittee: Mountain Bell Complete: May 14, 1972 4. District: Greeley Address• 2701 9th Ave.. Greeley, Colorado 6. Telephone No. 352-5800 6. Project No. C-2-0917 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County, S. Special conditions: start_ April 14, 1972 9. Applicant: Mountain Bell By: George Sas - Foreman Date• April 11, 1972 xlama an Title / 7/lam/////�//�` 10. Issued by e�-'�� fi'"(/ Date: �,72- Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry - Greeley 352-5800 2. Division construction manager H. Boatright - Denver 266-7444 C. Phelps - Denver 266-7455 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code - 6. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance 1f this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, Its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County rightofway limits. By. Maintain .y upery In a• ep g this pe the under:. _ , ed, representing the Permittee, verifies that he has read and understands all of the foregoing p . • slons; that he has aut.. 'ty to sign for and bind the Permittee; oand that byw3Jtue of his signaturOhe Permittee c-1/77,‘ is bound by all the conditions set f• • herein.-�`c- THE BOARD OF COUNTY COMMISSIONERS WELD J . TY, COLORADO /08 G.Z.f 74.3 Sc; 4S LC PL 4-.'X4'K(o' CXSz i,n.as. St7G PL 4!a$ a Arenaar✓3 Coe a/.., 5953 G TT ) L're 112.4 li.COOitcas-run! FRS SEE SH'OcFOR AP!' C_ASE i -+2 SPLICING -DETAILS. 'pL 15C-'7BO OW TERM. �. y i - ' ₹ 1 I !: tint tilt) .z 12.'1410 4 "TCI PL. 4'K4 -'x (e' cxart}i G4" •�-Auz TRAncSfw.rFn r --V A. L v � El Pt- 44a es A.Ferag.c ras c..% sa t3 /w s-wse,NC f c-ra cc&.tccc.'t%c. GAS tsar. ?ROY ' L dtC.?$a O Nhi TERM - SEE Sidtt MVP CASE; spc c;MG DETAILS. es. &war ritafre an: L.eFT 4 st { p � } p 1 % 1 t 1 * f .t 1 't I. 1 #1 '1 1 a f.. 1 1 _, t. 1 -1 :1.::t. { I 1 r. 1 1 = j , ; 1 "t t i 1 I t 1 .[[ 1 l o t � I I 1 i F.t_.�i, i,f 1 { .i t17:' .1 1 } 1 " I 1* b►� t t t tp 1 1 5 , .. .c. I ► L , to 1 9 4 t tip -c 1 A 1.4 1 .t 1 :thy 3, 1 1• 1 1 1 1} t 1 1 Tr • -� $ liiiiP��°L. 1 i 1.__1 t Permit No. • Date 3St April 10. 1972 CONSTRUCTION PERMIT 1. Type of installation Bile& jdze 2. Location and description of work Gill elementary school - RT. 4T age attarhea print for exact location 3. Estimated construction schedule: Start' Art 1_ 11 1972 Permittee: Mt. Bell Tele. Co. Complete' April 25, 1972 4. District: Greeley Address: 2701 9th AyP , at-wplc.y S. Telephone blo _352-5800 6. Project No 2E 228 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: 9. Applicant: 10. Issued by Mt. Bell Tele. Co, By: John Ramsey - splicer al l Title Name and Title it Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. supervising foreman J. Henry - Greeley 352-5801 2. Division construction manager C • Phelps - Denver 266-7444 3. Colorado plant manager Si . Horton - Denver 266-7455 Date • Date - April 10. 1972 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 4S hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed_ 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. forego fs bou A THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY. COLORADO n� Main ,• •r - - pting this pe it the unders •d, representing the P ovisions; that be has autho y to sign for and bind .. all the conditions set for . herein. ee, verifies that he has read and understands all of the tee• '' d that by. rtrtge of his signature the Permittee CI iif -- t a 1 y t t m i� I "I t, I t "R'tt trrl r Y`t ' t�r'ar I r 1' r.`s. j n. j . x -? , ; j ..fly )-. - f t.,1 -n fqt r I' c -t t i a 'q f3 r w -'i 1 �°� t 4 r 1/4t-- =� tr_ :„ i I ,w• . tt.yt t } t -It r ri�1Fii r } I J t ;Wt� ° t Mt a 1 r-� O't y I '. I d`o $$I s. I ` Fri i: I W r G t i 4 t t t N i s t ?, ; j� N 11 r= pc :r i n` 1 1• .i -,t, 1 r r� r. .a r i tea t 1 • 0 *• } r fir II t ca tit li r n- n' r t t" i� Irv- zpal ,'w t , 7 . ,i."P,rt t 1 Ili t 01 La IIIt t t ♦ Permit No. _ 3S.° Date April 10, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried wire 2. Location and description of work 21 66F P#32 Greeley Rural seeaattached print for a7i -n exact location 3. Estimated construction schedule: Start - April 11, 1972 Permittee: Mt. Bell tele co. Complete: April 25. 1972 Greeley 4. District: Address• 2701 9th Ave., Greeley 5. Telephone No 352-5800 6. Project No. 2W221 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• 9. Applicant, Mt. Bell Tele Co. 10. Issued by By: 11. Final Inspection by Sohn Ramsey — at,7jr@r $ame and tale Namee luldd Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ,i. Henry - Greeley 352-5801 2. Division construction managerC. Phelps — Denver 266-7444 3. Colorado plant manager W. Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permutes for 1 year after final acceptance of the work by the County. 7. Clearing of trees. bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances_ 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date' Date' Date' April 10, 1972 17 7� By • t THE BOARD OF COUNTY COMMISSIONERS WELD CO JY, COLORADO intenaneeu9eni.ar In ace tin this permi the under' -.ed, representing the Permittee, verifies that he has read and understands all of the foregoing pro isl s: that he has autho ty to sign for and bind the P ee; anat by vi e of is signature the Permittee is bound by a e conditions set forth herein. /) _ !/ •y,1 C�GG er 1. w 7th t j .1 1 N- +• I • . "�1 1 1�'y. -11 t' .1 ?III t' t i art oillie. ttis I x .I t.t t ku-i 14'; ! tr 7 I■'_ I r 141p I 1 't'- #' 4 le* g I 1; �, 1 .-Jn 1` � �F �: 7 1 l�. ir' t / hit: n A ;.....I �. :- ITSri N t •' .. ♦., r t 1 t L'3 .. .•.ten y A.Pt 4 6. Telephone No. 6. Project No. C2-5037 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 1 .1 ,353- 2(59 CONSTRVCTI•N PERMIT ermit No. Date March 20, 1972 1. Type of installation Vied Cable 2. Location and description of work Place buried cable acrrOSS rnunty road north _re Public Service Company Weld Sub -station 3. Estimated construction schedule: Start. March 22, 1972 Permittee: Mountain Bell Complete• April 22, 1972 4. District: Greeley Address• 352-5800 2701 9th Ave., Greeley, Colo. S. Special conditions• 9. Applicant• 10. Issued by Mountain Bell 11. Final Inspection by Nome and Title NOTE: if dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry -Greet ey 352-5801 2. Division construction manager H. Boatripht-Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-71a55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- if final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed nside County right-of-way limits. Date• March 2fl, 1972 Date • Date: Bv• THE BOARD OF COUNTY COM411SSIONERS WELD fi.Q}}NTY, COLORADO Wintense<e \ . In ck cepting'this permit the undersigned, .resenting the Permittee, verifies that he has read and understands all of the foregoing -revisions: that he has authority gn for and bind er tee; d that by f his signaturrdthe Permittee is bound by `ail the conditions set forth herein. MELD -mj Ti; 32/0 5/SC{/Z.57 HOLZ E E'STA <Crt5 H0055 :1TAatsa1 House 4p9isere5 CG .INtY RrlvtW t Are; Permit No. R tC Date March 20, 1972 10. Issued by CONSTRUCTION PERMIT 1. Type of Installation Buried Cable 2. Location and description of work Place buried cable along County Rd 47. and 16. See attached 3. Estimated construction schedule: start. March 22, 1972 Permittee: Mountain Bell Complete' April 22, 1972 4. District: Greeley Address• 2702. 9th Ave., Greeley,Colorado 5. Telephone No. 352-5800 c2-5014 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. S. Special conditlona• 9. Applicant: By: John `Ramsey-7nspecter C - Land Title-��,•, ,��- Name and Title 11. final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry - Greeley 352-5801 2. Division construction manager H. Boatrlght - Denver 266-74413 3. Colorado plant manager W_ Horton - TTPnver 266-7h55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date - Date: Date March 20,1972 By: Maintenance Supervisor epting this permit the dersigned, representing the Parini taar verifies that he has read nd understands all of the foregoiiz(provisions; that he ha uthority to sign for and bind the • ermitt.: • an'�r, at by vi is bound by all the conditions t forth herein. TH;E BOARD OF COUNTY COMMISSIONERS WELD U TY, COLORADO �//fyrG"�� Ar,.;12( signature the Permittee GiZAVFL F t is is Permit No. 3 510 Date Feb_ 29, 1972 CONSTRUCTION PERMIT 1. Type of installation dried 2. Location and description of work PlAne buried wire Along Co. Rd #26 in Rnrel Milliken Are - Wire See atteohed print for e..ient loration_ 3. Estimated construction schedule: Start* MA"rh 1, 1972 Permittee: PH•• 4. District: 5. Telephone No. 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. RPM TPJ� (^O_ creel Ay 152-5Rnn r2-5n2T Complete: MAreh 16, 1972 Address• 27n1 9th S p_y GtAeiry S. Special conditions• 9. Applicant ilft 1:W11 T11O_ Cn• 10. Issued by By: RArn Baker — t roman e and Title Name Ana Title 11. Final Inspection by Name and Title If dissatisfied with construction performed on this job, please call the following people collect, in the following order: J Henry — Greeley '352—_58(10 NOTE: 'eh, 21, 197T 1. supervising foreman Date • Date: Date: 2. Division construction manager .a. Phelps — DhnYer 266-7444 3. Colorado plant manager t"L Prorj:on — Denver 26A-7'55 PROVISIONS: 1, Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to Its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities -Covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. In ac foregoing p is bound by THE BOARD OF COUNTY COMMISSIONERS WELD TY, COLO-A ng this permit the unde . gned, represent ng the Permittee, verifies that he has read and understands all of the lions; that he has authrity to sign for and bind the Permittee;,aRSi that by o)1his signature the Permittee 11 the conditions set forth herein. HAZARDS __,! :maim w_— 11 1 • 1; 3' oMa.•a-IIf'. ...cxb,Y asCTIL /FCC APPROVAL' { - ORDER MEM6 1� 7 :1 LAP ,f� se - EIT'D COSH — crc,. _ TOLL +M1 '! • CA !1i'G ,ja "t,y .���STR. — — — 1 �• dQt j54.34 -G. PAR'cMeia 2., O$7An.a cos& PER-nr 3 L - . EMT AND $4q i RT+i EG : FM' RIP:. `'L OTHER MOUNTAIN STATES TELEPHONE CCINPANY txcNA+roE-J31�tS�[c�'M ea d/,Tl'R1CT—��£�:S. �_..^ _CPtR/TY f/tp �_,t +fir-rJ9Z�_• DAi[ AMROViO- ,loilast Tf?L:�j; AAr h IOE0 TO •_ CZ pitmen YOtyAOE --•.r �.rr AIECtifl7Ygdr RORJFZ?T4p! — Cat -4‘.1410 —AL .06,041L s aa�t kl4.�f:: Permit No. 3 zli( Date Feb- 29, 1972 CONSTRUCTION PERMIT 1. Type of installation Rimj ea wire 2. Location and description of work See Attached print for 3. Estimated construction schedule: Start• Marsh 1 1972 bft. Ball i stn. Co Complete: Nnreh 15, 1972' Greeley Address: 2701 9th Ave., Greeley Permittee: 4. District: s. Telephone No. 6. Project No 7. Place buried wire along Co. exact location Rd.4)7 pnral Windsor Area — 352-5Ann 2Z—.103 Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions: 9. Applicant• 1fF` RP''l TP7P f r>_ By: Rpm Raker r 1jtiPQli Date: ame and10. Issued by -`! - Date - Name an de 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following Order: 1. Supervising foreman .T Reny — Greeley 352-580Q 2. Division construction manager CT Phelps -- Denver 266-7444 3. Colorado plant manager Ll $ortro Den• sr 266-7255 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written regnant from 'Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed Inside County right-of-way limits. Eeb- 29, 1972 By: _ intenanee In accep -n: this permit the undersign:., representing the Permittee, verifies that he has read and understands all of the foregoing pro si• .s; that he has authority . sign for and bind the Permittee; and th)Lkry virtue of his signature the Permittee is bound by al the conditions set forth herein. THE BOARD or COUNTY COMMISSIONERS WELD U TY, COLOORAA/7/DO� r4 Pi' =141 1 1 t. 1- ..I t =ii. r iii d -1 `L t t" SS}'' s 11'1} 1 i c%1 1 1 1l i_ 4 Par .opt i.. _ 1 I 4'in ict i C:: o $ 4 1 h�t 1 r 1�b l 1411 1 6 if t1! i 'Pi 1it int 1rt - ripi> al I ♦ z: 1 } reZI { el 1 ,. } 2 -� } l: i # aI aI I w + } } 1 I, t, r 1 ; t._, r=y.1 .c.i 4 II p .} ti t4 t M 4 4 1 ti- z + r �'t t } ,i l E , + s t 1 t 1 i; r.::f. Permit No. 3 Date FAQ 75, 172 CONSTRUCTION PERMIT 1. Type of installation — 2. Location and description of work Pager. Rural. Wire xl nng !'.tt, Pri, /43 in La Sidle — 3 Miles F.nct r+nl 5 !Ming.Snitth ni' TA Sere- See print for exact location - 3. Estimated construction schedule: Start' March 1, 1972 Permittee: Mt_ Bell Tel e_ Co_ Complete• March 15, 1972 4. District: (Ira 4/I Ay F. Telephone No. 352-5800 6. Project No 18-235 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County, 8. Special conditions• Address• 27111 r}F.h AWL, frmeley 9. Applicant: lerAnil ¶njn C'o - 10. Issued by Name and Title Date• Web, 25, 1977 Date' 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J— henry — Greeley 352-5801 2. Division construction manager 0%- P ael pa — Denver 266-7444 3. Colorado plant manager W- Horton '"Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code, S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remote all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD Uf{TY, COLORADO ,-, By: Maintenan In epti. • this permit the underslgne. representing the Permittee, verifies that he has read and understands all of the foregoing pro . .ns; that he has authority . sign for and bind the Permittee; and that by virtue ofls signature the Permittee is bound by all the conditions set forth . elm �' %•-./7 1 in .1 Permit No. -57-F Date leb, 25, 7972 CONSTRUCTION PERMIT 1. Type of installation Rvriea wire 2. Location and description of work Piper' bnriprl crirg-sil nag Pry PA_ !Q - F-ctjgllP Rural area, gee print _for exert lncati,ir 3. Estimated construction schedule: Start. MAT Ch 1, 1972 Permittee: M+- Bell Talc_ Ci Complete: March 15, 1972 4. District: Greet ey Address. 27(11 9th Ave , arriePI t 5. Telephone No. 352-580n 6, Project No lE 501 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County, 8. Special conditions: 9. Applicant- Mt, Pell yelp aa. By: B a ker---Lineman - Date- Feb, 25, 1972 �. Nome and TiL'e �� 10. Issued by a `p -Title Date• Name and Title 11, Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ti ae^—T'o ^ (;reelPv 352,58n7 2. Division construction manager n Rhelno ,- Tlnnvar 2M-741.4. 3. Colorado plant manager W_.2loz*ori — De rarer 266 7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. a Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods. equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof-way limits. By: THE BOARD OOFCOUNTY COMMISSIONERS WELD C COLORADO SI v Maintenanc In ccep ng this permit the undersigned, repr-. eating the Permittee, verifies that he has read and understands all of the is bound by all the conditions set forth herei g g sions; that he has authority to a . for and bind the Permitted that bywi4tue�lf his signature the Permittee foregoing i -o t N f h �' , _\ \ iA .\ ‘1.`„-� ! i`'I O A p A z f O A • 'NJ 111 et > b 7 > n x O O n D A > > y )6: D O"O D 1 P> I. .--= o t g m m 5 -4 p D o 1-1 it 14.11.! ? '^ 41 I�lc-1 {fin 11 11`C b x t` I� `'S 1 a • 111.)1 \ I'X p �'1 i*yr 1 7Tm �,. 11 I�irr r 1x— I I Imo, IItI 'JI1-+ IBS 1 1 1 1. I I\:r, ,�.r Iy_ 11 I�r t 1 1 �IP. �,Ih Ill i is,l t,\ 1 a I 14�1I x 1T\I • I 1 1 r 'f:_ ' m , H I,0ilk' ,NII.,....., I r IW 1 I, k 1 1 1fc1- i 1 IN 1 1l n 5 xaz O 1h I I c0 l 1S I 2 o ���gLLi 4 .1 1 - 90, I lit ,�N4 I-'7 L < I t, k --u i In F� I N `,4 1-- 10\4 1 l\I 1� ^> I`:I� 11�f AL' v 111 fu 1-• �V< ;'��I1 = f �il`;I t its 1� '�1\j I(>I,�t � �I� ,��1 1� (r�11 'T A' L O� I Ply; O; n a D c % 1 It �D •O f I i sb I R I v) A �tO E•'• D 0 1 �1 IQ A. I�I �o I r ,.vl�. I `1;1� �p 11 yo iL ' . Iii -z_.- z > il , '.,-,.i.,-,10 MI • z o I't , ,I i .�NIII a PD1 1 I�;� IN I, '.,. o A n 1;�Ii..1(^^..1 1 III I ‘1/41Imo, I= VI`I.c y l ±1 11'1. II it Iyl •-ci:'`,1 ftIr`i I i I 1 i �l I I I I I. I 13ot` 1 T 0 S. I 1 . 28.e.:s/00'J-/0 k � M s .,r .r.,, / 73 E — — _...—.2 Ni� I .7 . J W Y { YI A LN I ( N N A47 ; laticL `/'1---^--Nom'-N-, `N-_-1---N--- ?:Z - i/8 Q PROTr/772X I 1-- 1 r} I —e, -70 ' S �t I CT) ; I� i C�� IC ' } 1�� -1 ,TT: 15I1� E k J { 1 I { is I1/4 --ti I 1 I :z - I Ij i Tt� l ' . vr_%g v Permit No. 3411Q .741;;;;71;#71, - CONSTRUCTION PERMIT Date Eah. 25, 1972 1. Type of installation Anrjpd Cale — (Whet - 2. Location and description of work Lo 2- L Nrthh And 3 M. WP9t of Pt_ Topton_ Plpee buried cable along_ County Road #21. See print for exact location. 3. Estimated construction schedule: Start• March 1, 1972 Permittee: Mt. Bee ¶T@la -Co complete• Marr•h 15, 1972 4. District: Q Peley Address: 271'11 9th Rye , Greeley 5. Telephone No. 35?-5gCa 6. Project No. 1E-059 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by ^ permittee and Weld County, S. Special conditions• 9. Applicant* lift. "'all Tel @— ID. Issued by By: Rana RokPr — TR Tlemcenr Name and Title Name and Title II. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J Henry — Greeley 352-5801 2. Division construction manager 3. Colorado plant manager T.l f7�. rn't^^ — Dever 7A&•7A 55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours In advance if this date is changed. 6, Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances, 9. Permittee shall hold Weld County harmless from any and all chums which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits, Date' Date: Er Date • THE BOARD OF COUNTY COMMISSIONERS WELOrUNTY, COLORADO' �. oe.. • Maintenance 3e- - Ly In acc:,,ting this permit the\ tindersic. ', representing the Permittee, verifies that he has read nd understands all of the foregoing pro •isio • s; that he has : uthori . to sign for and bind the Permittee- that by virt of is signature the Permittee is bound by a - e conditions set forth herein. OcxNT Y t I gip- 1. I 1'.jwr r 1 1t3" H 1 sir i : ' ',%t -T tIvN m �� S .. ii 1alai - .4 I tkii na ltrti ; N)a 14i fk:: f I fl t �Z pt -t ; t -� ; . rt.( c i n j jb jot �L1 ;42 i� tkt i = ,o .Rt i r i ik -c (�?t }t _ -r t ` I li 1 r, I t "1 lr'; t° 1 IN + t , i�if ii i,,.m a�1, CD 1� t- -ti z 1. {fit .' ill.,I 1 I -a stir.. :. n- c F; ` p w 1 -- is I, 2 1 ;'i tbrt NI t t,_,IV".N>.r ,j, o "1(-1�• it. t 1 3:'l : t,.4 te 1 1N- , 1;',. ₹ 41, " 1 I /, Y' t,- .1 (4awvn) :57?: /710. Xfi5/27". e.1O5._ smz .77-47 r Permit No. 333 Date Feb, 22. 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work P3 ace buried CabbO a fang r°1rni art 2H rrnc= S'tetn F,g QC r Southeast rural area of Platteville. See attached print for exact location_ 3. Estimated construction schedule: Start' PAIL 23., 1972 Permittee: Mt Bell Tale ramp. Compete• March 2, 1972 4. District: f4-aeley Address• 27111 9th Ave, Grealey 5. Telephone No. 352-5$01 6. Project No. C2.-5013 7. Permit granted subject to general provisions listed on the bottom Of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: 9. Applicant• Nit. Bell Tele Camp. 10. Issued by By: Bern Rakar—Lineman t� Name d Title 11. Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman a Henry — [heel py '452-5Rnl 2. Division construction manager C. Phelps — Denver 266.74h4 3. Colorado plant manager K Hortan — "Denver 2A6-74 5 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, Its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD CO , COLORADO Date• Feb_ 22, 1972 Date• > l•72_ Date: By. I.. Dtalatenlor In acceptig this permit he under fined, representing the Permittee, verifies that he has read and understands all of the foregoing provi one: that he hag aut ty to sign for and bind the Permittee; �nA)that by virps f } 8 signature the Permittee is bound by all the conditions set forth herein. 6o4,7 -�11 # k►G C De 1341,„ I t 2- ₹ 2SL.) 1)G.,1346;112 -14s -I- 414). /a/ m w w w Q� .v z≥ rein f ZOO D ,i 6'4=1 < G 2 . 'ni ON Q°,' I^ z_t",,, -. I it Tit tD 141 Iy x 1 t 1 ii F1 1-i ni litit ?ICI I gym I. 1 1 I i i3- c 1 f o `✓, :'fa ` I 1 I � m ₹ I' 1 ' m 'o E i 1 ' w I ^O b t m I n to 1 n -0 o r.e v Irl 1 = ti i C C R1 to 0 1 1 1 �: t 1'" k< t 1✓`) 'L la I 1 LP. I Ir , ,s•' o b i r o ' 11� I > ' 40 d I' 0 D ; x m . it - a; (1 ..I\ I r %JH 1 V1 P I in I ₹- I I 1 11 1 a - ♦ N it... Sl O fnl O C , , r 14 "N IQ . I7 ). I`' A •0 a 1 1 y,. Imo , fV 1 xi' o 1C or in pi- 1\ r... y 10 I N < p- -I ' I-- I"m ITOr I I"'FtL I t4,.,, ` tl . 1 , 4. rs I I 4i I in 41 le c n n il�t? ri ,0 I h��'��$jjj f ^n' iN 1' I r i 1 1 1 ' o` " 1. 1 IV] i, -1 1 H I II2 I Iy 1 : I 1 1 !1111 Atilt :a STA- 7+99 S� , ue�Ocr2. caLvet'Y s -1 ./If15 $7o. 1117~ Z4, CZ lAO43 1 —II L. DG i3-fo,d72-F2SL,''' Ira, i$4 95 - t3TA-144.5q Pte/ 738• n a ke-5-S7 rr Z. < -t L Pan* 19.74 _ : kcc5- 7 &io. 20-95 FL xD-S - 42 n 7O/All-1 COILCFCE, LVIJ if -4,42 43 -. sYctL - t_ 1488+ D.C�.t3••!e,tei-;Z4 H&24 14011 L PZI A2fffo S-7.0 39±50 PiEtesitite �Pc.. n )2.5' 1474. 344, PwwWaa. is kcC-s-�7 pc. PR 12-5-I cuts, ter /1 2p > m , x r o I •,n 1 y O 9 z w a -NI - ( .acro Y a • a C O m • • o y A ,m m o K.m y o < ; z. a U.I 1till } I r iC.,. F 1.4 1.1 I lei A b -,1 rzff1 1 i i; I o I{ I ' >Zi 1 • 1- 1 1 1 I ~ m I wt„ } I 1 1 r$ 1 I I I 1 m �j 1 fT I II m ttw A ATc VS p Y I I I n c? I'� K i i W I} S o ly o 1 t° I i 1 y m f 1� t I I e. IIC 'tC i� ri • i t h t, 0 > x m f 1 �" m 9 I i I o f r I f.',, a t i t I } t 1 z I V I I • i ! 1 1 1 1.. l I I 1 f? I r r v o A o c a w 1 o z o >F m o m `` m r 'v t p, z o o �t m 1 gm - n 10 Go �A O 1` m Q i_ IP °< {? r N, e `Nf I. t W r r-7.0 tO , rAt1 it I ,.r " to :C L 7. _ - >n r I IN I PI -I 3 1' . op TO I IL: i c a O. 1F S IQ 1 ?4 1 i i •1 K r I '1 I 7I 1 -! I -I I. j... } $rat, vvo%-± Sc! Ac. co. s.4 74 444 Cent eAkCe i z Lx≥.,, /!.. a4?z CO'/.. =.=. Ai- STA.tSsY6 '3,7-F. YI' 4-4. EELS f7 ;w24 -7E kc3-3? eta 041/70 AMC AD (P 19) P2z. I `T4. / 734 OS D.'33.53 - .N = 7 J TFc F R — Z 11. D PC Fz1k-IZ3J ;d CPIee,) Rz3 CFi )P.24 • sr4 no-i: Permit No. 327 Date FLebrinnry 2, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Ta[jra_ 2. Location and description of work tarried lrtre Platte 0.0, PD. #39 And CQ ED_ #28 See nttarbed print fur erect lnrntinn_ 3. Estimated construction schedule: Start' Feb 10, 3972 Permittee: ITT- $e11 Tel a Co. Complete: 4. District: Gree1_( Address• 27']I 9th Ave- ArertQAy s. Telephone No. 352-5P01 6. Project No. _—_20.1.008 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 6. Special conditions: 9. Applicant- 7"Tt Rell TPle, C". By: Bern %leer Date: Feb 2, 1972 -.{,c Name and Title /elm, p 7-7N10. Issued by C Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.Fenry — Greeley 352-5801 2. Division construction manager G• Phelps — il4Thvn . 24,-7444 3. Colorado plant manager __W —Horton — Denver 268-74 55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in. a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be as obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. Maintenance In ^cce. Ling this permit .e undersi. •., representing the Permittee, verifies that he has read and understands all of the foregoing . isions; that he has antho - - to sign for and bind the Permittee; and that by virtue of his ignature the Permittee is bound by all the conditions set for • erein.124M_ THE BOARD OF COUNTY COMMISSIONERS WELD COJJNTY, COLORADO/ 112 e‘ 1R E a n I r O a a it a P4 ® 0 A D 00 z 5 f Dracut O r ya. A K t = w n -t Y O t I F� w m ,�0 w e r` 1 h; : v 0 W � it ii-, t t 3 t. Ii; h rz k I70:1;,„ I el FY' 1 t I 'IN; I?- I 1 r, t TA 11 I I otnl I I ly I I I -I mt a II I e I` I� I hl r A K I t i. I 1 . I ra I� I I I I� I a I tL b�+ rs n I I o n 1 j ;` . I'., E I c.. I = v. I� I �I ' RI I rI I r. 1 1 1 IC 1 fI>:,1 I 1 < 1 I IRS I I I r t o m IC 1 ►Ik i r piii:u m I NI �`I IS I I 4. 1 I I..- Ir I I I o r v n ii b II I uO° m I b o t n D n o I0 i fr_ '��' ,, o ''- A b 9 "V O' 0 1� m 1� [,.1 kcr.pg r 1 O A "1 IC IIc < -' 1 I C.i I r R n i� 1 1. I I In I� \I I 1 ~' I_ e = o_ I 1� j I I ff,1 in I I`t6= A p I- \1 i i p `I I A, I I> I !� I Z w I I I L 1 OI 1 r i- t ii , iZ 1 it l I It.. 1 i ) ' ' i i I 1 1 1 1 1 1 1 I 6: z.c1 <E 9` EEc 135 FED act Permit No. 3 2 6 Date Janttrary 31, 1972 IJ 9. Applicant' Mt., Bail TP1 P fir, CONSTRUCTION PERMIT 1. Type of installation _Burledcable 2. Location and description of work 4 miles west and 1 mile south of Hudson — see attached print for detailed Iocption information 3. Estimated construction schedule: Starr 1'e1c 3, 1972 Permittee: Mt, Bell Tele. Co. Complete: 4. District . nrealey Address: 2701 9th Ave , Greeley 3. Telephone No 352-5801 6. Project No. C-1-5145 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permutes and Weld County. C - Special conditions• By: Bern Bnkar — linraman r f Name and Title 10. Issued by `ti�7�o-'lei 11. Final Inspection by NOTE: Name and Title tea a-, aS "r7741/ yen 7 v —C Name and Title It dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Tinny - Greeley 352.-5801 2. Division construction manager C. Phelps —_Denver 2M-7/144 3. Colorado plant manager W Bnri:nn — Tkanvar 2(,(-f4,55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a. location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permitter) shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD C.OJJCOLORADO�� Date - Date • Date• 372 - By. aintenanee Sine In accel ng this permit the undersf: i •, representing the Permittee, verifies that he has r d and understands all of the foregoing p isions; that he has authority to sign for and bind the Permit • and that by virtu of his signature the Permittee is bound by all the conditions set forth herein. TC v 1I f a° O o a s .11 rt4.1 a I i& I I< F I ;,1• z _-- 1T1"< a 1' o° 1 11 1�.= ir' x 1v P k 1 14P 1 to it I x I t . �l'.1 1 4. , ?I I t 't r I IP- 11 1 m Sj a; r ic.161b m 1L 1 I , I I v 1r L 1,... x. �It I 1. t I- o I• i f...." s p;- 11 t Y1 w �1'- g .r, m 1--1 _ I { i w ¢u Lc c Vt; n t- It 101 x c - IN z r rz I 1{t: f o i I_ rr. 1 I 1 = ° ti 42 isi ir < b' o ' 1•it' <m b 1 1.'1 ra IZII� 4 1 ° ii t t 1E:1 1 ' it .Aj I s t tr~ I I,�, IT I o Ih {: x w t''ir�, tt 1 d < 1 I z 1 1. 1 0 LH 1 1 I ¢ a-" i 0 C s..l~ I ,n I .1 f3, ..1.. jk 4.4 n o '\ I .1t- 1Ab o 10 illI t Ina; c N-' I lk I L1 i �it ti N. %i L 1.r ° .n.-1 1 I J1 1� a •> I '1 I, I 1n1 I - a Ij it 3 1 i`j 1 2' 31 0: I it e 1 1 1 -n I• o i_ i II L. 1i., ;o 1' ,'#ts I _ . t I .- 1 I I I• 1 I ki 1 I I .1- l 1 1 -1 f -t --+ I 1 'ti. i I I f. { ... Permit No. 3ot3 Date CONSTRUCTION PERMIT January 17, 7972 1. Type of installation Rnri ad C,ghl ii 2. Location and description of work Rop aco damped cable of Sit attpthed Print fur exact loratinrL 3. Estimated construction schedule: Start•Inn. 21, 1972 Permittee: Mt. RA11 Tel e . fin _ Complete: 7th St. and Cry. Rd_ #17 » gan 4. District: Creel fly, ge n 0., Address: 27'l3 9+h 4ae_ ,Ct-Pnl ay 6. Telephone No. 352-501 6. Project No. 7E 029 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Co�- ���._.- 8. Special conditions: �'0.- ! ai""--"""� —_ S 8 Sire 8' 9. Applicant' Mt. Bell Te1e_ CO - By: Bern Rnkar — Ttjnprmn Name and Title 10. Issued by re, Alodor 11. Final Inspection by Nat and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman T_ Berry — Greeley 142-5gi11 2. Division construction manager 0. Phi - — fpnvar 266_74414 3. Colorado plant manager W. Nor .on — DQnVer 266-7/55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans, 3, Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of wort; repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees. bustles and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date• Date: Tannery 17, 1972 Slaintenanee In \iccgittiag this permit Ae undersigne foregoing px stem; that he has authority o is bound by all the conditions set forth rein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO representing the Permittee, verifies that he has read and understands all of the sign for and bind the Permittee; and that rtue of hi signature the Permittee r M 2:4; PI z r o n I 4 0 5`0 « R I a C c ,g o o 1. -3. n x z z c al m I. 0 Iy i z t?, x I t i�� I IC_ I..: I H �v III? ttINi L. •ill a • I • 1� I Slr- l % lj+. 12 I y t1 AN 1 4 m s.t : 1 IC 41 m i i I t i I ���`` J v 1: 1 1, 1 1 CoV,I IN $ I I 1 1 � 1°I'j II t 11�:" n 1 I I I II � f" IIXI' It- I 1 lthI n 11X a 1 n < ti o i 1f , z .1 } r1 = c L • 1 i� a f' ^C .�I,lb P 1 Is. 54 1 1- 1?a 1 j I— I 1£ t 1 I i I i ty,i. 1 I F, u f IFr, i 1 i . o i. s An a1 V. x ` 1 s1 r i} sk0 I i $ 1 I t 1 A I II I 1 fryI 1 1• 1 I 1 I" 1 lilt , I 1 1 , 1 1 t1`! Q \ y 1 1 a c • o i PI 1 • ° r I 1 I r pn4' 1 I Ii , Icy L It -� _ > I 1b< ; I 1 I` a I lb I I It InI 1 i�y 0 A n i t� 1 ff� I T II,c \, t • t+' i Xir laI it; tE 1 '7:-I I 1 1 t 1 vv I I 1- 1 1 1 1 I 1 • Permit No. Date Sannnry 17 1977 CONSTRUCTION PERMIT 1. Type of installation Titrri arl rehl rt 2. Location and description of work . 7.ohlP 2�r m Attached print fur eruct lnnntinrt 3. Estimated construction schedule: Start' .Tart 23, 1971 Permittee: Nt_ Bell Telephone Co. Complete: 4. District: flrep3 oy, rnlO_ 5. Telephone No. .r,2 —SRN _ 6. Project No i`1-5n7g 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: I 7' - a B 3 S ' s _ 9. Applicant• Address: 27O1 9t1t Ayr, i reeley By: $Prn Flan — T.inemnn Date• Tannery 173 1972 N°°nTm 10. Issued by ---agar- �'� 4n.,/2 -1.. —Date' a7 7 Name a Title 11. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman sr Henry — freelay 357-58m 2. Division construction manager It, Thel pe — fnnw*r 7J 44 3. Colorado plant manager Ti, 'Porton — Danvt3r 2A6-7155 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 46 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. mainten- ance Permittee Permittee'sdfcilities covered ld abyiess this from ps permit, exceptand aas claims the same may may arise from or the econt of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. Maintenance Su. iso In ac epti g this permit the undersigned, epresenting the Permittee, verifies that he has read and understands all of the foregoing provis ons; that he has authority t. sign for and bind the Permittee; a at by virtue oof hsignature the Permittee is bound by the conditions set forth her d Date: THE BOARD OF COUNTY COMMISSIONERS WELD CO l TY, COLORADO v - T ,ti• �r. i f3 • • V • 4 1 W - O O m 0 m 1 \v I IR Y q A w a O a Y > r ° X I n 1 1 7 0 N C y t) A O A22 D ) 3.a x { a O a O D D • n) { H p A N O e z i O 1 ( n H Z ° 1\ A I 9 A o ni `�'�'Ir�1' I 3 i I iV If - I I: I.-\ ' ' I I 1 I t�r',1�? I " I y I 1p 1 1, L. 1' ,. 16! ? I 1\1 r -t I 1. I _t I 1 I 1 12,,, r`� It 1 1:C1, 1i`• 11 I I o,,,t�1IN' I 1r- 1 1 __ I I I II r t.: I,_:-. I I-, I f I ; I A l;1 t`_ Ic ; 1 Ii I I,-,, A I 4;, I\ I n 1,, JI I iZ I n$ b I-� rc 1,• Z 1.: I 1`I : ° ^_1`, I I h , 1�v N11, < 1 I Ih4j m < t' It 1'I { 1 I‘II i i. c i ., 1i iII I1 N. r_, i I Ir, I I 1. ' {- cIs o r I I I -I r ' x A ICI I I:.'` ; r r� , m I ..:. I.1 i a I 1 vl 1 1' 1,.1 0 \t tr,I I 1 I ;(b I IJ I I{ I lift, 1� 1I r - II', r r t • C) o C of I..., I I o t a t m n m 1 I IC) 1 a i�`; D O I� X ▪ 1 INl 1, I p I`�. O O 1 in �-" I' I ° E� -I 1;, 1 �, : I I \I„: mi. -- I I 1 I t` II.' / I'+ 1.. I r n nIt � i iL� o z ) Q 1_1; 1v 1 :I 1 ei 4 p l 1�, 1 t ! IN z A 1\ I-1 t I lr,11 V. n 1 I I ▪ L,, 1 A r•i i t I Il% I I C 1' 1 I 1 1 1 I I I' ,; 1 I I I 1'-? I i I I I I I. I ' I I S • • zy 2 S z 0 a a w a C It _ w C 1 q O RI J. w s r a a _ g a x o , o > n A D 7 > > xx > M0924 O A 4 5c to> a \ ft IN rw ^_ h 11 1� N I v ,I L. � { I..w ! 'L 1 I �? o�r\tln l �' -4 - ZNKPI 1.'1 k� -4 q'. IN< I� I r F� }v 1`.› 0.9 I ti n tilt ,N Ir-1 c C �o i ^I. a i 1 � I 1 I IN 1 n, . ' Iv1 1LP 1 1,�itcj i �I n �J 1 fj f I'J 14411, I I11 I I 7 I\ I ` 1 w t� 1�p O R M I 9 ICC I a I� I p I�r 1 0 1 I r Iv p I ' I..L !1--4 lyl I�ISi• NI i tk o t j ; I I 1 it Buried cable 1. Type of installation Permit No. WS 41O Date CONSTRUCTION PERMIT January 13, 1971 2. Location and description of work S co 3. Estimated construction scchheduu :: Start: /6 e 72 Permittee: "� "rte , 't Complete' 4, District: Address: 6. Telephone No. 6, Project No. C -C-5359 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions' along or across County Highway 15 West of Windsor 9. ADpllcant- By:-/ ,✓I 10. Issued by 1L Final Inspection by Name and Title Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J_ Henry — Grly — 352-58O1 2. Division construction manager C. Phelps - Diva.- 266-7444 3. Colorado plant manager W. Horton .- Dnvr - 266-.7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit. except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. Date - Date: Date • By: Maintenance Super for In cepttng this permit the und = signed, representing the Permittee, vvveeeifies that he has read and understands all of the foregoing pro that ho has authority to sign for and bind the P m t • and tha by vistas of ignature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMM‘8IONERS WELD roUTY, COLORADO )7-7 r V CONSTRUCTION PERMIT Permit No. 3 Date Daapplwr 3n, i 9Y1 1. Type of installation Buried Wire 2. Location and description of work, Locate 2 Miles E. of Kersey and 1f Miles So. See attached print for exact' location, 3. Estimated construction schedule: Start -December 10. 1973 Permitted: �. �A ' T 1 CO Complete• 4. District: Greeley Address- 2701 9th Ave, Greeley 5. Telephone No. 352-5$01 6. Project No. 1 —K -21h 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions - 9. Applicant' fH11 Te1e Cki. By: Bern Bilker in�>'hp, t Date• DeCfillibaT 30, 3971 P •, - 7� Name and Title `II 7 2 10. Issued by So-e-Aaf �'�� Date: `r Warne and Title 11. Final Inspection by Date - Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, In the following order: 1. Supervising foreman J Henry — Greely 352-5801 2. Division construction manager C Phel Fig — Denver 766-74 44 3. Colorado plant manager W Horton— Denver 266-7/55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of. such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permute° shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance. of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes aro made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Maintenance Suce4Jiaor In accenting this permit the ''undersig eC representing the Permittee, verifies that be has read and understands all of the foregoing pr,9tisions; that he has authorit to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein_ THE SOAR() OF COUNTY COMMIS LONERS WELD, COUNTY, COLORADO 7YR- r_ .� ?3 s l i t t i t,:_- 4 = I r t-", t •1 1 c a { r•-2 ,N c {• -� t _1� 2 j 1 ' .., . . a r s' a 0: 1 r o I 7 1a4_ I' 7I r �, "'_ ' i' _t t .i - ii+►1 A 1* - 11-4 I - [ -- 1t� s 1pP 3:-.1: 1 1 1 t 1 n ,r91"-_1 -.1- w 1k�1 1...I. 1 s 1 1- 1 t , 4. -1 t:,-. W t "t1.. r 1 :-t" (-1$ C:" • Aljtitt • CONSTRUCTION PERMIT Permit No. 3.Z( Date December 30, 1971 1. Type of installation Buried Wire 2. Location and description of work died Hire east. of Berthoud on County Rd. 46. See print for erart Location_ 3. Estimated construction schedule: Start' December 31 r 1973 Permittee: _ Mt. Bell Tel e CO Complete: 4, District: Greeley Address' 2701 9th Ave, Greeley 6- Telephone No 352-5805 6. Project No. C-1-0408 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: 9. Applicant• Mt Re11 TFde nn By: Bern Baker — Lineman Name and Title 10. Issued by����0/C�i —rT xame and Title 11. Final Inspection by Namc And Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J_ Henry — Greeley 352-5801 2. Division construction manager C Phel F's — Denver 266-741,2,,. 3. Colorado plant manager It Hari -am — Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be In accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5- Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittoe's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: Date. December 30, 1971 By. Maintenance Su In ac.eptl ig this permit th: widersi ga-•, representing the Permittee. verifies that he has read and under tends all of the foregoing pr. ions; that he has authority o sign for and bind the Permittee; and thatabyayirtue of his stgnat4re the Permittee is bound by a the conditions set forth herein. THE BOARD OF COUNTY COMMIkSIONERS WELD ,+U, TY, COLORADO 7G ei oo • / "Nos PI \ Iron, § !; • 2 k k§) 2 Q! s I «§ §o,I \ /•.Z , .e �_| k %I « I§//| [I U[2) | \|&| ||/|/ / I «I ; , , I F I , rn I I I ! I w ' I . 'i, ! i /i| § .ir�}i�`i^ �.CO, r' ' , w2. ,|�\q/i/)ik I I I II y� i<| (| y °|1�$' [, |I'�0I§ |; | / Q - / m I • . , | g | | ; ' I ' z I |!,' /| . 1 ' In , r r • 11 , . 2 / B. ' • ^ § & (I§�/.0I I • re 0 &O. re I if /I,§ // '\ \| I 'I L \I; |'Ei , I� \.a • \ i (|. . I ; # I �' I}=L, .;§� ]/ 7 f4„,, �!/|a Rt. ta4 �z C » of m ERR, ± Permit No, 3 2.0 Date CONSTRUCTION PERMIT December 30, 1971 1. Type of installation Buried Wire 2. Location and description of work print for exact location, 3. Estimated construction schedule: Start:-Thecrmher Taste 2 M4 Fnst aand 2 1✓i South of le,'Ln11e. See attached 30, 1471 Permittee: Mt Ball Tele Co Complete• 4. District: Greeley F. Telephone No 6. Project No. 2-8-028 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: Address: 2701 9th Ave. Greeley 352-5801 9. Applicant: Mt, Bell TeJe Co. By: ;barn Balcar « 7insm»n Date' Name and Title Y 10. Issued by �o rY4� Date• 11. Final Inspection by Date• Name and Title Name and Title Der,ember 30, 3971 o 1a. 7.Z NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J Derry - Greeley 352-5801 2. Division construction manager C Phalps — Denver 266-7444 3. Colorado plant manager JL Horton - Denver 266-74.55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. 4. 5. 6. 7. 8. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. Permittee shall return the right-of-way to Its original condition as near as practicable and shall remove ail its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. Maintenance In acceptink this permit the undersign representing the Permittee, verities that he has read and u erstands all of the foregoing provisions; that he has authority sign for and bind the Permittee; and thpi3v virtue ofhtj siature the Permittee is bound by all the conditions set forth heroin. THE BOARD OF COUNTY COMMISSIONERS WELD f.Ql1,ffTY, COLORADO �f Igo PED 44 PED 49 ktrl C 0' PED So REASON FOR REISSUE 0 0 0 tI • . i g.' EM RIP LOG LDM OSS Tit EL ;1 Io�� - ., -�---- - I YID 81, i ISSUE r NOTE d6 itom Lac- 2 M A.cJO 2M DATE 1L-27-71 Gov NT`{ EASs t ;SOtJT*=; Cr LASAL.L= CEM. DITCH -p 28C=1co� --ere-I-82.---E f AEL o74 E M ? . SAAsO:J /N N MOUNTAIN STATES TELEPHONE COMPANY G O2. O( FORM 3060 8.69 EXCHANGE LASAI_Li DISTRICT &if ALLY - _ COUNTY LOCATION L/ -r -SALLY Pl./2AL HAZARDS_ �i...�L __ ------DATE ENGRD. BY_ JDr -- PHONE sk452 DWG.BYO -=CKD. B� Y/f-~ APPROVED _------__--TITLE ❑ATE - _ -- FCC APPROVAL - ORDER MEAiO3/A-� "•' A2 �_ _ SRV. DATE / 4-7Z EST'O COSTn.) t--STR. _ __ --- EXCH CM rjC-)-- -TOLL ----- RLO - OEST'D MTCE.EXP.-__-------------- LC -r� 5 - -LINE NO.' -' NECESSITY OF WORK (3140) :27) _ inn n//l <= rJJ f'n rOp. JOB NO--%E-O28. J----__- -_-_.__ ISSUED TO_RCIC JU.GO.---_� --MEMO."__ �N c) POWER VOLTAGE-----'-------- C_JOLN1/T}' Pr2i i/T • __P_ J/ZA! _ _/Th L�El _rn. SHEET-1_OF- ...SHEETS Cr Permit No, 3 ?a Date T C artier 15, 19'71 CONSTRUCTION PERMIT 1. Type of installation Buried able 2. Location and description of work/Own-fag West and_ 1 mile South of Hudson - see attached -print for exact location. 3. Estimated construction schedule: Start' Dec 16, 1971 Permittee: 2$ Re11 Tel a Cnmj+ Complete' 4. District: betel -y Address• Greeley 5. Telephone No. 6. Project No. (1-1-51A 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions' 9. Applicant' 10. Issued by Mt_ Bell T'ele Co By: Title Date' Date: a7a Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry - Greeley 352-5801 2. Division construction manager a. Phelps — Denver 266-7444 3. Colorado plant manager W ROrtOn — Df3Dv_or 266-7L.55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilised and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD GO tJ Ty, COLORADO By. 'Maintenantc In acceptingithis permit :: unders :.ed, representing the Permittee, verifies that he has rea and understands all of the foregoing provitliops: that he has autho- y to sign for and bind the Permittee; that by his signature the Permittee is bound by all the conditions set forth herein. I PI '._x ram I (m1 --i 9 P. i 1 0 9 0 N 0 y 41 0 O m 4 4 I. > 4 2 ' m N - n 4 A iiii y 6 n 2 -1 �m \�` c tif�'ISInt u. I oI fit'- !.Q II�t� ->-t. I 4 I I3 �r It'Phid H I1 I I tttt, 11 I t,�IIN•IJ -.I o I 1, I I 1 +,tn1NIG m i�,jf I t I 0W kr d 1101)31 1 Qj I r 4A I i\ it O1p n t m tZb {31OI" pb [ `s..! z I kraI� i� n I ? 1.1-11. t .2 c a 1�f4 it" { i3I� m 1y Ii i' j.Pi a t< ; t\ t � ; rs ciliEl 1 1 t. 1 tt;I I i t� e(‘ :O j� t D I t In r a ii 2 9 C '^. 12- I. , 0 z n itI m m s n c bI 'I x t I 1O< t m 1 Ql ( I leb(��I< i' r ° �,, ``- i- I fiat fi N w ( INS 1 1 nt t i, n I p t 1 Oa a w yI;�� l c >a1y t 1 t I. IWm ti A�I V. I _ 1� j %' m .. 1tL I.�I 0 { w I... t. P j ig., 1 m In, M 1 It ItIt41-12t I t. t �I � i ' I _ t $ 11\3; 4 I t t i I i I t -i" a e z ,t - o_ CONSTRUCTION PERMIT 1. Type of installation Buried Wira 2. Location and description of work for exact location and description 3. Estimated construction schedule: Start- Dec. 7, 1971 Permittee: Mt BR11 Tale Co_ 4. District: Great cry 5. Telephone No- 352-5805 6. Project No.1 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County_ 8. Special conditions• `8'T1 ^+ C """�"` ""� fi"�� Complete: Address' Permit No. 3g Date _December 6, 1971 rnretrnir_+inn 9. Applicant: Pita Bell Tele Co By: 0.P, Weiler Foreman_ Date' Dec A, 1971 —, [�- Name and Title A 10. Issued by _&olaf ---1 Date' t2 7 .O, 7 Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J_ _Hen.T7 - Greeley 352-5801 2. Division construction manager C. Phelps - Denver 266-'7444 3. Colorado plant manager W, Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6- Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety - 8. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado- Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. TH D OF •LINTY COM TONERS Maintenenc Supervisor In( cce ting this permit the under foregoing isions; that he has au ty to sign for and bind the Pe ittee• d that �by virtue of his signature the Permittee is bound by all the conditions set fo herein. / 41 l' X11,/ ll t �X ed, representing the Permittee, verifies that he has read and understands all of the I z at § % 0 tm ) ( \21\a} `k —4 ��«/.� k TN /,/� -4 Sn t�iII%/((0/) I Al \ �,| mm | {i �If jII0.< at R. | \( AR � ]i. 2 I f� | | r I ` 1 tit , ' ( lo E m f Ii 14:3 | | c | t \ I� ©\/ » • ,ka/I k/ t a N | f i r/ § a% I° , | (| / \ < 1 \I { §•I.k •�|& |� |d | / /| \• q ( |� r ( 2 ] $ J § K / It ) %2 7%(C34' / or 2O/! 2§ -4 / K! 2. r/■��d' O. (/ 2 2 / § \ \ R\}�t§22,t ale P Aal �t§��;� || I ■ ) €|/ / | | i i j.1 i iI, I II t R.G+W 7I 4- * c� l Permit No. Sr? /2/7- 2.y I Date December 6, 1971 CONSTRUCTION PERMIT L Type of installation Bnr1M Wirt _ 2. Location and description of work ..31.ei Dis Iritribution County Road 55 LaSalle, Co -see attached orbitfor exact location and description 3. Estimated construction schedule: Start- Dec. 8, 1971 Permittee: Mt, Bell Tele Co Complete: 4. District: Greta, P7 Address Construction 6. Telephone No. 352-5805 6. Project No. lP-+B61 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant- Pf}` WO Tale-Cn By: O__P Weilar Ferprnan Date• non 6, 1471 - _ Name and Title Title x 7/ r lW7T� 10. Issued by>•P ` Name andDate- a � r 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman S Henry - Greeley 352.-5Fm._ 2. Division construction manager C. Phelps - Denver 266-7444 3. Colorado plant manager W Rortnn — ilen er 26E-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3- Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and -will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall ad -vise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6.Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado- Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the Installation placed inside County rightof-way limits. By• Maintenance S•.- rvisnr THE T� Wa—s RD OF COUNTY COMMIT' ERS , 't A _ 4, In ccepti g this permit the undersign • •, representing the Permittee, verifies that he has read and understands all of the foregoing ons; that he has authorit • . sign for and bind the remittee; that bj virtue of his ignature the Permittee is bound by all the conditions set forth h. ein. 0 O 0 T 4 COUNTY REASON FOR REISSUE ISSUE 1N! O I coo —,C. T — — 0 /4,3 �- 03 zrI a_ EG I RIP yLpsi. How: G"' TT 1O'1 a za Cr KAVCL 1�LvCR.T, Zurt-/ kn./OC2 pep 39A.g. _3j(,$411._ r-Z'l [3 VD CLEW:, vurty c.,a aLa M rAI. z4- Deep NOV DATE /1-17-7/ $ S." MOUNTAIN STATES TELEPHONE COMPANY E.G oz- al 0TF/E2 cite .C FORM 3060 EXCHANGE I..ASA-L_L(S CoLo,_-,---_JOBNO.L SCI----J-----_--_-� DISTRICT CaV.t' CL.-aly _ - COUNTY µ/ C r-- D ISSUED To AEG C- , R c • LOCATION_ 6114.5? E/-1 - JU-CO. - -DEMO. - HAZARDS _ -DATE POWER VOLTAGE ------------- ENGRG. BY _7:<.)+.t?L-- PHONE`3 z DWG. BY r11'ti.CKD. BY R/W QW-22-42X._aor. a Ec_RD LT APPROVED F L!"L_-_-_TITLE AR.EC1£A'..C DATElI1Z-Z FCC APPROVAL _Nv3' J.C •- ORDER MEMM0,3/& S -4r z7 -- EST'D COST_L_SIR. _ --- _SRV-DATE h&jZL__ -_ EXCH ---TOLL - EST'D MTCE-EXP• NECESSITY OF WORK (3140) gc Q•{i� ,f a ,/�cc--h-0_.Q -_ __ OPM cti F4 -4-2•a_ CA.REC- --- ---- RLO -CNDT. REC.. —_-- LC.O.c-!1L --LINE NO. � - �sJ�_Z_% 1�y'J •_ GO�1� 4t&4 -----------SHEET_2--OF_I _SHEETS r S • Permit No. 3 © 7 Date /r a ? 7 CONSTRUCTION PERMIT teLL 1. Type of installation (6 i_ r tj a .4r eta`- L i Tx.. e ,' 2. Location and description of work On- Li <8.‘-'t<8.‘-'tr. b t, -r3 Rd— (R L ;#4, \ I Pr. /C r. g1`k. \No. r.A S i d e_ r' rac cj- /9-1-67 3. Estimated construction schedule: Start: /1 -3O' ` 1 Permittee: Pet D i}-Tft.-c C- \ •1.- ( 4. L l.- Complete• f a -at,- I/ 4. District: kc St- ():S. Lie Let Qe. Address• 1i7.S o.cv rat RM.. sail F. Telephone No. c2ic is ` 9 7 7 3 6. Project No. If - i a- a. 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld Con ty. � � `nom ���/ c 17. 8. Special conditions- / 4-"-- --Gal --.Z-Millarafr— /i"^"� 9. Applicant; P1 G .t- • ..X GQ 1 • / t(�� By: CqnV k n e z.� C . t� �-et ) Date• // ' oZ 9 - 7' /46.143....t_ � Name and Title �� T ` 7/ 10. Issued by Date: !n)/l`o Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: r3 e l L 1. Supervising foreman la t L L HO- 1,1 i—et 2. Division construction manager CAP " . `-0.1 %\ 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5, Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. R. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee, If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By' Maintenance • raiser Irkaccep Mg this permit the undersigned foregoing-provi ions; that he has authority is bound by`ali the conditions set forth , < . n. TH OARD OF COUNTY COMMISSIONERS oUN epresenting the Permittee, verifies that he has read and understands all of the ign for and bind Permittee• and that by virtue of his signature the Permittee � i�patyt rF -tat (aa7) 1z Pi _ 1s z or On i n I 0 1 0 N 11; A A p p PI b a s i s -_ I r a OF F-1 q:Z'.- t in Z -1 n S A G m z..i~ �.�_ Z. 1 •C a i O{ 1 { Ilc i i - 1 us in lt11 � 3. t Os 1 h., i • 1E/17- 1 x tl" 6;41-4 t1g cr, 17 I 1E -4 lim i t-4 02 i o s I ID1 c r •�E m •X t ltd i II-61 z i0 ile I IOdD 1 -4 r 1 1 i 1 m ! i t r t.p ( I 1 1811 t 1 "1 p do 1 2 I� I�, �1Q GI 41g, hi `: I 1{`I t y 1 ° i i I� to, I ;`w 1 < I 1 1 ip1rnt 1 l -I !D1 1 tn� t I r 1 ID p 1 i inl o too ��c' R 1 I itsi r et a P ,_ I i t i tie a 1, 1 ip I F" I i i 1 - I I{ ! i I 1 s i� 4 s i~ I ( g r i n p o g_?'. 11 I-i• • o z o , 3E a, (1D gi i ; i s • c 1 X • is I 41 g • t yI i i j �i I 0 1?ii L�Ll I I. 1 I i I a tr, L. n m 1 N I • i r Y o 16 1 t t. ►- i0204 'n ;' i t 1 I 1Q i t o w 1 o f i 1 w '8 si w i 1 i . I 1 i o 1t' <ii�-. I i�; I i t t �� ir Permit No. v"3 Date November 16, 1971 CONSTRUCTION PERMIT 1. Type of installation Buried Cable Cr 2. Location and description of work From Tohnctown North on County Road OR to county road #48z,then East on road 482 to State Highway #257. North on 257 to Stanly Towers 3. Estimated construction schedule: start. November 22,1971 Permittee: Mountai n Be11 Complete: 4. District: i+ree1ey Address• 2701 9th Ave. Greelet 5. Telephone No. 352-5800 6. Project No. C-1-0708 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• Bore County Road 54 9. Applicant• Mountain Bell By: John 01 .tit FnremAn Name and Title 10. Issued by ED 740457 - Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. H. Henry 352-5800 2. Division construction manager C. Phelps -Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permitted shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the sane may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightofway limits, Date: _November 16, 1971 Date: IZA''a7/ By: Maintenance 9aservl,or TH£ HONIRD OF COUNTY CO 4IONERS WEED!1OUMW,' r In acceptiak this permit the undersigned, representing the Permittee. verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; ant} ihaj.i»t.xirtue of his a mature the Permittee is bound by all the conditions set forth herein. rm G 3 U H Nth ;a- OH 5';✓ -ISTC-310O' h* iL' _ ;4 ESL-a,HA1-i z5 _ 1-i CI -715& °L (r i ti° PVC r-nAIL c z U" r Sr) F -.1O' 5 , 3S SOL' �8�1 t�CL_ a y Ill N i O MOM X.. 1 a a a O i' O ' - Y sop = -•A >• R 0 g O -y C w O< I Z R p.71121/,; 1 i i �rt 1', 0 is ≥ i j iN 1 f1 1� m i�i1--0�' , to 1 t f ile +4'A m + I t i ii l- ° i I 1 I �'1 K I T 1 i sEt4 4Ii i I ' Is I 1 TIC � I --f 1 I- I Z I TIC 1 I tom, r» I I:4 V t I IL.. ' I w t i I io n i ! I 1 i 1� 4 -IQ 1 a 1 i 1 = t. D P I < t t*1 I 1 it lin , Ir.i 4 I O Q � I O y w I n A t I a I 1 11 i I O i i 1 1 1 I I I I L c c i 16 n G -, O °I.% O1� 0 t 0 S i S ,i OI 1 ., � DRIVE to <STA4SCI �� PRE 1-Q_ HWJ &57 GaEA i WESTERN RAVILIRCALL tin rn STA L4 CJNTD 3ELO\N LEF ST/7i,S \_STA7I- r IP -4 C ti$ n ' D" > rcLthIt H Z-'dO DNS [ern uo �*-P U -4 �, c GH w ;t-;' nD tD - N. fri Dy Ny zb I X P a p > a s oZ r o_ re g -t O 1 O NA a 1 w7 I CO p A O a D. y D �. m L O D 1 O O x en < 11 ~ 1,v'LP g.t.. IC- I "I X ILn pin 0 ID 1 $ I I I»c I--Vtz HH^^ I IF' K 11�—{ i z�l2 i I :NI 1 IV i 1 i O_ii- i1 I I r VI I A [p 1 1 A 11 t9 O I n C c I a a ▪ 1 < I I 1 y 0 i k I I j m 1<< I I V r, (�',� o I r ag• e t a 1 1 I 2 I 1` 1 I iI I 1 1 1 I I I I I 1, I I 1 1 , 1 rIyy 11 1 I . O Z O D i O a c g.IJ I I 1m>' a a ID I{ _ 1 en ( i 1 O 1 Z r 1 of 1 y t 1 1 2 i 1 1 Z� Ia i,„I I ! I )1..,-‘.T 1 Z z . gist, 1 1�Irt^ 1� Y�J o a 0 ti in' I I Vi- mnt I ^ 1?pal k II 1t 1 I gi jl"1 t 1 g 11 1 i it.'11i'ri 1 U E 1 I I I _,!,' 1"-i i i 1 a' I .'.a. 1 ... 1.;. 4 I .. EDGE JL /4 SRH a a cd LP CH 6b 7 71D .H S WOHA CC 1NC 3 e /`TEAS ON RIGHT 1�U' T3HAH- 2 St CoS5 35 -SO L.: L3, - Co 5, 5, / 3S- 1.501_ - // --4 Ira on O C N x x COLOR/1A° 5TiaT7 YVy=a57 rTh O Z N- rnoz IP r t/' r*7 U x�z-- n_? H2' Pz U9 PI - 23U auk � r. my 4. q5 IC .'3570' F.10' Mr►$t3 x-2.5 5.3S -SOL* r • IS Ss; 30-1a~ v ttpz 01 Pun, ,Z cy3 C tit 1 {.+ < 7 ti roLoPAnosTATE HYV>i*E1 -7 AS114^`T c rri • 7 131 n 0 2 a b r, 3 1�3 -dad 21> + -3 4. a 11 NECESSITY OF WORK ($I401 i n A x 11 11 I -I > A area vo Na 0 . X a ) 3. y _ a O C i O N =-I= 1 41 ie jn iij� l' �✓ tin r'+ IT, It 1�1�1� I I73 r H c A O a a ba 'V C O 1 (o !D) fv €^ 1_ I z N w -4 rn m rn m r m X x I O r a x� L 57L q 7rt' F.Ip, TURD 13HA'$ -7 S COSS, IS -501+ ro'55, i2 -\SO! rfi '9 O <- C' 71 1 A 95TC= 37'r4ICY LP mu c h- SO -----^ D La55, b'3` -5a0 rZB455=?0-L* 6' cos a, tJ5Si7OL A, CO U, i9 /\ «s/. tr \ \ 2 \ ®A <3 \-3 i» �k\ m/ 3}e J .@ /// / /z/ j\\ G$ M eE _ b2 ®': \ \ >\ » / $ .\ 7 vi .m /\ / »J / 3 \ & »f 2S govFL_' a 5\,3«-S3u Saw. egGLi- sue,so»° if D-12 S y A. D @ 'ELYGz cv»s»R /I 2 HSTLalp' .P/C I/1 CCoSS,3Z-SCLs- S8. Co5571L3`iSOL if — cone CG' e. CO/ r)EP Y3 STFT5 H.NA/ w L S 7 ASP\ -SALT Erin !, da r r -n -4 tiH a 71tZ 2 17-4 1) pa N WZ J6' d qrci Of) COLORADO_ STATE NW'J`&S7 ASP14ALT La` b 3 • o D •.P1EA3.UWER RILL -I T - a.... t) -E -1A-I- CoSS, 3.- z •57)-71f * L551IM-153L+ vA t.� t5S-1174; \. LP tn rn trfn ll'L�t -r1 rf rrt r= zo -4477 .01 171 fin fn gc r 1— _ r =A six D Tit .< x y N :t-{ 3 1 tP I I I. 1 1 r.I t { 1 I- 1 I II r z R z 0 I 1. 0 nO y a cI 2 -t O r r J o o II k Oa 0 I { Pt.I - I 8 C .OGE JF AS ETC-, 553 F*iO' 5uQ- L': -Y -* So Cc 55,35-EOSEs+55-701.: GS,1'�02)-15^L' 155 170L' ASO 9 -Ail InaNa t T s ; - 0 1.. C. J+ r ~0 If I I tr41' i r - PL .i t tt 1 et g t•1 1 i , I Itt, ts: -S I tot r in m 4 c a G r r L51 t G�®�"-4-31;j ti tip . , " C • Li w a6t• N 0 C' tNty "C �v1 . 19 ppf . Eat-N1Y• �2 cf— '511 ` 03too xiL 6`b�bt'b tt: 6\ \ � , IA -00 . ' 1t9 S' tvt9i9 {„nr'YUtWr: R3 9 flits In 6 DT1 rr,12nQ 4 C 'P r6 if £ Z - X IT \/ 20 z O m c N N ti w O O C '57 LIn �1 1 n \, Nc 1 Th 3U7-i i1HA%-4-5CY Cr. . -5O12 St-7O1_.t x A, so x p Z hrHS 1A/Geld -3>%;‘ a ' ,ft _ r1% .3rii Z tit2- tit ye X990 40 LCD RAO0 STATE 'H'dV's =57 ASPHALT In rte-' rr r r L& -21 t c- 6' 11 r x,r. t4 in v'g`ti >H-0riim rn r>`I -/D 3 H Z I r U < 3 m P1 S I I 0 7 1 2 dX1'ag1$ 0411 r z z 0 I I I I A x Z 1 1 1 F o r 1 r I t at i I I K t I t t 1 t t a o w r oinn I s 5 I i I 1 l c4- c wa c -OMaw Wails* 7 Z ; pr O X N (1 O _ h i 00 7 i wf• ' w tr i O ca K ,i Z �( AP �t1i ,t. .c1 1 ttH t ' t it'Jr- I a AN ! tI I ,. g- o I t i m 1 i 1L9 a CV o K O y 1. Q 1 K 4 a l< II A I 1 1 - 1 1 tl in r2 ▪ p 2 ▪ x a 0 I I 1 I 12 -7 z N -U U, H m r m .9 X 2 0 17 D om 0 0O 1 0 D73 -- (1 Nc it D 3U r 1s 2 ND D� r ri I- H i 2 z1,2 pri C f -a zm "H Ln yi N ti v.• rm cu~ u � y iv L • U >l • n LP V Z ; Aj I,L ---4� Xi a 2)a It krrt�t{i l9.Jol tip `n "S a T k44)-) "../ R E r 3 4 , ' { 1 q ' +i tHi 4 ++; Vis Hi { -j r 1 i, -a1 3 I :' �-I C f } 1 ii,D JIDDI 1j i I ti )0 FT, , i F ;i, 1 'i „ 7;j7I{ i t\ p -bed `7 v7 211.d& - T 1 n < - r D3 Do 0r O JD �.� I;j r 6'6\ rn n g bS f\ 0 0 1/4')L -.zS siL)�..R,,N IJ' -r sLHV11V) N � Ln,TN Hlell- LiHZ Z)%rDo� V HrR ni N r s '71 M \ \'1 c b 0 w.4 • Z) 7,���V'''... - ' 'a.- �{ -l7 LP '' ,v T l3 r`rt kvbU ''-,?M 11/4-4 tp it 4.tC' Z `�I N- � Z a --ft, � N- --1 N a 4 Ri b. & .1 - rte`tA 1HP Wit'--1_10-i - 2 --hi.',. _- j1- n E , a- _ Dt Dtv i9fb` toAY --r)U Iii' f d 6" ' t -ice r5MidfiPfi � ..1.&'.a,..p.i.--1-4----Hf?('''':::: ti Cfi r, Y � t 4' I t tP4..A 1 7e.C } T 3 r , - 4 !-! b t -+i y I o 1 � Il.•-I : .+ t , : , Ii,', ! COn yddr �'�c I it —1-1-1-- i , r- Di 3 Lei n i!1 I r- C C L- i�: LY r Th I • V �r yit a ro rt) The r -- 5 ,L (A Fr Dr f -r pl-4E— D <y D� Z H - . EP L� 2 X n N D r r3 s m r y C v^ r a Y n b It r p r X 1" rrl Fl 7 Cr s _ Z: = yC Zr- ,, -4 U T G.' n c - tri x IT c m 1 e4 r H� LP 2 M U z om 3 v bb b rri ai. Iti PI y a Q 1 p- N a o v g : l i >>' x I a a o p • z i r ' a 1 K o $ I'�i c i� {' ({gyp{ 0 PI ( 1 71 V 1 1 I s x t ( k�J+W�+i tlJ 1 S I 1 ( I IIv( I I x 1 I I I I I I I " I I" I (, I 1 1 11>11� I S I r I I I I I' 'k'C I I I, I' ( z(tdk4 (• 1 I I I I V i • 1 ,� 1 , 1 i r di1 1 1 1 I n t l I I lu 1 (1N9' I o} +DD i O s I x la 0 I i 1 t 1 I < 1 1 t y i A i l I 1 1 I I a .I i I; II ifttt 1 I i .I I �1 11 tt I I t w atoll 1 t t tit? 1 I I I, t' I" t t,1 I Ii'''' t 1 t. (: , a r 7 O. .--a C p 1 I I • o s n it II w `a C l i I I' I> I s G Y.1 I t. I v I I o 1.- R1 1 ou I I I I 1 < 1 r l I >i I j t > > I r I I t r I o IilA I I r z° ICI' 1 I 8I 1 I 1 t o p la ta; I I Ill 1 OM I P I t i I i t 1�y Pic,� I g I 1' PI 1 (' I �LJ1 i t 11 iI t !.I I tit Permit No. 9G C1 Date //-- 9 — 7/ CONSTRUCTION PERMIT Me3/4524-2-i1.4_16,1::74 44rie.' g6 kti-yrrri S 1. Type of installation an r/ed TGI9 Ac n,- ferze ,'.//Gi,' r 2. Location and description of work -Cr' /II 77 C5 ri- +� N, W Se" P. !/ no N/ I'( Lt YS/• al - Tc ,,d 47A,,rf,r'tj4/e nary- tiaureiif O 3. Estimated construction schedule: Start- b",— / - 72_ Permittee: 'r - Complete: to —der— 7I 4, District: 4- !/ eiit.i r Zell nit Address: H 5, Telephone No 3 `>< -z R eS 6. Project No C — /— 3 %Ocgb 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed tc by permittee and Weld County. 8. Special conditions• C4ntec Tp ,IJ +a Xr-/rid -�� !r �rp Al 9. Applicant* By: .E/i • kt zyac r Af.it Thrc.wn -t Date• Name and Title 10. Issued by Name and Title 1T. Final Inspection by Date - Name and Title NOTE: If dissatisfied with construction performed on this job, please cat, the following people collect, in the following order: •!—tom'As, ryldr NA Date • j/-9-9/ 1. Supervising foreman 2. Division construction manager 2. Wae7plant manager M• S, Fu 11 " r` - PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans - 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 4S hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility oI work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. -n T EOF COUNTY COMMISSIONER S By. • w J Maintenknee Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has sutfiority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. i Sec r. o..o REASON FOR REISSUE ISSUE DATE 1 Li-) O //"...6: 7/ Sec ll-J 7/0N R (ooW RL 1 s1-4otoo PSo c1,„Q sTici Otog Li .vt ID! Elmer KngPPPL i r N N f Sr' Otb7 Not e5 I. &ury Cage 3b" I, hep-Fh from 61/9 a to y 1-o sr/9 O-6 / 777 8 0 dQ/ Sec Ii 7 /oN (? (ooW RW. 1. 3q MOUNTAIN STATES TELEPHONE COMPANY FORM 3060 EXCHANGE -` /14 epc,a/e _2O/4C64 _ JOB NO. _C3 7422.—_J_ _____ ---t DISTRICT_t yam,. _ --COUNTY 1/'e �a;e.Sf_ ISSUED TO - LOCATION_ _----_.__ _ J JU.CO. HAZARDS_ --.-- -.- ___-,-DATE - ------ ENGIRD. SY_ - PHONE DWG. BYI.//&/LCKD, BY -- R/W-_goo_( --- APPROVED - TITLE DATE ORDER MEMO_ SRV. DATE EST'D COST STR. __ EXCH TOLL EST') MTCC.EXP- NECESSITY OF WORK (3140) FCC APPROVAL RLO - -CNDT. REC. LCD. a3c-LINE NO. EL.l2v. _SHEET_ -L _ OF _ i __SHEETS Mountain Bell Qjeyenne, Wyoming November 12, 1971 Board of County Commissioners Weld County Court House 9th Ave. & 9th Street Greeley, Colorado 80631 Gentlemen: Attached are three prints of Exhibit "A" and three copies of the Construction Permit to cover the placing of telephone plant on County Road Right of Way. R/W No. 9601 (Wyoming) R/W No. 99999 (Colorado) Job No. C-1-3708 Buried Cable Sections 11 and 14, Township 10 North, Range 60 West Location: Along Rural Line #2 by Elmer Knuppels property near Hereford, Colorado. Len. On November 1, 1971 we received advance verbal approval from Bryan Ewing and Bob O'Donahue. Yours very truly, ou } gaLtist t J. L. Tucker Engineering Superintendent (0.P.) Attachments WEED CO. FINANCE OFFICE NOV 1697 �Ul GREELEY. COLO. Permit No. a 72 Date September 29, 1971 CONSTRUCTION PERMIT 1. Type of installation Buried _Cable LaSalle rural 1 mi. E & ifmi. S. 2. Location and description of work 3. Estimated construction schedule: Start: ✓G'• //!/ Permittee: Mountain Bell Complete• 4. District: frnPloy Address• 2701 9th Ave. F. Telephone No. 352-5800 6. Project No. 1—W,-5nl 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County_ ft. Special conditionsSee attached print for detailed information 9. Applicant• Mountain Bell By: Date' Name and Title 10. Issued by Date' Name. and Title 11- Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry —Greeley 352-5801 2. Division construction manager H_ Rrintright. Tk+Anvwr 240-74/,4 3 W. Horton Denver 266-7455 . Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance it this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8- Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permutes within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE D OF COUNTY COMMI ONERS j� /.% / WI NTY�r.� : •O i /i By: _i cE f Z t0 r Z. Maintenance Su zvieo: In acceptingthis permit the undersigned, epresenting the Permittee, verifies that he has read and understands all of the is bound by all the conditions set forth herein. foregoing provisions; that he has authority sign for and bind the Per ttee: id,il at by //Jivirtue of his,algnature the Permittee oqsrt 11/ Feria -mew'. t Iq lr�l1 y1 1 r , . ti:c.711 4 It La I\I�til p a 1� 1kt...1 x a -kil,Ni lei Ai 1^�1� 1 > o t; ��i 41 -4 t Itll" t i I. I 'I If ..1„ �i 1 L f`l``I ! .... Ind I�°> 1 "ip,i � i .,, 1 > x IN, I 'Lan o i.tiit,I o lr,l l ,co i,�1`II I'.1.,.1 V 4:1‘41 N ,� 1 1 1 I NII�t I, 1! 1 I�11 �i� tv :*tlVJ 1� ,0-‘41c.,,, n % A A t_ INS �q o s n1,� I,` I '� i r' •: 0lir LJl Pi \II J fil t,.11�I IO< ICy t till ilCs- t"io It.6 1` ("Ill I S, �1 �m ' t�1 n I�1 i �vr z > 1>I 1 \il i = a I, I •i,,.1 I l a O 11.1 477 �,o_ Ill 1 lit 1` It I, IW1��C - 1 M1,,,,-,..,,t �t IL''l�II I -.1 ,1 1Ni ~ i IIII I I I I .�1'_,, I J J yy 1 i l- I i- l i -ci 1 O p !a= q no), a x r a m i n 0p ri 1cda y oo m n to g Z� p D CO I -N n N I\' �F" 1� 1 j V NIA \ -4 I\2a i 1�1 kid t `tnt him 14$ I : ratsth 1Z1�'l-�ii`Ica •: 1 1�I iVt-C1 r.ci m. I�- 1 ICI ICI It'll- ITT 10 I t t • t-?..tl := I 1 iO1•� x I III Ile; 1:11.4 = 1 tN111 t,-. 1 it,.;:, m, o' 8 k • 20 I - ! 1\1 L.._� ear,-/o�•v-/b` .. ag. /—.ZS2 a �..5: ass.< kt7 X I\ /O%i42 rL _ /184 57%07- !.rrR 7—' / �/'7 T; z/1/c x . ICI: 1 k.1 V M 1 17. t lJ t; 2 a Permit No. a SI? Date 9-17-7T CONSTRUCTION PERMIT Mountain Bell Telephone 1. Type of installation buried telephone 2. Location and description of work rnail 50, t0 county road #I+3 3. Estimated construction schedule: Permittee: Mountain Bel] 4. District: 5. Telephone No. 6. Project No. routine Storm job 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: Greeley From the city start- 9-18-71 352 5800 limits of LaSalle , east on county Complete. Address: 9-24-71 2701 9th, Ave, Greeley s. Applicant: Mountain Bell By: Jerry Henry —sup. forelgazbate• 9-17-71 Neale and Title 10. Issued by la_ 0r0l[4YGwide- Date• ! Nuns and Title 11. Final Inspection by NOTE: 1. Name nod Title If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: Jerry Henry 152-5800 Date: 7/ Supervising foreman 2. Division construction manager H. Boatright Denver 266+79 3. Colorado plant manager W. Horton Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods. equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County iprmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. By' ?fain Ih\ac�epting this permit the under ed, representing the Permittee, verifies that he has read and understands all of the foregoing .provisions; that he has au ty to sign for and binthe Prmittend that by virtu his signature the Permittee is bound by all the conditions set forth herein. THE HO WELD C•UNTY COMMISi0�1ER8_ SGL� Permit No. 7-211 Date September 13, 1971 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work r. Luptin (Fredoriok) rural 3. Estimated construction schedule: Permittee: Mnnntgin Ra11 4. District: Greeley 5. Telephone No 352-57n 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• See attP9hed print for det>'iled loeptinn informptinn 1—E-327 stmt. (1 edr /g Complete. Address: 2701 9th Ave. 9. Applicant• Ynnntv'In roil By: Date' I/ Name and Title / 10. Issued by i�O *,esr p_ rr2 sent a Date- sot-7/Name and Title 11. Final Inspection by Date: _ Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman .T Henri lreelay 352258!1O B. Boartight Denver 266-7444 2. Division construction manager 3. Colorado plant manager 14Hnrton Tlonypr 2AF,-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of conatruction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permitted shall advise Weld County 48 hours In advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County_ 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the acme may result from or arise out of any act or neglect of said County, Its employees or agents. 10. In the event any changes aro made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. 7, By: 7 Maintenance, Supenieor In accepting this permit the undersi , representing the Permittee, veri foregoing provisions; that he has author' to sign for and bind the Plttee is bound by all the conditions set forth erein. THE BOARD OF COUNTY COMMISsS that he has read and understands all of the that by vi ue2his signature the Permittee REASON FOR REISSUE ISSUE DATE O O O' $ 1 N! P 627 Y -23-7, I q co ei II v 4 pi., g J//?E TER/ 7 I DX/ .z;I 4 ZJ//i/"S g I E O PEoCa I n ----n I CGJ/1✓TV (:.;7?/1/E2_)c/C2) -'�/5 I pQ• / I tl 1/3 2i ' • i I 1_5Z- /G25'r ?“),IZ\ LC' 3 /D-/-23 _ �J 'Q 7."'/Y I I 47 I 7.1;ft PUP 2,_ LOG LD,M i P(05 �1 TOAI XL/SS-ELL 19ts' LJ'. GJ/y-- e-aa MOUNTAIN STATES TELEPHONE COMPANY 7-'/';', J11-1-%.,7 FORM 3060 7 EXCHANGE _._- -- JOD NO. J----- -- DISTRICT - --J-----=COUNTY .1.-/ --_ ISSUED TO 172_ f1/-! r I✓. C/- .7-7.77-..C1-'1 _; JU-CO. JAEN.O.- __-i LOCATION--_---__- -^ Y HAZARDS_ --DATE - -_ POWER VOLTAGE ---- - _ :// '.if_, 5`'54- or �, ,:. l' �;/// //"! E V / __ ._.___--- PHONE _ -- DWG. EY _CKD. EY.- -� R/K�--'------ .. APPROVED _ ____ -TITLE _ DATE -- FCC APPROVAL_-- --/I ORD=R M MO- - _SRV. GATE �" ' - OP1& EST'() COST ' STR. EST'D MTCE. EXP.--------_ NECESSITY OF WORK (3140) _—SHEET__—_OF_ /—S>:3ETS .s.4�...,,:....,.-.....s...a.....v.r..dom.:a--..+a-.�.s+�� sisa..: • ;ct= -TOLL EXCH —/' ✓ _ RLO -CNDT. REC. LINE NO. ----- .. LC _Afer;)/06eHyer, .1 Permit No. a73 Date September 13, 1971 CONSTRUCTION PERMIT 1. Type of installation Blirleri fide 2. Location and description of work Jhnst. - Milliken Sec. 5 Th,.N R66N 3. Estimated construction schedule: Start• Oa- ( Permittee: Mountain Bell Complete - 4. District: Gree1Py Address: 27O1 9t'^ Ave, F. Telephone No. 352-5800 6. Project No. C -1-5O26 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• See attached print for detailed information 9. Applicant' Mrvrntaim Ball By: Date: Name and Title 10. Issued by El /bier- Irt rl OPE- Co w Date: i-CC9��-7/ Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman T. HPrry Cre°Jsy 352 5`100 2. Division construction manager H Rhetright lDenvor 266-7444 3. Colorado plant manager W- Horton— Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code - 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BORN -D OF COUNTY COMMIS: NESS WELD COy'' , C By: Maintenance Su • ry . •r In accdpting, this permit the undersigned, foregoing provisions; that he has authority t is bound by an the conditions set forth he O. resenting the Permittee, verifies that he has read and understands all of the gn for and bind the ermitteq�,gnd t at by virtnwof his signature the Permittee r n rr z 9 0 a s I pi C n 0 N L O I t t f C 4 _.1 K'170 - rIi stir. #+ .+sa Permit No. eq70 Date SeptArrber 101 1971 CONSTRUCTION PERMIT 1. Type of installation Buried Wire 2, Location and description of work As per print fc 3. Estimated construction schedule: YStart•�a €PY //O 7l Permittee: %%!o it, airsN a e / 1- 4. District: C7 R e,e L y 5. Telephone No- `3'2 g `✓5`'o o 6. Project No 0 E -71 - Complete• Address• 49O/ 7.= Ave.) GReeLCi/ Colo, se,y7. 3 0 /77/ 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. O !!�t 1 8. Special conditions• 45 Pei' Aria, h e d, Ph/A/� 9, Applicant' By: Name sad Title 10, Issued by Date• re me and Titl Name and Title 11. Final Inspection by Date: 7- -2v- 7/ NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Henry—Gree]ey S52-5800 2. Division construction manager H. Boatright —Denver 266-4479 79 3. Colorado plant manager W. Horton—Derv4r 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum requ.red for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE =•A•D OF COUNT`, COMMISSI! ERS Br intenante Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provier a has authority to sign for and bind th -mitt• ad that by virtue his signature the Permittee is bound by ll , tflitione set forth herein. s38l11i��.- WE DO �e 4�h CQL//TY STE /3,-07 STB,,i3r/0 PED. /7 52 'icvs/27 'at OS. 5T,-7/8�37 PRV r. DR' 9/=lc,/n CONSTRUCTION PERMIT Permit No. �r/ Date SFr -ember 8 1971 1. Type of installation Buried Cable 2. Location and description of work FTOTA ?s#.i�-. Scree e�'t Sib Ava on 35th Ave. Along Bar ditch east side of road. 3. Estimated construction schedule: Start• Permittee: Complete: 4. District: Address• 6, Telephone No. 6. Project No C -1—09O+ 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: By: "r i - Fdrsfr Date: 10. Issued by tr" / V't Date- Nsme and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ,1 Henry-Gr 1r?y 359-5sS00 la H. Boatright Denver 266-4479 ,^�' bI 'r 2. Division construction manager r ti� 4. - Wa Horton Denver 266-7.55 3. Colorado plant manager PROVISIONS: 1, Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation wilt be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours 1n advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF Name 'end Title Z \/ Br baintensned Supervisor In acc.pting this permit the underggned, representing the Permittee, verifies that be has read and understands all of the foregoing provisions: that be has authority to sign for and bind the Permitted: end that by virtue of s signature the Permittee is bound by all the conditions set forth herein. WEL c OUNTY COMM 4014ERS N4_ FAotete /et i yr p7St 3 J TH Ave i - ei r.. c, s0 -2O U _ ref Pct. z FL -14 Ci. I«.$%°I 7 «: t ?d x, . » >.- $ ,ls2eb& eKK w_ I504,! --5C 35 T AVE C� ?i /f/ ct2 ,/. /{i(/ RL 75' 15 LC 0752.6 `i; ri 'o :R.. s i. s 2 Iir < A 1r O b r : x I w WIi w l l fill • O ` 3 t 1 f -I It?R� k �c I f 1 1.4 S 4 1; 0 itI1 • 1--1;M i 1, tit -11g'; _ g j`xr{ �? 1. tit; , i $ i7 ID 1 r IF 'ti, I I a w l lip 4' Int lc I 1 ii , , , i , r iJ w I kit 1 I�,.., n 1 I )ter1 x 3 c, 1=• Tl j t, I I • 1p I I <I 129 (:all j + < 1 i� 1 1 • t�ti; si• • t I% • 1 r y x w 1[ i kk I I yyr V�i I iA i .i p I 1 t 41 i _gip 1 0PI Fri1 t l 1 l,:it ; Iy I I It. I I 1 I+-, ' I 1 :n s o y a 4,,r,il 1li+� 7- 1,11 a t o o Im' .• K I I I' -,-....° Ir-' 1I1 r , I i I M is aL : trz > L,1 %f?,r; 'E10pII t t s, / It i , At fIII 4 P, 7 PEFR0M RECORD ONLY rP. 73 } X25-5-6 /W /P.7F (2S-5-641, J PL. 611 ni• (P.7Q% AR 25-5 57 / PL.6M 014.6 7 . 4 � co t //I 19 ��., 1I V r�� I� CP- �t!f 5[f ` S� U N�,_i..- 15. �� 35-09,5.4- i Zr -,. G- J. i I 1 r r. N --v" 3X REf1 = 15S- RURAL WlR Y. REM - ►ssc' x. 5Y/; OF Iw' RI_ 75T LC 0751S r—., 1 • $ .| : 'jr ( / & ; , a k • L » / Q I R % l93 )• t / ta r k 6 I mK, b, Jlos f t' R! ' I ri1 I Li I. > \ I w as tr D } -errp `o► • x J. 1 a:.42 0 s-.0 o a y ��� !op RcS+ , I I r i 1 **�` 1\ t" M I 1 r �n 1 I y F, 4.st► I i rjl'4 I a I I 1I I. I FN I I I I o I 1 I t1 IS) I I 1 1 w 1 1 I I-- I 1 r 1 L7- I P - b&, Is I i 1 r 1 >� I I 15 w 1 I O 1 kit i RR c - i M F. i It, 1 1,.t a' p k IN 1 (11 p< 1 1,;; I �.T c I I�'� O : o a 4 Hi 1 r 1 Y a i r1 6 I r ry J Q 1_ I, I g PI m 1 t4 I i 1 i *1 V I • 1 ' 1 I I w pc per' i, lam 1 a tt y t tfN�+ l— o L. o W it (`I .t I 0 1t � I I Pi I I F1/4 i I .4 0 4 fa L t tR r A A I 1! I ICCI • I x o s( I IN I. V Q I` 1i\ y w 1 I_S,1 �"IIi l�Eh tiC A owl I 1 1 In y IC ill I ?Si 1 #-1•o t t. 1.► F3'I I ► .t I1 I.1 1 1: I I 1 Permit No. September 8, 1971 Date CONSTRUCTION PERMIT 1. Type of installation Buries Cable 2. Location and description of work 9th street & "vans along North Side of nth St, west to 2;rd, then from 23rd Ave_ &r 9th St south ndQ of 9th to 35th Av 3. Estimated construction schedule: Start• Permittee: Complete' 4. District: Address: 5. Telephone No. 6. Project No C-1-0723 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant. '927,• 9n��L�/ By: C•211N Y0'2 -filet:, Date• �� _ ame apd /title 10. Issued by (ff,� •e Date: I and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: C 7. 1. Supervising foreman 3 �ianry-Groal.ey 352-5R On �` .,.. .._; ri..._ 2. Division construction manager H. B oatright-Denver 266-4479 4_ N, Horton —Denver aSh_7L55 9/n77/ 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all. harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or By: to the installation placed inside County right-of-way limits. THE -B• RD OF COUNTY COMMISSIONERS WEL...e NTY,,)i .-A•.. In nom ng this permit the undersign representing the Permittee, verifies that he has read and understands all of the foregoing prey :ions; that he has authority o sign for and bind the Ppmittecftnd that by virtue yti his signature the Permittee Is bound by all the conditions set forth herein. 2-22. 4;3O1- S0OL CONTINUED FROM SH,S to C.Q. nCfl < a --i z 77 in ill rn —j COJJTtNVCD BELOW LEFT j1213 EMPIRE STREET SFCM A- SO (/G 1of-750) ' & sot -2,6-o SSo • is) sTA <2.67/7-1'6 srq, 207x5 2 I y yWa v = 4 0 D �• CO ij 1 < m w, 1 1 a. N 5 Q0 1 p x IA t �� 1 t s i 1 i 9 1 1� 1 "f�'n tA. 1 v. r0 eD ! { t b j '�'� S I N a` t + Q'.0 1 1 d I ( I 17—ICr" -i ' 'c<-' C S IIIII� I-4 1 v OCO - N. r. 1 1,0-1 i t o 1 x ',h. Q� {' I I a 1x11 r 2 i t . m bit. I 1� i 1 r FZ I.<1 10 n {' 170 1 I n1 V. -1 ' 1 Ir I 40 w I (i 1? o l O kr_ .__. I Ic n s if" IN2 I D {,-3 1- Ill o c t -$ 1; K • 1 1 h� t a ® 1 t I� ICk I w < I t� I r I I f� 7b 1 t 1 }▪ ��[I I i j,z c I' I t 'm I k• ..'> 11- I )—tpp I 10 < • in I ��ad .,sirym I I'M1 m a Igo Iv.X cO _ Y" I r to 1 i 4 • �x a I_ 1 t I<I F I j •o fOQ Olga • •a 1 1 1 I i I 1 A Ill 1 i Yit�'o o c l� > 1 t t w p w l� 2 E 1( p 1 , tH INI .two I r j. I LI 1 om ° p lat �t I�fA< 1 < -N ANL 1 1 t'. t= -r I o .1 i I Alm: ! w I .t0 _I IG, I. -, t. to I I L laP t. H 4 �-i{' i _: , I I I ; I 1 c -4+ ..t t I. ° '. • 1 t Poi sets 152-C LC'It/52 3 ALLEY //IS 774 8dd} (3-6) 18,8 76- 9001- BKM.!-13 (16, 724- 75 i8,820-850' SKMS-1 13 1201- 122542 4., To/ - _7S0 +, /3, 601-625 /. 28' 15kl+4A-; t3,1101 -12.2x3+ 14;100-725F 16, $Ot-asa,. 1$, 220,-22,25L4- ' 801 -81.53.* 9 01-9 SOi ,SKMA-5Q 13,! 2,0 t-1225 /8,z20; -22254; ' it ,7ot-725 / act -,82,51., \ 1 s rq. 09_51+90 c4RSON sr LATH4 st nt mO A In r 5 --jNi1 Cox., J'KONc X2932 s�.za * a+ sr AVE. Sr CUT- N. PEb.20. 4 Ain NUEb ON SHEET 8. Zra NIP N p. ax) f roc' -6Q) SHeA_s . . (1361 t x0733) a 19 RM. (5h-1 GRAS,) AP 701-21C AYE. v 70."21$r4S=r i 0 M, * an -a Y 419 ler ,1!". u-+ao+Ii„.5 '. AP, 901 214 A'ilE Rm.('sal cias/ ... ,es;?0, si$YC, BKMG -1 suer, tit ≥2i. -55O -t ,aLr, rC 2.LSs7-27OO to 2O32 -27O 1393 -b aR: S)cMA—SO 9o) -S, 1 -SO 0 comriNUED ant sThc ca , LD PC 41.311-1•4t4. . ts,zLot�27P.9 =7 _ -,rn: PCrS-.1 Si351.t4O04.. Min 1 r 1 014 ? -1CV50 -'13)3St -1375 18, uOI -27OQ- X.. ,.. is { - r y. RP t,7ri . �. t l • ;& j ; < f.. Tat c O: Q IFn o Pt 1O T•.0<.i- 4 1.4 Q-1i��,,, l(y t3r l :r < a t i _ t, ��► i ^ .t L. -R° 12_2 1 i 9- sue, } t t -� i _i. iii Y .t. di i -`j`•' I- I T tom+ } A a ' t0' -1 4 d T Mitt ' Nfl - t iS 1 E4i 1 +i t_ } I t. t i�hth ; C .i-A'R'. 1-.t ( .. KIN:'' • aVD 7 1 19 j 1 1 -11 -ST M7--'• WAY Ln -7 -q 2 J.A. !C. Y~✓ - '-L ?O.'. -. __� X %v C /0 n I ! \1tt _ P+7,.lT 3 DROP 1✓�� J r. 0 • lit R- u; I`1{ D .35'"INE-AYA lJ�i', li rj -r, I erfrOivr V i lJ 1 t �Ss' r7jF ,/ r 1 -'OR N 1 _27 r- r_` i' r s r,, O N �. u ^. -{ Z. ii?g",-1C. ' ' I C - 12h - N 0 } .,1 �( r� S, :I Ti A J t 0 -L.' r- N ii, USL FT, ' ir„' _L_ Z e1 1. _SAVER, ' 6 '-' i IFJ ) 9 IA i tji w O s w a r o w 1' 1 y o' o n 0 a n i p p w 3 a s > 4 2 I 3 o 9 2 X I sri o i! $= 1 0 I < A $ ; ° ' '11n 1 w O it -t 1 Prt[Th VC I.I) ., I r - f s a t 1 t. I�., I� . 1 6 ;, , vlrT'"1 1 1 t i-:.-,I I g-'# h I t 1 I. wiN1 t t T I in 1 r 1 i . Ii '� I 1 1 w � ti 1 I 1� w btT r O t tr n i lc II .i: 1 c 1 1 = o ti w 1 r~ •~ t -c I 1 4 s P :v •< I 14 •1 'kit' 1 I 1, 1 IyL�1 I I t' I I'1 Iia' t I I t Sr , , Il' Ifs t I k' o n ♦ 11, _ ii I �-r„z' I w P 0J2 !~' I i I t..,,i loor t„I , t ~1 t it- I 1• I I 1 1 t`, 1 t 1 Ir. I I r J I I I I I ► l n 0 'o Z _ o 2 n# $ o c t pi E :i s° c h t t h $ 1�1' Fry po 1 0 1 C.:'. 1-c 1 - I: ►,I ItI I r na I I'"L I , 1 V o r i i 0 I, h k- • F -I t I r.1 k i o :i 1w N� 1 11 ki2 J o P:; P) . I t ( p l-; 1 1 5. �1_"�x� t 1 11 � 5 1 I.... 1 'lat.: I 1 1 1 4 ft Pt i i- i i I 0 17,4 f?nfs"4E,T71-1 TREE? I DROP Pi i i�43 vt pen es. i R RIY_WRY c 77".:13"-,E.`• `T -7.3C\ 4U, tJ . Tit i4 O 4 ©' 0 C s C 'Q C yr C C it o is• C 4C` ]� x . 7a r "pi 10 fi - xi,.. s• -7p '.... it %I., . us so at' ru M'• 4617 i in qt al:- ill t* tw t*'.`Zt... 0•°-1a Iw . A. f-.. r a e.,C . 11.E +b}Os to, Ac a" . 6 n es - 0-S es eh n an, 7� w_ p OE a 0 Wit et to IA n a Iw. Rut vISA-SD 66 D3-9, 1- so TRt VE DRIVE CANYON 42tet?' AVC 40rn: ME. - • x p -m 7 Z C X s n R O a a 0 a.:. a 't' 5' _ -. A...D a D < .a g. .-tO A 1 I .tom t ro1 _ i7 t a �ro Pi 1:-' ! ' _t . .1 t. in S 1 i-''t 1 1 ,32 r_{ t tr.c rill t t 0at4 1 t i '1 I ,t t 4' w" I i to I`. ,-ot ..t 1 r ty< A.^ I -.,q I> Fe I i t !d- it. t/R. ( ici A ' 1r. } ,,;.3 t o t` RI 'Mc t �1. x o. I s to tr t > .1 . .4 .: a t:I 4 q ;rtl 112_� 0 I.'jrtt I i i t iZ 1 tom} t (tL. O t t t lot t 1 , 1tO I t*t 1sr. O. t g x `^ iD 1 14 t �1t_ t._i. 1 t W, tii .z 't t" t' t t • , 1. ,t t ' t' I:II t A c i p ; 'i . o c , 4miAISIs �,t�a ;o .v . t It, tI 4C it ' ►� �' « t r' 1-t ° t ho ft 114.E a >DI 1 l }(� I t- x • .4 n i 1 t 'i -I t t�C9 D a..tti 4 1"' g.rr! .`at .1 r 1,t re 1 1 t t 1 t'A .nt .} t t t -t ,.1.„ -1 LY yELLWW STQNE sua.ax8n so 66 na-g,1-S0 DRI Va, GRANT:, cANYONI ALLE y 1814 M. r Sal P 0 • n S O 0 T Z w fyl :Pt 5 -TREE T V1 O q a 0 4 s et _Y1 0` s La to et'. v c. S- o A� x . ° :1/4e471!Q_ _ 3 - z S A r ure m a a C m < O m a n — a 72, r O { tr- •i1 �l 1 a 0 -+t 4 AforvT-\HU=D I; -HEET 2 oc"F-tSt' ADMC-1B 18,:/01 -2900 r- 205 to' ADAC-i/ J 8,1 -I/OQL 1 e�K nr 71 t P GS 0z.- N� Nom. cori XI �f (It >4 r a -i I1 n 4 3 4K er r, rA'x fry el• j(y in AS 9.� ir TH. ALLEY I M m w $ W z> o �, x I n ti -I0 11 0 N 0 - n I m G 0 +n p 9 ). > A Z z 0, x o o n a n 10 ,i ; y N m 4 0 p i -; p i* I -cm-4z-, a 1 1� _ 0 ill 1. 0 1 _NI 1 I. N I f ro I I N I JO in 3. I °s I l i tv &n 1 P >n I ( ( $ to I I I I i'-' I�. m ( rJ I I ! (C I I< _ IC) I I 10 t 1� Zs i I i 1 + I It I I r I al 4 ICI 1 fl ft 1 I P1 �* (tea In 1t m + I I�,;; I n IQ 2 n ; 1 If 1'r o Ir Zp I` =ol $ IRa10{ h^ I I a Ip < ID Iti I I� 1 m I 4 I 1S 1 I 1m I I y 1 M lOkik 1 I I 0 a PI I Illi r m I �I I ts,Z ICi, 0 I 1 1 I It - I I I 1 I I 1—I 1 t, I h 1 is + i` r 0 0, 0 c 1. I tr . O r n s i n C I m O ~ KI fa m IDU+ I A 1 0 n IN 1-4 i IA It I ` I r r I Olil 1 10 IT i c I 7i, I I I r 1 0 1 i" I ! 1 "' . L I R of,..,,,, t t� w l<2 o• l I t h t ,s N -i D I I ` (. I`.� .70. Z Z w 1 I I 1 n +— N A i i i }- -I 1 0 } I i 1 ,I tl�t -1 1 r i �+ p!? 1 } I 4�i i i I I I �: z 2¢ 3,13O1 -1500 O,NY!PJ'JEb FROM 5%EET*1 O C.O. ALLEY rr _ 1 3 t -14 CD — To DP 4 -1 nn 0,,, /s' Thcry1k 4-tir----- ,0' guR:BKM A-4-0-- 3.901-1100+i 1801-190 16,2/01-Z2.OG suR.BKTA-4 16,t9Ol-2oCOt13,2OOI-21O °+i6,2001 -21O0+13,1901 -Z¢ 3 1-2 ,JP --+- 3 !701-160 2-22 3,1504-1700. 2-26JP — ►' 16,z2of-24-00 $:1X1.-afisA`3 }3, t -300L . 3 _ - 0 sv • ' 15 T -h - &$ Tc-¢ y//Of spn w t o vi e' w 4 • n � n 0 4'-0" CONTINUED BELOW LEFT -« ST s RKMA-25 r 9, :25 t —"127' ict e - 0o E w - 'R ON 0 , oDT O ��n m o r m D w a n A 0 C a ASP D - ooL 3o 6o COON fl c cT t - —4 %v,\T-: W24 LL Ta 1 fib\ TOY t> 701-'2/ -;n00"`";21 7, ! IC; -; 5 OCI) 4, : - z. o0 ; 7.COi -Z I 0OL EZ i+A A-*; 1 65 Q.1-IOO L. 38-:6 4OA, I _Slit es. 7-2 L+2.3 -30K 31-34L+ 5 -368.15 -S -f -37-38L -------- A DTC - 24 -0 W Co C .N3 � /6, 9O!-: A, 1 ?DI - 92, 1 - 3 2O -�- ,. 4 J O MGR t4 WALL is 2.3e7 a O r 1n t -t) U1 r t — ta) O OO to -� W + D - p o vi - o00 i' oDO f NQR7N 4/49.1.,L '4r 253,9 2 Z ` J 0 C 0 70 0 0 C0NTII con/ TtNueD FROM ABOVE RIGHT TO C. o. < z- 24 - 1 ►• 7,461- 6OC! ` -e- BKMA - 2 -yr- ti 4, 726-85O+ 7, ' , i i3,/651 -17OO + ;+3 a3 1 / 4, 701-725 are N L- 7,1-400+3,601-SOO as X4,1201-1800 1$1 3 •� o 31' 9 ▪ s76-o� b25-67S+� � '95r P7.5 ADTC-9 N.C. 16,6301-1800+ , . .' • 18,278/-2900+(A.s0 -700+) • — to r+10 N.C. 4, 701 — 900 Zaz� /t T-.-i NIA ."-1y 1 7, r x t t\ t • 6 ot y o 2 °i C 1 �\-.-.31‘C S J ► Y Z I 14604:22 o o a 7-1 ei 1 „1 , A I al• n t� °�'V 1 I'i �y� N Ve ( ee K I �. I� � p el Qs hr' 1 `01— I a • l l Its' I oiler m 0 1 1 rn 1 I y • 1 7 !t I tp 1r ;�Irrj N I l -4 I I I G It`t tr r- 1 0- I t1 . 1 11 1 1�� 1, -0 II( —)4'I, �0 t ; ' 1 220 I I 1 t - W I IRIi ref 11 i In 0 i 1O1 X a I t i o to tv re I lc' (1 t i 1- i 11^ Z A E T 4 9 1 10 ! x ° I i ' t . I < ,.1101-/3c0B'r'a Z-. r` I M I 1, >• a I 61 < Q �' ti f I iIe ! at 1 t� t • t""h' !mt l I I IjI I 1 () •� I lt"i I I PS t; IAtr b 1 f I rA O � I + I ��ar z $ Jr .-� 1 t 3f I I 1 is,. I r 1 il r IL,t 1(, 1a+I a tI 1. l�� 1 I 110 r $ � - C' �, I1 I l � .; • i ! I �f > 1 a o y Nut_; ro �a.- _tit CO I NInt I<' ,6+1 i t pi i ID L Y� N Qv „I Cr o p IJa r- i n t•f. " N .44104A 10 w _' `� w Ai>,1: Z� I I I it. 7n w 0 0\ po$3 ; --i p yr O + Lx a -I { y �(tl rE 0 t O+*n �p�i TDtV� 1 "1 0 - al n el n I it f {? !u CS t iJ ON n ag ^ A A. : , .., 1 1 1 .; 1I 1 `s 1 ; , , , t CONTINUCD ON 5i-##. a- ant - Ho: Ilo1- 15,0q+ zoaaA, �--A D7 9--j r 4.-260+ 1S.:ia, i 13.01-,206 r CONTINUED FRcM ssk "r O C. D.M L-2 -- 4, I- t5O-t- LT,30f -350 420f -40Q BELOW LEFT rsMc-2 *COt-700+ 13, 35 -454 parr*JO ms'. CAW -27/00 tli?Qt:-f no* s-70 bit -3 ,'J _3 _ a2' 4Dxtc-3. saDtt4 *7 iz Jaw - - w 13, 13' ADMK ,- -3 24 t42st-SOO 701.9'O0 t.., 4,9"t- S CONTINUO F D /3t$ -4.40 t45 i oat. ix5lX7^-: t 14;1- sot?_t ":-: it`76irgib 4y+1�,o# 7�0+ t5' •Soct4A-50 - 5 fl4, /coo 11 d4C1L4->41•If 25oc+ t�5i-ZQOL'tSOf 1DOL4-' lb, 11-R104,—:,.•::. 1861:-.• "dee 00114* 4.pt- 00. !'ali ,,_- Loa a;c .e.csT =A-4- >6,Sfli=s2t 13, r376 -?*00f- R 226-300 4 A,,5O(‘0,6 ADAC-% 13. 12OF- fat d(-, 1 - 3kM - t ?.roc. /JI- /4- D.Q 7 3_ 1 is ;�c1-;e00 „> a " = 13o 1- 43504 451-Saa- O O � / — 4-2S t 4, 1 tO D yA t '` c a 0 0IU3 U! 6-) 00 cr n 4 p' o rop !3�+, G C1- 7p � P., 67- ion o ya fl ��, ;jam$ 0111 es.No, GO co -a 0 000 O + 4' ++Q Q, \./ cp it SS 1 Yy cr A C w in To p "ice. 7-14 /6 L 0 G r n D 9. 2 Z6 -250+ R; z6 -SG + h -c. 01_3.1351 i4 OO) 9, 1301-!3257 .1.: 16-4) i r 4 d.:. �4 - ,ti ±3, ?_5v,-i;oa LI I A ot.,,,.� 0003 ; -n 0CO 00 000 t r catiiTirJuED FP. 0M Sf!C=Y'`r„ -ro c,0. sea:13,T I `{ U4`O%c, nww II. i 0003 .po.r,Ow;a Ott rt InOO_� 3 D000� 0‘"w04S0 000 O. O �Noo'-� X 3'+t O dt+v+ 4 i 4 -0Zzwzp pttT� • O 1 - t w S. �ch 0 t 0 Aa Is e 0 + o -11.N--# aN-. P t p ON.X " tt. t 0 . OD 3o- n 2 0 .. 1 f:t'v_ O ND=0 41 71 kOiterm p -;wt+ct'' 0;O01- t4 fi }(]+ `N�W� w rir 0- `Dis0+ 3 I = w w g 9 Z > r m z t 28 TH. ST Al •i -+ 0 9 0 w f1 4 O F R a O m 9 D > > 2 2 Z ,,, 0 F op 71 -1 n> -t < m- z 0 t t • I +� Z I O -44 jq I to •�k I 1 1 t' to I O 91 it x j 1 el I I I t 1—( I . -4 I k I I r t' t 0 ? I t. I I I }, Il> I 1-4 I I • I I 1 lQ 1 I O i k-, t� ._ I I _I x I Ic 1 1 I. I I r fa ri.I I v i In I`. I 'ti t n I k n 5 I {It% 1`i y 14 S O I O * I it- 1 > 0 • T. I 111 i� 1 - 0 I 1 O - >.h A.. 1 t' t t I r -4 P •'i g I w i td r I I I • I x I 1 1 1 I ' I i C I ID I t t I t I.Ir I Na t .:1 1 al > t s q 0 a I -I 1 I I V I < 0 IO1 is1 1 0 1 �.j 0 I 07 1 1PZ 1 t -t r r: o f 1 I a I K I r- t t I t" 1 1 10 1.)l- 0 0 1 7 t liitin w rt a l t .1 t itz TINS,= n 1 t '1. I I i I p s o 1. ; I {j� I 1� o O 1 M _ F p I 1:...1 1 1 � a I 1 t� h t t t g: 1 S Is j I 100 (� t t; t rfir m n fn RL"93D-1 L.c "O93j AD si7587 na H .T175 8 9) 5'7 ''c.c.'. W.- 810AA-5 4,301-6&O-!- .mac, t3,1301/-13.50 4- 44•G.' ')Fast-.w?+):9,J3St'i i9t A, 4,0.1 *13;6ot_-6r6? McC (574 do) 41314A14 t w _03,, t2.0tmt3O01-) 1- 1075 t lOF14Jo ADAC.'` is. s. 601-11601+ CI) A, 504-900 AtH,4'16914 T- 5haft (E VANS). I4 N 7`" .4 A) IAN 41301-40o 4- .4 13,1301; 135O+ !o 7,1351 -14'40I - I) At+O1--S50+ 13 bet -650' 170O' itvRwHf r3,tZ0f rsODc SuR.3HAA 9, )76-2O0 -0- 3, 35) -T4 -00 -I- A, -74-/00 479'F -1O' ADAC- V r8;601--1tO0L't zZOt2500L+ A, 20 0t --1100 CONTINUED roP 4 fl 4-7C-'5Oo t= - ft O3; 145I -)#O -O4* so54-td7Si- ('k 76' -.1003 A.51-300 ('°-$) Z 1 i t t_ 1 t I I C;,I{Ir `r T g 4 s t "t I I. }lo. f.111} 1"41 ' I 1 r i0 _1 1 a t kC.t•y, 1 4 IN - y i 4-# $ 1 1�. c,� .q 3 : +,1 - Ps I 1 j_1 _4r 2 s. L4 1 I 7 t- mow 1-' j �tt .�.a, 1..' •t. 1 c i 1 l 11 1- . I _r'� .I P} c I ;`# i I tri t. t r 1 • t 11 . Permit No. Z Z - Date CONSTRUCTION] PERMIT '-1l 1. Type of installation tom. t 1 ek t_4 h Q n, 2. Location and description of work (\ix rj p r'. 0-As0-AsI. �J Ret 4 V N. E , O t- (O I\ @te Pr11 t) 3. Estimated construction schedule: Start- R - i$ - Permittee: MOu-`'•_t-°` r f` tLt. Complete• 9 -is- I ff 4. District: Address' j i 1 5 O c l our' a. dci r ess) fi. Telephone No o?ID&-4773 6. Project No /1-733 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions - 9. Applicant. By: Q Ca NO tin C L e r- K Date: ,, Name and Title 10. Issued by Rrep, tza y-3-1 �.Ltllitk.� ��i iDate. Naw� d Title 11. Final Inspection by Date' Name and Title NOTE: U dissatisfied with construction performed on this job, please call the following people collect, in the following order: e2j &- #i4'777 i 1. Supervising foreman Co )t n GJ e. 4 V e r 2. Division construction manager ( 1 L L H V Q r aioIo - $21 g 3. Colorado plant manager M r . Cat -ti. b t,.. r alto (o - 97a-5 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans, 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County, 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of constructionand before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the. same may result from or arise ont of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By, Maintenance CuDervisor In a ing this permit the unde :. • ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has auth ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set for herein. q M 02-37 r TH „ROAM) • COUNTY CO. lSSIONERS PERMIT Na. 44/3 TEL. CO. PROJECT NO. C-1- 3"707/ TEL. CO. DISTRICT lirrut O/7/? PERMIT FOR CONSTRUCTION AND INSTALLATION OF TELEPHONE FACILITIES IN PUBLIC RIGHTS OF WAY uNv fY //��,,,, Permitter 1. Location and description of work CL/..r'.r1, ak /,3 rI ��n.ror0 /.a f.'�(� A44 Cs A"n, #.? F,t'G.2- Co, 4'v les 8' 2. Type of Installation 1149h'/2/e) Co 3. Estimated construction: Start: 7—/02 — Complete- !-19 2/ 4. GENERAL PROVISIONS: A. The Telephone Company shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. Said safety measures to be in accordance with prevailing local standards. B. The telephone facilities shall be placed in a location mutually agreed upon by the Telephone Company and the permittor and in accordance with details and specifications shown on the construction plans. C. The Telephone Company shall inform the permitter of construction methods, equipment and operational procedures that will be utilized and obtain the pertnittors concurrence. O. The Telephone Company's installation will be in accordance with the Bell system practices and will not be less than minimum requirements of the current National Electrical safety code. E. The Telephone Company shall advise the permittor 48 hours in advance of the date work will be started and shall notify the permittor a minimum of 12 hours in advance if this date is changed. F. The Telephone Company shall be responsible for any repairs necessary as a result of the telephone installation. The maintenance responsibility of work repairs shall be an obligation of the Telephone Company for 12 months after completion of project. G. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. H. The Telephone Company shall return the right of way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before inspection by the permitter and Telephone Company. If joint inspection determines additional corrective measures necessary, such corrective measures will be initiated within 30 days and completed by the Telephone Company within a reasonable interval of time considering the circumstances. I. The Mountain States Telephone and Telegraph Company will hold 41/S44) /df / harmless from any and all claims which may arise from the construction and maintenance of the telephone facilities covered by this permit, except as the same may result from or arise out of any act of neglect of its employees or agents. SPECIAL PROVISIONS- f?/t !v//ye ZY 4 6. APPLICANT: Mountain States Telephone and Telegraph Company By_ Address p7 7 /.5 gliiir10/77— Tel. No. / A-0;4 Date 7/-2 - 2/ 4149 —iii/ 7. NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: Supervising Foreman %+Q 4//.4 CD X — etaa Division Construction Manager ,± f.. trio/}tR//r!F/' ' ri7 Z. � y7 Colorado Plant Manager /�/ Mc/to /I/ 7'vj/ 8. Issued by: orized agapt o ittor snCiyttee 9. Completed project has been inspected and is hereby accepted as being conformance with all genera: and special provisions of this e C Date � Date`1f 7/ 146q(a) u rzed' ent(sl of Pe oils)' ���� l /& J GJio U ,r ry 7- 7 91 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT PERMITTEE'S NAME ADDRESS DATE a ERLL 4 = A vie • GJaLy G P L, 1977 Your request for permission to install a C.Q,�✓t���T°-71re along or across County Highway No —' << at is granted, provided that the Permittee will own dfid maintain the same after installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. / C The Lit iils shall be installed beneath the surface of the right of way at a minimum depth ) of 36 inches, and the disturbed po on of the right of way shall be restored to its original condition. The back tilling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be Of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible- This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. '. SPECIAL PROVISIONS: Attached Boiler The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers End employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit This work shall be completed within 3O ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permtttee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp ense of the Permittee and in accordance with directions given by Weld County. Colorado or by their agent In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. rvAieEn roe x / ��7 rJ Maintenance Man on this section of the highway, with headquarters at h.4 S'.4 dC or his successor, will represent Weld County. Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: THE W EI ARD OF COUNTY COMM NTY 72 ONNEERS In ccep • = this permit the undersigned, ..resenting the Permittee, verifies that he has read and understands all of the foregoing p stone; that he has authority to . • for and bind the Permittee; an teat by virtue of his signature the Permittee is bound by all the conditions set forth here a SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provision, 5. mud -Jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under an highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit 11, Where special cases warrant weld County will permit the installation ofunderground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches cr borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Pipe Size for Tees and 90° Bends Minimum Thrust Area Minimum Volume of Concrete for 45° Benda at 45° Vertical Sends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.06 cu. yds. 3" 0.6 sq. ft. 0.3 sq. it. 0.11 cu. yds. 4" 1.0 sq. ft 0.4 sq. R. 0.20 cu. yds. 6" 2.2 sq. ft. 0.9 sq. it. 0.37 cu. yds. S" 3.8 sq. ft. 1-6 sq. ft. 0.66 cu. yds. 10" 5.9 sq. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft. 3.5 sq. ft. 1.50 cu. yds. 14" 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15-0 sq. ft 6.3 sq. ft. 2.70 cu. yds. 18" 19.0 sq. ft. 7.9 sq. "_t. 2.40 cu- yds. 20" 24.0 so. ft. 9.3 sq. ft. 4.00 cu. yds. 24^ 34.0 sq. ft. 14.0 sq. ft. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3- Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs. Permittee is allowed seven (7) days after notification for the executionof said repairs - 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days. Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said die. turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.00. O 0 O a= UT MC1glLE.� HOME PARK j • R t j 14N g CAP Li (4 cJ' 1 n �tt Y/ /. .-_1 T rt.Y i r -a Yl 77F; / Z'fit / '/TA " -4E 7". r. /742/7 / /Trc 95C-CO51.0- 600 S../ X-!'.G.'✓N TE.Rrnt oo2 / yTST ZIP/254 en'L'L;DS. 47,4.,1-) 83 4 _73K-71-5. h � � L o /"%i L 3 ;nom._ 10%' /'4_>cL,LC/v-6S« /'T/6,00 —S/, /—Ism 4SG= //13'Ft/C' 73CRT31<MS-2 //Of., Eats,- 25o +A, 26 - 200' f E"UTURF FEED 1=-c• o /10e,2c(p-a.5O .5(0 I 9�" --, �_I•' -, a -/C'S •f. =:L.:. /// REASON -FOR REISSUE ISSUE r49. / MOUNTAIN STATES TELEPHONE COMPANY EXCHANGE riPEE-L G YRiff -- JOB NO DISTRICTCA EZEY euto__C0UNTY_l`JELTi LOCATION .5O1. 1771 /r.': SEY HAZAR0.5_/�L�J/f/r. _ __?_- DATE -f2/ ENGRO-BY_in f 7.4."111-7114.1143;&4C‘35 JJ _PM6NE .s3J� p/�y - DWG.BY. M�CKD. BY6y� APPROVED J___TITLE _ r,_ DATE G"Z-7/_ %ORDER MEMO_ S M DATE _7 _5 - 7/ {EST'D COST ��! r . _ EXCH __/ TOLL - C 727 .23/./7i2_ P!'/=;�%Yi %/ ; / FORM 3065, JU. CO. r__ - POWER VOLTAGE -= RLO - -CNOT. REC••-_- 4 EST'D MTCE. EXP.___ _ -- NECESSITY OF WORK (31401 P�'J ���=�/ "F <l S� / 1 LINE NO, _� Permit No. Date Sumo 21 1771 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work County Road #51 East on County Ro&d #76 3. Estimated construction schedule: Start• t• 7 Permittee: �/ lJrl Complete• ar 71 4. District: Address - E Telephone No. lE 6. Project No. — X91 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County, S. Special conditions 9. Applicant' Mountain Bell By: 0 P Weil Pr Fnrewnn Date• iL1nis 23, 1971 )�� ��/11J� Name and Title 10. Issued by �•G'' �TL i✓/�if/en Date- I 7 Name and Title 11. Final Inspection by Date - Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J- Henry-Gr&e hy-352-5800 2. Division construction manage" E.G Rontriajit-Denver -266-4479 3W. Horton -Denver -266-7455 - Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2, Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee'a installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code - 5. Permittee shall advise Weld County 4S hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation, The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances_ 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits, By' Maintenance Supervisor In a' eap{.ing this permit the undersi' , ed, representing the Permittee. verifies that he has read and understands all of the foregoing provisions; that he has autho y to sign for and bind the Pertgdt.ree; and fta) by viue of hie st�ttsttjr9 the Permittee Is bound by all the conditions set forth herein. TN W ERS z«2 w' ZCT5 /g=2e t;! -:t E z n I -00M0 O. 0( c : © n ; n ; ; _ - , z ;§ e&$ 2 2 z;' n , -cm e , ' i A �2 z I0- /i/�i/�. IXI/, „ 2. 1,7. / §i § I f i | ` /' - w|� §. v, § , I I'tIriz'In 8 I ! M . |2 Z Ri �/� I2 -0 /C a<\. \\` § // !§ir!''-' I Pa I ` I cl / , w e /|| ®I r ° [ /| / \7§ r \I I| 0 /;J �II z I I4 \.� .%;.Ii CREEK 4 2 0O \ \ Permit No. x,71 Date Bay 13, 1971 CONSTRUCTION PERMIT 1. Type of installation 2. Location and description of work County Road 47 & County Road 344 Buried Wire 3. Estimated construction schedule: Start. Oa, 7, i77/ + a No 1? 7I Permittee: 2+'t6llr_ pj*1 Ball Complete: 4. District: Greeley Address• 27O1 9th Ave, 5. Telephone No 952-5800 6. Project No 1—P-194 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• As per attached print 9. Applicant• yoru+gip Ro4T 10. Issued by By: Name and Title 11. Final Inspection by NOTE: Name and Title Name and Title If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ____>1 J pnry—creel -y_ 352-5Rnn 2. Division construction manager . Boatright- Denver 266-4479 3. Colorado plant manager W Hnrtnn Denver 266—'7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 3. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date • Date • THE BOARD OF COUNTY COMMISSIONERS By• Mnintenane enaa, i WELD COUNTY, COLORADO • In acceptiing this permit,.pe unders ed, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has autho y to sign for and bind thecrmittegA }t}id tha, by virtue of s signature the Permittee is bound by all the conditions set for herein. Fr, N- 7.51N Z!�PL. E BUR G.�rRE /EiP/`!. 4r BASE 0n P. 3$ .9/.1 _ 25W/DL E PA-O7S. STR. 04.0 R/W No. 12320 - Width of trench-= 4 inches . Lineal feet of trench = 56 feet S .015/lineal feet 17 Permit No. CONSTRUCTION PERMIT Date 1-/031 27-74 1. Type of installation Buried telephone cable Refer to attached Exhibit 2. Location and description of work 3. Estimated construction schedule: Start - Mountain States Tel. & Tei_ Co_ Complete - Cheyenne Address• Rm. 250. 2020 Capitol Ave.,Cheyenne,Wyo. Permitter 4. District: 6. Telephone No. 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions: 634-2421 4F-001 82001 9. Applicant: Mountain States Tel. & Tel. Co. By: Engineertnge Staptwie(OP ) 10. Issued by W.F. Boyd,. Engineer Name and Title 11. Final Inspection by Nettie and Title NOTE: If dissatisfied with construction performed on this 1. Supervising foreman Louis P. Cicco 2. Division construction manager Howard E. Henderson 634-2293 3. plant manager Milton S. Fuller 634-2217 Wyoming PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. t Permittees installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense npon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date • Date - Date• By. Maintea.nce Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has authority to sign for and bind thmii ; at by virtue of his signature the Permittee is bound by all the conditions set forth herein, Draft No. 157747 5 .84 C Job, please call the following people collect, in the following order: 634-2529 THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO '7/O3/ - from the office of THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Mountain States Tel. & Tel. Co. 2020 Capitol Avenue Room #250 Cheyenne, Wyoming 82001 Engineering Superintendents Greeley, Colorado July 1, , 19 74 Enclosed please find your construction permit, special provisions, map, and fee schedule. Please note the minimum permit fee is $5.00. Therefore, please by return mail send an additional draft of $4.16. Thank you for your fine cooperation regarding this matter. Sincerely, THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COJ,.ORADO tt S. LEE SHEHEE, :f R. COUNTY CLERK & RECORDER AND CLERK TO THE BOARD Dpeuty County Clerk 771: EXHIBIT A AMENDED UNIFORM FEE SCHEDULE FOR THE USE OF COUNTY ROAD RIGHTS OF WAY FOR UTILITY INSTALLATIONS IN WELD COUNTY, COLORADO For all utilities, regardless of installation, permit fee shall be based upon trench width as follows: Trench Width Up to 6" 7" thru 12" 13" thrn 24" 25" thru 36" 37" and above Cimum permit fee -will be'$5. 0) For all non ferrous pipelines installed in road rights of way a suitable facility shall be installed with the pipeline to facilitate future pipeline location. Permit Fee .015 per lineal foot $0.03 per lineal foot $0.06 per lineal foot $0.09 per lineal foot $0.12 per lineal foot Service taps (residential) included on line expansion permit shall not be included in fee. Service taps on existing facilities shall be considered at the minimum fee. Encasement where facility parallels right of way line and encasement is suspended from or attached to a bridge or drainage structure shall not - be included in total. Where boring and encasement is required across a county road from private rights of way to private rights of way all charges shall be based upon $0.01 per inside diameter inch of the encasement pipe per lineal foot installed across county road right of way. The Board of County Commissioners may at their discretion wave permit fees where any facility is being moved and reinstalled at the county's request or any repairs on an emergency basis or any other reason in the opinion of the Board warrants their action. The above fee schedule and conditions do not relieve any utility company, its agents, contractors, or personnel of any conditions outlined, or duties required as specified in the utility permit required. DATED: 0CT0SER 3, 1973 4(--- 601 PRIVATE RoAD co. ROAD No. 12$ to u est 4 N . J ec rh Qw Q < cia 0 Q U STA illtJ7 Sec. 19 *-z0 T 11 -N R- 6L -W Scale 1 — The Mountain States Telephone & Telegraph Company EXHIBIT FOR RIGHT OF WAY NO. IZ32P GRANTOR WELD COUNTY Jb8 NO. 4F-oo1 6 -10 -74 - Drawn By WP BaYD ei,ni-tit 7O3/ WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road . right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONSS0-e-t)4,-a-Zed7,--1/42- 4.dcw.fr t%,' cy<+cl )17e - ft - --g�Fci,‘ WELD COUNTY ENGINEERING DLP1. INSPECTION REPORT • DATE2170--7fV PROJECT: LOCATION: PERMIT 7,/ SO le 73012 / -t ! ? REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH 4 a VB 4 51 Trench Feet - 1250' Trench Width - Less Than 6" Cost - 518.75 PERMITTEE'S NAME ADDRESS 15 Your request for permission to install a bllrle line along or across County Highway No. at northwest of Johnstown See attached print for legal description is granted, provided that the Permittee will own and maintainthe same after installation. WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT /J!�/ 197 DATE Mountain Bell P. 0. Box 1139 IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The buried line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or sack- ing through and beneath the road surface; however, open cat shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures. wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparied or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation. maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( 30 ) days from the above data No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night. Warning signs and signals shall be installed by and at the exp ense of the Permitter and in accordance with'directtonsgiven by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the Installation placed inside County right Maintenance Man on this section of the highway, with headquarters at .��P— •0174aSCl18' or his successor, will represent Weld County, Colorado, in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO By. Maintenance Snpervimr In accepting this permit the undersigned, representing the Phrhiittee, verifies that he has read and understands all of the foregoing provisions; that butha,,, ort7in: to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the con ctipgnahe lif ceahs re 9i - r`EEL$y. COLO. ,r r, 37`: J 7�!e.ac '- District Engineer SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without math. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. I. Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11, Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued. it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner- Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area Minimum Thrust Area Minimum Volume of Concrete Pipe Size for Tees and 90° Bends for 45° Bends at 45° Vertical Bends Down 2" 0.3 sq. ft. 0.2 sq. ft. 0.05 cu. yds. 3^ 0.6 sq. ft. 0.3 sq. ft. 0.11 cu. yds. 4" 1.0 se- ft. 0.4 sq. ft. 0.20 en. yds. 6" 2.2 sq. ft. 0.9 sq. ft 0.37 en. yds. 8" 3.8 sq. ft 1.6 eq- ft. 0.66 cu. yds. 10" 5.9 act. ft. 2.5 sq. ft. 1.10 cu. yds. 12" 8.5 sq. ft 3.5 sq. ft 1.50 cu. yds. 14^ 12.0 sq. ft. 4.8 sq. ft. 2.00 cu. yds. 16" 15.0 sq. ft 6-3 sq. ft. 2.70 en. yds. 18- 19.0 sq. ft. 7.9 Sq. ft. 3.40 cu. yds. 20" 24.0 sq. ft. 9.3 sq. ft 4.00 cu. yds. 24" 34.0 sq- ft 14.0 sq. ft 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely Limped to pre- vent hazards developing before excavation is resumed. 2. Final back till and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the.site at the expense of the Permittee. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution- of said repairs. 5. If the Permittee has not repaired said open -cut or cuts within the allowed seven (7) days, Weld County, Colorado. will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or bard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and.. acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Beard of County Commissioners and shall be reasonable; however, in no event shall the bond be less than $100.09. 47.;x7J H""c. c.. O4== <TN O = a9 Yr14 r r c o_ Cr O c r C C't m u, .n C aO+cD nK r OcD O, 4-3 xE t-3 anti) 0, o 'S .r O N OH, B '1 0 <D n a < cc so O'S 0' Mm c.,ti ' cT Y. ct c O N DI M C_ O CI O< o t* 0 o C, V o = .f n iY •• R n 0� n c K G7 m 'Py ',II a5 O " O "? £ a A cG M F' C I1`il�o r� I er Vmr li: (�%,o1� dnr''� iX�o cr_ r n n ° �i 4- 1- o c ' y� I_ C" <D o ri ti o ,-_ ti o.I IS Ii I IMK to Po Ii I z m I', U ,- I'1 r I b II m OM - z s O u, x -I - o d e -p z> >--D-=- I a O N m 0 • m < Z m I1 < 1 x I 4. r, i i II i i II 111i , I if ., , ,. i'' 11,1!'11 1 1I In I I 1 1,. 1':I 1;'1111! • I I i,---4 111lI') I s I n F; I c. �l 17i �V'' - I IA) I I I".. -o-`, is r< j�{ - m •I I t� dd 1 -I II\ ( T( 1 r 1LN I I I., a 1 �� I in n— I I\ 5 I r.I in N Ii1 I o I j:c IN �I z < 11O 1 z l�I ,. • ,m I ir m I i\--; < I i I I I�I,\I i� i 11 Imo! I !-;, 1 I I I- I I -. I t ° (` 1 i I I~ I p V ?, n� m ID! r .. + x I L. lb!'b I I In, I i.. I. I o 1 ki L�JI�, 1 I 1 IN I.r 1 la I I I Pci�, I I I(1 I^t7 r 9 o' O w I, I<Oo s n f m n m 1 c U ; f`'> if ° o i_I N ID m IN � i Vic, g a i o I", 1, n 1 I I ; ( I� I� I� I IZ 1f1! \r,1 Ism 1• IV\L ,°, i�i i II j 1 m o is I II kJ �` p- I 1 to X `a' 4 m 141- I i s I�� HI I I I I I I 4` I 1 1 1 1 i I I 1 I O O z z 1 z ..I CA W m r m v O O z m (l 0 -o D Z RelViUT De_ STA C t0� 5TA ,3 t40 11A 4f/ SEA !Zt&5 STA 12t3p I 'N.) I I ham` I -CP f' I I L • •WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the.Weld County Engineerine Department '003 -• 353-2212 Ext. 213 or 216) 48 hours prior to any•construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barrcades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL COND4.TIOVS WELD COUNTY ENGINEERING OtPI. INSPECTION REPORT DATE 8- Ze - ?4( PROJECT: /„i// /H/ 73eff LOCATION: e Tee nrt'( PERMIT # /077 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH B#52 r. french Length - 4870' Trench Width - Less Than 6" Cost - $73.05 WELD COUNTY, COLORADO UNDERGROUND AND UTILITY PERMIT DATE „741 Mountain Bell. PERMITTEE'S NAME ADDRESS P. 0. Box 1139 Your request for permission to install a buried line along or across County Highway No. 90 County Road 37 (Ault) g }._ had nri tt.. fur lnvnl riccc is granted, provided that the Permittee will own and maintain the same after installation. at IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The buried line shall be Installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations of the National Electric Safety Code and to such statutes as are applicable. SPECIAL PROVISIONS: Attached The Permittee shall maintain the installation at all times and agree to hold Weld County, Colorado, the agencies thereof, and their officers and employees harmless from any and all loss and damage or any claims which may arise out of or be connect- ed with the installation, maintenance, alteration, removal or presence of the installation herein referred to or any work or facility connected therewith, within the area covered by this permit. This work shall be completed within ( ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Roads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines)- The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be installed by and at the exp onse of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense up on written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside Counht of waylimits cf�--'44y ----.- Maintenance Man on this section of the highway, with headquarters at 2335 , or his successor, will represent Weld County, Colorado. in the construction of this installation and any directions that he may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Mehtenance Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provision: that be has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ci •32 as'{ * 4 c xe District Engineer SPECIAL INSTRUCTIONS REQUIREMENTS FOR INSTALLATION OF UTILITIES WITHIN THE RIGHT OF WAY DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 3. Any materials from excavation as the result of utility installation will be removed from highway surface EACH DAY. 4. Tinder no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5. Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives oI Weld County, Colorado, prior to any issuance of any permit 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractor that material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 1?. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 1.3. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches or borrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Pipe Size 2" 3" 4^ 6" 8^ 10" 12" 14- 16" 18" 20" 24^ Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3.8 sq. ft. 5.9 sq. ft 5.5 sq. ft. 12.0 sq. ft 15.0 sq. ft. 19.0 sq. ft. 24.0 sq. ft 34.0 eq. ft Minimum Thrust Area for 45° Bends 0.2 sq. ft. 0.3 Set ft. 0.4 sq. ft. 0.9 sq. ft. 1.6 sq. ft. 2.5 sq. ft. 3.5 sq. ft. 4.3 sq. ft. 6.3 sq. ft - 7.9 sq. ft. 9.3 sq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 450 Vertical Bends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cu. yds. 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 en. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cuts across the driving surface of the roadway may be permitted at the discretion of Weld County, Colorado. and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Phial back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. - 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backlit'. If it is de- termined unsuitable the material will be removed from the site at the expense of the Penalttee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway- If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for the execution of said repairs. 5. If the Permittee has not repaired said open cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6, No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 caches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced toads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said dis- turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County. The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however, in no . event shall the bond be less than $100.00. r"• "' IL. co, Y v o' o' r I O 0'U cm 0 .Q a' et0 nil t0t, nm 0.n ig He n V) 01 W O nam O'i Mmm c4ym H-P.n C O m m a'w m m O A - O a 0 n O 9a m 0) Wm m W m il m 0 .m.RIm m c�9V-1-4 �I 4 m'max 4roN 9 2 2r &la I o n g .a n iV = so n d tr H W w • n It m as CV m H z' n' . �. hr's p_ 1- zro a' M z 20 m P4 04 m 6 6 m a A > > p0 t !. n $ ,l O gall ll i 0 H m U< j� Z I~ < m .i Z i �. J II T'xO I' �PI�G y a! N t l I r� 1r r fr g I 27 .7 . 11 I c 0 Pz7 I in. 1 bli r: 1,g1 1� Alf' I 1 IL I I III L 1 I m' I>�l C 0 I I -r o F1 * j I r i L{ > ' m I II m < I I II I I „LT) • Do col, -I ': I I O> n m I I 1 l=m P i I L Lvt I I m I: I . 1i4��`` 1 I I C I &IGI I I i I�I I I ix r n 0 +I n IS t. m I ti 9 r v n- O c N bo r> t m c I m 5 m e a IO c I o • � I m C l G F -r1 r i`I > 1 N 1 I I j -C m U' L r m I I d L. z m I 1 frP 1 m L., I I 1 n m • I �" r j II p ' " I I 1 I 1 I I I ir I I I I- I I I I r I I I I 1 5TA,7t85 9A Z5+'15 . a/ • WELD COUNTY ENGINEERING•DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONS 4.11722:- WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7 g6- 7c/ PROJECT: mnU,r, F , n /% 6ue/ED LOCATION: �jO j9f g% PERMIT # /O,93 747 big REPORT:00 &vnfq ed 37 ��� w 4 Ot Tv4t,2SE&bon R7 avvi 9G OnhLr Mlms p( cA ),v -the SlAou(c/c q nh /A 9C'lcI Yt ,L% m /res /on 'tl+E' " z 6l /h(n 19anc la r 020n6 dv t/ 90 . ; " fl7/z RRO✓n 1_, n it-a_s n't __._911 al 7 Thy Ct4blc a244 f©.n a3'' k " Thp. 141 (Roo' l ti,2cccnon Of 90 ,in 37 asr- i+/frna Qa (.a9A/ 4 (?/n t/ a o „ 6P. @O/NG ;1/0 pp-► rnu/G <'o �4a R7 Z 9p y r 29 / /i-n.IFS' Vu# G>ov(4J iijol der i#vd t1 E /1/'P F% aper—dw PAL O7 (tie/ 90- attreer Akio' 73,4 zoeg 'u� SKETCH 427 "...Ana Lit / '3` 7y(O�L OFFICE OF COUNTY ENGINEER RICHARD L. STRAUB COUNTY ENGINEER PHONE (303) 353-2212 EXT. 216 P- O. BOX 7588 GREELEY, COLORADO 80631 July 30, 1974 Mr. H. C. McFate District Engineer Mountain Bell Telephone Co. P. 0. Box 1139 Greeley, Colorado 80631 Dear Mr. McFate: Weld County grants permission to Utility Companies to place buried utilities in County Right of Way providing the utilities are installed as per standard specifications. These standard specifications appear on each permit that is issued. We are starting to provide full time inspection of all utilities in Weld County and have found that several of your installations have not been placed according to our specifications. I am enclosing our field inspection reports for Permits number 1023 and 1056 which show the buried cable was not placed at the required minimum depth of 36". Please be advised that no future utilities will be allowed at depths less than 36". I hope that we can resolve this serious problem immediately, and would be available to meet with you at any time to discuss the problem. Ver ruly yours, Q l Richard L. Straub RLS/mm CC: County Connissioners Road Supervisors PELU COUNTY ENGINEERING DEPI. INSPECTIO:: REPORT DATE 7-26-74 PROJECT: LOCATION: PERMIT ?i Mountain Bell Buried Cable 90 at 37 1023 REPORT:__ on county Rd 37.,just_Rorth QfiYLters_ec±.ion 37 jinc1 90 rahlp etas placed in Iho shoulder of the road. At the intersection the ceble_then runs west along _Co. Rd. 90. At 75' m/1 from intersection of 90 and $7 the cable was from 23" to 24" deep. At 1300' m/1 from intersection of 90 and 37 west along 90 cable was only 20" deep. Going north along Co. Rd. _ 37_I duo two holes but could not find the cable. Cable is located in north borrow pit of Co. Rd. 90. About 1300' m/1 west of intersection an access culvert was damaged causing irrigation water to be diverted from its original flow- J.M. Ramsey, Line Foreman for Mtn Bell was there when County crew repaired the tube and said to bill the Company for the repair. Repair time and material as turned in by Loyal Warner is as follows: 22 hrs. for 4 men, 21/2 hrs. for pickup, 21/2 hrs. for backhoe, 8' of 12"9I1e, 1 new 12" band. SKETCH n. V , a.:l nnpr Inspector Permit. No. t %�� `� Date 6/12/74 /0/7 CONSTRUCTION PERMIT 1. Type of installation Bu rf zed Cab) e gaming at county Rd 5r going west on the 2. Location and description of work north side of Co. Rd. 36 (480t ft. ) is undson t_rnn=P 3. Estimated construction schedule: Start- 5/7/74 +� Permittee: M tarn Bell "r` --'r r ` 7./ .. f 4L �T"r 4. District: Boulder 2775 Valmont Rd. 5. Telephone No. 6. Project No. C-4-5128 7. Permit granted subjgeneral pro tone listed on the of this ermit and other special provisions agreed to by permittee and Weld County. C/�^y7Ly7 8. Special conditions: 442.-8223 Complete' Address: 9. Applicant: Mountain Boll 10. Issued by By: F. Parks foreman Name and 77W R Lame Sutenising foreman 11. Final Inspection by NOTE: Name and Title Name and Title If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Roger Lange 442-8221 2. Division construction manager Jack Earl 266-4557 3. Colorado plant manager William J. Horton 266=1455 PROVISIONS: 1- Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damago that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: Date: A/17/74 6/12/74 6. By: ataintenanee Supervisor In accepting this permit the undersigned, representing the foregoing provisions: that be has authority to sign for and bind is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELR.6OUNTY, COLORADO ermittee, verifies that he {� Pernliiteet and that by has read and understands all of the virtue of his signature the Permittee �. ca . V O COUNTY ROOD w 3 426-21F 5-EHRH- 1501,1-25,) RS' rOLr-164 o i(5.O A,17 -I9« c cAv0 WI.(Thy 4 �M,1 " (R/Y P.6) l25' (PSG _ P12.2 (P.5Hlo P.i2.2RR FIT/1W-25 IN TRENCH IN FED. SPL. "(MT TDT,PL -J Z (POO ?J-3 # w8)4, • egg CY.2) T I O (P. 3) (35"q59 4713' 88" 2 9' $182 5' '`:LY= _ -.sc-'. :r V PDLES Yc.1, 3, 9 70 DE SOLD TD UNION REA AND REMOVED FRO11 RECORD. RECORDS NOTE PLR.INDILLATES TWO POLE +4`b vAEft7E BOTH IDLES FOR ,iftOR-I} Pa&P,95E3, - 1 C3.5'TOH08) LJ set SW. Ix, V RCASOM FOR wc,5GC CONT. FROM BELOW LfFT (VRC) (35 HD✓3 c -4 (P13RR) R ATM X 30,TilnDS 0 vl (VAC) pf2) (35TUNDS) w 4 RURAL HELD ORDER aK ' ssu EONE Rtt 6O'-6/10.H,G. Rat WI-D.a c'ADGL) C30'TUROS, (P.13) P.14.7 35'J -M08 NOTES: 1. BURY CABLE IN NORTH PTT_QF r/1RNS7, ROAD 36. 2. EONS' DEPT. 70 OBTAIN COGNTY PERMIT PRIOR To ;TART OF ,TDB. .3 FIELD ENGD•2-26-79 9. PL.GHC SIT CLOSURES. 5. BILL OF 5HLE't 7453 -EE Fos S POL55 TOPE SOLD TO UNIDN REA. 6. ALL YSC ER3LE IS ono. 7. 2 CD..T/MPER TRPR5.1371t 9. TRFR. 2 DROPS. 9• BOND FED. 70 I v. 87 p/2.2i'e.1x7 /D PL G Sic&, Pe5T5 E/W "x" BUPICO cn sIGR1s a cool nous IOewTIFie6 Rv ®* DATE 3+5-74 MOUNTAIN STATES TELEPHONE COMPANY PRI, e 07 _''JF0RM 9365 CKCMAMOC-- 11E/91)1W RO.e_± /.t$ _J_ DISTRICT BOULDER COURT? WELD I„SUEDTODUTSTHTE (Oki; LOCATIONCDUNTYRD.3b NW. OF )7ER) ,,,,,ANION PEER. „KM,09S3,7: NAZARDs__ Nr.NE .NOTED &ATK _ __ _ __ .owrn VOLTACK_ Zb M.V. eNDRD.sY_M/�•�/T�H(•`_-eMo9Re32T?/l_/D�w�O.eTrIl?eRaeY/____ Riw_'OLfNTY o ]� _- . APPROVED _✓t22K__ _�TITLC -/ Tom-, DATE5Z6129 FCC APPROVAL �OT nEQ,f/ ORDER PERIL 79 DL Y.31- %4 2112328 H SH.3_ p¢DATC - OPR CA.R[C_ 170 YTCC.fxs. _ CELERITY OF WORK I11AV1- CECN RLO /j ] .CNOT. Ln.YD10i__-LIN(ND. RL 1x3 SKEET_ 1 _O/ __{MCETD FIELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will notbe permitted. SPECIAL CONDITIONS .120- 70-12— aeait a -,t � )C -49r, Q/2.42- t aL/t .. Permit No. / Oi t m44 Date ertain CONSTRUCTION PERMIT 1. Type of installation Sun -tad Cr,blo 2. Location and description of work Sr r}. t+ci nr rothv y PO. 9Van St 0* t'hS Input ids re CU. St t36 OM t+ ) to lawn taw 3. Estimated construction schedule: Start. 6/11174 Permittee: 4. District: Mattis pall loader 5. Telephone No. 6. Project No. 4‘241225 Ca -5124 Complete• Address • 7i 71 s'i7S Tabst 20- 7. Permit granted subject to general proytjions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions• 9. Applicant. Ipantida}u By: r=iariesterra Name and Title Date: 10- Issued by L� i a -'s Date" Name and Title 11- Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman l' ' Tea 2. Division construction manaagger�t., 15.4 3. Colorado plant manager J* IST'tim 2464455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utiDeed and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation_ The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. `/32/74 £/32/1* Br Maintenance Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that that he has read and understands all of the sforegoing nd lsthe that he has forthauthority to sign for and bind t', t b virtu signature the Permittee is bound by all the conditions eel forth herein _ _7 THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO WELD COUNTY ENGINEERING UENI. INSPECTION REPORT DATE S-- 2 9 -7ct PROJECT: .flv,,4g1„ LOCATION: 3 1.36 PERMIT k /Oi7 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH e Permittee: 1. Type of installation f-rce CONSTRUCTION PERMIT Permit No.. m! (O Date 6/12/7k Bunted Cable 2. Location and description of work or 3. Estimated construction schedule: Start- 6/17/74 mountain Bell 4. District: 6_ Telephone No, W+2-8223 Cr5l41 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by pecialpermittee and Weld County c e / a iYa r e s 2'e S. Special conditions• N/ Q/ l�L C.)4 - Boulder Complete: Address• 719 7$ .42 2775 Valmont Rd. 9. Applicant' RY: F. Parks foreman Date- 6/12/74 Name and Title R. Lange supervising forffi,an Date• 6!12/74 10. Issued by Name and Title 11. Final Inspection by Date: Name awl Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Roger Lange 442-8221 2. Division construction manager jack _Earl 266-4557 3. Colorado plant manager at T. $oetan 2A-74.55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date Is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. $. Permittee shall return the rightot-way to Its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof.way limits. Mountain Bell By' Mntntenenee Supervisor In accepting this permit the Undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is hound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD SiD.UNTY, COLORADO y3etr..; p. c'ati to k Sal...t �� 1. Type of installation Permit No. _ f-7¢ Date 6AIIMF CONSTRUCTION PERMIT NarrmN obis 2. Location and description of work 3. Estimated construction schedule: Start: 6/17/7t J L% �y/ Permittee: -f11 Complete: /` 7l 1 4. District NeatestAddress• 2775 Nola* ' r,. Telephone No. 6. Project No. C1 7. Permit granted subject to general provisions listed teon the bottom of ofthis permit and other special provisions agreed to by Permittee and Weld County. Sec C^Y��5 tai vv5 4-^g'^-urir 8. Special conditions: L 9. Applicant' Nouttaisi kU By la Parks Parma Date: Name andTitle 10. Issued by 11e SdTa+4aa4•4—t_a Date - Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed �♦� on this Job. Please call the following people collect, in the following order: 1. Supervising foremanagar LOS1114208221 2. Division construction manager Jaclifle$5 3. Colorado plant manager 114ar J,,ta 7Rd-.i$ PROVISIONS: 2. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. ; 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance 'with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date Is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility oI work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Ii is gum THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO By: Maintenance Supervisor In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the ermij e and that by virtue of signature the Permittee is bound by all the conditions set forth herein. crotwe From the corner of county road #18 .4 7 going west (785ft.) on the North side of county road #18 From the corner of county road #18 and 7 going south (1554 ft.) on the east side of county road #7. Then crossing to west side of county road #7 and continue(3922 ft.) to the corner of county road 16 and 7. From the corner of county road #16 and 7 going south (1105 ft.) cn county road #7 on the west side of road. From the corner of county road #16 and 7 going west (990 ft.) on county road , on the north side of road. :PEA .-d '7 /'i,.TRCLOSL1P,E it;Wi tT WIRED ssv-e ('/Pi.r6) (3STIIUDA) (E7) 853.3 (VW!. "A) (35' TOICE) (VP( r?) 057;„31S) EMT. FiC.y ERE' `Gi1T X ( 1.7evr,fv'+f.R10.,r —z-/9-/ -- •70• (WC. P.15) (35' TIIn:B) C' PSH.Y 45C (A') X PL. 92OV. H'XZ'I7E0'7.1. L/ii MONT f.ffllnN/-E P,rZMff onlif I' , P,S5.SNF x X COUNT,' RU.16 LONSMONT EXCHANhF FH£DEKILK EXCHANGE / ra v I, A A b Foi >� m I. t 1 I 11 I A I?~Y� 77, I 4y ,47:-Er:L� , ._ tk. ate^ / i m rn ..`13"). . _o ..L W g 2!A S N ,- rvro I� IT IT (vat I?I3) _yf. II _ 131 } I . (35'TUH:M) —. 'C t rz I ;4. F v I; -X I I 4 + 4 1 r z { 'd lby _L ' -6 .-n: wm C„1 i P.S5.S IN (P;s)X L.J PL. -E JIRI. T. -A/1 ON YOLE (tat Pm) (33-' TIMOR) N •Y T oEL I I p �. CC Sj r o I - £' 'NT1 P.)/I? IS A R97/14 4(.Yy5,l 7 R( 47/19 so pas: Fr- , r t- N_ p)..4o.p4A Na Mh'.`� trtr N= er 'r ryOl.. 7T N^ Fs T.."CJ n. ,r 77 .n n4 —..Lt V �a!Do- ",,'O t-- .In -4 . ?A `1i„- A -a- rn n r— � :" -: = A 7:-.x�0 la''' rn - -,-'r .4 -..� �OC�i b ha-. n::: --I � - Tn-i x ▪ `-I ,. n 7.-b `F a �� P =5.S -4. y 2 EX V M ~ ` ^ T. ` 4 .. .Z a " o H I ' N a. N O O C V I co47ss 4--'B-2-19• R1 47f1R LCCH75I c O O O r e r X LI-19-/- --B-- BAY CABLE® THRORGA DITCH ^' NTTHCN it B.I.E LOVER ?J7_DIX /AI,AYf ROAD PL 20 Y+IO, 2-191 LuRIED WIRE FROM ',Fact.? TO EA /c LiAIEO WIA:_. (izin-. hr,;eo 1 ATt ANG tUl',Y SPLZLE IN WIRE. es/.7 3s'TU� (YAC. P.3) 'i( (35 TUith ) (VAL. R 4) • _ C35'7UNpA) (VALes) (35'7unus) rn n A0 344 J= COUNTY ,LL ID RLWTf7 LLO'730 PED.YR,9 (48-6 Oki REDDER) 3;Aa�-bx RL4MRBLI-lut -PM)" 5'48 V) Na (2O' S9 •✓) (R11 P,4). 43- CS -55 'a') $' (RM.P.S) (25"17'✓) 9 (RN P7) (Zit '65 'w) ,g �RH.PJB) (20' S'V) ,cf(Eft l'.9) N (2541 Y) 2, Can LELGW LEFT -a 3/49 W3RADON IN PLACE 2 -5 -MI &RUED VIRES 'W . 60' PP. TWO BURIED writts FROM POLE NOVNTED TERMINAL _ r( \LNBLE FEQ5L.7 (4.7.ct'S'S0) ¼.- DUTLH (RNA ) it o-� p 7ho id WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department. (303 - 353-2212 'Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper request to the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONS l.'ros5,it? )stgs7' 6r Aor'ed C��:p WELD COUNTY ENGINEERING UtFI. INSPECTION REPORT DATE 0"-e~ 7c7". PROJECT: /!/4,/gjeoirn LOCATION: e PERMIT # /{j/6 SU REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH tia Sl - 1J WELD COUNTY ENGINEERING DEPI. INSPECTION REPORT DATE c? ---M1---;7-2/ PROJECT: &' LOCATION: 6/ PERMIT- # REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH County engineer Inspector M. # 32 -. ;•Trendh Mgas - 475' Trenxh Width - less than 6" Cost - £7.13 CONSTRUCTION PERMIT Permit No. 1'y'na --4 Date Pi 1. Type of installation Buried telephone cable 2. Location and description of work Co Rd 61 and 521k. and Co Rd 57 at US Hwy 34 See attached colored prints 3. Estimated construction schedule: Start • Permittee: Mountain Bell Complete: -�-G _ 47/ 4. District: Greeley Address• Il. Telephone No. 352-5898 6. Project No. C4-0933 CS -9222 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: Mountain Bell By: R.L_• Millner Facilities Planne'ate- Name and Title 10. Issued by M.R. Francs EnRr Tech Date• Name and Title 11. Final Inspection by Date• Name end Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 624-4479 Dnvr 3. Colorado plant manager C.R. Phelps 624-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damni-e that may result to said installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD F COUNTY COMMISSIONERS WEL N COG jOF X-LLe, xwiummimm gya In accepting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee: and that by virtu of his signature the Permittee is bound by all the conditions set forth , herein. - cco. c/tee/ Q WELD COUNTY ENGINEERING DEPARTMENT UTILITY SPECIAL PROVISIONS Please inform the Weld County Engineering Department (303 - 353-2212 Ext. 213 or 216) 48 hours prior to any construction in County Road right of way. This notice is required in order to schedule any necessary inspection of the work. All work covered by this permit must be completed within 30 days of the issue date. Extension of the completion date may be granted upon proper requestto the County Engineering Department. As a general rule, utilities will not be located under the roadway surface or immediately adjacent to the roadway surface, except for under road crossings. The utility company shall provide all necessary signs and barricades to properly warn and protect the traveling public. As a general rule, open cutting of road surfaces will not be permitted. SPECIAL CONDITIONS ate... 0- 7- ..4-0-0-D 5 7 emu. -t-9 eAmAttatz, _ ,J,,,,t_tar C./ "Quota Sin cwn K>v 041 C' nVN ^ ACP M�cacic \\rg pa. ~) ©yea 4 br cop Y ROAD / n RL 174 LC 17400 (OLD at V. FTMCH TOLL) O Z n LC 194E Qx �\ e td31 1134d 1 Hr. vines Ln07 J-1------ • n L O J P T. N C fir^ 9 F O 3'" n e t 0 •, RL 114W LC 1743Yt R. 014 GB.LI]L 2 IOU /ZOO 20 DSW COUNTY_ ROAD 4saf•3yI:j • 1i1� ni'� 4 4 1 O (324') 'Q (2517 O A P r �aa 0 L 070 .19 0 1 N \\ _ (262) P n C 5 74 0 F 0 ; L L • 1 Fa n 0 11 • T, • 1 ' BI a • C 11 R ` ny rn P A J L D A D 0 P S f Y A OAA 72. 8 sr KO Ilit ' /116-� 9-S)/ C. I PIi S ;// 0 5 \ I f 4R)6e -hJ ? I I^. � l5.9.37� m � P/2 I J11::;041; '�O'1'31� 0 i /Pry } orrin tom' P10_ in ° to • / Pto SLs D J 2 £2 'l7S 'MAN (2O' B 6079 CULVERT 2 0 N m w NI So' 4JOQO4 20 BSW (30) a v3 O ry CN \ f • R. At # 43 Trench Meas - 9,789' Trench Width - Less than 6" Cost - $146.84 CONSTRUCTION PERMIT —Ss -'7y- PertNo- ni La Date 1. Type of installation Buried Cable 2. Location and description of work Bury along west side of 35 Ave bury on north side of West 49 St to 47 Ave R66W, T5N, Sec 26 See attached print 3. Estimated construction schedule: Start• Permittee: Mountain Bell 4. District: Greeley 5. Telephone No. 6. Project No 352-5898 c4-0960 from 37 St to West 49 St, then itit�e4 0 4•n..1# t-.. Complete: 10 at It J4 %.l Address• P. 0, $Ox 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant• Mountain Bell By: W.A. Rae Area Engineer Name and Title 10, Issued by ahme tical Clerk Name and Title 11. Final Inspection by cc%No rip—uJ^f-r1 5g1"ISM_ Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, ln._the'-folewing order; .. 1. Supervising foreman J. Martin 352-5800 Greeley — 2. Division construction manager J. Earl 624-4479 Denver 3. Colorado plant manager C. R. Phelps 624-4681 Denver PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Pcrmittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code - 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is. changed. 6, Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise ont of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee win do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date• Date: Date: By: Maintenance Supervisor in acce¢ting this permit the undersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his the Permittee is bound by all the conditions set forth herein. C THE BOAR OF COUNTY COMMISSIONERS • WE TY. COL /7 ye,t'4fio e NNNOG6 District Engineer Atm 10. Issued by S 43' ench :,ea - 9,789' Trench Width - Less than 6". Cost - S146.84 Date CONSTRUCTION PERMIT I. Type of installation Buried Cable -4-(0g\-k_ 4C, 5 -S --7y- Perini o, eo 2. Location and description of work Bury alone west side of i5 Ave from_ 37 St to west 49 =.t, `hen bury on north side of :lest 49 St to 47 Ave R66wv. T5$. Sec 26 See attached print 3. Estimated construction schedule: Start• 2"i, 1e....,d,e4 to r. zr ' i 4.-.:v+. ;,e-.-,- Permittee: Mountain Re11 3 `_w �t yi C. i'e, -- irli 5/7 y Complete: n pa s � 4. District' Greeley Address• P 0 Rey 113 N. Telephone No. 352-589a 6. Project No. C4-o96p 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by n permittee and Weld County. 8. Special conditions: 9. ABnlicant• NO :n ai p, Rel t By: W A Raw Arne ?,r i near Name and Tate fl timer Analytiral rter$ Name and Title Date • Date • 11. Final Inspection by LZJ1L.sue' -,{ t Y.S.45eQ Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Martin 352-5800 Greeley 2. Division construction manager J. Earl 624-44479 Denver 3. Colorado plant manager C. I? Phelps 624-4ii81 Denver PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permitcee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specia4 ations shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittees installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable sad shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. 1-2 L as royery rt THE BOARO.OF COUNTY COMMISSIONERS WELD- (e' S J fL _ )ti In accepting this permit the undersigned, representing the Permittee, verifies that be has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, en, 44 yes District rug eer At m »c.79 T =� IZZat _- r .-D 9-G' — I.F31" d// (/ S) A dt50 NC �"5 "j(GLL'7-9 XI/4 /8hZ-IX &' AG HI (Ld.D3-9. 85-� ,) LS /35-/45 ct C$ ccz O C (a,nr-y.µJX) /.5.150 -MO h .B- - ...- CONTINUED -- a* L4N,-- 45 X '. I/lY PUCE X L5/' ,YG / (PS &7r03C) 4450 GxC —8 70 F7.iIG — S RED 4383 R OV Silt-A7T E/M AT1/G-msr F,UM ABOVE LEFT ^,NT./".'.1/ED — 1 O U } r o ES I • - 7 F � . 1„ 44, ri 1, I\ b a U ri ig c" `I.) 9 BH: , Ia01-1 N — J °� cauatt .t 9 ti.F I• In A.2,c.-50 ry C. X rj V r' 1 HAH-jO try 18. I.50L 2 X 7 MEAi Oa JUC) n—alxw '. L. Lit _ N f _ CAALE PLACED ON C4-5030 \ AJMW25— A I-5 I- -.r-- L341N-SL- -a1Ri!b CABIF DETAIL YPtY'EX7Y IJNE N A N Y LOCATION 1 7),/R ('Aftilr L\ —j7 iH 3T B -HAA. /350,-.55,0 n• COUNT ACTUALLY FOUND IN flC. 1• DIRT RD ASPHALT 7HVEMENi S .,. a a ZHAH-5O- —R _ 8/ -SO P17 l5, SHAH-L—�- r•" 13 Win I A7l1l-AWL1. IS 4DI-4COL PED03 1-G 79 7 - 5 051376. 976. /-z f 5/ ➢-'re t`jnl O� EA/ZOO 4400 " 1 lai 1,7 03145 A. ,�../fil, ) at 10/41 cto3 JI cOl--ll+} n 3 47' OF 4' PI A l“' PaV sr - 1 c 6 Qz > P56AL -'CREEL EY C.45 LINE e -44,ccr. ¢5-C ie6Pq/R EXIST Are 0.42./.2 EC d,GD ce .CGn lTAGN _ p/YE_ _ c I-4vBLB t R/W 11700 - Width of trench. 2 inches Lineal feet of trencht409 feet S .015/lineal foot CONSTRUCTION PERMIT 1. Type of installation Burt eel tel ephonn line 2. Location and description of work Refer- tr, att,r erl Fvhi hit Permit No. Date 3. Estimated construction schedule: Start- 06-01-74 Permittee: Mountain states Tel. & Tel. C.O. Complete: 4. District:-Cheyorwa 5. Telephone No. F,,34-2'464 6. Project No. CS 9160 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. /��1 /� 8. Special conditions: N ill Lay k6 1, c r J. /f l"n/o, at (113} Si14 -�33C a" W c -f l lcnn..fy 117 an- a Ore. O. t1 / J,C/ln. zTrC'l ali (1o1) 3ala ix/ !L - HSN* Lefts Cors. evott /»vim ac ConFilef�n Y7� 9. Applicant• Mo _ n tale 1e1. R Tel. Co. CO/if7dn }JO S. Address• RM. 250 2020 Capitol Ave., Cheyennes Wyoming 82001 By: �'� -._- - _ Date• En 10. Issued by Date: • Name and Title 11. Final Inspection bvi0/8,/ ile.z. t r , /Lit - 12N -,?'ti 5 Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Louis P. Cicco 634-2529 2. Division construction manager Howard F. Hendercnn 634-2293 3, mg, plant manager Milton S. Puller 634-2217 PROVISIONS: Wyoming 1, Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2, Permittee's facilities shall be placed in a location mutually agreed upon by Permitted and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted prr.ctices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shalt remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. title Supt.(OP) /74-0 t0 " c22. r verifies that he bas read and nutters rids all of the fie; 8nd that by virtue of his signature the Permittee Maintenance Supervisor In accepting this permit the undersigned, representing the Permittee, foregoing provisions: that he has authority to sign for and bind tb ermi• Is bound by all the conditions set forth herein. d J5f89% - %./'f THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ' f wcg> O y\NI' 14 CABLE TRENCHED 36" DEEP Ow+ AtRo55 [Ot1NTY RORD,4 ,•0 if 1.4 \r., NWe-NE4 SEG 34 l 1 cc� T -12-N R-62-W/�t 04 G4 9` 4, 4,i\ C 4 412 413 d4, 0 4 V y, / G9ot,FQ N. "°^'s a The Mountain States Telephone & Telegraph Company EXHIBIT FOR RIGHT OF WAY NO. 11700 SrA 4Z7+42 GRANTOR WELD cooN-rY1 CO 1.0 PA Co r 0 43o t}1 PR0JE.Cr No. CS9/60 f Drawn By W• F. 4oYD 1-9-74 0 Q Q 0 n O PAVED Co, RoAD 1r CO • res r1 (PA vED H _ f9Z' 4 r4 /ROPasED BVRLED TF/cPNaNE CABLE PLACED TPRU A Z" HOLE BaRED 4-8"' BELOW THE PAVED ROADWAY BRIDGE eirt 2$ 34, 4 Co. ROAD No. 136 PPoPosED BURIED TEs.EPNoN CABLE PLACED THRti A 2" HOLE BOREO 6b" BELOW 7}1E PAVED ROADWAY. M 4; N' Sc. z7 —Z8 z8-33 T- IL -N R- 6 2-W Scale 1"= NONE The Mountain States Telephone & Telegraph Company EXHIBIT FOR RIGHT OF WAY NO. 117 OO GRANTOR WELb COUNTY, C0L.OR4Do PROJECT NO. CS 9/60 3 Drawn By W. P; C3CYD r-8-2 co. ROAD No. at Se/ LrWELD CO. ROAD DEPT. SHOP COMMUNITY sTA 411+ 13 s> A 4/S+97 m 430 ---1.4-.-30'-► N J a PRoP05ED BURIED TEL£ PHONE CABLE PLACED THEW A 21 HOLE PORED 36" BELOW THE PAVED RoADwAY. Sec. 27-34 T- ! 2. —N R— 6 2. -W Scale 1"= No NE The Mountain States Telephone & Telegraph Company EXHIBIT FOR RIGHT OF WAY NO. 11700 GRANTOR WELD COUNTY/ COLORADO "r3 PROJECT NO. CS 9/60 Drawn By W F Soy° - 1-9-74 WELD COUNTY ENGINEERING DEPT. DATE /s _ 71 INSPECTION REPORT PROJECT: dptQ CP 0-evCP LOCATION: 24 (9f kW 0 /a PERMIT # lQ SKETCH County Enginfrer Inspector 6 1/74 M.13., - 31 Trench Meas - 18,685' Trench Width - Less than 6" Cost - 5 280.28 CONSTRUCTION PERMIT Permit No. Date o e 1. Type of installation Buried tP1 eph nne (-able and wire Roads 40 2. Location and description of work County , 1+2, 43 LaSalle See attached colored prints 3. Estimated construction schedule: Mountain Bell Permittee: Start• 30 9J, - v 4. District: Greeley 6. Telephone No. 352-3152 6. Project No. C4-0929 Complete: Address - 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant' 10. Issued by By: Mountain Bell R.S. Rehurek Facilities Plannione. Name and Title D.P. Platt Engr Tech Name and Title 11. Final Inspection by Date: Name and Title Date • NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 624-4479 Dnvr 3. Colorado plant manager C.R. Phelps 624-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code, 5. Permittee shall advise Weld County 48 hours In advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation- The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety, 8, Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Maintenance Supervisor 1s -accepting this permit the gned, representing the Permittee, verifies foregoing provisions; that he has au137to sign for and bind the Pe attittee; and / 4 is bound by all the conditions set for herein. 2 39.$aZ C3 flOCe00 S THE BOARD OF COUNTY COMMISSIONERS WELD'-' UNTY, QiOfRA A he has read and understands all of the by virtue of his signature the Permittee 4 est strict Engineer 4t 3 ?Soli/ $0. art t-#'—'31 i 18.685' Trencht Width — Less than Cost — $ 280.28 6tt CONSTRUCTION PERMIT Permit No. Date I. Type of installation Buried telephone cable and wire 2. Location and description of work Cr-flinty Rnnriq 4(), it? 43 LCnlln Con nit-,rhuel rn1nrnA r«;,4,; 3. Estimated construction schedule: Start- Permittee: Mountain Rell Complete• 4. District: Greeley Address• K. Telephone No. 35? -3152 6. Project Na C4-0929 7. Permit granted subject to "general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: }lnunta5n $a17 By: Name and Title 10. Issued by I) P P)att Farr mech Date: Name and Tide 11. Final Inspection by Date• Name and Title R S Rehurek Fari 1 i tips Ul nnrtpate • NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman '-h M2rtin 37... Run Grly 2. Division construction manager Earl 624-1+79 Prior 3. Colorado plant manager C -R. Ph,)ys 6211-1+681 Anvz PROVISIONS: I. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the' construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee 'shall return the right -or -way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary,' such corrective measures shall be initiated within 30 days and com- pleted br1 Permutes within a reasonable interval of time considering the circumstances_ 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except at the same hiay result from or arise out of any act or neglect of said County, Its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County,wColorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD -COUNTY, COI, RADO- it. Maintenance Supervisor In cepting this permit the u d foregoing provisions; that he has au is hound by all the conditions set fo v A. igned, representing the Ferrante* Ucptes tbat,I6e mad gn understands all of the city to sign for and bind the Pe t andha y itne ila signature the Permutes herein. r trict Engineer ri //. _ • f 7 «..j�gy.F7a Cp O ro -ate—RC / - LG CIO/O0 �r fL7REtcrJnBSL R./3 -J4 �w e—Rz / [.c 00(0O --t 3P0 t/' ti A:IC MbN ts nns /. 4itc \ (s,cwvft) M 6 rn rFl • O f . _ /i_ — // —//—� -- -- �sa rt' „ s A 1I kin --k.{ iip /PL/OS! _ /79-/BSL• d7 L3 -//o (IWO) 1"Aijci .H1HniH n r' Ort N G\ n Qc a C) C- 4"4 4"4 L.. 'VD # ¢� ((P9VEL) A'OS?/J0A.'V HT 2NO2, r-- O N i 7.7 I N 2 N PR m rnig. aab j 0 r RL /6r-_3 it8RSDLE /CK7 177 PP, fiP//k7T 4N -/1 _ U tkC Ob 11{{ LAO , o .1".-7772311 1.874 r 4N CO RD. O O R/5 70CL0s 37, ti 0 sm3Hts € m rear Q&YA ( gr) RAW/ QFW (L2ad ¢ ✓ La' (O1/'r) SIN i0+ 2S t�. n fP. /f)A175/7G 777-71.5 FR 2/J? ITO COS 37J SYA _5E+OO 6m di 15 (SRBVEL) S ftscessanyty S$ 11./3-/a. SI. 4, r M C 40 Ja - Jf JO �. 14 12 .. 1.. 1- '4 .. trailiabeTtliterriaraiilt.iarAiertladat Era ItatitOlialiblialaingalli r: 1O -its •_.I • :I; : ri? ., • - �L• JtY 70.. -, t� vai►t 4'i�1t � df _t � ± .7, 'C`i`��_:c-.tic -il•! �ty_J � .+I •: y� r y`. es �sa e s �' +fie-a��]�t�� �muni as•r iC:�i'i. �l iW T c a a ,,��� ,��y-R- nitlar „a U. ; ilekiiI6C..r:111 ;1 7 iron" _quirr, .951,1,:a7 to r arrp .yam 3 3�. _ `� W /y Pin. ,- �r` ,, fl. • al - a M ati elf , r .g' - T �; . I �`_ era ry -R ry l IS . _ 44tt jjjj rani ll sittratamearmonsimargi atatigs arl Ill at ,3. -WM. .. at zuriralli Y_aa• ,41aragaRasH: a+o 4"�b/ n etifrillis 'CU �{ w I% re �i �: I t, '' ;-............ a Ear iliMinaree _ 111 .war in _ . iit k1- .`.. C .w. SUalltatar _.._ so ' i 1 f2 , :-. . en • Ti. - n '5Z II` •'°t ... e la •�. - '4r_ t •' ;. .:7 l T.o• 1 .71 7- �: ' •" I . ' .rtis j i a • it is it 1+ it - i7i ante .1 yl aJ rr Jt al • hF • c 0 u N 33 I'S 27 » a T u µ o p St WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7-3- 747 PROJECT: Fait, !Ain LOCATION: �( 2/f 7C' PERMIT # C 6 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH _A p County Fng�neer Inspector Form 03 6/1/74 MB #41 TrettC 'Measurement = 570 2rerch`Width - Less Than 6" CoaYt - $8.55 CONSTRUCTION PERMIT 7111 Permit No`��V U __ Date 1. Type of installation Placing Buried Cable and 4" BIP Across County Road 62 at County Road 49 2. Location and description of work R64W, T6N, S36�buryir_ss cable along shoulder of road 14' east of property line, to a point 440' north of said crossing, turning east and crossing County -toad 49. 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete• 4. District: Greeley Address• 5. Telephone No. 352-5898 6. Project No C4-5149 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 36 -Dais P. 0/ Box 1139 9. Applicant- Mountain Bell nr: W. A. Rae, Area Engineer Date• Name and Title 10. Issued by L. D. Verquer, Technical Assistant Date: Name and Title 11. F Inal Inspection by f aI;A /101 y a x o2$H'7€1927 Date: Nameeend Title NOTE: If dissatisfied with construction performed on this lob, please call the following people collect, in the following order: 1. Supervising foreman J. N. Martin, 352-5800 Greeley 2. Division construction manager A. J. Earl, 266-4479 Denver 3. Colorado plant manager C. R. Phelps, 266-4681 Denver PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. I Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Fermittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: THE BOARD OF COUNTY COMMISSIONERS WELD -6Q I/NTY, CO DO Maintenance Supervisor 0 ete In accepting this permit the undersigned, representing the Permittee, verifie at he has read and understands all of the foregoing provisions; that he has authority to sign for and bind the P¢ri'aittee;1lnhat by virtue of his signature the Permittee is bound by all the conditions set forth herein. '/6,05 istrict Enginee;ift O O O O O FFvR. _ IFFICE rJU�G E ) _ !+ ;— �l C V tom— LEIS c, PL13 -31.1VXS I' /3l 0•\)- 1"` <11 Ti MER--TEO GRELN W..T GFi1S-_. CONTi\CT 211E tOLLGWINC, FOP L_?.,a,!OK) pF EURIE.D UTII-ITIL'S P5EFCRE'RCMCIvINC& Or( OF Cj'AEEL=K 15'5 t2 CLITii7,L t3EL0 COGUTY LjA7 V`57 CnREELEV GP5 352.7171 I.ICN'IL LIG SLIT t ROL:CP. 355. 1144 LCCATE EXIST\LC-TLR\LD CP?1_E. (:IEFCPC-TAENC.IIING IN AIDE,A 352. 1234 COKi -\CT L GIA 4_E.Y.ING FOR ch7NKE5 513RXS FRIOR TO COVhTK START -LATE_ /,- ,aW -/WO 'iJ"C 75, 01oRf\liLL PIZ/kW-25 20 57�'L-OJL 4 niA ItATFti t\IC PJ PED EP C. UT' )-- Cc. // —+r+ .t — Job Seb No Per ma. Aerl apt Reg Sere Date Aeeoc Job. LC. 531`J Lasua.. Camel of — DrP Trfe_a _earl _boRR CO Jumpers AR (J 66w/466 lire /7 Pr Trf 0 Mcg Held Orders Hold Regrades Cable Other Cable Urban ✓ Job Class 08 Job Cat 801 Job Prier - Joist Use Power Co Power Co Vacate Attach Traf Tel Co Vacate Attach Tret��,,, R/1' Pet`Nvy Co__City RR Penis Re Prints totco M15S141IWPi .\t\lh ti's' 4aNy V4 csS RPNGE Co'I TOL\A1SU\P [e U "LOTIONS Q Ci`Ut. '1 ROP[h 419 •- ;r% MOUNTAIN STATES TELEPHONE COMPANY O ▪ �eMKT i:. L. ._i_v COUNTY Lo:*T,o4 RL Pons v0LTAOE ---- I 45K • 1NuG1) r _ „ = xIS71NC, 6 D1744 -SPED KC x/97 tO J 7e cgLY CD FORM ASS J0040.-LY59i---J—..-.._- NYOEO TO a:'`.F MACARo[_ DATE e4340 .__.. ' .s gI.. _ ORO •Y -F-- aT 9R Y APPROVED ra G✓S _ JyG_____neuQfs ArEl/ -2•41 O ROCR atM0.. Mv. DATE 15"7- [YC4 -- [Pre MTCLEE.. Y = 4EC[[NTY or WORK 121•0122i. a r11 JO CO ----- LOO aPPAOVat. o/4i'ff _cA.REC_-24{. r -[sttT_ -or_ -mans WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7 - /0-74 PROJECT: 44&,14iv^ Es It LOCATION: &e E (?2 pI- 49 PERMIT # (217c, REPORT:'Th.ls Aora4-tcn. 7s R,• Id- AV f-LF rAkp wic C, f) it& Irk- Z HtteSaci log. has c Il b£,s ri 1?, c(h Y PAOEd. T�s. CAM itli±y /CEos.S t4E was ,vnaakd by it 5,;n-. 7z fAVc 1c; beet /Az. av£ r.,9 zags )1a, -d p�mw a e Cart 1---;d /,i o /}pPAY 4 HA ciAlei ss fp '!� 6.O s of ,e/opc_e /y 4F SKETCH —ercz _ Coun£y ngineer &ct Zej M,3. # ?t0 .-Trench Meas - 2260' Trench Width - less than 6" Cost - $33.90 CONSTRUCTION PERMIT Date A - 71 1. Type of installation Buried cable 2. Location and description of work County Road 66 see attached print 3. Estimated construction schedule: Start• Mountain Bell Permittee: 4. District: Greeley 5. Telephone No. 352-3152 6. Project No. 4F.-293 Complete • Address: S - ate- 74/ T. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions' 9. Applicant: Mountain Bell By: R.S. Rehurek Facility Planner Dote. Name and Title 10. Issued by D.C. Sinele Engr Tech Date• Name and Title 11. Final Inspection by Ed !%.7 —in(, xl.y ✓..-.AZ-'(tt Date, Name and Title NOTE: If dissatisfied with construction performed on this job, please call tae following people collect, in the following order: _ Jack Martin 352-5800 Greeley 1. Supervising foreman JaQk Earl 624-4479 Denver 2. Division construction manager 3. Colorado plant manager C.R. Phelps 624-4681 Denver PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient; to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be lose than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed, 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same nay result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF C�I41NTY COMMISSIONERS WELD C6kiryTlj, 9OI9RADO / ( 4,1(4e% By: ntenanre supervisor In accepting this permit the undersigned, representing the Permittee,`4e:lfies that be has read and understands all of the foregoing provisions; that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. X " Pb3 NA. District Engineerq -1`�‘ 3,qa /7 1 i `J LJ £02)/9K 4W/,C/ GATE 1 fi '.b H h1 O O 0) 'S h7 OC O O 9 0) ',c1 O m O O O w I M c O t 0 0) 0 o • r• rx 1-, a' Ii l-'' R7 N 0.a c -P• O O 1 OOO a9 OHa n wv) O n O N Sc O CJ a O O 1 M OQ`R) y 01 C. 7 IS O- I." O' < O 0) 03 0 W ID N O < O O-� (m) C O N CD 'I o7 01 ((�� .O 01 C7 O M 9 0 O B Al • ^-n 0 O L' >rNg' 7Z3 93 V <D II x ��� r�v1/479 fs I Ir n I I, O j� I� Iu I I�"I o I;, r N; I I� m 1 0 z a 1 no Er O m I Ir I I C-. CO.G n s O-0 a O.w C-4 C; O 'l a' 0 T. D 31 N OO O ly N bu*t V 4 PR. De l_) 5 14 , nPi ti b A PDS L) U B— ---,-8 2 (7's / iireZDs 71-D# 3 1.3.7 57/9 000 37,9 '/ tB0. FED 3 574 414-5- .STA /ss&9 STN ZZ166 p 7L.1D"TER! i 7f 374-23 m RE,2TE/D7' on on s O Itn Z I O I • In 1 P z s z ci I- n In m r m v z O 2 m n 0 t -n S 1,1Nztik ti.) 11) c'Na KODAK R. R. z-)K—YAmes WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7-/b'- 721 PROJECT: MM„n-rAiN '&44 - LOCATION: 6G aA Vii:1 63/ n/ %,/,,th PERMIT #_ 95/l REPORT: SKETCH Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. coin y 'n;�neer�Gy Inspector �� Form =3 6/1/74 K. B.#-34 - Trench Meas - 3,634' Trench Width - Less than 6" Cost - $54.51 CONSTRUCTION PERMIT .4_ 44, -)19-74/- Permit No. Date 1. Type of installation Rtlried Wire 2, Location and description of work County Road 4 See attached Qolore_d grant 3. Estimated construction schedule; Start' Permittee: Mountain Bell Complete• ad liars 4. District: Greeley Address: 5. Telephone No 352-3152 6. Project No. 04-5047 Hudson 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant, Mountain Bell By: R. S. Re7lirek Area Engr Date• Name and Title 10. Issued by D. P. Platt Engr Tech Date: Name and Title 11. Final Inspection by Date• Name and Tine NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J• N• Martin 32-5800 Grly 2. Division construction manager A. J. Earl 624-4479 Dnvr 3. Colorado plant manager C. R. Phelps 624-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Pcrmittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 6. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Maintenance So In accepting this permit foregoing provisions; that be hi is bound by all the conditions ae THE BOARD OF COUNTY COMMISSIONERS WELD-GOS1ryTY, COLO 7/ CCC NT'd CBUISSIDN, S Ing the Permittee. ver3l[es that be has read and understands all of the ifo sigl'' z slid d the Permittee; and that by virtu is signature the Permittee i yes 9,7=;a . MAR 4 4^r . District Engineer 907' ct I oc i- STA S?4O •.r V /0' o CiewruPP&f RIGHT \ �„ fir, /VOTES: I. CALL E1✓G t 3 6/+YS //t/ 40(/AV✓CE Jr mcr/ %5 L VLJ F7'. - TIKES Z FIELD C -_M •..:I 4'-/7.73 3. PLt7r 'X R5 /./ 5 :0v/"✓ < ZS v a4 1N Q 1670'F W W Job Sett Mo Per RuL Aer1_Sp1 Reg Sore Date {.27-74 Assoc Jobe Assumes Compl Of Drp Trfe_Aertbu�RR_ CO Jumpers RR 66W/466 Rre Pr Trf I:kg Sold Order. I Held Regradea Cable Other A' Cable Urban Job Class /lp Job Cat 701 Job Prior Joint Use Power Co Power Co VacateAttach Traf Tel Co Vacate Attach Tref R/Y Pv t_Hwy_Co X City RR Permit Roo Prints to: COL(NTY, RCASON .0R MCISSUL I ISSUC IOtit /V/ / /2-/B-73 (L1/7 /. iik STA 441215 STA 444 STA_116O STa3i*TO .STA 29,75 _STA Z9'2 5 n MOUNTAIN STATES TELEPHONE COMPANY LXCHANOC 1�✓'��-rte _ L_OLf.I. _ _ Joe LOCATION_) u_ ±/2..:h2:1 NAS ARDS__Me1/ .. o.YC 12_ CNCWO er-r'jr�"/� .� ,:.unc_��_o.m.v4.L./exo. e.r ARregy(o X.a.GL___ _TIT Lt&L4 0AT C/ OROS. wewn_ 11T•0 COST EC/VE 0 1N Q 'c FORM 3065 A-Crs ISfuro To (--).' CQ; 7-• __ _ JU DORCR vOLYAOC • ..._�. EST'OKra .tx. w[CC{4Tv or WORK IS MN __-C.C_7y OfCC.eewovAL&C_ T1, _CxCR _L POLL IPILO f . CROT. RCe. LC NO. _LINCNO. k?i� T _:MLCT_ .OI_L_-SMELTS WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7-5- 7 PROJECT: ten. -1Z-7- LOCATION: Se//,q /ay xr / 4 131) PERMIT # 967 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH goy engineer— Inspector Permit No. 977 CONSTRUCTION PERMIT Date 3/11/14 74/- 1_ Type oI installation Ruripd Cable 2. Location and description of work To hurry on Soutb side of Weld Co. Rd. #36, for A Watgnce of 875' East of 3rd St. 3. Estimated construction schedule: Start' %/1R/74. Permittee: Mountain Bell Complete• .. 3 4. District: Boulder Address. 2775 Valmont Rd. e. Telephone No. 442-8223 6. Project No 4E-144 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• 9. Applicant. Mountain Bell By. Felix Parks Foreman Date• 3/11/74 Name and Title 10. Issued by R. C. Lange Supt, Foreman Date- 311/74 Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman Iffier Lange 442-8221 2. Division construction manager Jack Earl 624-4557 3. Colorado plant manager W J. Horton 624-7455 PROVISIONS: L Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will ao so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Maintenance Supervisor In accepting this permit the undersigned, representing the Permittee. verif es that he has read and understands all of the foregoing provisions: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOAR WE OF COUNTY COMMISSIONERS COLORAP9- ,` Pj113 O U O Si a cn `I I'' I I"•1 I fit — I I 1 1 x I 1 - 4 33 O s m x r a z > o O N C) OP x -1 r m O •f 9 0 O r r ;. IN t %Z.4 C Z rrs -1 C n 0 PI PI 0 C m 0 0 0 b 0 to z 0 1-4 II I` 0 0 tro — 4 Z z D m N —I In rn 0 rn n O tt -n 0 O s 3RD 5T 2 n k p D z I j^ Ir r irn EL27-.; V T 122 CO 1.J FQ aj5S JCj Q 3 •o PC27SV-/0 P.C. PEDIF3.0 TO R 3G 4� -G50 44% 4-- 01 Cc. 2 t 1 al I It" r t" >L ` `• 1 ' I 0 0 O+ f t — is TO Li 6 9 i _n ntr Ib LA- PFD 54. O pivr- fltii r 0 1` amAlt m WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE :��� /7 / - PROJECT: PROJECT: R LOCATION: T�y �rav4 q (7//c � PERMIT # / / 7 REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH County Engineer" Ifispector G�,ti2d, 2—'3-11 Permit No. F7 W Date 04# tot/5_03 O/36, 00 keoc1 CONSTRUCTION PERMIT 1. Type of installation Buried Telephone Cable 2. Location and description of work On Weld County Road fi 13, (West side), going north two(2) miles. On Weld County Road # 32, (South side), going east 3/4 mile. 3. Estimated construction schedule: Start• 2/14/74 2/22/74 a // 3/-7J Permittee: Aadrees Boulder • 2775 Valmont Road 4. District: 5. Telephone No. 442-8221 6. Project No. C-3-5420 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: Mountain Bell 9- Applicant Mountain Bell By: 10. Issued by 11. Final Inspection by Foreman Name anti Titic NOTE: If dissatisfied with construction performed on this lob, please call the following people collect, in the following order: 1. Supervising foreman Roger Lange 442-8221 2, Division construction manager Jack Earl 624-4557 2- Colorado plant manager William J. Horton 624-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3- Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 6- Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. S. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall he held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and - debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9- Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: 2/7/74 Date- 2/7/74 Date - By- Maintecc Supervisor In ceps g this permit the undersi ed, representing the Permittee, ye fies tha has read and understands all of the foregoing prolisions; that he has autho y to sign for and bind the Pe • a virtue of his signature the Permittee is bound by all the conditions set forth erein. ( i THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO wuwu FOR REISSUE issutII DATE u75i3 RL - 2 04200 TOGO. <-13 I NAG- O/-S7S A. /L-/OO • V N r N PEP2Z.6 RR I Lu P27 PED 22.4 RR -1 • PED L.1 P17 lip 4 FED ZO.Z Rep Pro I9.9 Ric U s JP b7 0 FED/8B N N N 0 PS PER /9.S RR -2 O P/b FED 20.9 • PEP 22.8 P 30 RR-/ P 34 pep RR- 23'3 2 S PEP 24.4 JP42 PC LAS OTHER THAN URBAN N 74.1 "4 v 3 I - GENERAL NOTES.' SPLICER USE 700 TYPE CONNECTORS WHEN SPLICING WATERPROOF C.+BLE OR STRIP CONDUCTORS BEFORE USING 2 WIRE CONNECTORS. 2- POLE AND WIRE REMOVALS ON SHEET 2, 3. USE GNC -sit TYPE CLOSURES PL NEXT TO POLES. 4. PL CABLE S" FROM POLES ON COONTY ROW. ASSIGNA4ENT HIT£ IRAN. STATIONS ON PA/RS SO4 [SOS TO S// .1511 lb CLEAR PAIR FOR 1.14. G- TRANS. 2 CO JUMPERS ACCT 37M 7- TRANS et PROPS ACCT 28M 8 R.R /4 DROPS ACCT 28M •= C SIGNPOST F/W x TYFE SIGN. WELD CO. RD 34 DIRT LPC ITEM 2-4 /CA PR SO LP • 4 20.9 WF 70/ AA -I CC Su/ 2:i LS2 LC 1.50%SOS f / DC ,I A. 7• /S+ S. /L -ZS wrur et) ND SZ DIRT. PC 4326-V I/O- At. Ll1S. ais. at AJAw-IS /.SOI.Sos* 0 S. /4.2S ClwN�. ".' Y �' r v /SL • t. AUGER UNDER - " a 4 A. N OIL 30' x4. RL 27212G G D 00203 gLIk A- lk MOUNTAIN STATES TELEPHONE COMP V PR/ ac t i [ACe*xo[ -ML . - _ _ Ioe xo. C-3.5420 _ onT.icr12OJ1.142?J _ _ COUNTY WELD Eocnnos_5,As7 Oi MEAD RURAL x.[A.DS_NONE NOTED __DATe1F6.7y �4 9 [xMo.[r_LNNTz __P1.pI[l3111,00..��% W _CxD prim! ARPWOV[D eLr T(TLC S: 12.‘_ OAT[MJC-24 ORDER SLEW, _qv. DATE 22-/-J3 [WO COST sr.. Erg) MTCC CXP. x[c[WTY uP WORK 131401 TOLL - FORM X65 usueo ToCFLT„�T17lE CCN$T m eo /JN/ON Tr FA aro. ROWER VOLTAGE .74 WV ./FWf4D COUNTY FCC APPV OVA* -' OP$ /--cAw[c/A/ SN4 .Le,- c-.QAL e&l U L,x[.o- C° N I__or_ Z_axErn JPT iiiiifikettlinting NS ritir� init goat fesrainmsemeram WARIPPIRCrtramiralilliarra MASINIMPALINIMIRMV: _ )1' win MICICOUNIOANSWArAffillEIV __ scuitimsestimumitito5orra ters r►T:;�� '.....,,,,,,„s„.....__,,...„,,,....,.,,, ib-e. mow orb, =... i�ll��r�' l g" a ,� a��_:.rw ...,, ,,,,„s i4Pi- ,,.. is t a «. • aitaipl`� oi1,i _ 4� _ metal r` eamon Rii f 2 aWa41 n a . aramattorantaramersaiwniatir m. rfitainswittatalumessnalianatimmr ialt 30. Saa�� r ". IIOINNUMN N lD"'�.y i i u tram TS ill li ry -r �- iEr 14 fininatirH.-..ra sta�y !I....4. _ r cn .a9(Ri�' Iliale]■\r'lftii� . 1. . irgrld • 1. a' CONSTRUCTION PERMIT Buried Telephone Cable Type of installation 2. Location and description of work to County Road li 17. Permit No, $`7 7 Date On Weld County Road II 36, (North Side), from County Road # 13 3. Estimated construction schedule: Start• 2/11/74 Permittee: Mountain Bell Complete' 3 / ? 4 Boulder 2775 Valmont 4. District: - Address: F. Telephone No. 467-8221 6. Project No. C-3-5417 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: _ Mountain Bell 9. Applicant: By: 10. Issued by F. Parks,Foreman 11. Final Inspection by and Title Name and Title SForeman Name and Title NOTE: It dissatisfied with construction performed on this job, please call the following people Collect, in the following order: 1. Supervising foreman Roger Lange 442-8221 2. Division construction manager Jack Earl 624-4557 3. Colorado plant manager J. Horton 624-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Date: Date' Date: 2/7/74 2/7/74 4. 5. 6. 7. S. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. Permlttee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittes. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise ant of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO sou �Mninteno'' e Sueeeeicor ting this permit the and igned, representing the Permittee, vertEes that he has read and understands all of the foregoing ivisions; that he has avth rfty to sign for and bind the Per • and irtue of his signature the Permittee is bound by 311 the conditions set forth herein. k 106 o7 Protein itteirree 1 II i h N '4k b WELD CO ROAD OIL 1 z m m o> m = r o m m N a a 9 Z > 0 ,, x 1 n -1 a O m a N O y 0 maxis > ^)1 m V o a o- o a d -6 i 1 y m m A< ` a! Q 1 ,< m -s t o 1 I,_ I m�, I "' 7 Iv:,*o 1',IC a I x Io1Ibl���i-il I I I to I I I` IiZibiti y I I , Ioim X111 / I o P I I I I� r�I� OI I i m b1 p1 II 1I IAI II C I m as Ia�l Ilk n t i n ii= 1N1 r > (. * I�< I het I I m IJI IO I 1/4\I I "� I I) !O; I �' 1�ryj o $ m m bl �+(I r ® q IIII I' °m Iif I ''' N Nil In' i ;�'3 w1 In 1 I I I IGi I I <? E. f n= iE c o c I(/! III i0 n 1n o f o IV -1 �'tiC 0 Ib ? 1 '� I - 1 ,r ism I o L w _ ; I ZI ;�1 m i a l I IN I IN a n I I 'I 1 I (1 is I i in I ro NZ ; I` I I r k X11` I rtn 1 I o i i� i ; 'i'yr I IW 1 1 1 1 1 1 i i i i l S C cn -4 D z m —4 rn rn -v O z m 0 -n 0 0' Yf x- -x- it H 601 X -x ro I) ti L ; -43 --:'LLD CO_ Q :p• M -1 rn r �r ci n ti CIN d y .SE 710 ..YRIAT ;802 TO CO z N O' ro t Zt dam mr - RI Ufa �a �a NN NH w: total N 4�r O /Z67" PL 22291/140 SW -1! I, 251-261 o o o>4o 0 j £414 ^'411'�i' PL I LC 00/00 PI (KM 4A/C) P/0 PEP23.8 r 0 ROAD IS DIRT P20 Pt/226S p 3 a oo PL 3,42.5 IILOCK. N , .p to N rn VA' Nztt PCD223 kZ�r�Pim G) 1 n N Qn kVna) i\ b co® Z� Z to o. M G1 rj1 k in n o� ono C1,7 7 ' COG y( � � z;tEl 1 PI ",N1 P40 �y 11 f'CD 3/. 6 ret `t1 c i') _._ — — r PL 3.AZB BLW. RL I E RL IF/ LC 00114 p LC 001/6 g 379) at if FUTU26 Wn Cctstr. rn • k C.. GOPOP ta07Zy Zfi t1�i��CW n, a a h tito 1m� P 30 �o� >s IL FED 29.0 �' o> ry w cci -4 IInn N., 1 C WELD Co ROAD /7 DIRT g - U. M 44• 40 as ao. b 24 24 20 • 14 . 2 . tin.. E - , G L It 111111111 ooux IV; • at•• . • mss• • 1 % : ql i - 1�w��!�l�ay2,��y S i -s. v -ra ' . Faster I �.. . t�i r rsaI-- te t' .' s9,R? J' LJ.afl `ti` '1 11ra ler . = intre....st--.,,----gro,Ar-ad_-, -- - kg .iitirkv -x Atta"DaMilridr-NitterrerfAllgar Vir lump ‘ tr.__ - - - ..„ 7-1.- -al ... • ltririzitealliiii .,,, __., roweratita _ ....., I msllaillgalatiPerraWringailinal µU - *LIM'ifs ini ► .mot � 3`3111 II . �� ��j{{J�j���4('r �I`"w�ls i an (" % oil mo [tse1 - hlo ri ill ill ' aind-ateinuataximatisitatiewniingine' 1W- Friu�� munrip in ' ..t.tri we I - 7- f - "LI :I. ei pa ' .. • . ,,,,,• .,,•,......., ,,.,,,,..• i • ; "i -4!".• WSW, ii1LY/� .]1V`i1 •Vii*.'+ I� "�.. r r�� �,11�:A1�7 isiniss₹.+0 �� ^tt II J/ ;-t . [•, . 1 .■ ., r.,,`"!i lair •,a 2r �1�'l��U�il�� '1 jJ� ••• •--t- J �1..i/�I.IH.� �"nH 0 - • -h-I -- /per . ' - • % l .._ /illitala �i 11 6 U ^_ l 0 [ R U�. 1 1 IL a'1 : 'i •,' fr' .'i 1 ,cumeamwor1� I SIZ allies//" tr �� 1 1 1 ••, 1 ice^ !j2s • BSI/ 1 fT+•C SI • t, t F I� /. - - ±'. . Ci/- 7•Cy! . • J j i _i - 1' "s I r"\I 1 "I '14y 4a . -#• :� -,/• ;{ r;7, _ ;.. �_ ate... I. . _ l�.r •-T•X T.}f'� _'1 . -- i. i . v . 3 1 :S -S A 0 ..1/2'.„ in I 2 5 7 1 11 12 11 17 S 17 2 :i n-... n q1 13 21 27 21 21 2a J1 37 39 41 43 43 47 4t 1• • r' 0 c 0 n . . . ,, M.B:#-30 Trench Feet - 300' - Trench Width - Less than 6" Cost - 85.00 rPr.7 ,c-777777:711 . 1 Permit No. DEC 631973 +li Date CONSTRUCTION PERMIT ,, /0? -5- 73 1. Type of installation Buri es1 telephone wire 2. Location and description of work County Road 15 See attached colored print 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete• 4. District: Greeley Address• 5. Telephone No. 352.3152 6. Project 'Co 3E-896 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions. O .124,1/4_7'y 9. Applicant. Mountain Bell By: R.S. Rehurek Area Engr Date• Name and Title 10. Issued by D.C. Sinele Engr Tech Date• Name an Title R, Final Inspection by Date: Nome and Title NOTE: It dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Ma i 3752-5800 Grlyy 2. Division construction manager A.J. Earl 624-4479 Dnvr 3. Colorado plant manager C.R. Phe11s 624-4681 Dnvr PROVISIONS: 1. Permittee shall he responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and Com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOOFOF COUNTY COMMISSIONERS By: WELD TV, COLORADO r in epti�g this per it the u reigned, representing the Permitter, verif -s that he has read tand understands all of the foregoing pro}. ns; that h has authority to sign for and bind the Permittee: and that by virtue o his signature the Permittee is bound by an the conditions set forth herein. cd3(3'637s' t37OC District Engineer • • v 6\ �� '1 't1 O c' = 1a b M O• 'y] N O (TO < 1 =. O ti (t\'D M q 4 y pr O . el. O q q e* A. nt In O V N 0 x7 x1 H 't7 C4 4 fl S M Ol f] t1 9 9 x, 0 'A \ N O O O R > •7 0‘O c q O O sue'~coo 7 �F�-'W in 51 a' 0 01 O 9) _I 0 o.ta x o O1 Io r• c* H m H IC 1C- W A 0 s N '.d Ai PJ Co Pi 0) A PS E P — 0 M 4 0 0n & n z m In 0 m H 1 0 m 0 O m 1 0 m I IN14 mHsi ka �I ) I N m I In I a I C' z 0 -1 a In OS 0 0 z IW IS` zI (4L I I In 1 I�} I C T 033NOHd3131S31V1 (30 O 8 MAO fN • Lel�k fPb W• MC A Io tit rN N In otri N lit (,LhEa 7.x Q2) STA /130 z. a • 374 /•100 STA 3700 r /,c/ .sSEC S 3 • - c•mipc.a -,-.1-, in arain a imfacipstatantalainuirtom .orbri anat ai »... • ibacat iifi etr" 'iiiii { nlitrs+�; 711i!!��riifiFll<il tranurtituansmrseseta s' ' minuip ^yam mis ra StriffielaillraffligiitiSt.w... `'.'.r•c�eCJ7a !a�YCckw �e0.-�. .a ,./.i ��. lL i�"'w�'���l�I{��ILr���rllwe tensgusitram. ,Srearnwartegain StEntilitantle411111PAIMINNIMMIEWIEN allialgiUMMIE211111 iffilil >z.. to .` \. A Rl'�T�1�1[1fOI '• -• - T 000 - �.Jdi00 L" filla -1 -1101111111115111 stallittili 11 1' 1AMORIIINDIMIMINO y0 Mitsairaalliiiip. 1,,p, pi: Al , kWI � ompa.. IillEk �_Ei� ME r Jr 1I• e• RGSW e,} C 0:v M T n 33 37 77 41 43 WELD COUNTY ENGINEERING DEPT. INSPECTION REPORT DATE 7 3 - 7c7 PROJECT://o LOCATION: /c J /71 /a /� PERMIT # F3C, REPORT: Due to this permit being more than 30 days past inspection date, we feel a field inspection could not accomplish any goal, therefore without any complaints from any source, field inspection will not be made. SKETCH �ou'nty engineer ` sp ctor Form =3 6/1/74 M.B. #-29 Trench Mess - 8,1300 .Width - Under 6" Cost - $121.95 (.0154) 1. Type of installation 2. Location and description of work Cnunty Bripd_24 See attmrhPr3 erileire4 print —rtnit No. Date CONSTRUCTION PERMIT 8sa3 Buried Telephone Cable 3. Estimated construction schedule: Start- Permittee: Mountain Bell Complete: 4. District: Greeley Address• P. 0. Box 1139 S. Telephone No. 352-3152 6. Project No. C2-5325 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions 2 l 9. Applicant. Mountain Bell By: R.S. Rehurek Area Engr Date: Name and Title 10. Issued by D.C. Sinele Engr Tech Date: Name and Title 11. Final Inspection by Date: Name and 'Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 624-4479 Dnvr 3. Colorado plant manager C.R. Phelps 624-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed In a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methodi, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements oI the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly, at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any'tasaaee that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof- , limits. • ' it THE � D OF COUNTY COMMISSIONERS WEL'ti; NTY, C•1.,• .. By: Mainte m Supervisor . Y• Cep, ting this per.. it the u .ersigned, representing the Permittee, ver flee that ho has read and understands all of the foregoin, prey slops: that he has aut ority to sign for and bind the Permittee: and that byvirt e of his signature the Permittee is bound b the conditions set forth herein. n 2,Gn 7T ete* 38.626 / rT !2!. ?s ,+one 3 � District Engineer o——i-io9— MARsaS a .mail. is kilinglitiDinatiaty_ Prala tnaPritairag Y.W �� �.I C FIJI � / i�� k;;nt,,�I�i�D�� rII�I i��.:'�_.:. sin r Mikan PM WW1 telailablfit II @-r ;':��'d mmir 's }aaria-'" .Jt;��• 2ref _sr * [yam. ai s �sLe:Fitnt`r�i i1` L ^..,i#z'G�/ yo , Ti�l'SWiat ' iiiR � .mlasziastantosdAtimuna- Mate= 2rallitlififiatai4192ILSWI�.. j li Cl "RI s' lltill " trio a. WatitiEMICSILIEVAIP2a2111 minas 3. mavemanastosintiraira • Mann 32.. . ,� ,y� 7 a.� OVA il11 itiliantra5r W a til Melifir_ nammuli Aar nn �a :.a' W 1111111011 linmairantaa� F.�lili►� Ala retimampiir I, itiltAlli ;Bizrattrtr4y,�r. likantergitirM ASttiZfrallik Utility 8 Transport Field Report Applicant's Name _ Typa of Permit _ Permit No. U OC Date Issued Expiration Date :Location and Damage Report,'.Date Time (If no apparent damage at this time, so state) Inspection Date _ WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: /\ _ { (%aO Au °sized Agent TO THE TREASURER OOPS Elii . IFT) 386361• c Mountain Bell A„r,,,,,,„ Greeley, Colorado November 13, II19? CNOOOMWa T THIS DAAVT DT 'MS S ACROOMUMOOS FU.Ar11Mt Or TIN VOLLOWINAI WR .TATRRRRt OR RILL NO 29 DAT°D 11-13-73 PAY -One hundred twenty one and 95/100 - 23-7 1020 NOT GOOD FOR MORE THAN S2OO.00 TMs / Weld County ORD.A Or WOO.; TRROUGO UNITED BANK OF DENVER N.A., DENVER. COLORADO 11° 386 36 lo I:10 20m0007i: DOLLARS $ 121.95 7NE MOURTAIN STATES1EUPHONE ANDTELEGRA is COMPORT 04 224 8E° AUmURaID MO.IRTUR[ �I• *. M.B. # - 28 //b27-25 Trench Feet - 2,102' Trench Width - Less than 6" Cost - $31.53 1. Type of installation CONSTRUCTION PERMIT Permit No. Date Buried telephone cable 2. Location and description of work County Roads 2 and 65 See attached colored print 3- Estimated construction schedule: Start' Permittee: Mountain Bell Complete• 4, District: Greeley Address• P, 0. Box 1139 5. Telephone No 352-3152 6. Project No 3E-677 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: at d-7. 9. Applicant: Mountain Bell By: R. S. Rehurek Area Engr Date• Name and Title 10. Issued by D. P. Platt Engr Tech Date - Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Gr1y 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4- Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado- Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Staintenanc' ,Qc9erviwr g this permit the uncle . geed, representing the Perm tee, vdfifies that he has read and understands all of the foregoing pr. - ns; that he has nutrity to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE D OF COUNTY COMMISSIONERS WEL NTY, co "X!c7a C." X67737 >'ar7. 473 p i District Engineer C n 1SOD m n o I L11 • C) N n y n • T D T ]) Z p p77-1 D • m n o w i o < L m. Il I I 1 , �. 1 Ii . II I I- \ 1 I ' 1 1 m.,•a F -1I b-.' o r o o 0 1Vn I-1 II OUNTAIN S' ES TELEPHONE COLA 0 cP • LA o tA • If- csoaractariwb I 4.0 - 41 • . 44 •X11. ' e. r • �� :. ... ..x.. .l. •1��1�^ ..er. �ti • } .— • I•- i sr • • - - . r- . w,, � . . • ♦ . • . . . . . (•- A•.. •e• . . • ,J1 •r Sr�ws- • . - • . . . .. .. . ,_ ', • I Aga. . Cr r�- .� 1 • �.Rine t r - s iwrt, n J (!- •tpr 101 103 103 107 72 70 - M .K M -62 60 SS 06 K s1 so M M Y •1 40 33 u 34 A 30 3, 24 .g m v 16 u 12 10 • • • 2 it 31 is 57 39 61 43 63 07 69 11 n 77 1• Si i3 is 6Y 10 N 0t f3 � • ORea ?MOON, UNITED BANK OF DENVER N.A., TO THE TREASURER Mountain Bell LyJ1nQjl DEM WGreeley. Ccolorado DST• 47c'v�H..b' ��Iz.5,. 1973 ENDORSEMENT or THIS D RN UT THE WAYtt pompon -WOO, FULL IATM.NY or t STATD,tNT O..iii. NO, 28 w*te 11-5-73 369737 WORM t\7i P c 23-7 102 NOT GOOD FOR MORE THAN $200.00 AT Thirty one and 53/100- OUARN $ 31.53 THE MOUNTAIN STAtUOTELEMONEANOTELEONAPN COMPANY TM' Weld County COLD RADO 11'36g73711' 1020-00071: 0i. 224: an &/ 2 x`17 Permit No. Date November 6, 1973 CONSTRUCTION PERMIT Mountain Bell 1. Type of installation Buried Cable 2. Location and description of work Bury Approximate) _5065' of Telephone Cable To Provide Service at Location, Nnrth of Rnad #6 on Road #17 3. Estimated construction schedule: Start ��jj �e-7 (� Permittee: Mountain Bell Complete• 2%! 4 4. District: Denver North(Broomfield) Address: 7020 Lowell Blvd. F. Telephone No. 624-4773 6. Project No C-3-5416 45C 234 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: 9. Applicant: 10. Issued by By: Mountain Bell Millie Beaver (PRC) Name and Title 11. Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, .in the following order: 1. Supervising foreman J.L. Heighton 624-4773 J.N. Knudsen 1e24IM 429-1504 458-2782 Date* Date: Date • November 6, 1973 2. Division construction manager R.W. Taylor 624-7208 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement location or relocation. 2, Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods. equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for constriction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and rhaM remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permluee. If final Joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances_ 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittec's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future tbat would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: 1 Ma nte:,an'% uperviwr g this permit he under ed, re➢resenting the Permittee, verifies that he has read and understands all of the foregoing . -.us; that he has auth ty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE a OF COUNTY COMMISSIONERS WE TY, COLOflDO Mi 1 1 i pn V 't' 6 a-47 i 3 3-t7sss •A`po,9s- Dr 1' 9O✓+S'1S4 /55S'Vn1' /10 n7aM-//x 8+--�-A3'& -// Aft-" I -!S/!'-- rA(M /Zc10'sva er ow, natt .40'el TO eaL4 I .+ — + — -C—(x Car -o.0- --• -w- 2 _.-(Isom 0 -0-0$09--- 00 -._C110;),-"^ -(KO)- 0 _ 1'aSO')I 4/0. KOS'tSG i-,v— �/u•- .- lee--+ tha X ar-Cr4r' Z1Q -•-CrcR)-^ IT" ROAD mI a m m p ! 9S O' be -S' idc > s I T Sr,'t yea' yy Alc I ---re' +-419 •- ' — t—(/•cfM)� CIF M- u. -RLM orrx' LW, ot OW en, AMxs n RO.R At � X1310}�- +•-•{1409—•••• x($10}" /.211'✓ry' 4dt 0 r..�Mew-//(e _ AL i-xtft/•4/L R< x/a -8- __ — — — � y‘. — - —-A-C/sav}- r �41�MLt Iva ii' -MAIM u atir. air �i68 �.E'.s. 4.- ,MIME ''31 (ghost_ 1' MOWN --`t-rsuszataaralaj c 6 •.e.�r ssn,. 3 flier S"`` ntalgent ; ilagairrargi li=^+' wawa& ii��1E1� "' �ll4 r;1110 .osVi a1. n` 4j - ViengliMitagrialtraltrirdir ����jj '•.Cff I' rYJR.I�.� hiSed Matta tWitiEltriZiateateritSEW25.11 Aw qrinmsumsti�'F.allS.1 va raoregunifflawris sa4. p serenua Cron H i C V it 91 as if 87 �ilr� g sa n MOE Man rJt IMMO wags can 1in Inn r 377555 FORM STaa F IS,', c TO 771E TREASURER ® Mountan Bell • - • •rirAnnM Denver, Colorado DATE November 7, 1973 ENDORSEMENT or THIS DRAFT •Y ma rivet* Acrn.Qtzboq FULL MAIM 8Y Ma ,Ou.oWIMC, Permit • STATEMENT MI MM,t NO. 1 Statement DATED 23-7 Mr) NOT GOOD FOR MORE THAN $200.00 PAYNinety THE OMER or Peat And 98/l00AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAlAAAAAAAAAAAAAAAAA/bO1.LARS $90.98 Weld Counts Engineering Dept. 1500 2nd St. Weld Catary, r�TT nrAdn 80631 UNITED BANK OF DENVER N.A., OENVER, oozoaAoo II. 377555R' 1:i020-00071: 04 224 8u' THE MOUNTAIN STATESTELEPHONE AMOTnIORANI COMPANY 12311"- Aunq,um aioNATY•E 414.13. .# - 27, Trench"Feet - 12,089' Trench Width - Less than 611 cost - 5181.34 1. Type of installation Permit No. Date CONSTRUCTION PERMIT Buried telephone cable 2. Location and description of work County Roads 56, 15. and 54 See attached colorej prints 3. Estimated construction schedule: Start' Permittee: Mountain Bell 4, District: 5. Telephone 6. Project 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: Greeley No. 352-5374 No C5-0938 Complete• 3l ��r.sc73 Address• p_ 0 Rot 1139 9. Applicant: Mountain Bell By: B. M. Lafferty Area Engr Date: Name and Title 10. Issued by D. B. Hamilton Engr Tech Date: Name and Title 11. Final Inspection by Date• Name and Title NOTE: It dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1, Supervising foreman J.N. Martin 352-5800 Grly 2, Division construction manager A. J. Earl 266-4479 Dnvr 3. Colorado plant manager C. R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County_ 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and PormIttee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permitteo's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the insta -iton placed inside County right-of-way limits. y' it' 4®/Jt /T/ r Maintenai a Supervisor IseHoge tine this permit the dersigned, representing the per foregoing pr. slots; that he has uthority to sign for and bin d th is bound by nil the conditions se forth herein. THE :OARD OF COUNTY COMMISSIONERS WE 1 •U TY, COLO0 6W Ckk 3691z4 ee, verifies tha ho has read and understands all of the mitteorekd at Y virtue of bis si ature the Permittee District Engineer F; "! 4 It Y /7S/ 4 • I I r #x}w kAgend -J_ v TNt b ✓ RI ;WI pie ,SE £Neerz r- r seem WES7£R u/ �w�•. n 0 V O .Drn n3rd/• 60111 i co 0 3z 5779. In 2 ''ED Got/ r - p. E Cl a Iiii Qyy rip, A EC F4 2 k `\ �. / �/ F -- SA. 17.2.C/ A/AR/CNN 772 [7(L. Cc. - Cat Z4S-7875 C Y TJnm F/ rot LOONrION F` N n .` ,1 5rn. z�fr c I , ;7 / {•• ( e¢C¢QU ING 3G 3A04Dd" G f ,V.r S� ♦♦� Orr 0490WG•AC IA SUI WS.G �.. a y a N e :', .2 E� Ux� 477442 rvlmo IN rlfcD NOT- Ory fsrD?D 44 477 ,e U N 0 n p�iSS 21n,DSI. 1.G0 t >a 54 / [aat �J 31E1E�\ N �� ♦1♦♦♦♦�3� )✓ara PED `il 6L • // 35♦ T ✓DN/�15 TA4.�i N. 0 In dalI. e / rACIef_P X X O )( ♦ ♦ I (1�.V n�. N / i cgb �- C(Ub �. .'uIt �1♦� 7- 2,41Qa�4' 0� { I�N.p g''♦♦♦O ..� 4i vC0 O E t{on zb YD 2 1 LJ c S -4 7" .'7II7. Z5 f39' 2 L El `� l V < lACGIL/AN 140:4)PPDDUC73 RicLair '0 m < CAI,‘ /-307-3L4- 404 EX. 253 A I In In n :: CI I 1 F -I oI 7 ELT OLD (JANti°° r'9f it 0c G E-3903-0-1 cc OLD \ w [-SluSEE DET EE DETAIL SHEr I say _? ftCoCN NJLL f tttSN O/ Mai Funtar(t LOU(MA'C EXC//AWJEE SSA. /06+BF t3K 01100. 0 T2. atinte:tkUrilltraftlitattEMMINFIN ipar;_aastairoatepsuatilemnairt...., a isrlittatiliiiitharahtMeWite mostaurariormairoirrets '4 hirCIIIIIMETO4Clitikrtailetal �\y't�••,111'• ` 1•lS.�lL. 1rs'•i�tlA\ c 1. � �1 �{�,{�p�{�{`��� .Nf :e n yuli?�1 izte A rotil isll N✓Flysy/it ST�ii! [Ms ��+eAv..•r..-••:�l�iJ.G��_'.V s v��.i✓.�J.• �����fI1������,�. rftinsaut ntragatemirsom Wrillairatiliffraidnialli !Winn iigika Vii. _ a . Eat _ii7,' ri M + e FIl!',1�i.� . _ 1�) j ., i���i .�•.�� .1.�a15��L � n� � ii„ter ((fi�gg rr racr �l►et vraiAimsolwa atant Utility & Transport Field Report Applicant's Name _ Typa of Permit Permit No. Date Issued 71 3l 6,..x-7.3 Expiration Date _ :Location and Damage Reports "Date Time - (If no apparent damage at this time, so state) Inspection Date _ e Nea-er_ 7'3 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY; �49$ Aized Agent M.B., 4421 ' Trench Ft - 8,294, Cost - $82.94 • CONSTRUCTION PERMIT Permit • ! 7(7 Date o : A 1. Type of installation Buried Wire 2. Location and description of work Bury wire in borrow ditch of County Road 85 S's i8 & 19 SE 34 of/f, T4N R61W See attached print S. Estimated construction schedule: Stag• ` Permittee: Mountain Bell Complete• 0 3 ice- C. 73 4. District: Greeley Address. P.O. Box 1139 6. Telephone No 352-24%5 6. Project No C3-0951 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Attach conduit on east side of bridge 3D215 to railing supports to S. Special conditions: encase wire 9. Applicant: 10. Issued by Mountain Bell By: R.J. Aab Facilities Planner Name and Title 11. Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect in the following order: J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. C.R. Phelps 266-4681 Dnvr Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permitted, and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be leas than minimum requirements of the Current National Electrical Safety Code. S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Pormittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date • Date • Date • By: 1. Supervising foreman Maintenanc. Supervisor THE D OF COUNTY COMMISSIONERS WE _i/ NW, COLO:.DO, ,. ng this permit the undersi', •d. representing the Permittee. °rifles that he has read and understands all of the foregoing , •vi-ons; that he has author - to sign for and bind the Permittee; and that by virtu8 of his signature the Permittee is bound by a he conditions set for , •erein. ,tiv/ey /a/3/ia District Engineer 1'ED"'C,. d PE? L.`.9 Pl [ N'!ir _L0 EL/ 7- / \ 22C:lay _ — ILr PE Dd9v.6 PL attar £E27- / lent 1 L. L / . !C- /LE: p !Et L __I -1 " /0 c4''9&O '41%A/QE P..t E Ori •NS" A 0 I_ tSb A u S7 SO 41 41 kw. 103 103 107 1 IWl[r II t .... .. wezwii-J1 i f % IMIy tl *477O+', r. 07 M 101 72 70 Y K 44 42 > b 3$ 34 34 $2 30 i 43 TA 7)M Ilk 4 44 44 42 40 2. 33 34 32 30 20 20 24 b 30 -� l4 14 8117,7"..11, 12 65 p a Y1 >h A 77 74 at 07 a 47 N It a a *7 TO THE TREASURER Mountain Bell J.QCATION Greeley, Colorado Dan Octobeer�' ���,//y/�, 1973 WOOMLN{NT OF TWO often{Y TN{ FAY{E ACNNOWL{O{{o FULL FAYNijlT Oil T' .. 16LLbWOW. • vein ..A.{NOIT es MO. .O. 27 1O -3Q.-73 ' Yew_ set* F i I.-nI 369724 c Z3_T` 1020 NOT GOOD FOR MORE THAN S200.00 PAS --One hundred eighty one and 34/100- oou.ARs- =1R1 34 TO TN{ ORDEN OF FAVABU '"'eve" Weld County UNITED BANK OF DENVER N.A.. D CDI.ONADO "369 7 2411' E: i0 20'000071: 2V THE MOUNTAIN STATESTELEPHONE AMDTOiGRAI$, COMPANY O4 224 a 6214-1C47.40- • M�.#25 Trench Feet - 917' Tronch Width - Under 6" Cost - $13.76 (.015) • Permits 7% CONSTRUCTION PERMIT Date 1. Type of installation Burl ed PeJ ephone Cable 2. Location and description of work Counry Roads 43 and 76 See colored- print 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete. ay •Z44' 74' 4. District: Greeley Address• P.O. Box 1139 9. Telephone No. 352-3152 6. Project No. 3E-797 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9, Applicant: Mountain Bell By: R.S. Rehurek Area Engr 10. Issued by R. Martin A.C• 11. Final Inspection by Name and Title Name and Titk Name and Title NOTE: If dissatisfied with construction performed on this lob, please call the following people collect, to the following order: I. Supervising foreman S.N. Martin 352-5800. Gr} 2. Division construction manager A.J. Earl 266-4479 Dnvr • 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5, Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 flours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 9, Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Pennittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the Installation placed inside County right-of-way limits. Date: Date • Date • /t%? /z' e Supervise lug this pe .. it the u :rsigned, representing the Permtttee, verifies that he has read and understands all of the foregoi.: .ro - sinus; that he has a bority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set .rth herein. THE BOARD OF COUNTY COMMISSIONERS WELD CO LORADO ye. /I2 C !r District Engineer co. RD. 43 ASPHALT ND 'D m o 0 o m 'S ON O d m OP XS 0) 0 o as. rC I•' -o' O'r K 'o N m a WI 7 M co t! ra.-7\e•+ c o et m Ca '1 r' C o 'I r c H© c CO m 01 'e PO r O roc 3 y m on 9< O C P on 0+'(7 M N 4 '! it t+• R C 0 0 N r' W (D Co 0 C 1 m 0 CoI S m z I far CD 'f°r O _ ro I SI m m O > m I 1--m, a z a z> I n i o v 0 N b m o o m n z s r m m ° a r m m K .(1 c, mr. C, n (" n ',1 1 o Iii• jp I ''I in ; I a v I MIT I(,\I i IA{ 11((C,' 1i x I 1 tu> �,\1 I h q jh- n l I r l I b 1g a i y � � I .t is o f s P-'-' I I I� I a I'01 I b IA.II)1 1' -71l17 v t I m 1)1 I I I 1n m ' IN 1 m i '=10 1 z I o �{x u133 11 i 1 132 t > I I I -4 m 1 it, m 1 I Iv ' I h I i W 13 0 I I I N s ti o n I C' F 1� m O m i I \m I }r, I 1 to Ira I111 I 1 t LJ If 1 I I IL, l I Hr p o m A a I O r a o_- o I O: 0 a 0* m I 1 9 E < X 173 fv o o I o f -1 lt< I-I� v1 PLI , 0 1 n z> -p I 1 h.I I r` In o m A I I ��i 1 i7 o m P 3 — I L bit In ;� -i I In r. I ; y kb re Ifi �' I { 0 r I I aI I `� I I I I I I I IF i 1 i I I I 0 z Z ti a -I It1 N 1 m r m v r 0 z 0 D CULVERT 13 LC L0020T ST.DfO0 STA. O+31 P s 71-S7 n 41 a. A 0 c e F�— min _ - a-.. 1►.t-' A laligliti Main a... ,f ISSAS -, y,i ► ail 'ra . t ►n n... ADlillt rilWapi p a... `" '; Illy aS�'� E N` f - fl :....-:.. Main - •tUDIUME n : I iS.©lM 1 m ' nom ..... I m If k'• - in ,.....:o - En! any ° 0 .4) . ' .. - DO ,.....,N trn! 1r - D MO ,l IIIIlIIIl® En MUSE IIMENNEMI It_ ,....V \• V 61 i ILIIMENII MENU .� _!, - c .-ir;aasnin si �::. A EMMUMMOCED ODOM- g *1 �d a - -ill n soulnairaaim swam III. . MitAiitilterallinit0 - est= �nsitin of ttl ADM n.... Th... irS; a `"MU tall WARM Y.S ?: • 7`-.? 27.4E"R I. t slien p: Utility & Transport Heil Report Applicant's Name Type of Permit Permit No. 7 / C Date Issued & t 73 Expiration Date O Location and Damage Report:' -Date Time (If no apparent damage at this time, so state) • Inspection Date _ WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: /i ,e(P p -e- Au prized Agent 10 not oteu or AWAS t •NtMgN ?5 ,wrao.'IQ_1{�'�)7- ^�_'. •^. . • F: -' : NOT GOOD FOR MORE THAN $200.00 Thirteen and 76 100- - PAZ"~w�- / --~ - - ---- .00t.uRs $13-76 TNc MOUNTAIN STATES11&ONORE ANOTfZGRAN1COS *W I ri -4. ; - triti. LOCATION Greeley. Colorado • ., _ wnr �`toyyP�` �{C7• 'l3 ENDonstazirr OP TNis own- DV It Mm a oWt.W.s Nu. pantNf Th IOLLOWINKI .r _... :Et.3.�lctc»'.�'s..f.�.:_..ee ....F_..,., ii.3_'*—` ? •.r. of >i:_'i.. \.,... 237...P _ g{�tp# r_i2 sijni V.�t('Sitt �2� - r; };�• .z }� 1 . . lsf £020'1.; UNITED SANK OF DENVER N.A.. DCNvcR. COLORADO 0 3 6 9 7 1 fns e: 10 20'8,0007C S • TOO* AYATUICNT or WILL $0. • pone ..n r :'3697ii. 04.22-4 8n' 10. Issued by M€B. # - 26 - 's Trench Width - Under 6" , Trench Feet - 555' Cost - 58.33 (.015) • CONSTRUCTION PERMIT Permit III 915 - Date I 1. Type of installation Buritiziasine Cable 2. Location and description of work County Road 31 See attached colored print 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete• 4. District: —creel ey Address• P O Rox 11'Ag 6. Telephone No, 352-5898 6. Project No 3-533l 7. Permit granted subject to general provisions listed on the bottom of this 'permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions• zq f44e74f 9. Applicant: Mountain _Bell By: W.A. Rae Area En gr Date• Name and Title W.J. Shaw Engr Tech Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Orly 2. Division construction manager _11...J• Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and 'Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's Installation win be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date IS changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility oI work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee sball return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstance& 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance or Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Maintenance Super•i _ n acceting this permit the dersigned, representing the Permittee, verifies that ho has read and understands all of the forego i.: ,rot'sions; that he has . uthority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound b I the conditions se forth herein. THE BOARD .F COUNTY COMMISSIONERS WELD CO .SJJ COLORADO tze 7G. ?J�c23c ita /-I J,4' District Engineer P1 (.f t. laa) vE has# ((d.!a`ae) 4.c/Waal*$ 84014-2. A. 1- /So / N.C. /3. /S/-- 70L-0IQ. C- S. en Its) )- iv-ns is. /la- 2.2.511-C, S. N T N to N • r t_ CI N 36- 36 30. tstua- 21 a 24. 0 2 . ur..^v 07476e" 66 Y. •R krbillitii NW IV liniala- Vaal atl. p` i`t AllgortinaatirMalittniTiCION aJur{ 'tile lltip vI a;► large wie IMIarias u ��^-� .ter " �•`. i tagii _ V err. Avail ,Milligentirilt...,441_ ariJill ..�.,..� r -.., ._. • eift-7.,: '.�� e.a,..,:...,2&•i--iay I "lima'itau PIIMhICEallgiliatet-Slifira nut alinagretaliaMiltrai ..re ....„,„,,.. /462611Miliaelfar Ifieleialaar` . re i i;f 0��'' �;f BatirtanvangilaPI :11 .s 411 IMILMIall Eta . ea Clink -. -A Inallialla iietranilliallattal ar Beriminami, Ni., :gi it.t. t hatifelaaririata:0411112 VW Ella vapiatigreenin IS 1 r vita i r J (jam?ittiti ! �"rr, Utility & Transport Meld Report Applicant's Name Type of Permit Permit No. Date Issued • Expiration Date _ a 7 ?. -2- c2c.71? Location and Damage Report:' . Date Time (If no apparent damage at this time, so state) 1 • Inspection Date _ WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: t ,TO THE TREASURER Mountain Bea , r00r 4153-• t r X LOCATION Greeley. 11 , Qrade MR V[ � �I�a ♦• Y.. OrOONSENCI f Or TYIa 00.18 ST fll • Tat OCKNOWLS IYLL reent Y OI OO iAlii . 7 4.'t < `t• G tI yt 2^ i 0 + a $ eh ,r"^23 7 S - S t ft �;,fir, It? t � f ',—•` ..: `.f • ci P.Il��.fr 2t g"F -Sw- ,...4CI :TOW-- .tr e,I>. i•r f+1.F ° ,I s=._ ,. t f:.t Yj .t _ } TOON RwTPKMr ON ANA NO ' GO `• ` { aw ,410.:16-73 � y } NOT Goon FOR MORE matt cacao° PAT —Eight and 33/100- sS'------- / THE MOUNTAIN STATES Imams= ANDTRUUiRA►N CONRNNY ,5_ ay.fit MNRIl TMOY{p UNITED YANK DF DENVER N,A„ OR:rrVER. CDLORA,OO 9 MB. #24 Ti'ench Width - Under bit Trench Feet - 8[560' Cost - $128.40 (.015) • CONSTRUCTION PERMIT Permit Date 1!lla I,i 1. Type of installation Buried Telephone Cable 2. Location and description of work County Road 38 and 25 See attached Col ored pry nt 3. Estimated construction schedule: Start' d� Permittee: Mountain Bell Complete• A.4/ T#,r -.7i/ 4. District: Greeley Address• P.O. Box 1139 6, Telephone No. 352-3152 6. Project No. C3O951- 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions• 9. Applicant: Mountain Bell 10. Issued by By. R.S. Rehurek Area n: Name and Title D.C. Sinele Engr Tech 11. Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-800 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permitted and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such Installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date • Date: Date: By: Main ace Supe ing this pe •. it the ersigned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has . • thority to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions se forth her - - — - THE BOARD OF COUNTY COMMISSIONERS District Engineer 50. PLATTE BNAG-SO 45X= 3565C' -e At.at,gN Iva 'S 2 I - col Y O ci a NJW pWv a a 4 H IN PL. J W ' L 5, \C1 4SX •L$78'Lw) C -1,2S AOANOON IN PL, 111:1:4112 • C-CiHAH-SO g a Y • M 10- li---' --1) ^ _ SHAH -6O q . T7, .9I mYuVaNAD. y.�ait t�(ilidi�)4aWt 1' <� i IO\ f 1Z /6 m c . j Pao. I-i? ek�.15... MR WORTON al -I AC -50 IN TRENCH IN PE 05 SPL.: cover 4SC' TOTAL GRAVEL VOTE: L/SE CAL/7702./ w//EA/ BL/.QY/AIG. GAS az/.P/6° At/ .+ KE/V, CALL CO.t./T/VezTAL P/PE L/2/E CO- 307-83(0- 26/5 "AC LOC. USE E-L'/ST/t/C GLOSUr2ES , r Aa Loa. TA T' 1RFR I DP `(%; ( (3KMG-ZS) 1� (D. n20r 74. -rood 4SA MDOWt510iT4 IAT 9 A^^pAN DON ,N P{r a LO45G 'MO s. MO P[O 12 T. STA. Wok CIKT,6`_a� i_62; Cj PA aR./O,RP qry rr ^ -1(- .YL'LOA-0" • ') /a70 8 '�9\\ ,.. `STA 3+60 M1 PCO 14 ' 1 \ flY L ~STA 15+400 v+°Bn UGHE STA STA 21+4S ?ED 13. STA al -190 4SC a13T5L+IS -COL DO..I2(a ,61-5C• PEP STA (:.Kn&-ZS) (pc.. u v., 51-7ID) 45X•1b75' (W) a-70 A3ANpOr4 IN PL. 0 48+20 PED.5 STA 54.4r SO MOUN'T'AIN STATES TELEPHONE COMPANY Et1- D £5.0 - FT. 0007JUar„o._S �I�'L_J_C4__Q9.A1__ [Ac.1AND[__ DnT 11ICt GR.E£LE`f coDYrr '1J E4Li - Ino[D TO _.Q_5 cistST___ loc�no.,F,//TnLU/�TD [J-,2U2AG _ac.CO._ "� nae SWARDs__^/a ra DATE POWER VOLTAGE --_� �..... ... [+.D[O..r- DPI p,y+S��a�� /SwC- PROW{-ie Dvo. �Jd-<oa.`rF�-.^/w-C.14/4/71' 'FR" tilt APPROVED a(,�-�_T.TL[ .q.�CCa L.AC:� DATE) ZZ.a ICC AfROVAL-_ TT 0I1O[I. AMMO _ R.v DAT[V O[u _ CA..1[C_/�/.5f/-/Z [{T'D COST _.- .T11- [%CH _Jl_-_TOLL1.[C..yy-� (IT'D .ITC[.[[.r. L0.'L iL7JY-l.[[MO- •LtiQ Y[GWITr or WORK uua_ PESTO.QA nu 4_ _LIP S77Pt'J QA;1'9 .. T..... 7-U_ £L _≥!J ritiiiitIlitithititistitutsiiii kapannittattageramato grtac,A.-cmgrationnitsintagn:4---_,,c,-.O.,-:, aik g a r :` ' aka4�'' i1 IIMMISall 422 tigislitiatnr roc ‘,..ar 'ortrguippans‘..1 -+'trpiMtil 741742 TO 11 WEE Ewan; ?b1��..+��'t'. %fK�'"f,?'!/��. it IyrB�Pilr 3 ..—ice azta-.7.:A. 5,.,,a,a t z.rz s_i-4; trice: , tmeict)1. im ,•awii@:P�i '� �r i �rzswiw...,iNial &*t ,,• fit. _ ;alall 2LIIIIIIIIIaraillariCIFI; � �3 S ' MIS muntrairmitionovittaursturi is v c s I Ian 0gj sb� ems;11316411112 S00DIIE n 1 il giciew a -` U I ii YOYP ARAnNM OA Y4 M. -One hundred twenty eight and 40,100- —Dooms ; 12RJ40 7NL wow.n KsTa minis xont *ND1 tGR*st cokou rr�g; Weld County ^aii.•-o-1a42 sac shoo UNITED SANK Or DENVER N.A.. ocNvcR. COLORADO M.B., # 23 Trench Width - tinder 6" . Trench Feet - 3,270' Cost - 549.05 (.015) • CONSTRUCTION PERMIT Permit Noll s r /;Noll Date 1. Type of installation _Duried Telephone Wire 2. Location and description of work 3. Estimated construction schedule: Permittee: Mountain Bell 4. District: Greeley 5. Telephone No. 352-3152 6. Project No. C2-5339 Start Complete• Address: Re( 7:514/ 7 V P.O. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant• Mountain Bell py. R.S. Rehurek Area Fir Date• Name and Title 10. Issued by D.C. Sinele Engr Tech Date• Name and Title 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Orly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and an harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. G. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7_ Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at Its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County ri€ht-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WE 4s'UN • COLORAD• - 31 enanee Super% piing this ermit t undersigned, representing the Permittee, verifies that be has rend and understands all of the forego r visions: that he h authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions et forth herein.C -_ -3'6' *.2c Qom'• - District Engineer /O/' 3 I m W N A a= > r h x n yO I'`'1 m D O 0 b z I A S I(�' N D 0 O D H N. 3 O < O n Z I y ti N m m m N i 2 N ▪ m -4 z v 1( 1 I m I(jx I 11 ICJ I I� �� I� 7 IW � '' I i� I� 11. . I 1t�j-,i I I�a I:, u I I C I I I IN I\ i II 11.1 'S I o I a if\ i 1 I il1 1 ,IJ I I Irz I x -A i i �N Iv I I I ,� y z\ os,l N ,i 15 i' I j I� r r'- 1� I Ni I I m IL1 ka 1� I� 1�i ° < �`� I C • 16 z v I NnI -i • 1' i I 1, 1 1 y0i I h' I I11 m j I I. I ly' I 1_ .• g i, z 1 1 1 I�i r 11V., m P i j `o I o< I m 111 1 I I I o I\ 1 �•S" I in iy I [V 1 I I I, IT (r1 I A 11 0 \ O0 C N �N .t: O I n 1 * m m An in IJ IT v I^ a 0 m • IW m 1� II\. o I` � 0 I % 4 I� I c s. � i� r • m C i`r z a I N1 I `m o D I \ I I _N r 1(r `I re II: I I m IG CO I i I 1�1 I p 4.;--',1-'), - 1 1 i - 4 m m N -i m r m S O Z n 0 -o Z LA _STA. PEabs D tDd -tiallItritiltL� �cf�1711 S�.w��.,Q \. ,�r _ .d r ; ' aM �� •:- . • .• � t�5ll�li.�IiiL ve wearinrsatiranair,...."ffie1Lc .�„�„ 7M'• _mai ur nataMixiltapariti.,E.fflOglitabittIMIDi !r 1I t i" r ' �,�f.� �. ,�rrr���-��� �_p��!,,"�z�•�r.[/x/ar,�ib�liiA y �.�.� S [ a 6 a r t , lifirallitagranFlatilliPSIIIVAill Will '. SMIIIIMIKArdristillii trials. tedifitagliitillSWATAltil IMPIIIIIIIIIIIII IlliVaNintillgreilltifarailllililfalalletal Williliknettrargalitligiallilliiiilli 2. Man ELISATIMCWIIIIIMIIIMIIIIIIIIIM .. . 14411Maalliiillallitill allIMILIIIIII fa 'ft lialltairifirz..-a'94��J7.l�.c `rcf®1.J�r'#11n� .a. 7j ii •3 N i1' �. t 7 I1 13 is 17 it da of 77 ]7 a1 a SS 377 of 41 6 Utility 8. Transport Field Report Applicant's Name _ Type of Permit Permit No. Date Issued Expiration Date _ 7 73 X V &t73 :Location and Damage Reports. Date Time . (If no apparent damage at this time, so state) Inspection Date a- rst • 7V WELD COUNTY, COLORADO HOARD OF COUNTY COMMISSIONERS BY: % t pz-0_,. d ?rrc� Au prized Agan? n TO THE TREASURER TMMoueM UNITED SANK OF DENVER N.A., O[NVCR. COLORADO 2R Trench Width - Less than 6^ • Permit • 7 L Date Trench Feet - 24,073' Cost - $361.10 ($.015) 1. Type of installation CONSTRUCTION PERMIT Buried telephone cable 2. Location and description of work Frederick area See attached job prints County Road 13, 8, 11 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete' 4. District: 6. Telephone No. 352-3152 6. Project No. C3-0971 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Greeley a t/ r-,9ir 741 Address• PM Rnr 113.9 8. Special conditions• 9. Applicant• 10. Issued by Mountain Bell By: R.S. Rehurek Area Engr Name and Title D.C. Sinele Engr Tech 11. Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order; 1. Supervising foreman J.N. Martin 352-5800 Orly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2, Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety, 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date - Date: Date: THE B OF COUNTY COMMISSIONERS WEL TY, COLO By: Main: e c Superv„or Ling this perm: the un' . signed, representing the Permittee, verifies that he has read and understands all of the Lore, - • pre, slots; that he has a ority to sign for and bind the Permittee; and that by virtue of is signature the Permittee is boun a I the conditions set f,rth herein. 5*((' %1� yam. x)Ae a , , H. C. Mc Fate Dis;rict Engineer N ieed D/YC// -g FLD De 7117 At :T9 Z7v30 STA. Z7/7S — -e-'s-,'— — --0) cazee PL. ON. .e0 C2-0753 x B G.CAVEL SN 3/Y six 351455 R LPG tit PFD VY V-/ 5Th 7,5 090 DZ. "CaK. l / CLOS Ay 2-4445-3 73. REBeOL V C.C73 5Th' -01400 RED 1r/7.2) PEb 48.5 2Pc. ek sr/.ya Czos. Winv KC5,/37 -- f/LID DF STA G}SS ow anew t'sE r. R75 STA /21'00 ✓L KC 57 RED. Ano.V V eret6 /.DP TO BURIED 3777 LS 4,0 R4 A-Z.04AZ R.C.0 Ate &CS oL/70s C' nzwa'S4 /7:L C/{.1,118$.:::: S/h Sy' 1 /'/). Ji: /. el "le / U{+ TO SDPTED .CL /7F4.0-- LC -0/7/3 70ZF,F C0 �I l T _ l 111 Ham.. a s �„ 1 1 /' a ( a iw�iivtiv - 1- )) tt 57 -'61 - pia mT N nM'� rangri-1 �,��aID U D covr.I ON Si/ V D NC LT4 4, bAR� 3 U �r"t b ti 77.27 /3./ Pl/J /3,& 4e t1?Ve" 5 (37CtV. i- . 21- LJ S s+o :: c;J/L3 //C4i 51-70 1/6.5 .'. S AC PED. r -/KO CPA4£L cost <.eon -Reeve .eir✓sr .Er CUT PCs SS -St / AeAO /JAEAO LZre7 sT4 /e593O=- 3lA r)/024-4:1 x A--1 odE/CK _ z T.L/G%/TO7J e • Yi IN kLt- CC I .. N Qt I.tiS�; sfxS3o tt", . < t: n:I '- • � 5: Ll K� 1,4 Cv n : n r �ro Ls N • N• STA/./TOS AZ A"C$/.37 RESTS e ZOPS. 4p I b t /e5/D ` JAS IT 5TA./S017(14 ,AZ. tL ;7 I Art 9.72•F ^ Le.CZ ✓/i.y ye' C8KINC ViL n OX ! c k STA/SAWS rl?, PL KC5/37 Ff/J.7rS24 PKr4 /54 170 KC55/37 • An) )328 I_ 7A 133955 I AC -le / S7A /1/97‘/S /14-C4/.57 PG 9'39./ tf 7 /01' 1. 1.O sr4,(3m. 1 I,. rY. AC5/.J ••• ) ..h �7— x 3aT / C ❑ 4 i iC STA/45)130 `- -' AGS 37 A' D. rt o. 7 E l-1 n e Y P.P. De. • h J p P b 4/1 4, J t - 4- f S - AJ6iAGX _ /76z, .57-55-1/./1/0 6 a .—_— 0 r P3 J rzz 1 nmmL, zazDs-4 tr n "I m. 3-0 it- .4 /437 F - COUT Fee.fry STA 57495 3/ CUL v£eT BURY AWAY SAO STA. 38r70 FLO De 4 - STA e7fb. •CC5/37 Fro 773/.0 'p Ch itp rXa Ut S I t STA a515OFLO D.P. -g_ ! # JJ STA 7J9Y0 FLO jJP 1 -d., Il ?T4 75)4.0 TLD. tie- # -e . b re/V/7F ea - seavEL SFLDDt It a Y. 4_ 574 /.71150 i t- ti FLD. DC. t # Z ?2 ff 11 I .• U , 572:/9rr:5 PL ,[0.37 PFD 77tSTY >f L7//L / /,P v«D e') u.Y--k1 -i- Ca• ell y t to n3� b't ?,tiny ,II T e n Pe C. io ;. - ASV a 0 FL /• 70 /1 7D/Aq/LCG. E"IW 7/ r4 /ICy •SC7-.59 59 .4 pull at. C i !1 /7C.4A cG J/:/n ,' 6' — r 2-D/ --2.-1> - Ntra NIN bet 11 b� RL /7 Y8 cstb_ bo/ 1, 23 LV 6 SG a.CAtl2' GOVT BCLOW LEFT E" 6' a it i. i i/ s 1 ia s le Pagrestitstistatv enonnwearaminwas rancrissuntsgrad MIUMME /PtiMr 9,-,1 a. 411 SAIRCRUNOMMitilrUfregard CIINSUMEtraMillPingai liw. �?�L.�."r`�r^ �-f-�''��� r�F�i�s�isr �� �. i�� v.• �•i.r.•�- I�AR'i�Cc�~NF.�����.!di � �%.sr� �li�o►��`.L����: _ wouswastagrestionvitair mum minainint,ittitairinillaratiatitta infacamstantreataramorma twanmulteaSIIMMErialtildi raLilfgtGME sy : se 2. fi+ r' �r...c'a sermig1 it _ an, - Itsismaln ,. mwma matilitilbims MiESIIII i r , e _ 1� re "F i' - fF y wn • RffV .0 .. ..tY ! V_. 1 RN. la • • •� R6fw • 0• ...�:r`, M .j MRtlO 1�• C O U M TT Y S ! 11 1] 17 n 17 17 'b IS 9 M it b 33 A H 41 a Mr" peg lar; • 1 1 a 'V - grail r�� Utility 8 Transport Field Reports Applicant's Name Type of Permit?, .�. Permit No. ? Date Issued Expiration Date _ :Location and Damage Reporti .Date Time _ (If no apparent damage at this time, so state) Inspection Date _ 1 A WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: V©.� Au orized Age • 10 THE TREASURER NIOUltain sourom Greeley, Colorado .ATLt� 1973 C„ISO.stMva 091101i ORAR .T TIR Pant ACR.ORLAthetA PILL PI.1M w YON. .TAMYWT Of SILL NO. 22 DATED 10-16-73 Pq{W Cfl Pr (5.71) 366970.9, c 723-7- - 1020 NOT GOOD FOR MORE THAN. $200.00 PAY--�-0ne hundred sixty one and 10/100 Doltwai $ 161.10 oo�r���In Weld County f.. i:" �_j'. a T+i1tititii"yi.$t..;:• / UNITED RANK Or DENVER N.A.. colonist, ODL.OIMOD 11.3697091° I: 10 20s000?I: TO THE TREASURER Mountain Bell 369708 Q„ Greeley,Colorado pc.. 0ctobinrw' 6T 1971' tuoo..o(SM oP nut ORAPT .Y THE mat AC.P).iNL. I MILL tonsitihr& ETi. MI MOUNTAIN STATES TELEPHONE ANDTRLsnRA►M COMPANY - r s'1 •yyj * s. p4 tila 7C;( _ ;�� �1�A+.i it nth wT)IOStAareatIw� tr. is i�ci ry !I 1( �t.i :} tS #°i:s't'd YOUR IITA*PWT ON SILL NO. 22 DATED 10716-73 PAl`--TWO Hundred and 00/1 Weld County 23-7 I - i020 [ 3 NOT GOOD FOR MORE THAN $300.00 00- DOULAN$ $ Pon nn TNe MOUNTAIN STATESTitEN/OM& AMOALLDRA/K COKVAMT- _.�• • UNITED BANK or DENVER N.ACOLORADO 1'3697080" 1:L020a000?t: Olt 224 8tl' • Permit 7437 10/8/73 CONSTRUCTION PERMIT MOUNTAIN BELL Date 1. Type of installation Buried cable 2. Location and description of work South side of Weld County Rd. U 12, between County Rd. # 5 nad County Rd. # 7. 3. Estimated construction schedule: Start' 11/15/73 Permittee: Mountain Bell Complete. '- f 76-7 3 4. District: Boulder Address. 2775 Valmont Rd., Boulder, Colo. 80302 6. Telephone No. 442-8223 6. Project 'Co C-3-5383 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: 9. Applicant' Mountain Bell Ey.: F. W. Parks, Foreman Date: X0/8/73 Name and Title 10. Issued by Date• Name and Title 11. Final Inspection by Date: Name and Title NOTE; If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman R. C. Lange 442-8221 2. Division construction manager A. J. Earl 266-4557 3. Colorado plant manager Wm. J. Horton -7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit. except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: - In ace foregoing pro\ is bound by all Maintenance Sune •isor this permit the undersign ; that he has authority t e conditions set forth herei THE BOARD OF COUNTY COMMISSIONERS WELD •,!� ;, TY, COLORADO presenting the Permittee, veil es that he has read and understands all of the n for and bind the Permittee; and that by virtue of his signature the Permittee /%7/73 4'9x0 M ". r M1 X O :n r >i< z g a RR i , x ( ^ ? Y \ WS, p -- oo 6 a ,' ,� who 3'E7 i at./ mt I '_n 'RR Z 3 1 a I v i X i 1 >{ :ED 2G I6 S �.. , b Yo • ' 7 T N/F[D CDUNry AD 7;; z ^ s .tiY 1 n ANC w y o y Y 4 %C0N PJIA:/ f1 2ED 3i. 3 O RA C DRS? , 1, ti I wJ C � 4 I %'t9 7/.7 KN 1 DROP ti J 1 P so. 44 46 44• 34 34 23 36 - 22 1I 12 10 $ 62 34.... X53....-_ 1 3 3 •..� v +.. r. • '- -i z Da 7.- :w • -o citcJQ' -r. T=ne Tine r 7� r- ti !! 1 . 1 . - k" t;"' --- f - % -t!.C��>• 'r42 6 Il ;" S s b v ���/� ',� `. �� .'.,," a�4r 2 •� N,iL' "ice ._ SY"•i ! !^!r e',ne �. I. `.n �. e. 1 rteer 1+ _rt 1 N43* c 0 M ne T • 39 31 33 33 37 39 4'1 43 t; 010; r /. Y• 1• ` .-\ , e . h .• 1 3 5 7 9 11 10 13 M S • 17 13 21 ]3 3s 27 I 43 41 49 i 3 TC THE TREASURER ©Mrflv ►oe, sin p 366526 I.o=ano.E Boulder Colorado pan October $ 1973 ■NoORSO45NT o► THIS DRAFT .� TEE. ►AYEtA6KFOw�.00p NLL ►A#MSNY o► *N1t ►O&s Gwott + j• �il ii'Fyy *It' II-; r }?b �. } i e + r -«r--. e 4 to a,...n.. To.. Permit Applicatiow,m'- 10/8/73•' - .• �_ - f - : • + • _ ; ; _��— —•---f E fl }d. t.�y ky' Z.' ; , e < < + - '�.� �—/ �. f. + !!OT 600D FOR MORETHAN f200.40 PAIForty-Nine aad 60/100****************** * **. ****80 E ARs 7N[ MOUNTAIN STATcihLLf$ONE AMOTWGRAn1 COMPANY Weld County Commissioners " '• 1 :7‘41 Greeley, Colorado 80631 -- TIRAME •►IIOIMM UNITED SANK OF DENVER N.A., DCNvcR, COLORADO 036; S 2611• IRO 20x000 ?I: 41133 SIOPIAIIMS rt\\ car :`o. • #-18 Trench Meas - 2,180' CaDia - L' Cost - 521.80 Perne, 7.5-7 Date 9 „is-- 93 CONSTRUCTION PERMIT 1. Type of installation Buried Wire 2. Location and description of work Along south side of Cgl ny Road 52. crossinz said road and burying on west side of County Road 47,R65W. T5N. Sections 35 and 26. See print 3. Estimated construction schedule: Start' Permittee: 4. District: 5. Telephone No. 6. Project No C3-300 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Mountain Bell Greeley 352-5898 Complete• Address: P 0 Box 1139 6 as -C 73 8. Special conditions - 9. Applicant• 10. Issued by 11. Mountain Bell Bv• W,A. ttae Area Engr Nunn and Title L.D. Verquer Tech Asst Name and Title Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect- in the following order: J.N. Martin 352-5800 Grip. manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phew 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specification shown on the construction plans_ 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permitted shall advise Weld County 48 hours in advance of the date work will be started and Shall notify Weld County a minimum of 12 hours in advance 1f this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as thersame may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Wend County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date' Date • Date • By: 1. Supervising foreman 2. Division construction 1 Maintnn., t T crvi.or In acc n_ this permit the undersigne foregoing provisions; that he has authority is bound by all the conditions set forth be ,in. ,e?` /73 /Of//7s 2o -d. THE BOARD OF COUNTY COMMISSIONERS W EL iJ• r ITY, COLORADO representing the Permute verities that he has read and understands all of the sign for and bind the Pert ,ttee; an thatv)ue of his signature the Permittee D: strict Engineer a o sailt S ; a:siiiA rte,• -:, , :.n rr+' ' S. `'" iii' rfgl i 1 itinIt'iSI i ��',.�letk ft►t e� -74 liMAZA o IP,a MOMS eitietyptianzmitazitit yr.._ N J =trg TPWIPrc e!7(r1 loon :: li nel Wittatialalirwriartinistaili Fr imergistiraci,„,-,...!..:r.:..-,:t.-z-sevekeiraNwoWatrialuttil air; 4i la PligniUdeor:;.4.stioare,FIICAIIIkliWodditsiPL isitiarAlk CIIMINSIMNICEil -' i * alitttoidtl e` .snua11110 7 s Lla '*Oler 211 216142MUIRMIttlEtalitillilleallairlata MitillelaWitilitritANIMIN21120112 X71 , ,a ' EINI - 421111.21.4122 meve-, 110111211.1112 ittalantistantiattIOREWAIIIINIMMEN mon= ii II. tmangrant_ a i'IIMPTION. i* i t: I-, it p►°te 41 friar !Si . INTO .65* O 'J M T T it 41 43 u Utility S. Transport Field Report Applicant's Name _ Type of Permit (�«.-7,-+o,-Cre L - Permit No. Date Issued Expiration Date _ 7 5-7. Q6*. :Location and Damage Reportz .Date Time • (If no apparent damage at this time, so state) fir werA4-hrar Inspection Date 0 7 .8eC !7,3 WELD COUNTY, COLORADO BOARD OF COUNTY commISSI0NERS Au rued Agent I. TO THE TREASURER Mountain Bail LnnsArloM Greeley, Colorado DATE September 19, 1973 ENDORSEMENT OF THIS DRAFT FT THE PAYEE ACKNOWLEDGES FULL PAYMENT OF THE FOLLOWIHO: YOU., JTATLMFnT OA O'LL NO PAY _ #18 D,TEO 9_18-73 Twenty one and 80/100 FORM 4133 e 13-711 354576 C i I I. 23-7 1020 NOT GOOD. FOR MORE THAN 5200.00 DOLLARS $ 21.80 TO TMR **PER OF MAYA5LX TMIOVOH UNITED BANK OF DENv_R N.A.. DENVER, COLORADO Field County `,,,t 9.1 THE MOUNTAIN STATESIELEPMONE ANDTELEGRAPN COMPANY SJ 1) —cc -a t..c.a% II' 3S45760 1:102011100071: 04 224 8u' AUYMO41YO SICHATUPE M.B.'t# 2d Trench Feet - 176' Cost - $5.00 266/701 - CONSTRUCTION PERMIT Pern�o. 7 513 Date Y-2' 73 1. Type of installation Buried Cable 2. Location and description of work Across County Road 54 Sections 30 and 19. T5N. 165w See attached job print. 3. Estimated construction schedule: Start• Permittee: Mountain Bell 4. District: Greeley E, Telephone No. 352-5898 6. Project No. C3-5307 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• Complete: Address• RC Dec 73 P.O. Box 1139 9. Applicant: 10. Issued by _ildaataiti Bell Ey: W.A. Rae Area Engineer Name and Title L.D. Verquer Tech Asst 11. Final Inspection by Name and Title Name and Title NOTE: It dissatisfied with construction performed on this job, please call the following people collect, In the following order: 1, Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A_•Js-BB.*1 266-4479 Dim 3, Colorado plant manager C.R. Phel,ps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permitted shall advise Weld County 48 hours in advance of the date work will be started andshall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to Its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before Iinal inspection by the County and Penaittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit. except as the same may result from or arise out of any act or neglect of said County, its employees Or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed Inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS Date: Date: Date: Main:entm'.npervlwr ing this permit .e under: _,ed, representing the Permittee, veiifiee that he has read and understands all of the foregoin, pros slops: that he has author y to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound , I the conditions set forth herein. fi /0 3;; 70 WEU NTT, COLORA ,v# X71 %/7.3 raiwt, District Engineer • :,-,� e No Shran. aPIPRIWP-DatiWAVIT a--'' TS INW�Ci !t►I^�Sir•`` .:!St; _,r irway , rii4moitgabt-a,„,,,,n2ztermiorwirt.srlit2 -------,r,r.s.tm.‘j...":1_, A .:7;ijr ‘..."'• .::%-• CZ.:Lit ,Al ;' • 4at, MS Ina gal lb I rizzZakieilaiaiiistateKsitittlimill, MIND RIMIlligirtagallta AleriMgSdritigtrill SITIOZIVEWIMMillitc.„-;I:MIIMUIONOSPRII itiiiintraffOrMERWAIMILIMIIIMICIIIIIIIM I i€ �1.� in • it r N L.; �� ELiii rarapPASIMPIOMfri Stattilr� TC moor " I Fiji rem !.•- 1 - a,.aliti ,, t /n w w $ !if E 3 1: I ✓ • —+ 3:F1 r,.r ic, I b: 1 7 n P P r n F', rtr'vn f n "' s or; : ^' N sD( YJx C en, of 5r > ;LTA 11 I J:51 INV. I re.c.1 .IIS BS 9ERUICC ROFD e.r- o -7-45icfni 5O 1 = 1 44 vp - SET hLj t rti r25O q WCLva*fl. £f.n.c 5Ir„I CC Utility & Transport Field Report Applicant's Name _ Type of Permit nisar �s4-- Permit No. Date Issued 7,sr. 6 7_, Expiration Date _ :Location and Damage Report:'.Date Time . (If no apparent damage at this time, so state) Inspection Date _ • 1 /q 4.€ 73 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY:C d2.22 Au rized Agent •.. • - .t a 4 .4 r+.. FORM WOO r TO THE TREASURER Mountain Bell l.ocA:,o_.,_ Creele;; , Colorado OAT( 9-21-73 ENOON5CMEN. or THIS DRAB OY TAE MAYCE ACKNOM'ILUG[S FULL PAYMENT OF YRt FOLLOWINO: JUR srAr[mENT D, NCL NO. 19, 20 'AY _ O THE ORDER OF K IIOUON UNITED BANK OF DENVER N.A.. OEI+VER, C04o RADA DA,rO 9-21-73 Eighty eight and 46/?00 Weld County _ 354579 IS.TI, c 23-7 1020 : NOT GOOD FOR MORE THAN 3�2pp09.00 DOLLARS $ 88-.48 _. .. THE MOUNTAIN STATESTELIPHONIf ANOTELEORAPN CO NTANY '3545?gm' ': 102011.000?I: 04 224 all' . ✓ yimPA ED SIGHATURE M. t3: #'19 ""( Ci 7/.2 / 7a Trench Feet - 8,348' ( L Cost - $83.48 CONSTRUCTION PERMIT Ca Diam - 1" Permit Nil 751 Date �- 7-5-- 73 1. Type of installation Buried Cable 2. Location and description of work Bury along ea;:t side of Co.Rd. 13 from Hwy 14 south to Co.Rd. 44 and alonc_west side of Co.Rd. 17 from Hwy 14 north See attached colored print 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete: a 6 Z' e— !r 3 4. District: Greeley Address: P 0. Box 1139 6. Telephone No, 484-8311 Fort Collins 6. Project No. C3-0961 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and 'Weld County. 8. Special conditions: 9. Applicant• Mountain Bell By: I.E. Troudt Fac Planner Date: Name and Title 10, Issued by Date: Name and Tine 11, Final Inspection by Date: Name end Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Davr 3. Colorado plant manager C.R. PHe1ps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2, Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance -with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements oI the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final Joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WFjfl LINTY, COLORAQQ Su pen boor f / In a • ling this permit the uncle igned, representing the Permittee, v€fSfies t6 at be has read and understands all of the foregoing prov ' .s; that he has auth ity to sign for and bind the Permittee; and that by virtue of his signature the Permittee /� is bound by all the conditions set forth herein. �y� C lot— ,,,/� /t//13 �¢,c/ District Engineer Caner- Ae.4'Atic'.e547 :11. 'r 9/171 39.29/ /LF Ld-G • 42 ',Z1. b " CoAir /CC .S // 6 1 Zen ; k ; .I( 69fsz 1 r 32 e r.C7 t 2Bsv._ LOI / :,.g.,.�/�� XS& ova E.R4at--e7•y aso _swam 14,es Srs/3 /suss Parr /N: leg TJS/- ens.' so /. 4 4J7- SbO 7S Ozer 69loa11,1-/S'o BP 74 -22.5 - END 1iG - flair e,d 44.E ,stab ate R ' '7c:0420i Se Pa irA/se >NC0 ≤ft'4fva l2L /SD (1 aN .e nes ' 76"7,FiwrN 2-,?Aze3 TB PY cxos • /a" SPc )31:447 A./ 39.444 ,t"' Co,vrONS//"`7 :I - '74304e 77110 21/sc 'stir t 94.Goo zr L2)•L• 4,1 es • Corr k i\ \ Esc SeSter/.CE _1 r- C'4.vr_/ L. W Jr; - I " Na V .. �K ! re Aer ATe ASO VE /714/7 4Z S: 29126 __u ft •//tGo _37;4!.t: '- NG Aga - 04i ,t,0- )1G9f0foLsiR7 J Gas . YIt37 AJBv-2S 99'• LoorsZPriaL ii 70- Cans i /7 Svc eCohi - 7 n 7 r44, V ti ai 1 8 R D t , 41 t&/C B.t oW-X Pt TN. 1-/00 nl k /goo& P2/7 FrLLCtvrika ✓nwcs / 2 WW.vtsOC EAcnAAvcE 4n4Y1A, '' .. co,Qa/7 (70.1 CW/N1KO.P asxoo h ' .13 �n ,.Ql a re EA! /300'x2 : 2L00 - /a7 /300' - C/PW fracas ,%TE Co,v77.4..4 -50 Ea ,& ovS6 J S./d7C-/ 5 ,Pirt2-r'r29/ Sr CA3,-10a y, (K71/OE/A,//e91 6790M2,67- PI- s'+. 74.0.0 Cs Z //H5 /17.e/H64 4a q CA/v.4 . oC so 6 2 Co,vr_& Jo( ii err del 45.29/.c' r" CLos / 0;z-vP •437 ToirAr 1 ban' ainiffIlINOWIRIPPRIIMPRIPOPOriliielra —' "WWI" lag 681s1 ,sx.7O4.r,C Kea/ay 1. e 1 I ^0 " L. onT �N+G I. gins 3.31-38 4sJ9�/CP KC -S- '/ 7" Buz/7fl /6' `':.'4<dejr*lfa47:_-13 G99afm./a/-/o6 Gn'rnzi/ C n a ,, /4‘2. 7XrnrN 2 ii SL' 2oe//aa.F t _cc' Ctos 2a tb /6 ' Sri f'['e,. r g .. k ! 179o' rorvo .,t is.,, 24/I L I Ka T 7N AG74' I i i i —/yy4' .3a' -r I 'a- i I I N —4—,EL #6Z H I1 a4.1 • Co .L4 */3 %VELA Co £o 0)3 IS In Lgg,N,£R Co. /*WS 1 y i�l tiN FD'� P7 > • �° 7L Lill h i-' _DP -2-109 47. 172 er is p ® 44_67/.er r r. re- s -y9" let i f�- 45, no cc ce•s•v9 _L7i,Cp 4oi0 4121il1F,E ! Wady £ VMVL »�" C4hrAleSN. X1 $ O" /// - 9//: ,2,ce -► 4C G5b.f:i iYC-S-yr 703 CZo-33jW 20S P2‘ill 9z•• 7,e/e -2- /09 / -Sear 45.710 .rJc 1 # t WM t rca ..-3 • Raynuts7%r" 140. In-. 114... 112.- 110... 100 101 100... 92 90 RI M 1a 1] 17 11 21 b b a a 44 w Al 7 4. 44 K 44 s .[ i Rsss. - a e Rt} 1� b - r-.rl.V•. / Li. ,, 1-1.v;\ , .---`1; : :it -,,....._:. ...L.., . . ....r. .-, ♦ •. ,,,, I,. t / x.,.cc - J I �`I y .:� � ,` \!.F 1 r L1 1 \ N I -iSi,a G lir• f l i 17,,--..;..;5 t•� i•,...„, . 1` ., a \; • I :I • - . .' �,r. t�i1 .. 1 4 I 4 •1\'(4. e 1 I 7.I t t t, • , I I T • . , I . I 01' I - ' . . • ` � I I .1 ! l — . . . • I. • • • 1 • •1 . • 1.1 I. •\ • 1.ti•1i t• •- •'' - - . . L.N. . c 1 JI aan M,I�..�•�f �¢" yid. • • . -� • r - E% .. r.. ... 311.......1 �- \ • 1 - 1 - • 1P I‘z). It - . .. i • • . y 2`. • , ' .�' 1� L. .<... ,. .� I 4 \ •, =:t I • . ...1, �1•/ .. .i` v y. .\ \�r• ��1 0�.•• . :�.7 \ f�5?. ••`11' •, If E�I-• / � °'I •�l �Ta _ ...�Dr �•.: Applicant's Name _ Type of Permit Permit No. Date Issued • Utility 8 Transport F eld Re rt Expiration Date :Location and Damage Reports .Date Time . (If no apparent damage at this time, so state) t Inspection Date 9(1 7.3 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: ,- ttiv�� Au rized Agent FORM PUJ F TO THE TREASURER Mountain Bell TOUR FTATEM[ 354579 C LacAu2N Greeley, Colorado PATE 9-21-73 ENDORNTMEM. OF THIS DRAFT OY THE PAYCE ACKNOWLEDGES FULL PAYMCNT OF Tot FOLLOWING: OR CILL NO. 19, 20 p.,£D 9-21-73 23-7 1020 . NOT GOOD FOR MORE THAN 4200.00 PAY Eighty eight and 48/100 DOLLARS 8 88.48 THE MOUNTAIN STATEST£LEPH ONE AND TELEGRAPH COMPANY TO TMS ORO[R OF PAYARL, TRRo4aN Weld County UNITED BANK OF DENVER N.A.. DENVER. COLORADO aNce aaer /-Y % THORRED SrONAtuar •3545798' ':L020II1000?I: 04 224 flu' H.B.. # 21 Trench Ft - 8,294e Cost - $82.94 Permit No. Date CONSTRUCTION PERMIT 77O 1. Type of installation Buried Wire 2. Location and description of work Bury wire in borrow ditch of County Road 85 $ t s t&-&- iS- SE 34 oft', T4N R61W See attached print S. Estimated construction schedule: Start' Permittee: Mountain Bell Complete: 4. District: Greeley Adams: P.O. Box 1239 6. Telephone No. 352-2475 - - a. Profit No. C3-0991 - - - 7. Permit granted subject to general provisions listed on the bottom of this permit and other medal : provisions agreed to by Permittee and Weld County. S. Special conditions: Attach conduit on east side of bridge 3D215 to railing supports to encase wire - 9. Applicant; Mountain Bell By: R.J. Aab Facilities Planner Data: mow sad ?Ws 10. Issued by - Date= Nam. sad nue 11. Final Inspection by Date: Nam. sad 1ttl. NOTE: If dissatisfied with construction performed on this job, please call the following people 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Dim 3. Colorado plant manager C.B. Phelps 266-4681 Dave PROVISIONS: 1. Permittee shall be responsible for establishing safety measures suffieient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. S. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will, be utilised and obtain the County's concurrence. 4. Permittee's installation will be In accordant* with acceptedpractices and will not be leas than minimum requirements or the Cturent National Electrical Safety Code. S. Permittee shall advise Weld County 4a hours in advance or the date work wilt be started std shall notify Welt County s. minimum of 12 hours in advance if this date is. changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year atter final acceptance of the work by the County.. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction anti safety. S. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish sett debris following completion of construction and before final inspection by the County and Permitted It final joint inspection determines additional corrective measures necessary. such corrective measures shall be inflated within 30 one and,. com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten— ance of Permittee's facilitiescovered by this permit, except as the samemay result from or -arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In— stallation, Permittee will do so promptly at its own expense upon written request from- Weld County, Colorado. Weld County,. Colorado, will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County rightofway limits. THE By: Malnt.nsue Supervisor ag this permit the tinders i representing the Permittee, 6Grilles that he has ':read and understands all of the foregoing . .vi 'ons; that he has autho to sign for and bind the Permittee;. and that by virtu ojh1s signature the-Permittee is bound by a he conditions set fo erein. ,xnect, in the following order: 0 OF COUNTY COMMISSIONERS WE NTY, COLO$sSDO.e,r 4", a/3/f3 7!r District Engineer .COLORADO ,,, Permit Date 9/21/73 Y CONSTRUCTION PERMIT Mountain Bell 1. Type of installation Bunted Cable 2. Location and description of work on Weld County Rd #5, 1710 feet south froia Colo 52. cross Mountain View 200 feet west of Co. Rd #5 3. Estimated construction schedule: Start 10/17/73 Permittee: Mountain Bell Complete: 1!1/76/71 4. District: Boulder Address- 2775 Valmottnt Rd., Boulder 6. Telephone No. 442-8223 6. Project No. C-3-5373 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions' 9. Applicant• By: F Parkc Forman Date• 9/21/71 Name and Title 10. Issued by Date• 4/21/71 Name and Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Roger Lange 442-8771 2. Division construction manager .lark Earl 2®6-4552 3. Colorado plant manager Wiliam J. Horton 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permlttee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 1. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal :'or relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: MaintennnSupervisor eceptikg this permit 4the undersi ed, representing the Permittee" verifies that he has read and understands all of the foregoing pliaxisibns: that he has author to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE ��BAAARD OF COUNTY COMMISSIONERS WEIR(/'4UNTY, COLOR )2# /8 /O/3/f3 (, O I' COLD 52 TO CO -c - BNA6-/ 103. /0/.200 RL rg N h _ EASEMENT FUTURE E• — •- ply wf• / ®7Qp./01.// - 21` MOUNTAIN VIEW eisr r m 1 FUTURE <a. . rl 2 • - y 2 ≥ e y ' n Ip Ili z y rn rn H r r w ti R17UPE E — O -Dl t/1 r - Ip �/m /�` G1 N T K Ca a D X an O Ca Oa r ' o 9z LCy o x 0 tb J 2 PEP 22.5 Z. N PEDL.IP-c S31Lg/f7NVJI 2 VDVWHVD ]M]13‘1 Y04 NOSY 3* `�►sase aSrr ,IM I in*I ..2,Nin.s.goillag; JEVartgliiiiiiii lilt. req...........7, ,......„..iwaii .,,,,,,,,,.,,,,..„......, MOM rela a 1U PAD Ore '4"P Viliallarariallataie (;e1 SHIM &`-'INI 'iV Ili ITMtikiktI i-irait � ,•�e.�ti�" I �"O4e .-�. .�/mss �t.anar r t 'rrt . iii i KAV l-elid CIPOINIEfilandilichnitlart ifirlditilaggraMIMISMOMMI itailkligl=klitirr E1 isiE 11 N. X71MIS(, L ell -a ayserazianste- ragowswatiwkop dittai.. ' gaigreatieffeglale .1 ass t a co ada Tit IP4 Fp, !!,:go Imo RANI asto warm XigliM gar omen innegegrAsio in 7iyf liosl r a_► -avigA tS L M� E •..:`i iii Pal LIAM EIM I o u d 9 33 i7 31 4i r TO THE TREASURER Mountain Bell rOcmO« }SntllAPr Calnradp DATn Seflte r 22. 1973 µDO«s[NtfT-Or This DRAFT sV THE Pan ACKNOWLEDGES FULL LL PA -0M O! THEMU-OWING; rowel. sir n.Tn 365271 C 23-7. 102b= taus crampon be BI‘L NO r1-5171 DATED 19/17113 - NOT GOOD FOR MORR THAN 5200.00 PAY Sixteen and 60/100 ****************'t***'t'tr****** `***f`**m*ne 5.; r *16.60 ti's ` INC MOUNTAIN STATI41ELZPWOMt ANOT[L*GRA►N COMPANY To++.. Weld County :, t4., - e: .. . _ n , 's,°;'altelt:,' 1500 2nd Stt +t;ttY .tT '.li4T ).\ Greeley. Colo. =80631 ;ss;,ret.#:\ 7,? Thom* UNITL:D BANK OF DENVER N.A.. D[NVtN. COLORADO - ::' t.- ,..i n•365271n' (•10200.00074 !ICE..ir - 17 .L.T-Ft. - 1257' Diameter - In Cost — 512.57 Permit 7.s 73- I�_ �'' Date CONSTRUCTION PERMIT 1, Type of installation Buried Wire 2, Location and description of work Road # 1 - 1200' North from Road # 48 3 miles north and one mid East of Berthoud See attached ,print 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete: 4. District: 6. Telephone No. 6. Project No. 7, Permit granted subject to general provisions listed permittee and Weld County. Greeley 352-5374 3E-452 8. Special conditions - Address P.Q. Box 1139 on the bottom of this permit and other special provisions agreed to by 9. Applicant: 10. Issued by Mountain Bell By: B.M. Lafferty Area Engr Name and Title D.B. Hamilton Engr Tech Name and Title 11. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. MartinL352-5800 Gr1V 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C. R. Ph@ 266-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such Installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1. year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By; — In 4,p foregoing 'provi Is bound bt‘al, 7'56 9/3/x3 Maintenance Suneleliot mg this permit the undersigned, T9resenting the Permittee, verities that he has read and understands all of the ions; that he has authority to /s/i(a for and bind the rmittee• d ♦laa�t by virtue of his /signature the Permittee the conditions set forth herein. U P�District Engineer Date: Date • Date • THE BD OF COUNTY COMMISSIONERS WEL TV, COLO---- c v CL 3G CCOJ®OO as 2/l ti p1 t O U' n t- o 0 0 4 I [AEMIEY COaN7V LL"YL LMa1FY N -y► a /JEW 6214.1 PI Z040 Si 43 C -/u7F asf o ea !-/9-J OM w/?£ M- SW Oen! /N £4aa0 P/7? 24,Sz tsiiaMy sr►:`zetrrerk,i: - +n+ ,"fir"'fl kibliteDeltitniallartem OM mar Fan% air sap nand -71 lirS'M EimcMlettligf riiinigi�� r 42241P;rani� a ' �}IR.\ anail ?rig; la ��.?y:vh�wl: 1�IYzr'�'i '1�T'ril -7412011lartralre:c 1- ..7_,-.1....,-_,c ktillitillitiPlitineatt0)01 ?ran i fi.*T RI's VOSIMV:0011 .n to anannuipran etilligitSOD : nir vannitlitring INOVIAIESAMI Ed I r no nj—N awAME l N gil-I' in ii I r MESIMMINgrantliratila MAW EarlaVtirktii!INIngl rent �". • -110 iManaill Y .. 'r F LantingrAnli Era tatiniddingi eraati pr.Wis!►etct+ ii ostasaatik 1P47 1. i= S1 nit�l Applicant's Name Type of Permit _ Permit No. Date Issued Utility 8 Transport Field Report S 75l Expiration Date 7.3 j2 770-7)--7... :Location and Damage Reports'. Date Time (If no apparent damage at this time, so state) 1 Inspection Date a7 la,- 73 • • WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSION9S BY: c.2 d7 t. Autkorized Agent 424`1 - TO THE TREASURER Mountain Bel I AcATJAA Greeley, Colorado 1TR� September 10, 1973 WOORRRM WtA T op THIS WIT ay mg wATRR ACRRWO NOWLruLL T•ATmRNT or Ma I0LL0WINS, vOuw wraTRYR.T OW WILL SO. 13, 17 _- 23-7 oATRn - - -• . -• mot GOOD FOR MORE THAN *200.00 -One hundred fifty five d 49/100------- PAY an - -- Downs t 15_49 me MOUNTAIN MUTTSTELIPNOnt ANOTcltORANI COMnn AUTIORRtD YOMAIVK MOUE IMPUGN UNITED BANK Or DENVER N.A.. DENVER, COLORADO M:B: # 16 i.T.Ft. 81' Cost - $5.00 permit. 75-3 of t r Date CONSTRUCTION PERMIT 1. Type of installation Buried Cable and Pipe 2. Location and description of work Across County Road 35, 266W4 U.S. Highway 34 By-pass See attached print 3. Estimated construction schedule: Start. Permittee: Mountain Bell P5N 496' North of asphalt Complete: 12. 20-0— 73 4. District: Greeley Address: P. 0 Row 1139 6. Telephone No. 352-5898 6. Project No. 3E-490 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9- Applicant' Mountain Bell By: W.A. Rae Area Engineer Date: Name sad Title 10. Issued by L.D. Verquer Tech Asst Date: Nam. and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-1+479 Dnvr 3. Colorado plant manager C. R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilised and obtain the County's concurrence. 4. Permittee•s installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility Of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees. bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permittee. If final joint Inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permitteo a facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: na• a Supervisor In acce ring this pe' • it the under ned, representing the Permittee. verifies that be has read and understands all of the foregoing prow sions; that • o has nutho • y to sign for and bind the Permittee; and that by virtue op hissignature the Permittee is bound by all the conditions set for • herein. and shall notify Weld County a D OF COUNTY COMMISSIONERS TV, COLDI3A9O a.t,a C//00, iG ,sty Aar: 9-4- ZJ 7,i Al 4 District Engineer MOP 5OL. .s - 0120 \MAN 50 II OA 0:•MM°. .,6—pNBs e• Ur -1. t51 -T00 — p_ INt' awl P•Ir'67 IIIN.'501- WOO —0— a ESNPR.1�1 111V. 701-•100 IS It57(e-IMO L PL 3• MR 9C SWOON PON RUMP RUO1l1onL 2ZC. CAUL REODUCE-17 B`( CONTRRcvo* I\M\R L --- • SQ IIJ51'EODLR 601.130 a.1el'I:oo PL(1) IV{ Rik -25 Purr iv' Sus 0) HI OZ Ca Tau, SrCT Asia (2) .1102 Cs.TLAIT 56ct VW( I) bLYI i-25 Com Sur. (I) IBTbAI Brts.Bo,w 45C• AVM !MTRENCH W. l9PLt-COMM 10' :,; 1fTAL .' 7p' azc. —alaw-zs___ F45 ROTES IF JELLY FILLED CABLE 1S MOT pUR1t.A tt JJL�',tsilstt. (j fl \ !utlertg pit PLACE MOM -CURE P1 -13G5 RCpU1RE COUNTY F+EJ;C11T BEFORE; 5TA1;TiNG CONSCR. CQA17RCT C1TY OF 6RLY WATER *DM 5EUER DEPT t. GRAY CARS Ct). FOGt . tOCRT4Z7.3-OF Btiii5E.D P5PEUNES.:....: SEFORE.,IRENCFMC1 LASER DEPT rSa-6123 •3'19 ALEX .FROMM _.:.'i 5EWER -DEPT 553.61Za at& BOB MOORE GAS COMPANY btZ-111I RAY FOUT5 Fe1FY Jl7MPER8.RR O ,. DROP: 0 DP^: DRGc_ ..:: 0 6610/4601 HOURS CANA. URBAN OL1E COPY 'La COUNTY COMMISSIONER5 C7EGC!0.Y E6 C L P 01- I 5ERUICE -ORTE 9.28.75 M%MT/JH STATES TELEP1WI4E COMPANY FORM 7065 IOCNANOI __.Co5E.ELEY--..CQLC1 Si No.3E_Y@Q _ _ _ J 'TTY nn.MT ��//..�' TGT�`R�.yEELE( rp�TY Ar,7ELID Igolo TO Tj�E_L.O .;. LIICRTNIN:�O/u Lly.is`�.'Bll -t•_31YPBSS— -___-ir.Co. a.----. HAZARDS- OAT/ �.�ppZ-7!'yyPOSIR VOLTAGE . gwllo.MY. ./,' p n�ieNseJ''J ors wL +D. F A _-C�.__-_R�-- M.OVIO!!l?LC____ -VMS / 'C€ EUp6SApTt 7+-� 22 FCC APPROVAL. -- ORDER Yq MV OATI _3: sey7)_ f . OA1 _ CR.11[Cr_ L. pO LL j '� qT'O CMR�✓J —tTR. \nCN __f --TOLL __ RLO. W IT'S NTCI,IIl. Lp. LINA NO. r N ICI«ITV Or NOIIR In«I - _um-1__o._-L_Irll» Kf � -Tivs! .'tom �y .a tra C DIM nargintalaigir4124rATItreirti ramiamexPinwilVirsaavisi ;.tesic�'.,-- ,,�R!'��k .��.tiy�x .��.• ads►.�F'i''i�A �.'��►�2 ZIE MitAtiesnantwinasom COMINFIZAINErnerittriarittlitfiall ationmmtsurszymitm mulant MEHRIVELSUINK1 L_ .:;. • t2fDLMIOIMI OWEN en id Me I .� ql✓ G u 33 A 443,,4 0.0 N T it 41 43 ♦S p M dt Applicant's Name Type of Permit Permit No. 7,-3 Date Issued • Utility t Transport Piel. Report 2Z Expiration Date / �. %Le-r� '7 3 .. :Location and Damage Report: .Date Time . (If no apparent damage at this times so state) 72e - Inspection Date /A 73 i • WELD COUNTY, COLOR= BOARD OF COUNTY COMMISSIONERS 'utt Au orized Agent TO THE TREASURER Mountain Bell I%1CATIDN Greeley, Colorado DATR September 10, 1973 RNOORICMCNT OF THIS DRAT [T THE 'AYE[ ACKNOWLEDGES FULL FAYM[NY Or T„[ IOLLOWIN4I TOUR 4TATORNT OR EMI. HO 15, 17 . PAY One hundred fifty five and 49/100 -- DATED To TN[ ORDER or Weld County .. ' ' i. AUTHORIZE* SIGNATURE •a_ FORM 4133 F 354568 % .V ti NOT GOOD FOR MORE THAN S200.O0 , DOLLARS $ 155.49 THE MOUNTAIN STATESTELE►µONE AND TELEGRAPH COMPANY Mae THROUGH UNITED BANK OF DENVER N.A.. DENVER. COLORADO I"354568u' I:1020"0007u: 04 224 8u' 2. Location and description of work See attached print A M:B. # 15 ,Trench Meas - 3,573' Diam - 4" Cost - $142.92 • CONSTRUCTION PERMIT Permit 1 Date 7 t3 1. Type of installation Conduit run County Road 35 from 20th Street south lyz miles 3. Estimated construction schedule: Start• Sept. 11 1.92.3 Permittee: Mountain Bell 4. District: 5. Telephone No. 6. Project No. C4-0902 Greeley 352-5898 Complete: Address• P.O. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant' Mountain Bell By: W.A. Rae Area Engineer Date: Name and Title 10. Issued by D.A. Garcia Engr Tech Date' Name and Title 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N _ Martin 352-5800 Grly 2. Division construction manager A•J• Earl 266-4479 Davr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance it this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. df final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance or Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE WE \ Matmenu„ 'neercis,•r ARD OF COUNTY CQMMISSIONERS UNTV, C L�R39O ��r ac'c'"e�pt n>; this permit Sl e under s ed, representing the Permittee, verifies that be has react and understands all of the foregoing 7+,ryv ions; that he hue author y to sign for and bind the Permittee; and that by virtue o his signature the Permittee is bound by all the conditions set forth erein, Erf // District Engineer 7/.5 //a%/ tlit ,(f 5/C//,,S a '4 I'i b:= API ter r h l k I!� I fr 7/ C, I L 4` ne G 0 Iwo M e szs•zo coax 7'n }a -41, DS. ache Pn -' '& ' 7ptia e R 6 4 12 10 TIN • 4 2 - 7O271 zasii, 7a2►W.-�,r'-F. .ti'. 'i n „, ... a m diem prmstaaommivlammxim k4tiiiiniDOOSPIRUSS NOM ill'ONNMISIONIMIMAI WAN mitiolownwrOmu-mvam It ISOPII,. R.17ll!!A�': rrr` ` ..r E' 101121WahiPIPSAKIW: "MRS WINNIONSPREIMIIAsSI Wan mgmansmazsmmummilimm Imp WMOIVILIMMVAIIMMIIIMIIIIMII liiiliti j - InWIRM �A .--;ill L lil Mat =5947Allaingragnignill. MOWS }A.VISIIISIIIII ) 1 I 4IIIIRIgrat i ines, II ,MOW=_,II �i � mina iirtiligarJr rea lireXa l�� M.B. #'14 as o, yS 7-3 Permit . 7`f3 Date CONSTRUCTION PERMIT 1. Type of installation Sea Ps 2. Location and description of work County Road # 35 _rola 20th Street south 114 miles (6) See attached prints 3. Estimated construction schedule: Start• Permittee: Mountain Bell 4. District: 3. Telephone 6. Project No. C4—0902 Greeley No. 352-5898 9-6-73 Complete: Address• P.O. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant: By: Date: 10. Issued by Date' Name and Title Final Inspection by Date: Name and Title Mountain Bell 11. W.A. Rae Area Engineer Name and Title D.A. Garcia Engr Tech NOTE: If dissatisfied with construction performed on this Job, please call the following people collect. in the following order: 1. Supervising foreman J.N. Martin552-5800 Grly 2. Division construction manager A.J. Earl 266-4479_,Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation oI this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not bo responsible for any damage that may result to said installation in the maintenance oI the highway or to the installation placed inside County right-of-way limits. THE :CARD OF COUNTY COMMISSIONERS WEUNTY, COLO-: •O By: Maintenance SuDervl.or In acc tiug this permit the uncle d, representing the Permittee. v ties that be has read and understands all of the foregoing provisions; that he has nutho ity o sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth ein. / C 97/ ` f District Engineer Y ii .rig r lY P PAffigirinitaleMellitInriiiiiSSIM iiivicitiatrairiislaellnINTkrea fa . ..asp .,__a•' l �" .._ 7 zr I!141471P�1�GlR�'. � r � .. rttilrirll illy , �ZCiir `!;_ ;4 !7j .r'ti:!!�:I��li►_' !e'uporrinit$04: 0 tiL__,Hiern__Jsed.A.a.siti!Att. 4dieira!4-miiiekl:7"-F1'oce.4274..slarravilatin Le+Jkik .°/ Pew' COMMIWitlantletWArlrarillingliqua Ilirilitillaglaitdritiliatiimillrilitilltill NOM SIM A 5 -. - aaCL.difa R ' IN I., 1+ !I ,2 T ki C r. 4. bl ItNYNDU P f Ro SW TAP .01 / / d i • / / r / \‘\` / / \ \. / a / �. \ \ I I I P. \�\ I e \ I'ft\ \ ▪ N. \ \ a ^ \ s /b GG4t$ G4p nit ti /Pt '.a. _co/✓r1wzzn re/)u sized CrrIV Nti a1 11 I I II 1 1 1 I I1 II 1I I;1 III t •R I I 11 I' I. 1 1I. rb „,1;" G N. ra jeep,/ e 1 1.45 HWY '3E C .•.wrWI/ tn IV/ Sant. F. rA3 I n a 7 7 3 IT 3? - n 2 r k .S C4 rez« r Jz3Frnc � - /L2.4. Wit?L c 7 I' ac a r M I' ti EN =n i t B Er< r4b ro ri O V tks a1 � ��irTaur� py S.LCf 1. G -21 T LIZ 2OD" 5TOLLT Cigna • 7� Piv t WLSr T P rvu Ltiaz. U ) O • a 10 ra ; 7v2,44 r rGN 12 a crs1Lr- -,r+Hutt - r It h M v fl O ti 1 44. ar C4 PVC l c SZ.•74LAPX 6 MIi. C_W.n✓S G'm,.. TO THE TREASURER Mountain Bel! )(.TATIDN Greeley, Colorado ENDORSEMENT OF THIS DRAFT by THE RAPES ACKNOWLEDGES FULL Y OF TNt FOLLOWINQ, vow. ETATESSYT ow emu. No. PAY TO TNt ORDER OF payable TNR0LIR UNITED SANK OF DENVER N.A.. DCNVER. CDLORADD 15, 17 (DATED One hundred fifty five Weld County DA,E September 10, 1973 FORM •113 F 354568 (,_T„ , C -...."_• 23-7 NOT GOOD FOR MORE THAN $200.00• ---�--^ DOLLARS $ 155.49 . <•. THE MOUNTAIN STATESTELEIHONE AND TELEGRAIN COMPANY 0354568o 54 568u' E: 1020m00071: 04 2 24 8u' 2!!1 ♦UT ORIEU SIC..ATURt • • r• M.B• # 12 • • Permit • 737 ✓ 2.T.Ft. 4,050' Date .COST 840.50 ♦ CONSTRUCTION PERMIT 1. Type of installation _Buried Cable 2. Location and description of work County Road id 41 See attprherl print 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete• 4. District: 6. Telephone 6. Project No C3-5140 Greeley No 352-5898 Address• P. 0. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permlttee and Weld County. S. Special conditions - 9. Applicant Mountain Bell By: W.A. Rae Area Engineer Date: Name sad Title 10. Issued by L.A. Verquer Tech Asst Date: new and Tide it Final Inspection by _ Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Orly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. , 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum regdirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. G. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permitteo's facilities covered by this permit, except as the same may result from or arise ont of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits, By: Nisirtenase Y rvi.or this permit the undersi ed, representing the Permittee, verifies that he has read and understands all of the foregoin • •v' •' us; that he has nuthori to sign for and bind the Permittee• and tie by virtue of his signature the Permittee Is bound by all the conditions set forth herein. 1 ,� /% % a '4,! THE BOARD OF COUNTY COMMISI3IONERS WEUNTY, COLO7.2 ' -O• J1 /7 Hai/7s —fe jF H. C. Mc Fate District Engineer f H I H f f f f tfttfffIH I i I I 1 i 1 1 1 1 V V v u v v J u J v 1 I 1 I i Wit f-4 tuamm to d;�► 1ft esh.. I man* -WIIMMICIDOESIENIRIErivitattaratoritgam, wraps i--w% rllaItte 61 aft .WARE'rii � � f 231 .4 GM PISAnitainiglatkOMIII5!.. VMS VI lLIFIMM-te-rONIII Kiln CZ ariAltaitiliki.pleritt4 rAir" „alai -in iY•-�.r ..t �'�Il.�t:i+��l'V•",-''" � ��,�'��s'.�,�/rF17/�va_tion D 11 M ItliM a -� � et#WW :���':�1 N i jT1 liaL_JINNI Utility 8 Transport Field Report ���J ti Applicant's Name : �u z�a :f:1 —'^ 1ia Type of Permit Permit No. 7 3 7 Date Issued 73 Expiration Date ez eat 7.. :Location and Damage Reports'.Date Time . (If no apparent damage at this time, so state) .TO THE TREASURER - • _ Mountain Bell • OORCCMCNT Or TNT o •ou, T+AT[MCNT OR .ILL NO. GATT MT TML ACKNOWLTDOET FULL PAYMS C3-5140 DATED 8-27-73 PAY -------Forty and 50/100----_- -_ - TO TICE ORORR 00 PAYAK( TYMOUTH uINirc0 BANK OF DENVER N.A„ OCNVCR, DDLORADC Weld County lYrnfrl ey Cnlnrndn } e ..ORM CN,+N .411.71# ' 341022 c 23-7 10 O • NOT GOOD FOR MORE THAN $200.00 -oouwas $ 40.50 TM[ MOI MTAIM STATESTunMoN[ ANDTR1uutA9N CONMNT CPI/"Le-A10- lA. 11•34L02211• 1:1O2O'9(OOO?I: 04 224 ail. Inspection Date 3 ( (59c- 7Y AUTMWRKO mmoru11C WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY:� r o — iPermit • 736 9. Date _August 16, 1973 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work COUnt..Road #i$ 1764Ft. east of County Road if U 3. Estimated construction schedule: Start• 8/2753 Permittee: Mountain Betel_ Complete: 8/31/73 4. District- Boulder Address' 2775 Valmont Rd.. Boulder. Colo. 80302 5. Telephone No. 442-8223 6. Project 'co. C-3-5160 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County, S. Special conditions- Applicant - 10. Issued by Mountain Bell By: F.z._W._-:ax1C8_._.EOSeman Name and Tide U. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, fa the following order: 1. Supervising foreman Rte_ C. 1342-8221 2. Division construction manager A• J•_EBrI 7�6-I�jSL_ 3. Colorado plant manager W. J. Horton 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plane. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shalt notify Weld County a minimum of 12 hours in advance 1f this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE OARO OF COUNTY COMMISSIONERS W �OUNTY, COL Name and Title Date• 8/16/73 Date: Date' Me:m• ne sect tlug this porudt \hu undersign foregoing representing the Permittee, rifles that b e read and understands all of the n 'sinus: that he has authority o sign for and bind the Perm rifles of his signature the Permittee is bound by all the conditions set forth herein. ,11.17 uatie4smoG v CU. i 4. • I - CD CAD Co ti CA) /ED .t9.? LOncoarr_LlN3iY MAD X11- R MEDERICC e' r r I I I% 1 ,p � , nl 0, ; e r �I m a T. 0 O ... - n H I r 'I'tw' --1-1 C 1n —1 — V I_r.z -4 v ' O i--H-in r n 2 v O 70 7 X -+ O St 8/ HZ_ 7/14 PS/ -6L♦ n, i•z5 'A r y 8 a - r DITCH _ J0 19112:4" J � D Is ED i M ft 14 0W04 2 re 0 4/ H£CD !Y/rri SCRUND9 rIPPrie. 44 a Lk. a MAtriat SMOWILIM14140lititeriVeran skiemr- •.�� -�� t u���+-�:��r''.��I.��++FF,,,,����i eRxl�. \�'►<T+ice-r9,+���iir�,lai���rf�� �!� Iterrigrbets.wv-lia ifillt .............„......„.., ,..... n.,,,,„ .2.4 ars.... rill ItTOMRSIMAIltriE7iS11011 Ingo es,____Iitil . erniftd . lit 1 11 all wit - tarsal It .�� tanifen3 I nw }TAU of DO 1,1 �� r' tucke 'PM%iSlut.v\ `se UMW§ PLITTAMMIDIONMENNISSCO rittastablelyiront tan !prat '�'c�. Carle YlP'.SmIIo .i vv�w 7 ��+ Utility 8 Transport Field Report Applicant's Name Type of Permit Permit No. 7y Date Issued 3 Expiration Date r�T :Location and Damage Report[`. Date Time (If no apparent damage atthis time, so state) . p.•A*.•fir..-.. . ... .a •15." To THE TREASURER ' ' ` -,` ..r...__ Mountain Bell LCCATI0R Boulder. Colorado RROORRWRRT OR THIS DRAFT RT TMR ACKN0WLR0DRR PULL vel,* RTenYOlf OR SILL RO. DATCO DAn btri iron,, 1973 8-16-73 a . a..�- .� 4- 4. +.....,..r. • : 'oat CIS r' 45.n h.. 353252 c 23-7 I6₹0- NOT GOOD FOR MORE THAN $2OO.OO PAY Thirty -Eight and 87/100 *SA*AA*** **A*********fOLLARB =38_87 TO TMR auto 0. DDARLE TR IoN The Board of County Commissioners 1500 2nd St. Greeley, Colo. 80631 UNITED BANK OF DENVER N.A.. DENVER. COLORADO i [ MOUNTAIN STATi3T[L[►NON[ ANDT[L[0RAM COMPANY VY1o2 a n c v ,uTMDu6W RMJNAVN IR II'3532520 I:1020IN000?t: 04 22c4 a' Inspection Date 37 O9C1 /3 ., WELD OOUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: Au Agent ✓] i M.B. # 13 L.T.Ft. 50' Cost - 55.00 i CONSTRUCTION PERMIT Permit 7,3S" Date 1. Type of installation Buried Cable 2. Location and description of work See attached print Cpunty Road 15 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete: 4. District: Greeley Address• P. Os Box 11.39 5. Telephone No. 352-3152 6. Project No 03-5014 Frederick 7. Permit granted subject to general provisions Sated on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant: Mountain Bell By: R -S Rehurek Eaoility Planner Date• Name sad Title 10. Issued by D.C. Sinele Engr Tech Date' Name sad Title U. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.N- Martin X52-5800 SrlY 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R, Phelps 266-4681 Anvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permlttee shall Inform Weld County of construction methods, equipment and operational procedures that will: be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permitted shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of I2 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for contraction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final Joint Inspection determines additional corrective measures necessary, such corrective measures shall be Initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9, Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed Inside County right-of-way limits. By: Vatn:nn Supervisor lug this permit the under::. ed, representing the Permittee, verifies t be has read and understands all of the foregoing • 'isions; that he has autho y to sign for and bind the Pscmtitee: and at by virtue of his signature the Permittee is bound by all the conditions set forth herein. t ict Engineer THE BOARD OF COUNTY COMMISSIONERS WEC)UNTY, COLOOADO� � y -29 2�47/.3 7'�✓`�e�.s thiceiritakinittilL Aswan als, AV" WS OM Mitrilatilira Zieffitarialkealiteilmaal maprirrzeittatitAsnigielafin lllJ!plt�!I�4lR�1��M,�� � ,.,s�1 ranwrisetradasomilflitilie iasimS2V .. of marsougaritiffirarifipala Niquivalienteibitriewsgrearni mamma , ....„Hp onI _ i �bytk�tos,'ta L►;Rs f•�''3:Isitil"-r11� rgr a ili idarta it . M: ' �: ' - i rr'adtr, _,9M0 ' Sa MIN= 2111111113102,411 . "fie P' 5n • ' vim' COMIIMEMBEIMEINMEtrillli Mall ERMillittala9liteart - ihm earl .iiJ asingusamnsagima in all riketweesirfaintwa an toiatomPiritimitarcaumis Mar �� t, _-jS St • Utility 8 Transport Field Report • may- 7V - Applicant's Name n a�C.C -~�-E_¢., Type of Permit Permit No. 73s. . Date Issued Expiration Date o9 cey .t 9 cP-73 :Location and Damage Reports' -Date Time (If no apparent damage at this time, so state) TO THE TREASURER Mountain Bell LOCAT,Df, Greeley. Colorado .Z.OORSIM.NT OF This DRAFT W TNt FAVEZ ACKNO*LtQOt. FULL FAO. row CIAlN1lfv w Sea no. C3-5014 8-28-73 PAY —Five and ----- - --- tD me *won oN Neat ?FROWN Weld County Greeley. CeTnrndn UNITED SANK OF DENVER N.A., DENVER. COLORADO DATIL LLOM1 MM. .,» 11.111.. 354551 C 23-7 IOT20 NOT GOOD FOR MORE THAN 5200.00 -------ootuas $5.00 THE MOUNTAIN STATESTLONONE MIDT*IWRAPM COMMIS`, 3 arltrt;e.a.. FUTNOROLD NOVA 035455L1' ':L020'000071: 04 224 8R' Inspection Date J7 6:71%;?, — WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: i c � v Au rized Agent # 10 Penn . ` 3 V - L.T. Ft. 1,250 Ca. Dia. 1.9" Cost fr]2�.t1 ' 0O Date CONSTRUCTION PERMIT 1. Type of installation Buried Telephone Cable 2. Location and description of work See attached print County Road 17 3. Estimated construction schedule: Start' Permittee: Mountain Bell 4. District: Greeley 6. Telephone No. 352-3152 6. Project No C3-5258 Complete: Address: P O Any 11.34 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special condittona• 9. Applicant: Mountain Bell By: R S RehJ rrlt Ijrn. Fengi near: Date: Name and Title 10. Issued by R.S. Rehurek Area Elle-71W Date: Name and Title 11, Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction Deformed on this job, please call the following people collect, in the following order: 1. Supervising foreman J•N. Martin 2- 800 2. Division construction manager A J. Earl ?66-4479 3. Colorado plant manager C.R, Phelps 266-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Pennittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's Installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permitted shall advise Weld County 48 hours in advance of the date work will be started and. shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10- In the event any changes are made to this roadway in the future tbnt would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation In the maintenance of the highway vr to the installation placed inside County right-of.way limits. By: THE BOARD OF COUNTY COMMI;SIONERS WELWt JNTY, COLORA 0 (ems _ Maintenane. ervime I g this permit the undersign , representing the Permlttee, verifies that he has read and understands all of the foregoing provisions; that he ham authority o sign for and bind the Pcrmittoo: and that by virtue cf his signature the Permittee is bound by all the conditions net forth he -in. District Engineer vi b CA_CONTS9 FR SA, a'7 TL F?BZG&l/TrYGYT 7 -aflirC-2-y Tl 7ZO.5Z So/ -S25 O s 0 I z O -1 I' N n 0 c); G r r p T,9L•9n , BURsi rHTru r PYTAR - Z� Y; `i r.r r n N n C b n ' , 1 r. Ji'-r✓ r. T • -, I' 1r• I U \1 I v O Chuos 01'1 • 0 Ti;?* c /� / /AL.. :rG;cc/ F COVTD ON 3Ne C' O n 9 N� U n b 0 mry 'I r 1) S r 9%93 /WSHZ B3 biz '& 6". 0� r nn coh� N Y.9.93 /Z RC ST Y9.93 P/ 7P.3 C L N T.Y 7i014)461/ .iz•r.iY/TE u/r:rr c[FT Y 1b :"WWI! if a,441:4 }r 1) rj itI Y 9 1' 111 1 � - ' I I:Ark �L` rd , , it; ;ti Oy ^I I � i iJI I NI; f 14 ?i d=r.11a-. .,, CI t ZI I' I7' n NI I I �kY : r ' 0.so�1P3 �+a=all 1 ; Li �i w1 : • IF: S IN. cc f ^� #I Kr 1 i'�L I 3 ° :s? i i I', Iii g it hil s bet adb bk421 Co co AI^ N 1—N b :"*z t 11 ,99193 (/W 319283 PPOT 'a9RJ 'Ii Thor 0 b V COUNTY PO/ -/o co2 RL S7 I wwzrefrancitylVkIWOrlifiatiSM eirialfralilai ita PPM Warn, IMO try) Z InepegbIglill iillizictior14.:Frivirille:Eitril;LIAFEje; a ai camNatitialkACECILENIPKYAtiffiiixent C � it= MCPY �f��Nn, �Lrfy�.1�Rff� +S . ``�J "�' pr ��A1.�\:.���i'�" ��llr'+13► ".':i'"•NMi�swlj ` k i sal •.:.. 'lame'..) . ri{i c ,+'.�. .a' as 'a 142i:� i ayAk. 2 aw e ip 2:1111121217101-22. ,%�,�`FI :P !LD' ;' m weiffittrzionemoranaliarawirip Si ' IIIRMIionagraelana Stirmaimatza�lalx tal! Villiflaer dllititritrr MEM Nil MN ieAkPmegg. n .a1..'-''.1ii LAMM iteariareas a. nallINIKIIIin NEI eons._ ' HP,a ,airialliblitilEtIOr eilliffli niblral, :1 Iil � rc li K Utility S Transport Field Report Applicant's Name _ Type of Permit ot7' 7 V. Permit No. Date Issued Expiration Date _ Z?aey273 :Location and Damage Reports'.Date Time— (If no apparent damage at this time, so state) Inspection Date © 7 12e-zr-f 3 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: h 4tz � ttiG,.s�9'�uc.� Au ized Agent TO "THE TREASURER Mountain Bell 'AY _ D THE OND[R Or ATARI! •R0"CR UNITED SANK OF DENVER N.A.. DENVER, COLORADO I„AVON Greeley, Colorado ANDORSEM RNT OF TRIM DRAFT RV THE ACMNOMI-ROORR FLAK DA,, August 23, 1973 THE rOLLO✓IMOI C3-5207, Q ,5258 8-20 One hundred thirty nine and 11/100 - // roww-ty1F a•nr C 341018 23-7 1020 NOT GOOD FOR MORE THAN $200.00 DOLLARS $ 139.11 THE MOUNTAIN STATLSTLLEPHONC ANDTELSORAPH COMPANY Weld County �n� , Greeley, Colorado avYHO�pUD ,"�-m-'^4) U' 34 10 18o 1:10 20'100071: 0b 2211 8'& TO THE TREASURER . , - FORM ens F Mountain Bell „CAT,ON • Greeley, Colorado DATE V' • I ,ENDORR(MV T OF THIS DRAFT ST TMS PATER ACKNOWLEDGES FULL PAIN August, 1973 WT OF THE FOLLO IRO .! •f fi1lt S1fj}-i., I e:I a •--ti 1 4 l i 2 :. 3E-395, G3-0966,.. 516, 3E-538, I:#:8_#9j thru a 'i . STATEMENT OW RILL No. z0� T ;�: • t T !_ [1} It `'.1} 1020 if •? - - I r.{ NOT GOOD FOR MORE THAN 1200.00 5 99, 3E , c�� %aft A ,....-. ,•C,Pi j<YgiF"- ,- —One hundred 'eight two and 91/100- 1- RS j t! f ! 1 DOLLARS $ 1$2,91 THE MOUNTAIN SYATESTYLEIRON[ ANOTLLLORAPH COMPANY > TIRE >ROES' OF i WANE • tA0UER UNITED SANK OF DENVER N.A., COLORADO t • . 31,LOL?o .1:1020w0007i: 04 224 air • -- Weld County Greeley,, Colorado TO THE TREASURER Mountain Bell 7. t : • o f 1 .I IOCATION Greeley, Colorado - DATE ENOORSLMRnT OF THIS DRAFT EY TN' ACKNOWLEDGES PULL PAYMENT OF TMR FOLLO*ISSI . August 23, 1973 Draft 1 of '2 " ! '' 1:1 •= A0TMORIZED Y0MATUNE /• . r ' }s Oil ), f 1 ..I,:'� 1!air 1 .I!ij1l.'}11}i l(; 5 - r' FORM RISR F- -..,la-71T' :11 341019- c'- I. ,11 .7'�.� - I. I. .ltl .1O j' •••• i t •I , ii. .1 i.. :_ 1. .- 1•n ♦4 r 21?.4 : ,> t "R .,ll no. C3-0963 - - DATED ' • , % - ; : • • NOT GOOD FOR MORE THAN $200.00 i • -_ IiL•: >cit:i••its'tti l PAY ----Two hundred and no/100- _ •1. TO THE / ORDER OF • RATANS TNROYER Weld County Greeley, Colorado UNITED SANK OF DENVER N.A., DENVER. COLORADO DOLLARS $ Ma MOUNTAIN STATESTELL%IONL ANOTLLEORAPN COMPANY I 11: f;s�ti3�Ff .T vt.e... J L.1 ,z_.tr ;, .,i 11E31.10190 I:1020cu00071: 04 224 8u' TO THE TREASURER A Mountain Bell Greeley, Colorado $oCATION EN0ORIEMCHT Or THIS GRAFT ST THE ACKNOWLEDGES FULL Draft 2 of 2 YR RT.T(M(NT OR Rill NO. o TIRE agog• OP C3-0963 DATE ------0ne hundred sixty seven and 42/100 -- Greeley, Colorado 'SWIMS UNITED BANK OF DENVER N.A.. DENVER. COLORADO August 23, 1973 THE roLLOW,N0. ice. ecl ARMORER* SI0 ATURE •.n • FORM 1131 F a.TI, 341020 G 23-T 1020 NOT GOOD FOR MORE THAN $200.00 TNL MOUNTAIN STATESTELZPMONS AND TCLLGRAPN COMPANY DOLLARS $ '167.42 AUTH0MIZWD SII0NATURE . M.B. # 9 • 733 2. / L.T. Ft. 5,766 Ca. Dia. I!' Cost $57.66 1. Type of installation 2. Location and description of work SPA attached .print Crntnty Pruad 19 het w eti Cm, Rd -'s 14 and 16 CONSTRUCTION PERMIT Permiti. Date Buried Cable 3. Estimated construction schedule: Start- Permittee: Mountain Bell Complete: 4. District: ;reeley Address: Rnr 113O 5. Telephone No 352-3152 6. Project No. C3 -5'n7 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant• Mountain Bell By: Ra Date Name and Title 10. Issued by D.C. Sinele Engr Tech Date Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman d.N Nsrtin 352-5800 2. Division construction manager — 3. Colorado plant manager C.R. Phelps 266-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permitted and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near ae practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: ltalntca In 'weep ing this perm,_ he under geed, representing the Permittee, verifies that be has read and understands all of the foregoing '-ions: that he has authty to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein, THE BOARD OF COUNTY COMMIkSIONERS WELp/S.QUNTY, COLORADO ! a c al; othe/z9 District Engineer • t I 1 4 5 /EZO De. jTF 3G/LO 7X/K. / aO (tv5) BL/. `4, PL'_ ?,IIS J/e%LI /:c SUr.0 _+,w ZO,42D J/N 7_•OK°l N;L� ,, U/7. / S 774 OA 20 .,J///. /J0 • 71.4 A ,U!/7), 0✓J//l y/ i 7J JL 1 Co-e✓L ✓Lt'r a/.€ r,ITU.t4 etreArt/e et / 1- LNPM4/ N /J F/J//!) CO. 7QP.C. / OR STA 9040 AEO. STA �brco �'✓� •- ,ee G/fG/ TS a... g Yl Stioit,yli:•444Ki �f9�di' 'r ;;;P:i:i-ii . t• �-. tit IRMIE siristvLoleihaTADMINAMititigrAiiiaar isSt-tftnitilliSSIttetlaVIONCASII Ij. I oo a ! iatrit risquirzu12,4402at• ii i'ann . imparga"&-tazieurt;ta"..wr--sprii% Areirars) 1 ft-Szaii at V-SINESitireAlitilliil S aalat?.ridgy%,mInner 22111111211761:43 ,/fillICIPARINIK SteriffiallifilkillEN eta uni i hear m glia iW �: l am ci adi �_ l t:0-- ' rarivi1 ? . t�0 _ Lamm puine.',;lig l Fair rikelkiliffigtiLl - k. i • i 2 24 arm- T,M. timp r.'ii t4 ( .. S I 16 rogrecura r a .., .. :„....;In `•� Eli ! +r° a ryil 12 . :_,......: '1r v. ,1 f1 f ! ... 1 D� �• : Mini i A, lili�j�£� °�i. atrailit Utility & Transport, Field Report Applicant's Name 7 Type of Permit _ Permit No. 733. 4,,->P4-Le4 Date Issued % 7 3 Expiration Date _ Location and Damage Reports' .Date Time (If no apparent damage at this time, so state) 1 Inspection Date 0 7 acv— 7 3 WELD COUNTY, COLORADO BOARD OF COUNTY CO&Q4tSSIONERS BY: 4,tR Au orized Agent • . I, - 4 .r .-` em To THE TREASURER Mountain Bell - 'ORM 1133 I 13 -Tel i SAT, N Greeley, Colorado DATE August 23, 1973 INDORSEMENT OF TINS DRAFT SY TN[ FATES AORNOWLEOA.S FYLL PAYMENT OF TN( FOIAOW INS, )YR STATEMENT OR SILL MO."3-5216, C3-3207, 07.52$8 8-20 341018 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 'AY 0 THE ORDER OF ATONE MAOUGM Cne hundred thirty nine and 11/100 - DOLLARS $ 139.11 THE MOUNTAIN STATLSTELEPNOME ANDTELZGRAPM COMPANY Weld County Greeley, Colorado UNITED BANK OF DENVER N.A.. DENVER, COLORADO n• 31, 10 18,11E E TO THE TREASURER Mountain Bell I:10 2071t000 7L: 04 2 24 nn°_ DATE !1 ' (MDOR.EMENT OF TR'S GRAFT ST TN[ ACRNOWLEDOES FULL FAYM[NtOI The FOLLOY/IPICH •;TC AUTHORIZED SIGNATURE FORM (133 I' • 341017 c JTMAT,DN Greeley, Colorado August 23, 1973 ---�- "' "t 3E-395, 'U. STATEMENT CR will 'A t � I .�it) 1 :: •is )• 1' -1. 1 C3-0966, 3E••3161 3E..5381'i''�t#4 "t3 5199, 3E 386.. C9'Tt'k' .. i. • li I-1 •,. �:vLYTA,�-.1ITi pi! It 1 ' C•- 'TL'W` �i T7 �. f':)71; ' l 0hundred ei t _' ne i$t 8 r if, I -f-k' Sr♦([{4 8-9 thru'-20� 11 a 1! • _ S?. �. I:• �).S`l, ' NGT GOOD. 1 FOR MORE THAN $200.00 . Y gh y two and 91/100 DOLLARS $ 182.91 ) TM( )RDIR - or • wart • HOOVER UNITED BANK OF DENVER N.A.. • , ---Weld County Greeley, Colorado • .1, • r t11 . COLORADO y ... 1 • 'I - .II.34 10 17n° ' .1:10 20'0000 V: 04 2 24 811' • TO THE TREASURER . Mountain Bell THE MOUNTAIN STATESTELEPHONE ANDTELEGRAPH !CO:MPANY' li AYTMO*IZZD NOMATVRC .. 1• • t LS 1:1{ f;\ I 1 r . • ' FORM 41133, I. IS -TIT 1 ,iii • Ian r Greeley, Colorado —` DATE Auttust 23, 1973 (MDOR1(MLNT OF THIS DRAFT SY TN. ACKMOWLEDOES FULL PAYMENT OF The IOLIAW,Mt, Draft 1 of 2 11 t o '.• • h - ff • auR STATEMENT a. HILL NO. C3-0163 '- , is `•: ' -� 4 DATED PAY "-------Two hundred and - ',�/. I',` - t - ^il _ RS • )111{ 200 'DOLLARS ;' • 'tA• • THE MOUNTAIN STATESTELEPNONE ANDTLLEGRAPN COMPLIES' O TEE ' ORDER OF I "YAM( TMIMUOM ' Weld County • Greeley, Colorado UNITED BANK OF DENVER N.A.. DENVER. COLORADO 'AY _ n'34101rill' TO THE TREASURER Mountain Bell Greeley, Colorado £orArloN ENDORSER [PIT OI THIS DRAFT NY The ACANOWL[OO[S PULL 41020m00074 20'D0007L: Draft 2 of 2 C3-0963 04 2 24 8n( DATE '-341019' c ^. 1 NOT GOOD FOR MORE THAN $200.00 r August 23, 1973 Y of Oct I OLEO W iMa, AUTORI)ND N.G/LtNRE•' L {� r)(71. FORM Sts* F 15.711 341020 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 ------0ne hundred sixty seven and 42/100 - DOLLARS $ 5167.42 + THE MOUNTAIN STATESTEI.[PHONE AND TELEGRAPH COMPANY D THE Weld County ORDER OF Greeley, Colorado `2 ''--'tt•S AUTHDOIU ED S.OMATYRt .DIroN - - UNITED BANK OF DENVER N.A.. DENVER. COLORADO opal STATtMRMT OR eau. Na. DATED • :;I M.BL # 8 L; 2.Ft. 5,645 r Ca. Dia. 1" { Cost $ 56.45 • CONSTRUCTION PERMIT 7 3 1/7/713 Permit• Date l. Type of installation Buri ed reel P 2. Location and description of work See attached print 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete• - 4. District: Greeley Address: P.0_ Box 1139 5. Telephone No. 352-3152 6, Project No. C3-526 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions. 9. Applicant. Mountain Bell By: R.$_ Rehurek Area Engineer Date: Name And Title 10. Issued by D.C. Sinele En.,r Tech Date: Name And Title 11. Final Inspection by Date• Name end Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 2. Division construction manager _Ls. Earl 266-4479 s. Colorado plant manager C.R. Phelps 266-4681 PROVISIONS: 1, Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5- Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permitteo's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits, By: Mnintenanc,• Si visor In 'ccept g this permit the undersig ed, representing the Permittee, veri ies that be has read and understands all of the foregoing - ovis us; that he has authorit to sign for and bind the Permittee; and that by virtue of his signature the Permittee Is bound by . he conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WEL UNTY, COLORAD • e%lc7/,J I,t` 4r•. J/a1/x3 District Engineer C0n/T .ASYA"( e/0//7, L ^7A 29,,e0 a ACS/ et 7.8 Pt a STA CS/GS Cat.eAG OB STr7. es" 79 .1 T.21 _5TA _J/.;O Si,? ZNI9 /L ACV .37 A O. a 4.7 J 1 C �— Y O K r i 5 i rc fl v cr3 ANY 4,4 $100 (A 31oJz) STA. 2,020 (N f3OJ) • ti 0 T 9 STA 2/00 (A s9) Jr 6--- OG2OZ'77 500 //70 37;90/00 s192 37/50"O/DO RC. /CC 5/.57 dDra0 At. Dt. STA S(.//0 PC aC. STA 70/05 Pe a - sT.v-SC?5O STA sz/zo rO A` ACi At a l t] a n ...t9111C. S777 SOARS - I n I GOt'L Feat:, sao i GEFT A c t v " ardirr--: my s. i � ' 77 M --lin- . um 744 101 ia, 1 °a Il s - . — .( . . VE Ill ... - , . de.VVre S . . . . .a..,-;,. - f • = rea K 5 ete...1 irmi �°fir.. amim g .. f, inu,�.a- . �� -`"� tea... - - `a - . n _I --m-191 - -ampin INIMM MAO ��aa�gaawliar_ ggek„ L` .j,. sn_ `,%i o 46 41 fl tYA mu■a----•g-oa-.-OW _ - fa a,mA,a,,;eit _ �a rr " :• 12 Mnn� x u g°}xtir3 w- 1 REM=a M =ME22 NMI= /mom. •. tt - . . • . — c �{ ., 26A. } . . �. . INERIVESAM ' e 1 16 ifffilefalint 'ft 1 i is I Will ,'_ `r I • • a tHi. R -S 1! .._t... ... .. "��.... eer " ate r _ _ erw' 2 2 D A A. S I SAIIAT .1 51 53 a 57 , e 63 65 67 610 it Y3 1'5 72 $ n is is d N sl 4 is R Utility & Transport Field Report 7'f Applicant's Name S = 3—e Type of Permit % Permit No. Date Issued • Expiration Date ?3 F 73..• gi era' 73 • :Location and Damage Report:'.Date Time . (If no apparent damage at this time, so state) Inspection Date i • WELD COUNTY, COLORADO • BOARD OF COUNTY COtMAISSIONERS BY: / \ d Agent m���r - Au prized Agent 4- v. TO THE TREASURER Mountain Bell J 044.'41044 Greeley, Colorado Dn August 23, 1973 MOOR LLMLNY O/ TM1L PRATT ST 'MIL ACKNOWLLDOLL FULL /Anoint Or nit 'OLLOWIMO. NR .TAT, ,Mt D..ILL N..C3-5216, C3-5207, p 5258 8-20 'AY _ O Mt Winer OF One hundred thirty nine and 11/100- C roRM 6103 I 45"711 341018 c 23-7 Io20 NOT GOOD FOR MORE THAN 5200.00 DOLLARS $ 139.11 THE MOUNTAIN STATES TELEPHONE ANDTELEGRAPN CONPANT Weld County Greeley, Colorado avail R UNITED [RANK OF OENVER N.A.. OCNVCR. COLORADO ++'34101811 1:1020111000?1: 04 221. 8t'_ - TO THE TREASURER Mountain Bell wrMO.BUD HGNATURL " I06M 6101' }R-:' 1 ;'i. i:'i , : 341017 ti c . • ,„‘,5,,„,,,Greeley, Colorado D R August 23: 1473 / ° •; Yi wDONiLMwr O/ TICS DRAFT LT TNt PATLt AORNOWLOKIRR PULL rATMLNi OI Mc rOLLOWiroo - - t{L , )i 1f! i yam\ 1-'I. :-..•! . . --7-..:i: �� IS. 4!(!)1 ' WIi;.;- .3III w 3E-395, G3�966, 3E�T-311 f6, 30(,5338),'!! t ' '.. (I i hie FATLMwT OR EMI. N0. e3 5199, 3E 386, c,Irsi2 One hundred eighty two and 91/100--_" --Weld County .Greeley, Colorado UNITED BANK OF DENVER N.A, COLORADO IL II' 3 4 &O i 7++° t: 10 20.1'000 71: - ;13;1;. TO THE TREASURER Mountain • • :.j • DT:ATION Greeley, Colorado - OATS Bell ;1I {x•••12' i i' TtHHi! 1 1 1}ir1f4-1020 1I.- HOT GOOD FOR MORE THAN 5200.00 ' DOLT AR$ ' $ 182.91 THE MOUNTAIN STATORTLLSPHOKE ANDTELLGRAPH COMPANY fit.;! MITI.OR,ZLD MGN/.TURC t ' 224 fit' • I OW ti :. .l i, t` tti t 1t. c, ;1 August 23, 1973 woofLRMRNr or nos Draft ST TNt 'AYES ACKNOWLEDGES AAA. PAYMENT Or THE rOLLOW1nO, - i • / ,- FORM E1„ r. 341019 =- Draft 1 of 2 r.r•lt`.,r •� „"_�,�•; �? !�, 1 ::2��3��7•fi • C3 -r0 r t' • GU. .T.Tt«ENT rill NO. . • I i !L1,•T' 1• I ' NOT GOOD FOR MORE THAN 5200.00 G, J63 ban-.� ' PAY ----Two hundred and no/100- 141 t o . EARS ###11",4`.;#11114\ , CLEARS ; . „N, pa MOUNTAIN STATLSTELZ►HONt ANDTELEGRAPN CONFMIC ro rot ' ORDER Or "MKT NKD0DR UNITED BANK OF DENVER N.A., DENVER. COLORADO Weld County • Greeley. Colorado 11'34101911' 1:10201800071: 04 224 8t' TO THE TREASURER Mountain Bell Greeley, Colorado D„t August 23, 1973 i ne&rzos ENDORSEMENT Or 74415 ORA/T DT Ma ACKNOWLEDGE* PVIL rarotor Or In rOLLOWIN0. Draft 2 of 2 OUR STATEMENT Or SILL NO. 'AY _ D THE ORDER Or &rail MROUOM UNITED BANK of DENVER N.A.. DENVER. COLORADO C3-0963 MATZO One hundred sixty seven and 42/100 ------ Weld County Greeley, Colorado ,css AUTHORIZED L.GMATURL I ez r:; • ;%1.+ FORM I n 341020 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 DOLLARS $ '167.42 TN E MOUNTAIN STATESTELEPMONE AND TLLEORAPH CONPANY AUTNCRIZES tkiMaNRg • • Penni. 7 3/ 6,250 cal 'Dia. 1" Cost S 62.50 CONSTRUCTION PERMIT Date 1- Type of installation __Buried Cable 2, Location and description of work See attached print County Raod 53 and 42 3. Estimated construction schedule: Start- Permittee: Mountain Bell Complete• 4. District: Greeley Address• P -G• BOX 1139 6. Telephone No 352-3152 6. Protect No C3-5242 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• Ce 9. Applicant: Mountain Bell By: R.S. Rehurek Areq, Engineer Date• Name and Title 10- Issued byR-S. Rehurek Area Engr Date• Name and Title 11- Final Inspection by Date• Na.'. and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman S.N. Martin 352-5800 2. Division construction manager A S E++r1 266-44?4 3. Colorado plant manager C,R. PheJ.p 266-46L PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in n location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. a. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5- Permittee shall advise Weld County 48 hours In advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for constriction and safety, 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Pormittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be Initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the Installation placed inside County right-of-way limits, B5: forego is bound .Mninte.. Sunerri,nr pting this perm t the und - igned, representing the Permittee, verifies that ho has read and understands all of the visions; that he has outo .rity to sign for and bind the Permittee: and that by virtue of his signature the Permittee 11 the conditions set forth herein, THE BOARD OF COUNTY COMMISSIONERS WENTY, COLORADO 00" tAzoith District Engineer 61 w NLASOrM 1,O..t„4,L I '::u1 /VG / COUNT) RORD'4'4/ IN ,L /G-73 i i 1 1 RC /1 - Pr]) S Co.O .37A6e-SO B BHFlH- SO / B3. /O/-IaOL- /ODD 70CO. STFI Ste- 3S PL KCS/37 S.S. € SIR 5/Stftrl CYOS"SS 7 S7R?LD- ZO PC ACT/ 3 7 7RFR Z DPS E ST; 3S &D/ TRMI LE7?S 57/1 73r0S- hOUSE E STR //T85 ? P11 i c0 k n K1 ft Ic b m a 1P46/11c' Co, X- DE D.E LGKTS 57A2Y^!ny CLI7 s COUNTY ROAD' v2 GRAVEL STA St°SS PL "E" nos CLOS'6/.3 P03RIDLE ECKTS P1AiiT•ACCCUNI{7:G If Air Core PIC CZ",•: is SUbiitotcA for iklproeof' :Moisture Ping, r. y be r"occA Co RIMPRR3 RR WORKING PPS TRFD DROPS TRFD DROPS RR AIR DROPS RR BUR 66W/,66W HOURS_ — 3 BNAH•2S- / 83. /O/-/z5- 45C-RJBW-C&( XNTRENCH- &E 7.71 IN CCOS _ 70' SFieC Q' TOTHL= G3 7S :R/R DI7�N FIELD .DR 'ter .L PVT. DR. PyT aR, 7)4 DR SHOULDER OF RORD 5TR D.30 I' S' 1 P/I 7Z L /F/O 4'5X -9H3' W FO3 x X E X x 21/8R P12 PB/7/VZONIN PLACE THIS JOTh ASSUMES COi12LET-ZON or- c-z-ogvl NOTE_S: CONTACT .E!'VG'R 3 DP/Y5 ?RIO? TO 37/9RT OF CONST POT? STAKES ENG'R TO OBTAIN CO/JN7y PERMIT SL.V DLL a 7ePT/C /(.7) P. rAIN 7?EO'D FOR ALL COST, TiF(;'L) EOIJJP 1A/NS Oh:D t kt L) c>I L- Z-C,O'd I CQ'ATE EXIST BUR 72.?P BETWEEN P//-P/Z RFF/1IFFrJ;'7`r,. Nibs 7/R/, PL BUT? Ch A7 // /%//J /tit 'IN nP /n" asRLIFIOAcs r d *L000141' rnL IFSP / LCOOir? / .PL C/Ay-E3-' - (p/ Z ) PROT /O/ y'G ft.= �' l CLOS' 6)2.3 PL E CLOS STAOTOO BRIDLE /CPCTt /DROP CRT 56 OL4i CABLE "OTHER" MOUNTAIN STATES TELEPHONE COMFANT FORM 7065 LYC.AMYL-LrL 1rV eIiY `. /�. , - VIOL MO�/i.-1r% 412._-� J- OILTIIICT Gj Zj couNT,JeL�l�ii_ Ii3YLO f0 _LL Na-L[1-/�i�« /_HU/Yr NASMIOL-J1..- 'Y ar LND.o-sr-C-47 "t.o[�-./��D�t�D tv �«-caon���} N/./��/_____- An".1" jGJt=L�---,ITC( aS - `P OATC7JZ-.12.CC A.H1OVAL -CvZo7 ? Cr�QIy�Q � wog111..y1O IJ7/:�Q _Lf%5--NW DST L./ -Z�__Dw ___--CAJ!Lf_bnL ra . £WO COL .... 4Y�LTN. new «-y_--TOLL -_--- nLO - MI) OTCLLCP. -DAYS PMILN VOLGOL LINL NO. HtCLULIT, OP WORK i)IMI - - - _.3-LNLLT( Nw' o• si if u 57 31 61 63 Ow M6r0 A 66 67 N ��_�'.•• ...... yaw �J�r wow 14..72,II C • O O • t ir Y1 it a 7) it a q 4 d 66 6S M rzae tr 10i 103 103 107 M 74 66 66 u � f0 "7J 1 TiN . 66 M 62 44 66 44 42 40 u x u 32 x b 26 24 n l .::.v. n •• I 10 .I C 'a 6 __. 6 t Utility 8 Transport Field Report • /.-#754 Applicant's Name 7Z'1 -- Type of Permit _ Permit No. 73 Data Issued R 9 Q?l4 7$ Expiration Date � F co 72 .. :Location and Damage Reports .Date Time (If no apparent damage at this time, so state) Inspection Date a' 7 !--73 WELD COUNTY, COLORADO • BOARD OF COUNTY COMMISSIONERS BY: Au ©ep zed Agent TO THE TREASURER 'Mountain Bell Greeley, Colorado D,,, August 23, 1973 I .,rA7toN ENDORSEMENT OF THIS DRAFT DT THE ACKNOWLEDGES 'vu. IAYMWT OF THE FOLLOWING. w T T DR RILL H0.�3-5z16, C3-5207, 0:-5258 8-20 AY _ One hundred thirty nine and 11/100 - ) FORM Inn 1,-711 341018 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 Douses $ 139.11 THE RORR Or Weld County Greeley, Colorado .TARO( \\ MROVGH UNITED BANK OF DENVER N.A., DENVER. COLORADO THE MOUNTAIN STATESTELLPHONE AND TELEGRAPH COMPANY 11'34101811' E:1020100007': 04 224 81t'- . TO THE TREASURER Mountain Bell • • .LTION Greeley, Colorado D;n August 23, 1973 • • 1' ENDORSEMENT OF THIS DRAFT ST THE PAYEE ACKNOWL&DOSS /Uma PAYMENT OF S rOLLO ING, &urHO.IZCO SIGNATURE • FORM 5411 F ..45.711 .• 7 r I+ '-----•'. . l , t i t { ' i • L.------"'::: - 1 I V j• 11 ter.. --23 T 1' IF1 , . •(1• _: , •fi•I•C t() i1 {� ��l �' i;, I 1 1 :I) HI ,r is,s ' rI 11,1 It 1•• }1020 1�• . , - f,,. 7.17 `t ii(}1731/ erl ,di ,C41E i, i,;r:•,i %r1)_..;i. 'ts{i r• -;•7 y a a. 3E-395, G3-0966, 3E-516, 3E-538, . r' r ' 1 1 1' ° ! T _ 1 7,11. , • nAr< "T RILL..° - D C3 5199 31 386 C3'T�2712 $"9 thru-8-20 ! 1 ' NOT GOOD FOR MORE THAN 6200.00 ' 7 , . ,tifir 1 J<.Lif y'-)11(11 f ( ..z,:.. ia'! [w\ —j t)t 1+i1 Ay _— --- -----One hundred eighty two and 91/1.0-------- DOLLARS ' ; 182.91 - THE *OCR OP AUTNORIXED SIGNATURE II,s 1 TASK•'•' ••w q, J .1 tt Tf � T`�Itt(111 NOS UNITED BANK OF DENVER N.A.. DENVER. COLORADO 1 }. .1:L.., \ ,.� + ' _ 1 > >t ,. ,t -;;f- .FORM343SF ,..; IS.7N ' -341019-=, c'- • J u • ..:.., .7 ,::,23-7.. L 'J i, rr _ _1. ',4. i4. I?I.I-Q{{•.yt r HE ` ,.._;:1\ •:� t I' - -... % N.11 .2151 :tT,rl` .OUR STATEMENT OR SILL Ho. C3—0963 DAM, -•NOT GOOD FOR MORE THAN 5200.00 r `.:-_ _ =.�: °': i,a `' I1 t PAY -------Two hundred and no/100- - - - DOLLARS-- 2�•� 111 Weld County 'Greeley, Colorado TIE MOUNTAIN STATER TELEPHONE AND TELEGRAPH COMPANY `1 fit. 341017 '\ ', u3410i711° 1: i0 201110007: 04 2 24 8R' j vAu�N Greeley, Colorado ,A„ • Au: st 23, 19'73 TO THE TREASURER , Mountain Bell ENDORSEMENT OF THIS DRAFT ST THE PAYEE ACKNOWLEDGES FULL PAYMENT tit THE FOLLOWINO1 . Draft 1 of 2 3 ' ro tot *now or MYAM( THRMgR _ ... ...._.. UNITED BANK OF DENVER N.A., Greeley, Colorado COLORADO THE MOUNTAIN STATLSTLLEPNONIE AND TELEGRAPH COMPANY 7 Weld County n „i .;..�.. ,1 • AUTHORIZED 4°HATURt / �` ti s` �� � i1 _IT 115 34 10 19". 1:10201000071: 04 224 8u( TO THE TREASURER Mountain Bell Greeley, Colorado .IsATIHN ENDORSEMENT OP THIS DRAT GY THE ACKNOWLEDGES FULL Draft 2 of 2 OUR .T.TI.... OR SILL NO. 'AY c5-0963 DATED DATE ------One hundred sixty seven and 42/100 - August 23, 1973 of THE FOLLOWING. FORM 5135 P 19.711 341020 c NOT GOOD FOR MORE THAN 6200.00 O THE ORDER or Malt n.000R UNITED BANK OF DENVER N.A.. DENVER. COLORADO Weld County Greeley, Colorado DOLLARS $ 1167.k2 THE MOUNTAIN STATESTELIPNONE ANDTELEORA►N COMPANY ) 1/4 _a)0(1.4.4_44 4 .,25) AUTHORIZED MONATOMIC • ��4 .M.B. # 6 C a9 tt Permit No. 'y � L.T. Ft. 1295 Ca. Dia. 1” Cost $12.95 CONSTRUCTION PERMIT Date Type of installation Buried Wire 2. Location and description of work See attached print County Ron 241�� 3. Estimated construction schedule: Start• Permittee: Mountain Bell 4. District: Greeley F. Telephone No. 352-5896 p� 6. Project \o J-38.6 tier -10 1c) ei Cbk Address• P. 0. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant 10. Issued by Mountain Sell By: �a S - Rehurek ,Ar-a g n Name and Title D.C. Sinele gngr Tech 11. Final Inspection by fame and We Name and TitW' NOTE: if dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.B.Phelga 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minin`•nm requirements of the Current National Electrical Safety Code. �. Permittee shall advise Weld County 48 hours in advance of the date work will be Marled and.. shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permitter shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Portaittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit• except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: Date: 8-13-73 5-17-73 By: MalntenaucSupervisor in k.ccept ❑g this per, the undersigne,, representing the Permittee, verifies that be has read and understands all of the foregoin rev' ions; that he has authority •. sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth h • eta. THE :OARD OF COUNTY COMMISSIONERS WE �• NTY, COLORAD. f/. /7c-u� District Engineer �UNTJr AO a /L PEA /O.7 "T m o o n ,9b 2 ≥ o • zoom n a m O • < I I . ^t • i:„.-1' I ' I : ti I�;;I III`I al i l I 0 „+,, "I IIN, - I H I I`22I ., INIA. I •I IZI I r NSF SI --I I n I I II I r It.),I` b I I Ill V• M I I I�� o 21 L en I. �OC m m I 1 I. I 1 I GPI i ND 1 3 �` 1 o IN m z , n i • I' W 11 1.1 I Witt I IW V ILA I O I LII it i II I.i W b r a a z a o ✓ v n - 0 N I, '� I ° 1 y toil m I I o a r y I Ip lD < IN -I I-- r 1` I 4s1, �3m I I L� Iry I in r I'J a= JP N I I J , h m o s I�\�IC I GI I Yk P tl i., im I I n �I i a 1 mi " I I4I. 1k1 IL, I 3 I I I+I I.„‘I I I I t iU I hi 1 m 0 0 z m n w w w AL -7zr A! , 4o' 2',13/P ze o28ac`— rc::=D 45C 1295' D I r IZ2.2-- I „ 1, Z1.8!b -1 tW ?SbttI*f t k * ` "WM cs*HitAiblvisjkm No ,.ter _,�� � tiev,irill i DIM volinarrannowtRakipitr y�g���� i71k \" ^l 'i��J.'' It S �( ,y mom vdin sir eimnsr eP ISI SOME. Vixe aZENDEpr E"M Etna Wray J cumnittmmactitsvam amorrearesesswifflaias Lama a a► amt+ r - flo MEM _arm re- SerrOilerlidi ,; ladirulara L� a 'frr '1 "';1 cialbla c/,; Utility 8 Transport Field Report Applicant's Name "� 2�ZQ y Type o£ Permit Permit No. Date Issued a� 73 • Expiration Date sz ct1-7y. :Location and Damage Report:'.Date Time . (If no apparent damage at this time, so state) • Inspection Date 1 7 -v--7 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: gi e s:&z,sZ Auth r(f ized Agent 341018 AUTHORIZED MMIATURC • Greeley, Colorado •_ p.m August / 23. 1973 •r , IDONEENENT OP TM* GRAFT ET THE FATE% ACKNOWLEDGES PpartitionHE FAYEIR Or T/OLCOWINO N: i _� �• #f2f f• ; f•{! ., i(;.L �;f 1�•I ^311 Lyt Il. ' l 1020•' rfl_ ,! .e.ft )j r.Sk -'� I 1 E 102Q ,r.f ilr iii i s 3E-395, G3-0966; 3>�516, 3E-538 ! 8-9tthru'8-20r +t '' 3' .1 NOT GOOD FOR MORE THAN S2{�� 0 � . :TLTr1.\ .111r!11 .••.:1 i-+�• #tti . 'i;pi FAY -------One hundred eighty two and 91/100- DOLLARS 82.91 0 TO, THE TREASURER Mountain Bell 'AY _ y AT)ON Greeley, Colorado DAR August 23, 1973 ENOOR. W tNT OF THIS OKAFT SY THE PAYEE ACKNOWLEDGES FULL IAYM[NT OF THE FOLLOWING, C3-5216, C3-5207, gj -258. 8-20 One hundred thirty nine.and 11/100 - c 23-7 1020 NOY GOOD FOR MORE THAN $200.00 DoLuas $ 139.11 O Wet 'RO[R OF Weld County Greeley, Colorado WANE nNQUGH UNITED DANK OF DENVER N.A., DENVER, COLORADO THE MOUNTAIN STATESTELIPNONC ANDTELEGRAPH COMPANY nE34LOLao I:L020"0007E: 04 224 8111_ t TO THE TREASURER Mountain Bell yarATION STATEMENT OR AAA Ho g) 5195, 3E 386, CJ 152112 TN[ )BOER' OP • .TANS . ANovaR UNITED BANK OF DENVER N.A.. TO THE TREASURER Mountain Bell THE MOUNTAIN STATES TELEPHONE ANDTIuGRAPH COMPANY.- • 62ra.'ld? ..l.:t• AVTNOGISKO MOMITU•NE ffi ; �1/2 !t', . COLORADO. - • i .: t 11 Hs no •I:L0201.+00071: • 0t " 224 any )s. +° t :.:u 11 - �.i•:► , "!1111). _ - ;1;1 •:71 2 .'11. ' _. '<•1 • i f•1,tii.:6t f , . n f.' �+' FORE DSP F. fi _..11.71). `, ' \ i pfi 16CATIDN ,. Greeley, Colorado DAR August 23, 1973 1 ENOONSIMENT OF TWA ORAFT BY ONE PAYEE ACKNOWLEDGE! FULL PAYSEMT Or INC VOLLOWIN6, OBE STARN[MT ON EILL MO. PAY --------Two I" ! ro TNc' OCOEE OF FAYAKEINIVOWIn FORM GIPS I' 341017 _\ c:. 4. 341019- c= ) I i;';n'1,: �; 23-Y.=1 \' r r .-. 11! it1 �� NOT GOOD FOR MORE THAN $200.001 • hundred and no/100- -- - - '..'200.OOFt . n0Lua9 . , i • Da MOUNTAIN STATRSTILWNONE ANDTLLIORA►$ COMPANY I • I � /f..ri ,-psi ` AUT'NDRIZEO MGNANIK 'Weld County • Greeley. Colorado •• ,":1 1 i• •. .•1•. UNITED RANK OF DENVER N.A.. OCNVCR. COLORADO 034 LO Lqa. ': L020.000074 04 224 Bo TO THE TREASURER V Mountain Bell Greeley, Colorado � ,T) N ENDORSCMINT OF THIS DRAFT ET Mt ACKNOWLEDOEE FULL Draft 2 of 2 'U..T......T DR S•LL MO. C3 -0J63 'AY_ O THE D.D€. OF '.TILE wNGB6N OATEO DATE August 23, 1973 or ONE PoLLOWINOI 1'. • • ai .. • FOAM •155 F 341020 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 -_---One hundred sixty seven and 42/100-- -------- Weld County Greeley, Colorado UNITED BANK OF DENVER N.A.. ocnvca. COLORADO AUTMOOISEO MOMATURC DOLLARS S !167.42 THE MOUNTAIN STATES -TELEPHONE ANO TttCGRAPN COMPANY •l A. 't %ttel3rlls4 11 ,app fi, -36,74121 l3Ezit 2 CONSTRUCTION PERMIT Date 1. Type of installation our/?t, AAP/U E Gee E / 2. Location and description of work S,E gf4C`j cetA rlrfS 3- Estimated constructionAwn* + schedule: RE// Complete: / I £/{ Complete: 4. District: F `�i Address: 6. Telephone No 3 ' t�- Q O/ 6. Project No. C -S — 9OJ 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions' 9. Applicant: 3,1/ By: ES- .PMM7aant'/C ER Date: Name and TItI/ 10. Issued by Date• Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on is job, please call the following people collect, in the following order: 1. Supervising foreman gat le / !4115y .3.52 --C-80/ j2. Division construction manager a.ci- Ear/ 3. Colorado plant manager PROVISIONS: 1. Permlttee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods. equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint Inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: anee Supe epting this permit the/undersigned, representing the Permutes. !relit foregolag revisions; that he has thority to sign for and bind the Py..ittee; an is boun y all the conditions set forth herein. THE F COUNTY COMMISSIONERS WELD � ./ • , COLO read and understands all of the irtue of • is signature the Permittee F/23/7-07 -Wst_" V F! Q • A 2..; t.;�^ .1 . 1= ", t vt 1 1 •1 c e1/ D3 v s4 is .Cu N- n,nn _ c cz:Tr1� a�1.�^�D U.•'vim lyc y 7.. rk STS _ ^^ :'1 EZ,5a ^'L-.11�7tnp"Ari .71C D nnlM rx+ri7 CI NC rtl t1 g,cbN6 • O� b 6 10 -[',� 7 th ;r3 M D f'I� ?'7lr^ b p rr' ro,th R1�'' b Ill 9p 1 s A'm to ^w ti._ z .*A' --T •V m tr /h'1 NCA 3 t' Ob I rX pg e b 2i i. A b 1 21 • b L', t T '��ND COL/1.'17_1 kO/)vn -ASPH- N r - sefaELC aO s TOLL TP 476 0 26'UP PACE 81-140. -e 4.11-1.:41-I —IA, 45e4Z 1.2007- r - w— 45EM 1-/CaOL 5717 0.64 AJA U/-25 `740+/3 571%6.74^.' `�5 EM./S/-/7SC (/NUE.L 'v ' ,Vh7W fin, s71 HW_y EOREy 7-,-)4 ,- �1 /j -fI5PH- N 7-4 I'Ol. sr, /•/6 9A/c'7 4.37N 1.39 ,rW% FLb t(v CLOS - /52 qq KC.S%37 5743.95 P/ : 1/ 4714' SG/ /8,25 /Z ITV /A'.9b U/67 /U_! JiM. V _7A /9.25- /RRIGN7/pN S7A /9.23 - Q 57120.08'y/C1r FLIT L'<^l !COS • // r G'G-S25 ',1LI-1402 I r New FCLE I r! 1I 3Z . 277117 0/A7 in.) UAV LZClc ./-Li 74 34• /a P PE" .14C4)!-OLE. X ' 't/140y I €s7R42r63 .0/ffi fLD J.x'V elr)7QC". 18900 4' 571 50,-42 L IL 7 cLD RI -614 7LD ZZs 71-1 !Et at RLloR N t3 0 (P/vJ) ` perCLOS w 21.2 CLCL'. X03 E17/11. u./IF f 7EpA' PPLZ - , K[' 5®— /moo• PL. /5 r2"B/Pti, PSTR •9S N/ 19'f ISc 5b• • �e— a c�snrco e--1-- ---J'z2z--B--1---J tk 0 aCm Dr a 0 (P. /O/ A.R) P212 AL o d c ROUSE r St. a Easl at saves at. .••,IZLCDR *"LCOOGOI sr.F92 WL-4E.C"J . LCJPE CO. f//LL LL/CD. 6b -,104 FOE LxAk.T LoC/?IOnl 4, N L.7// Z:-'7* SG, L71E CO .5RJ 0•PO 'vf ALPPI 1 1766 re- me- F/W 3 c'E ® V® •P a IU 7/L' //,4! /TL >47.5 ---e -- - ---- _c1/cL('≤" 1. 21 T I! e s . fo`>! 7f 1.4b ---"ED 23.2 4f72� &II 4 C Anrao2 6k-- �- PC .3G 1 'I 1 -ter, I ---4HXq-f• Ai:ii FX (l:;L, f,e `-erl--r• y_E7. �a70U 4.5 no 169-/7p• 4 55 STq 3f.YROPE a L•57'J -3 # /0 c4.74 [i . / 'L_Z/ =/,/2G•8a /K✓L,L H _ 50 P5Z ILLS 2' C - sifforigne 8 /U92J.25 _ 13'/O OR.97WLS �j w 4,5 CM 1Sh1704• 1-n11 :LTA 300E a NA _`T �q' -r -q' ("16.;r LO $79 6+00 2 COUNTS QORD 23 (PN) STA. &'S" Dhi. FLL /-.¢ T FLPib.'v 6J'.:/o1 L//AN /L!i /6 ✓ Ft2 '/U)/".0 /Y// P .3/H. 41./9 GSI74;•° DA' 17 acv 66Y 7o R !$aq7, tr f wl c; tit R m S SPYrth,61-t T rxi ZW s N N C. —CL (LC-0SI 00) •••— RI 6 --• LC- 066x0 /4MK __S. ;Fang oss) O C C u .. Pit t lN� B 4 (R/ 30-- rnnw. S ly Er -1 �1 �n po (PR/) \IA OvJO L D (PM) CTA ' 'COP I 1 I S771 /25.74 o%PT FIG L44C r. eyhriS «3341 �.. �N n137 ^� .m c7H. / ;,.Ri �/O3: �34ti e erns _.///,�/•may F."4; 5 CoX U-- W .).7s iszywo NEW RJLE Z, e CLOSS/..$ 'CO • J.//,35 PL 31/7 ( /L• O6.316 r",2LCDC '2c o0(o50 RElZDLE 'ocr PL, AC 5/37 s,;z ,/,44•49 -S 11412) D/.kr srr LIev I OS•SC/ b1S 377! /7J'&'/- sQ S7t/ I76d0� 7N� !ST's•33UF -y__— _7E/ --s-- ln _ i!Eilc 1�IS 1 g n S77/ /77'/0 ----rS t - n. STA /82"/2 arciO.0/Qh, 1 4 S7P /R21G0 /R4/C✓27UN II c./d(: r 39.6 tin SIN hi4o. 94 .3' 9L6Y4Q 1X Sig at, 'SS I i° NEW ROLE ` $ W/tLD.ZE EYE L:4EELE! EYCH 0 Ig) N 11 i 4. `n', , l Nu a l N N i t• s• .N W N ' is !v a AJBx 1 4SEM, /flLZL i 773'F 1. COUNTY ROAD (HSPH) ',fro f a ;,k4 ,C•2; T V $ T RJR, Nttzir b z 0/7tH O (P rL. .234) ARETAIN P '7) , ,b B.L. EC_H77/4( LT077!PU S74 /SA O AE. DE /DX•AEA/ LOW EPIC ALL /2-7S t 1- 0 r G/(rr (0 kJ) aS1 LoL fr—,. MG^A a - cacrr OA04 [c- 77&J :31CM iI Viit el. i\ lbw Ait. ag "'` r, , ✓ ▪ ' ' f � ? n:. 6 t •7/) (,2/'. -47/7£L -- PL. SUR/E-D CA MKR. STA 29.30 .c, Cb Z Cr Ct --4"<") o _ ac r9 `b EA 64EILE STA46.50 s GAS METER STN 29•d0 DIRT PVT Dieu ( STA 29.40 \! W Co .0/ET 1ZD DQV CSfi.93.30 ENf7L/JG£ P/T 44+5O J DIRT PVT DkV rE CIA 45.62 o/R r /LD dRV 2 STA 46.20 G CG•Jr TOP LEFT '3 s G'-CONcFayWJ 7 et y ec;5 METER sDl. X07 COUNTY ,9OI7D N. r"'` 'N • nq of G trit`x D/kT ILL) L%PV £ 27/7 eDa:3 DI2Y P41770't/ ! xr,c %3P man �M ^ ft a, n27 CCL ST•7 76.00 -. /R4 D/TCH $T/7 9O•/3- O/[T( . �-2s/5 JTA,100420 w-- _TH /OH 1--C suet T-wt.r 70 //UUSE 2thM L4 S T/7 74.,2.5- 0 ✓tn teahl c� 7t, urs4ci b B re 1ATr1 c1S' -440 C S7NI C9• 70 PI{!T ILV. J)M'U r7A n:7o DINT PVT L1P1/ d c. -/t'/ - S /o-RL 2K -s) LO 003141 Im T 4 DINT !UEI D Div EN/'/// -/F kvr crm /4I.OS:- DIRT PEW IF/ M --w-- i `T/I.IO3,2O • "Dr. I PVTLIEV (SI/I /o5i,S 1 i 1 C's J Utility 8 Transport Plaid Report Applicant's Name _ Type of Permit Location and Damage Reports' • Date 3O Celt 73 Tim •//.'dd- (if no apparent damage at this time, so state) nx 4&&/ ,t --dad r-- Cf 8 9 a� , '�C% - Z3 SC1��- . ;9L.-a%iC..1 z 8`'r: bler ; 4 `%ttr_o-K rr° Inspection Date 3 p ecat--?-3 WELD COUNTY, COLORACO HOARD Op COUNTY CONRIIS3IONERS BY: A(176,40—c-cs-. zed Agent MB: # 4 L.T. Ft. 50t Ca. Dia. 1" Cost $ S s, 00 CONSTRUCTION PERMIT Permit No. 7/ Date 1. Type of installation Buried Wire 2. Location and description of work See job print attached County ibad 44 s .` vr. -�� 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete: 4. District: Greeley Address: P- 0. Box U39 F. Telephone No. 352-3152 6. Project No. 3E-538 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions: 9. Applicant' 10. Issued by Mountain Bell By: R S Rehurek Facility Plant}en ate• Name and Title D.C. sinle Engr. Tech. e and Title 11. Final Inspection by Date: Name and Title Date: NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager _.1.J._Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3, Permittee shall Inform Weld County of construction methods, equipment and operational procedures that will, be utilized and obtain the County% concurrence. • 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final Inspection by the County and Permittee. If final faint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9, Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the instillation placed inside County right -Of -way limits. THE A D OF COUNTY GpMMISSIONERS WE NT.Y, COL By: _ _ -.\ mai,'.3. ccep ng this permit the underslg d. representing the Permittee. verifithat he bait read and understands all of the foregoing pr isions; thathi, has nuthorit to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. District Engineer f/>. -a/73 u� I m m N >d 'ro = a 0pp n x ^ n ^NI 1 O m' CI - N n n j� m O1112173> O n Szx D O O z n Y I %t I� I, i i I I II F, Pit I' I I '�\II II `I I' I t I� A I I I F\ I, �' jam: l>.,, 1 y I I• t I�1�\ fL. l� 2 I 73 1 i' 1 1'i1l X11 Ti IN�� I i I 1� I i 1 �I I zL� I' I IBC \I I j � m` I' I \, ICS, f . I I m Iy \ in Im1 n 1 1� 1 0En Z {~ I` [N : •00 y �� { O £ < I El I y 9 I I I I m < I i �1 I "PII 1 ICI I I\ I 1�1 I ~°> j 1 11 oo> n U1 r \gym c • I I a I > m i I 1IL\ I (.- Iw f 'j I I I� 1 I I� ICI I I I' ;I i I i i I N I ii I I I ICI I I I I I t i i z D "I F. N In m v 0 z z m 0 v D z t PED. ?x.99 PL. ,se's /37. STA. 7z'7O P/71 25.17 .377/, 67,400 Utility 8 Transport Field Report 72, Applicant's Name Type of Permit Permit No. e,11-4\zt.fr 777 Date Issued /5 - Expiration Date _ Location and Damage Reportzt.Date Time (If no apparent damage at this time, so state) Inspection Date 7/ At -7r WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS TO THE TREASURER Mountain Bell --Weld County 'Greeley, Colorado THE MOUNTAIN STATES TELEPHONE AND TELEGRAPH COMPANY. i.,) J .n) N"fil, J r e*TION Greeley, Colorado ,„,t August 23, 1973 CNDORSIMEHT Or THIS DRAFT .T TMR ACKHOML[DOI. FULL FAYMIMT OF THE FOLLOWING, Ma..TAT[II[NT OR .,,,..c3-5216, 03-5207, c,7D5258 8-20 FORM 033 I I,•]Ir 341018 C NOT GOOD FOR MORE THAN $200.00 'AY _ ] THE JROER OF ',TOM •KWON UNITED BANK OF DENVER N.A., DENVER. COLORADO -One hundred thirty nine and 11/100 - DOLLARS $ 139.11 Weld County THE MOUNTAIN STATESTEILPMONE ANOTELLGRAPN COMPANY Greeley, Colorado 34 10 1a11' I:10 20"000 71: 04 2 n, 8u'_ TO THE TREASURER Mountain Bell AIITHORIUD SIGNATURE FORM SIn .. u.Tlr . ;::::,i:,:, :i ; ; 341017 J nr tiON ' Greeley, Colorado ':._-- DATE August 23, 1973 r • • ;' INOOR{[M[IIT OP THIS DRAFT RT TNl ACKNOWLEDGU FULL FATHOM} OF YMi Fa40 INOI rL , f1 • I ;���./ FI rrl� •I -7.a.� 1 r1, r} ,iIlii • �'r23-7'r't I.', .:'i ! .t t ft ( i _ L.•SI ii;�}fti #1• -s1`;Ir 1'.tr •: e([ i}I ,•, 1020 —; 3E-395, 'G3-:0966, ' , 538,�IicI}"hit <T1```'r(,i Iii ;4;;:01 irl•I: ,3 ��_(--.� {}I•i}!t i;•1{ ffl 3E"516 DRe3 5199, 3E 386c��sTATIHeMT 00 PILL Fro. r 112 8-9 thnL 8-20' ! - 1 i • NOT GOOD FOR MORE THAN 5200.00 / , . OneII::I I•I ,}TCMZ- iltitlli' f £ ,•-rL'-\ y ' 1 •1 rl.t ]•1,} FAY ---hundred eighty two and 91/100;—=:-------�__.____ DDr.uae ' $ 182.91 I . -1 H MOON. . . or 1 / , ut••O•I,z[D O•DNATURL TAMA ir . a..., �. '. M r} 1_ ;;. 3•.},i UNITED BANK OF DENVER N.A.. DENVER. COLORADO. N - / 1.,:.\„ -�`" j`}, -:-.7-,‘',, I .le' 34101?Ha .':1020'1400071:' 04" 224 au' - : ; ; r•tl:.rf;iipt - ` 'I f •. _.i I, • ;11.1• ,.��^ .•I. .j 4 ; �I\rF 7 �t f/ -. -i , ri•Ili•, . 7 TO THE TREASURER Mountain Bell 1,. , orAnrtN Greeley, Colorado •--` DATE INDORSEMENT OP THIS DRAFT IT THE PATSE ACRNOWLEDORS N4, PATMpIY OF THE FOLLOWING, , August 23, 1973 Draft 1 of 2 i : ; I a , . • r' FORM Otis F•. ;'� ,_ .IAA, • tf 341019 - L•3-0963 00100 r !, Ilr: :'y'• r_y.;�C 1;;�;f;:" NOT GOOD FOR MORE THAN 5200.00, .OVR [TAT[N[MT O[ SILL NO, � N ii PAYS -----!tiro'hundred and no/100- ELI `- -- -, t -.,:'I o. -- Ji-'2 :.i�it,` OLLARS ' ; Ce ro THE ORDER Or 'Weld County Greeley, Colorado . :•1 ! nnt011611 UNITED BANK OF DENVER N.A., COLORADO THE MOUNTAIN STATESRLpNOME LEGRAPK COONpANY {! i <'I :. "t / liti 1llrji / I s Aus•gRlilO RMNATUR( n L I r .141 .,, i`�``.. ✓ it , 3 4 LO 190 I:10 20'14000 71: 04 2 24 all' TO THE TREASURER Mountain Bell OT.Tt0N Greeley, Colorado August 23, 1973 ODORSEMENT OF THIS DRAFT ay THE ACRNOWLIDOES N FULL FAYMIT OF THE POLLOWINO• Draft 2 of 2 ,um .TAT[M[HT ON .ILL HO. 'AY O TKO ORDER OF Oat( UNITED BANK OF DENVER N.A.. DENVER. COLORADO C3-0963 DAnD ------One hundred sixty seven and 42/1006 -- Weld County Greeley, Colorado ::?If. • ',,1,1. root suss r 341020 C 23-7 1020 NOT GOOD FOR MORE THAN 5200.00 DOLLARS $ '167.42 THE MOUNTAIN STATE$TELEPHONE ARO TELEGRAPH COMPANY A V TNORISID MOMATURC M.B. # 3 L.T. Ft. 60' Ca. Ilia. 1" Cost Z S a -coeD CONSTRUCTION PERMIT Permit No. Date 7/F 1. Type of installation Bur ea Cable 2. Location and description of work See attached print County Road 35 3. Estimated construction schedule: Start• Permittee: Mountain Gell Complete: 4. District: _ Greeley 6. Telephone 'Co 352-5898 6. Project No, 3E-516 Address: _ P. 0. Box 1139 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions - 9. Applicant: 10. Issued by Mountain Bell By: W A Rae Area raigineer Name gad Title D.A. Garcia Engr. Tech. 11. Final Inspection by 2r'Fe nd 'Title Name and Title NOTE: If dissatisfied with construction performed on this fob, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4474 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. Date• Date• Date: 8-9-73 7-13-73 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation, The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOA,,''ID OF COUNTY COMMISSIONERS WELD, 'J!,gi , COLO- - !O By: ....1 Maintenance Supervisor acce tine this perm t the unders forego' ag pro fsions; that he has autho to sign for and bind the Permittee; and that by virtu of his signature the Permittee is pound ll the conditions set forth •ereln. .T/ may - Z44 i/v/9 rat. ed, representing the Permittee, veil ies that be has read and understands all of the District Engineer U U U U I-\ L, '133MS O h N m m 1 0 {I .v 7 765e? Jet - I _r m x m X a O r r r r 0 r in z r o In 0 0 N m O 0 p t L z N 1 rn T 4,1 nl u v O O z m n 0 v Z -n 0 70 n u/ I\`1 • UJ N 14 -+1 3 w-T6 4a ST rn n C) L1 C tJ :I 2) C .5%-:r' F'UL11/l/t —FSPRIIz r-- 773 C.O. .6--8 3 _2? trd≤ -3 21 /36/- /a,OO CR8/1 P/A7Ca a't/ C-/-6964 !_rDUit/T Pre % ovoi CKill PNzTLU HI L 'NI'r `II TO THE TREASURER FORM 6433 • IS•nt UNITED BANK OF DENVER N.A.. Dtsv[R, cOLORADD. ..11.34LO1?He 1:1020"00071: 04 224 ant FORM 6133 • _tFTN • 341017 c.. TO THE TREASURER Mountain Bell IOCATION Greeley, Colorado EMDORSEMENt OF THIS DRAB ST THE Draft 1 of 2 - O4R RTATRMMT ow Eu.r. SO, C3 -0y63 Mountain Bell Greeley, Colorado Tr AT1DN ENDORRKM;NT OF THIS DRAT KY THE ACKNOWLEDGES FULL DATE JYR .T.TF:EM1, Dw SILL w0.0�5216, c3-5207, 0705258 8-20 AY One hundred thirty nine and 11/100- August 23, 1973 or THE FOLLOWING; 341018 C 23.7 1020 NOT GOOD FOR MORE THAN 3200.00 O THE Weld County DROWN OP Greeley, Colorado OASIS NROYSR - UNITED BANK OF DENVER N -A.. DENVER, COLORADO DOLLARS $ 139.11 THE MOUNTAIN STATESTELEPHONL ANOTELEGRAPH COMPANY ii'3$,101BS' 1:1020'00071: 04 2224 ant - E TO THE TREASURER Greeley, Colorado August 23, 1973 •1••• ; ENDORSEw (1,Y O/ THIS DRAFT\T THE PAYE; ACKNOWLEDGES FUEL PAYMENT OP THE 4,6116 ma; .4 r .uTHORIZED HGHATYRE ,u. EtATtwewt ew sou. wo.03 $1[1Q 386 c3,521,2' - u-9. thrtl - B-20 ` • t ` 1 f ; .'NOT GOOD FOR MORE THAN *200.00'' J 9%t •c3,521,22 i=iTt•;1 ,\ iItf{i‘-t'';I rc.' jhI r y ------One hundred eighty two and 91/100--- L D°Lams�' $ 182.91 THE MOUNTAIN STATES TELEPHONE AND TELEcRAPn COMPANY Weld County • s ,• ;:111, ••F'• "I >+.1 ...Greeley, Colorado \., • 1 r•:,.!?.9: �✓-�•.t <1_4) /.��u s� ,` .71; •••• YTHOR IEP HGMLTYRE t ..:� / y> o Tic: • ,_.-r 1 ti 1 Ai -rem !!, t {f1 t ,1} .. ' '':•l'. 113� 1:?/ DATE August 23, 1973 ACKNOWLEDGES VMS RATMKMT OF rim WING. . tr.411:::1 .ice } `! PAY -"-"----Two hundred and no/100. - n Tilt ORDER - Or • -'TOALE TRROWI 'Weld County Greeley, Colorado 1 - UNITED BANK OF DENVER N.A.. DENVER. COLORADO II° 34 1Q VIII' TO THE TREASURER I Mountain Bell DOLLARS t!�1'200.00 THE MOUNTAIN STATESTLLUPNONL ANOTELLORA►n COM►AIK AUTHORIZED SIONATYRE } itt .1 1:10201{100071: 04 224 Sue NDORS Greeley, Colorado DATE August 233 1973 1 N VIDORSEMERT OF THIS DRAFT EY THE PAYEE ACKNOWLEDGES FULL PATMENT or YHA FOLLOWING; Draft 2 of 2 >YR ,TATC.MT 0w RLLl MO. C3 -x%63 'AY _ 0 THE SEDER OF DATED One hundred sixty seven and 42/100 -- 341020 c FORM UNS • 23-7 1020 NOT GOOD FOR MORE THAN 3200.00 Weld County Greeley, Colorado DOLLARS $ `167.42 THE MOUNTAIN ST►TLSTLLLPHONL AND TELEGRAPH COMPANY Sat) -97Le M AYT.glutED SIGNATURE RROVOR UNITED BANK OF DENVER N.A.. DENVCR. COLORADO a M.B. # 5 Permit No. 7/7 L.T. Ft. 3,200' Ca.- Dia. lit Cost $32.00 CONSTRUCTION PERMIT Date 1. Type of Installation ..__-_311 ied Cable 2. Location and description of work See attaoheik print County Road 6nih and 27 4. District: 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete: Greeley 6. 6. 7 - Telephone No. Project No 352-5898 c3-5199 Address: P. 0. Box 1139 Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant: Mountain Bell By: 10. Issued by LA B.C. McFate Dist Engr Name and Title . Rae Area Engineer 11. Final Inspection by Name end Title NOTE: If dissatisfied with construction performed on this lob, please call the following people collect, in the following order: J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Dnvr C.R. Phelps 266-4681 Dnvr_ Date. 8-10-73 Date • 6-8-73 Date' 1. Supervising foreman 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement. location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will, be utilized and obtain the County's concurrence. 4. permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances - 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: In foregoing is bound Maintenance S.nervisor lug this permit the undersign representing the Permittee, verifi2s that he has read and understands all of the signs; that he has authority o sign for and bind the Permittee; and that by virtue of his signature the Permittee the conditions set forth herein. THE BOARD OF COUNTY COMMt$$IONERS WELD LdJSJ , COLORADO se,or f/; /z. District Engineer I J,I* -1 r.� I r 3 C x 4 ----- -x 5� -to F � 1 I t t jI s �8• tr. A R n o n O C D n r O _ Y v r t^rn r v5C•�]Q'F•50' 4 H'Bti YJX - T03°. tJrtP•. •udll- B 1I -Ito 13 .s F r•/ ` ^nM6 •F i la •r.• .029 WIOASO / �yF A Utility it Transport Field Report Applicant's Name Type of Permit Permit No. Date Issued 7?a: IA+ 7/7. /5-73 Expiration Date / 5-0c,29— 73 :Location and Damage Report:'.Date Time (If no apparent damage at this time, so state) J Inspection Date 7/ en 3 WELD COUNTY, COLORADO BOARD OF COUNTY COMMISSIONERS BY: Auth'orized Agent TO THE TREASURER Mountain Bell T AY ---'--`---One hundred eight 3 The • "DeR- OP' • want ' • 411010$ UNITED BANK OF DENVER N.A., DCNVCR. COLORADO. - 1�r Greeley, Colorado DATE August 23, 1973 ENDON,CMCNT OF THIS OMIT ST THE ACKNOWLEDGES FULL PAYMEN1 Of THE IOL40WIN01 JUS STAT[MRNT OS SILL 00. C3-52161 C3-5207! 0,.5258 8-20 'AY _ J TNe "OCR OI RAILC i5DUCR UNITED BANK OF DENVER N.A•. DCNVCR. COLORADO One hundred thirty nine and 11/100 - 34101 23-7 1020 NOT GOOD FOR MORE THAN $200.00 DOLLARS $ 139.11 Weld County Greeley, Colorado 1e' 34 10 1Bil' K TO THE TREASURER Mountain Bell THE MOUNTAIN STATCSTELCPHONE ANDTELEGRAPH COMPANY AUTHOR13tD SIGNATURE L:10 2081100071: 04 2 24 an_ • • . ...•:�,', : .j::•:i1.-)-t..`•1 -/ 1,e,,,,DN Greeley, Colorado OAT; August �1, 1973 . 1 ?' LNDORSEMtfT OF THIS DRAFT ST THE PAYEE ACKNOWLEDGES SILL PAYMENT OF THE POLLO IN ,t i FORM RISS F 341017 .\ cL st i `'—'�4tt t ,r,i i:i ti ��._. Sri •ti �,�� 1: i,,: ..'., :_..�•` t s :4hti ifi tip;, 1St I'i i'1;, It's ,I '1111 f71 si ;.}j1,. `st11020 3E-3951 C3.-096(6! 32Ctr516, 3F538, 2 ' thru -8—z0 { • i' ,'' i . NOT oo- FOR aR THAN $2ooj ao t. ..TOTEM. SELL NO. C3-5199 3 386 C35121 +{ `i . :ri•i> .1<rctkM\ two and 91100- -- DOLLARS $ 182,91 Weld County THE MOUNTAIN STATESTELEPKOKE ANDTELEGRAPM COMPANY ; �-•^ �. `:• If i'i , •-'r'-\';4elf, ---�,`•,; 034 10 ?Ile .1:L020..00071: 04'"'224 8N': TO THE TREASURER Mountain Bell AUTNOIHSED SIONATURt ... ) -.1.... ;.; 4•/ iI ,;`n'FORM RI!>F- )nrAT,NN Greeley, Colorado DArt • i ENDOREEMtM OP THIS OKAPI' SY THE PAYEE ACRNOWLEDOES SILL ►ATMEN{OI THE /OLLO•%NNO. 1 y • . f • ��-. 1 if; .,-7, • i•�'. �, :23-71 . : {••11Q t LT (•71-I L >> ff Draft 1 of 2 August 23, +197 341019 ' c'- .0D$ ETAmRar Om I'LL NO. C3-0963 DArm '.. i T = t { • • • - ' NOT GOOD FOR MORE THAN $200.00 c PAY -----Two hundred and no/100- - --_ _ `tT=x'200.00 1 '} noLURs ` $ ' �'• ro TRW ORDER OP matt natation UNITED SANK OF DENVER N.A.. DCNVCR. COLORADO INC MOUNTAIN STATESTELEPNONE An TtLtGRAPN COO$MPjANY I I d r �OO•t t-ea11 L2°.1.�. `, AWbaDSCE SIGNATURE ` - IfI ' . f i l;r.T:; Rte• • • -Weld County Greeley, Colorado• u'34 L0190 410 20,000071: TO THE TREASURER Mountain Bell 04 2 24 Bu' ATIe$ Greeley, Colorado DATt August 23, 1973 ENDORS(MCNT OF THIS ORAVT ET THE ACKNOWLEDGES NULL IAYMEM OI THE FOLAOWIHO. Draft 2 of 2 >Ua STAY&MEFT 00 Will NO. 'AY _ D The WIDER Or C3-0963 DATE, -------One hundred sixty seven and 42/100 -- FORM MISS .111•531 • 341020 c 23-7 1020 NOT GOOD FOR MORE THAN $200.00 DOLLARS S `167.42 Weld County Greeley, Colorado THE MOUNTAIN STATESTELCPHONE AND TELEGRAPH COMPANY au'IMOH•Zt0 4,0040R/Re • CANE 'NAOu,a UNITED BANK OF DENVER N.A.. DCNVCR. COLORADO V AIn.C:1 st'.I M.E. # 2 L.T: Ft. 4140i Ca. Dia. 1^ Cost S 41.40 Permit No. 7/6 r/ 2/ ? 7. Date CONSTRUCTION PERMIT f t 1. Type of installation , utl..&Cak1t 2. Location and description of work Can att-arbeA prints County Road 2914 went to County Road 52 3. Estimated construction schedule: Start' Permittee: Mou1ttain $ell Complete: 4. District' Greel Py Address- p p BOY 1139 5. Telephone No. 3525898 6. Project No. _03_-0_9_6.6__C 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 9. Applicant: MOuntaitl_Bell 10. Issued by Name an Title 11. Final Inspection by _. Date: Nam. and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, In the following order: 1. Supervising foreman J.N.Martin 552-5800 Gr y 2. Division construction manager .A•J__Eter _66-4179 Dnvr 3. Colorado plant manager C.. R.2helps_266S1,Dnvr PROVISIONS: 1. Permitted shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Perntittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permitter shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permitted s installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permitted. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permitted within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Perntittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not he responsible for any damage that may result to said Installation in the maintenance of the highway or to the Installation paned inside County r!ghbof-way limits. THE SOA�P�Q F COUNTY COMMISSIONERS WELD nyFY, COLORA Pr W. ,.-_Jae Area Engineer Name and Title W.J. Shaw Eau'. Tech. Date- -73 Date• 5-1-73 I17 acre tine this permit the untie .Igned, representing the Permittee, veri es that he has read and understands all of the feregoi pro isious: that he has nut rity to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound all the conditions set for herein. ;Ka a:--__214 ,17,71/21 /75 rest, District Engineer I - t i y i• 4 -Al 1 . A • ,. sA A — Coe.",. a PG IC ,P,GNr r — 5. D ! fd/.r• 4-3' 1.-1735a0101w.- z„ a 4 C 0 P , C -o 1:n N� N P<M.4.N SN.a Pin 45 t ¢c3 -5•I 7-zre - rORofu xt6.11/4 Z PL. CA. MAzca •^ S a �`[1DYj n0.>•`• r v rgb £-Geo S. (_ I�S�/ I /]46,p Co 4407' "I 70' kI P 267 7f 11 •a. 1 C6eaI<L ) PC 1� ro, a -z B P Z57 0 Zak. N b N b ho 4'tLd veal a PZ6r/z 0 94. - i• Elw 26 -ruse b n' Ta 45.s ipME 1 ht.... �1!� S NeACI, I'•b J% _. ,46'. 44• -F .' -I Rt. 0-40•N iC O<•G 13 13 � 91a 0 eitA 4SCP-15A'F Cost Lowell Le iT ec-0: 44.9 Kee• 39 i a - 2 n' or -' N 2 r n' R So ' n r n • 11 (T at CO t • 9 G• • tc i .� 7 A C s. ry ; AC m y • U n rn 2 2 it A I - D y (1 0, 17 ar 1 i•'' r i C t �.�' it \I`In • s 3- 043 • p Y ; • h . A O • cs N 13 Tt”J in 3. Err: r c 4— ; CaNY. GtlovC Co Nc kerre n a II '0 3 ip Liu, Hi:. l l I . • 4 1 rp.! Couu rY t#� 2GOJG 0 C3,I. weir 2 m";t-.`C j • o I E'y, LtR1 m a'--1 d,L..'604/0' D B+v1 raw -4X I RLclyPt5p)1O-214, ac-- .5 --•yy 3o G_es. c 1 0 42 r 0 y 4A fiJ• 34,7 rcc_/3'1 !o a• Di ;al!.31 72.2 •Z tn 2'r 5 8 waiX of I NS Z w?lY In- I- 5-37 'r 5..3 lG'IP/ II Pea.<o2 ▪ P�.ICsb7 a a 0 p \ et S C to e, po DP tft 4 0 c 2 J x ,moo Y`A, , cn.C 4(.05.44 KMD-OT. B. i fi •oc. rcr.r S4 m 1` Poo. Y2, l _ CC6• 37 I T (Rsru,4 LT) V rY S4,4 ba (1 '6; • enJ trot M/ X14 0 4, 2 P.21t; PL. Gott Vi^ pp . <WS '11.2 c rte. .I'L1-2 M N- R/97 .M GC" 47,0 are, P•2o9-2/S P Lob P:. l -u GurnaO 1. 3 - et m I,r 0 0 x P./55 • Re . 5566 LCCr47 a5.1'L3c,co..3 ,a2,1 -2a Neet 204 r� v v ToC-O. 1 TO THE TREASURER Mountain Bell 341018 Greeley, Colorado .LOCAT,D„ ENDORSEMENT Ot THIS DRAFT NIT THE ACKNOWLEDGES FULL DATE August 23, 1973 YR .TATE:E,.OS .ILL MO C3-5216, C3-5207, 0°238 8-20 AY One hundred thirty nine and 11/100- O THE Weld County DPW D• Greeley, Colorado "AM IAOvcM UNITED BANK OF DENVER N.A.. DENVER. COLORADO OF THE FOLLOWINS, FORM 4133 F IS.T1. C 23-7 1020 NOT GOOD FOR MORE THAN $200.00 DOLLARS $ 139.11 THE MOUNTAIN STATES TELEPHONE ANOTELEGRAPH COMPANY •utHORILED NGnATUR[ 03410L8" I:1020"100071: 04 224 Be_ E_ ---- _ TO THE TREASURER Mountain Bel{ ,or.T,DN Greeley, Colorado DATE August 23, 197 • • ENDORSEMENT OF THIS DRAFT ET THE PAYEE ACRMOWL[DO[. FULL raiment OI THE FOLLoWIIMOr - - . ` i , 2t .` + I; - 2 / . ';i4;-1; '1 iiii{1 fil1.l ll r14 -ii -it 110, :11•;:r Ii;iliftitr} i t!: 1020 •, -. � +,-1.1-L17-(11-N• ".103,3ri.=T 11 -rt1) (�.14131,!128+"ii:1;f, 8-thru 78--20 ` 1 1'' 1' • NOT GOOD FOR MORE THAN S200.0077 mot HATEMENT Ow RILL No C3 5199, 37E 386, C3'Tglildpt12 t ff t -•• • .! :r •i1 _ Yitt'Mi IItT 1°+..i. ,1 • �•,i�11 �. y --------One hundred eighty two and 91/100--Z: DOLLA RS ' $ 182.91 • ' THE -. EDER. ' of •j TABLE NUGR UNITED BANK OF DENVER N.A., DENVER. COLORADO. • --Weld County 'Greeley, Colorado u■ 31, 1017i1D I:102O00071: TO THE TREASURER Mountain Bell Greeley, Colorado PAY — ---two • -O TM[ ORDER OP »TABLE * RDUSR S tOR,ns' 341017 S a. • THE MOUNTAIN ST/TESTCLEPHONE ANDTELEORAPH COMY• PAN : 04 2 24 any• :. _-- .1: *CATION ree ey, - - - August 23, 1973 [IIDORS[M[M OF THIS DRAFT ST THE PAYEE ACRNOWLIDOES FULL FATMEMt 6F Mt toLLOWIM6, DATE Draft 1 of 2 I: • .. 1 - • RI AUTHOZED IONATURE t-1 •.; ; ;(;Ili —r ft - ',IF i 1.11 ',Cii•• '/ORM Quo F. E.T1, • ;T1i 41019 a- ct • / it ,•i f 1 ;,:23-7' I • ' 'ZI020 our H.Te.EwT or ..LL MD, C3-0963 DATED - t ' I ' •NOT GOOD FOR MORE THAN $200.001{{l • ti..._ I t471 1 , .�t .'''• `. _-. 1111 i7'7j1 t,ityi1 hundred and no/100- - - DOLLARS ' i ' • 200w00 THE MOUNTAIN STATES TELEPHONE ANOTELEGRA►N COMPANY Weld County Greeley, Colorado UNITED BANK OF DENVER N.A.. DENVER. COLORADO 11.34 10 1911' I: 10 201R0007': 04 2 24 8EE TO THE TREASURER a Mountain Bell Greeley, Colorado OAT[ August 23, 1973 .IfATI�N [M0ORSEM[NT OF THIS CRAFT ST THE ACKNOWLEDGES FULL PAYMENT OF THE FOLLOWIN0. Draft 2 of 2 JYw STATEMENT OR •'LL MO, 'AY co THE *ROES OF 'AVAELE MNOU4S UNITED BANK OF DENVER N.A.. DENVER. COLORADO c3-0963 DATED One hundred sixty seven and 42/100— r POEM SIRS F . IE.TH. • . 341020 C NOT GOOD FOR MORE THAN $200.00 DOLLARS $ 1167.42 THE MOUNTAIN STATER TELEPHONE AND TELEORA►H COMPANY AUTIIONRED NOMANS[ Y M.13. # e L.T. Ft. 2326' 40' 7/c 31 7fV Ca. Dia. l" Din Cost $ 24.06 CONSTRUCTION PERMIT Permit No. Date 1. Type of installation Buried Wire 2. Location and description of work See attached print County Road # 57 eSix- 3. Estimated construction schedule: Start- Permittee: Mountain Bell Complete: 4, District: Greeley Address: P. 0. Box 1139 5. Telephone No 352-5898 6. Project No _1E-395 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant• Mounn Bell Ey: W.A. Rae Area Engineer 10. Issued by Name and Title L.D. Verquer Tech. Asst. 11. Final Inspection by DlesNalci TIW Name fd 'true itnni NOTE: If dissatisfied with construction performed on this job, please call th^ following people collect, in the following order: 1. Supervising foreman J.N. Martin 352-5800 Grly 2. Division construction manager A.J. Earl 266-4479 Dnvr 3. Colorado plant manager C.R. Phelps 266-4681 Dnvr Date• 8-9-73 Date • 5-23-73 Date• PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and We:d County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that win be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5, Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6, Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7- Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permf )tee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof-way limits. Malntenaura S&4ervl.or I tccep ing this permit the undersigns representing the Permittee, verifies that he has rent and understands all of the forego) , prov sinus; that he has authority sign for and bind the Permittee: and that by virtue of his signature the Permittee is boon the conditions set forth her THE BOARji COUNTY COMA'I SIONERS WELD COLIBTJ/. COLORADO Pep District Engineer ;%i/%3 zinc/ CoREtLEN A'_1..)ER YOU— ••••--S MILES"TO LUCERNE 727E «mv,3 ) § g ;o 71- s- r`3Tia 6+00 st 0 °G 54. O It %» Le Utility 8 Transport Meld Report` 7 Z Applicant's Name a —S-4 Type of Permit Permit No. 7/(5-* Date Issued 4r 73 Expiration Date i.�dot- 73 ar Location and Damage Reporti • Date Time,_„ (If no apparent damage at this time, so state) Inspection Date // Oct" -772? WELD COUNTY, COLORADO BOARD OF COUNTYCOMMISSIONERS BY: � AuSrized Agent s •1i •4� r. TO THE TREASURER Mountain Bell • �-y FORM SIRS F 1O.11, C J,NCATION Greeley, Colorado OATS August 23, 1973 DIDORSEMENT OF THIS CRAFT RY THE MISS ACHNOWLEWEO PULL FAYNER' O/ THE FOLLOWINOI Cult STAYS.FRT OR SILL NO. PAY TO me ORDER of MYMIE THRODON UNITED BANK OF DENVER N.A.. DENVER. COLORADO R'341018E' t TO THE TREASURER - - `con RISS F - Mountain Bel _- 341017 c TOOK 'TAIOIa' OR NLL "°'C3 5199, 31 386, CY-T52412 4 thrn 8-20 T } } NOT 1rF<.YLT£IRi".-Y lAl5; r{$'. :.r,.iz ri•`rteS,..�{ =:S,,..... i DOLLARS i 182.91 '•'' THE MOUNTAIN STATEST[LEPHONE ANOTELpeAPN CONPAMF e uny' �. < C3-5216, C3-5207, 8258 8-20 341018 23-7 IfoRi NOT GOOD FOR MORE THAN $200.00 --r-One hundred thirty nine and 11/10O -------------------- Weld County Greeley, Colorado ,^rATINM._ Greeley, Colorado --� DAM `ug s OIDOnto OR or THIS Purr ST Tut PATER 1Cl{NOWLlbif PULL PAWNOR OF IWM 23-7,7 _:• ,I III j+r. L tsi is^ 4 !. •',I .< 'i I!, L AI I+ c4R 1O2O •r##i}, i C+f'161`%� t t�}f.►��',4#j LO 20.000 71: °LEAR, $ 139.11 THE MOUNTAIN STATCSTRLRPHONE ARDTEZORAPH COMMMT 04 224 8u' AUTHORRm SIC�IATURE 3&395, C3-0966-, 3E-516,' '},s-538..' -% i s, s. I • , 8— ,_ , ' GOOD FOR MORE THAN }+M DD ,4} PAY ---One hundred eighty two and 91/100 TO 114C wldCo t • Orr r ' _Greeley, Colorado T, moss TINIOYOR UNITED SANK OF DENVER N.ACOLORADO.' . • -.7-s\ ; 0 34 40170 ': 10 20-0007E: t 2 1973 �� INLOW tic 04 224 8E' AUYNe.afl-SiO ATDRE TO THE TREASURER_=`: Mountain Bel • ,� Greeley, Colorado QQww„E ��TTq�.—.��t 23, 1973 EHDOrsDoo T of THIS DRAFT ST THE MTSC ACKNOWLaDSSR FULL rATMUNT OW TIM INS, _ 1 . r • ip Draft 1 of 2 ;,"^ ,--- ' ,r .j' i YOUR .TAYEMENr OR SILL Na C3-0963 - wno , • , L : f • rS i C I }' e ,NOT GOOD FOR MORE THAN $200.00 [[[r PAY S ---Two hundred and no/100. —=— } t �.�-� ' Y r ` '%+a T ;-i ; �i• y� nowRs:-.,;. . teA: THE MOUNTAIN ISTATEST[llnNONEA*DTZEITRAPHcomsat s Si • ff of MARE 'nest, Weld County rt - Greeley. Colorado 7i. UNITED SANK OF DENVER N.A,. t1'3410i911' • TO THE TREASURER Mountain Bell .COLORADO 410 2O000 71: 04 224 8E' )(CATION Greeley, Colorado OATS ENDORSEMENT OF MDR DRAFT ST THE ACKNDWLEDDSS Pull. PAYMENT or THE FOLLOWI e, Draft 2 of 2 YOUR STAYEHENO OR SILL NO. PAY _ C3-0963 DATED -M---One hundred sixty seven and 42/1 -T' teet.t.ttid ..421i71i •YTNOR.=MMATYRE ..-�. ' , 1 i ttir I 1 August 23, 1973 TE FORM .IRS F 16T1 341020 c 23-7 -' Vial NOT GOOD FOR HORS THAN ;200.00 DOLLARS $ 5167.42 To THE O.OER OP Weld County Greeley, Colorado TINE MOUNTAIN STATESTELLPHONE ANOTE EORAPH COMPARE --CORQOaSADAdFeglidn444114. ADTNORDID MOMATORC 1 WANE \\ TNRMNK UNITED SANK DF DENVER N.A.. DENVER. COLORADO R'3410200 20.0007.:..,•.04.. 2 24- 8E',; y H ' >rY.•ti�Tt. j• 1. Type of installation Permit No. _.--.S/ 6 V 1.1.17 Date May 31. 1973 CONSTRUCTION PERMIT Buried Telemhpne Plant 2. Location and description of work east side of road 3. Estimated construction schedule: Permittee• 4. District: Greeley County Road $7 from BS hivhwes 341 1925 feet south along Start? 5-31-73 6. Telephone No. 6. Project No 352-5801 3E-410 Complete: Address: 2701 9th Avenue 7. Permit granted subject to general provisions listed on the bottom of this permit and other special Provisions agreed to by permittee and Weld County. S. Special conditions: One inch black iron pipe placed on bridge 9. Applicant:Mountain Bell Commas 10. 11. rm. ad Tula NOTE: If dissatisfied with construeon performed on this job, please call the following people collect, in the following order: 1. Supervising foreman jack N. Martin 352-5801 2. Division construction wager A. J. Earl 4,- 1-266-4479 3. Colorado plant manage C. R. Phelps - 1-266-4681 PROVISIONS: 1. Permittee shall be responsible ; establishing safety measures sufficient to protect the traveling public from any and all harm during utility constructlolmprovement, location or relocation. 2, Permittee's facilities shall be ped in a location mutually agreed upon by Permittee and Weld C'ommty and in accordance with details and specifications iwn on the construction plans, 3 permittee shall o shainform oWeld e d Cow of construction methods, equipment and operational procedures ;that will be utilised and obtain the nce 4. Peerrmtt e' linstallation Electrical befItcooreante with accepted Practices and will not be less than minimum ragnlroments of the C6. Permittee sshall f 12 hours in ladvise Weld adCal48 8 hours date 1in s acdvance of of the date work will be started and shall notify Weld County a 6. Permittee shall be responsible ftny repairs necessary es a result of such installation. The maintenance responsibility of work repairs shall be an obligat of the Permittee for 1 year after final acceptance of the work by the Comity. 7, clearing of trees. bushes and otb`egetation shall be held to the minimum required for construction and safety_ S. Permittee shall return the right-wy to its original condition as near as practicable and shall remove all its rubbish and debris following completion of ceuction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective wures necessary, such corrective measures shall be Initiated within 30 days and com- pleted by Permittee within a unable interval of time considering the circumstances, 9, Permittee shall hold Weld Coun*xmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities coca by this permit, except as the same may result from or arise Ott of any act or neglect of said County, its employees or ita. 10. In the event any changes are mr;s this roadway In the imbue that would necessitate removal for relocation of this In- stallatton, Permittee will do so tly at its own expense spas written request from Weld County, Colorado. Weld County, Colorado, will not be responsibl ny damage that may result to said installation in the maintenance of the highway or to the installation placed inside ity right-of-way limits. Issued by By: R. E. Punish, Service Foreman paw 5-31-73 lame and title N.mr TMe Final Inspection by Date • Date - THE BOARD OP COUNTY COMM!{47OSIERi WELTY, COLORADp//i cieetp Yalntenan. Supanl In ce tug this per •, t the ti ed, representing the Perm! tee, veriliq foregoing pr• .: ens: that he has a to sign for and bind the P :ran Is bound by all the conditions set fo-rein. that he bas read and understands all of the t by virtue of his signature the Permittee O CONSTRUCTION PERMIT 1. Type of installation Mall Buried Cable 2. Location and description of work Placed buried cable South from Hwy. 66 on County -Rd. 3 2900 St. Permit No. Date ler 3. Estimated construction schedule: Start- 6-18-73 Permittee: Mountain Bell Complete: 4. District. Boulder Address: 2775 Valmont Rd. Telephone No _ 442-8221 6. Project 'o C3-5153 7, Permit granted subject to zereral provisions listed on the bottom of this permit and other special provisions agreed to by pernlittee and Weld County. S. Special conditions. 9. Applicant• Mountain Bell Ey, Felix Parks Foreman Date: 5-31-73 Name and Title 10. Issued by _ Date: Name and Title I1, Final Inspection by Date: - Nane and Title NOTE: If dissatisfied vIth construction performed on this job, please call the following people collect, in the following order: 1, Supervising foremen Roger Lange 442-8221 2. Division construction manager Jack Earl 266-4557 3. C�;lorado plant manager William J. Horton 266-7455 PROVISIONS: 1, Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2, Permittee':; facilities shall be placed in a location mutually agreed upon by Permittee and WeldCounty and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence, 4. Pcrntittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 4S hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6, Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8, Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by PermitMe within a reasonable interval of time considering the circumstances. 9, Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except an the same may result from or arise out of any act or neglect of said County, its employees or :rvents. 10. In the event any changes are ,t ads, tr. 'Lis riiiiti.rty in ...e u? ti re that aculd necessitate removal for relocation of this in- stallation, Permittee will do so prompt'.: at it' own expen=se upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any dal -.:•,e !list may result to said installation in the maintenance of the highway or to the installation placed inside 'Monty right-of.w::y By: _.. Mai THE SOARD OF COUNTY COMMI$$IQNERS WELD , COfARAj1O ��.�L� In ti.: --pU, - this permit the undersigned, r- tresenting the Permittee, verifies that he has read and understands all of the foregoing pro' -..:.,is; that, he has authority to •n for and bind the,gcrmittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein V RL 50A LC 05001 1 m ID COUNTY LINE ED To C.O. HIGHWAY *Lb MILLER FED 33.2. RLCOUTE Z BS°J GENERAL NOTES USE. KC5/51 CH CLOS_ 3`3 PUCE PEDESTALS NCXT TC RAE$ t4MSTRUL77tW 7D DBTA/A/ PER//l/7 FA077 41E/D CCZ/AITY CPOtf COUNTS RSSUME VNY PLETIUN OF 3E -06Z KNIGHT IRK I.n( (nM LIR& 4 FSVR160 Csie.X _ MOUNTAIN ITATES TELEPHONE CptANY PYLI LI FORM Tuts RRCnAwbl--_LQtArnON1 Ioo so. t=3r-S53 J OUTRK'r_c_Y1i•L� ____Cou.T,__I LL.fl ____ _I Mule rea{ira�4T-t_ `�LT•1$T__ LOCATAOwy..T HI t (L. IMA F. OF thowt-1 Beet DI „ec HAIARM_1 Salt _ISIOSerti. �yOAT[ �l OROPIOA�T_4A __AA 4iZ at O�rCRORp AROVRO 4SC- TITL" _ids: OAT[l ORM! tilEM0F2 3_Q7 LAM_ SRN OAT. 10-1-13 m•OCMT fl .._�._[Nw TOLL _____ m•O YTOCOsn NCCOWTV OP ■CLLR NNW _ POWER VOLTAOR .__ _ y„,.CDNT lb clliJAIIJ tDuNT4 &n /CC APPROVAL on. _ S___ umte21 I„ 31b -7j Permit No. Date 1. Type of installation 2. Location and description of work See attached print CONSTRUCTION PERMIT l40WfTAiB BELL TELEPHONE Buried Cable 3. Estimated construction schedule: Start• Mountain Bell Greeley Permittee: 4. District 6. Telephone No. 6. Project No 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• See attached print April 25, 1973 Complete. -May 25. 1973 Address: 2701 9th Avenue 352-5805 C-2-5315 9. Applicant: Mountain Bell By: Jack Bauer. Foreman Same and Title 10. Issued by 11. Final Inspection by NOTE: Namr and Titles! e Name and Title If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.A. Martin - Greeley. 352-5801 2, Division construction manager AJ. Earl - Denve 266-7444 3. Colorado plant manager ti. Horton - Denver, 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: Date • 4/25/73 By. C Maintenan Q Supervisor In a apt ng this perm the un.:rsigned, representing the Permittee, rifles that he has read and understands all e' foregoing pro ions; that he has au .. ority to sign for and bind the Per ittee; and that by virtue of his signature the Pe is bound by all the conditions set forth herein, THE BOARD OF COUNTY COMMISSIONERS WELQ'MtINTY, COLORADO% *wS -eV r 3 v/ t 2.p5X r�4JYS • /44 - - _ - - Sn. 17.Si -AA IA S O5i-5. Permit No. Date cfl CONSTRUCTION PERMIT MOUNTAIN HELL TELEPHONE 1. Type of installation Buried Cable 2. Location and description of work See attached print 3. Estimated construction schedule: Start' April 25, 1973 Permittee: Mountain Bell Complete• May 25, 1973 4. District: Greeley Address' 2701 9th Arent* F. Telephone No 352-5805 6. Project No. 23"820 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld. County. S. Special conditions: See attached print 9. Applicant' 10. Issued by Mo'imtSt 512 Bea l By: Jack Boner, Foreman co i/ Name and Title "��C Name • d Title 11. Final Inspection by Name and tee NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman ,1 .N. Martin - Greeley. 352-5801 2. Division construction manager A.3 Earn. - Denver, 266-7444 3. Colorado plant manager W Horton - Denver, 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permlttee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: Date' 4/25/73 Maintenance So In ace m this permit tho undersig , representing the Pee'dtittee, •erifies that he has read and understands all of the foregoing provis that he has authors to sign for and bin the Perm is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD,QOWNT,Y, COLORADO -(f7 ✓ at by virtue of his signature the Permittee I) 9 1' ' 0 0 U v O 4,� s b z > r k R D o m b a > > pN x n S 0 0 a -I > I g 3 m m H 62 fl m in ��0 '' # i I� i� m v 10 ,jI I V I I. I M I -: �' I I\i o Igo lb) I UN I I I�� Iy, IN, i l - ' I I IC 1 ii '1 1�I l a OI IL) 1 j\ I N 1 I>) I ITI I\ it) I i mINl I II (� I m r... i I I IN n I. m I I� n r l'j 0 I' i I '1.!.0 n I , < I� lb m -C I IIN jyi IS k. 1 I I\1:2 -4 \ d n H ni I IO II I � I cry r Qs Ip o U W I I I 19,, I. r n z m 1 I 2 A Ii1°II IQ*,' i I I I II of aanssi I� I 31VJ S NIYINl10 WOD 3NOHd3131 w /0- zo 5'J CQUNTY RaA� 04 /9 1/Mfl' ,r1NGQ7 A y 4 44 0 NO CA. le�'M.-►� ts ts n 0 7y4. y-''1/ Pal lie PL. R'CS/S7 45M-30'FtS BP11346 � 1- -50 DC 0 PED39 71460 II- > x I -I -10 0 9 O N 0-1 0 ,m O m 1 1 > > A I IN H a 9 0 o A 1 > IS y 1 m m m m N i y 0 I < m 0 I m I� r xI 1� I 1[� I f a I�t�rU INi 1 Irrx I pI< i fynl�f ;IN, I � 1 la r l 1 \ 1 , i I'C m 1 a i�, I I I- I ,� i 1 I + I. aI I1, 1 It\ I I I of i I� I I ~ m IN)I I I r Ilo It I Ir.` 1 m i•-. Zc I I gn IN n 1 1 9 is Ir Z 1Iii N z zi y b It \ Is_ i$ �J N ICI% io ,�i I N. I > IS o . > x m I . ICI r Nm m I I 0 \....< 1 !� I z 1 I Ill o IN i I I�i i I i I I . I� 1 . I 1 1N y r 1 0 m D 4 4- If) 0 r -o 0 "3/4* 0 0 m 0 3c C1 I * o m ID I I a I A 0 ° i lyl�i I 9 .h° I PI IC II I Imo 1� ° I ,q�I t tl ik IC , I I lid !" i L INr o 0 1 1' m Is i o b I I Illi i 1 I i " y 9 Jrf IK" ko ri ( 1 I IP �I, I a n I\, ! , �I 1k rhit1 a It>1 IZ I , N`^. I i I\ I 1 I 1N 1 1 In , Re -.0 32 Ot/Dam // _ a� -7 Permit No. Date ec7 CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation &tried. Wire 2. Location and description of work See attached print. 3. Estimated construction schedule: Start: April 26, 1973 Permittee: 10OUDtAjn_fiell Complete' May 26, 19'13 4. District: Greeley Address: 2701 9th Avenue 6. Telephone No. 352-5805 6. Project No 3E-007 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: _SSft attached print 9. Applicant' By: ., Tac $ane+,ry Feramnn Date: April PA 1973 Name and Title N • 10. Issued by Name Date.nd Tft7 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman Ja. S,rt1m Greeley 352-5801 2. Division construction manager 4_J, Earl Denver 266-4479 3. Colorado plant manager W. Horton Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee.. If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: THE BOARD OF COUNTY COMMISSIONERS WELD COJiJJ'i?f, COLORADO -��7 hisintene In ccopt ng this permit the and fgnod, representing the Permittee. foregoing rev lens: that ho has autority to sign for and bind the Perm is bound by'rtll the conditions set forth herein. at he has read and understands all of the t by virtue of his signature the Permittee p AA e.r7 CA. PL. OH C9-4.342. r Iive 1 R$ ill L l g il IC to • 9 21 X 0 O A A-> m I • (30 1 I I r m I�nifI.i \'b 1' 1k ID '. in,Z o I ��icjnit) IIi� iC IN 11' ell1 11 + �� i�'t� • I ~ I N I IR} %I,4.1 j g l x L t I I tIv i� I k 1 i I�"I otry .j • \ III I 1Oi I iIN , I �m I\ k, Ill m 1 tin n �1 m lit �o 1 IIr, I= 5 �i o n Z l t (�`� I • m Itr� I I I I Ian' 'l i I � I ICI IN,> x 43% b! I I I� 1 I6` m i i °m Ili I �t •Iii o I I I 1 I I I ;IN I� i ; i In o • r n * * C I n C • I� i ICI •Aro I0o` o I� m i NII C0 I I I �I Ins t� IDI t\ I I I. m t(rl L o �_ _ n ICI I 1 w K m y 's I\ t In' �� r�° m I� I+ ICI L.I I It I� i r Iln t m ti t111 i I` IV I o NiI . tQI I I, I\ I I I I d+)I 1 Ik. lyt i l 1 f 1 Ifi t i t 1 i I_. _[.....j j _j,1 I -i tit IIt mn r - m v 6HB4-2S 4.70 I-IIoM a, n -as 1SiCEM cut_ autz'( ovER. STA -O+OO STA 0450 R.0. la STA 1130 STA 4+o5 STA 27+45 d ti c 7- 7c7 639 Y Permit No, Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPAfIE 1. Type of installation 3uried Cable 2. Location and description of work See attached print 3. Estimated construction schedule: Start•Apr31 26, 1973 Permittee: Mountain Bell Complete' May 26,, 1973 4. District: Greeley Address• 2'701 9th Swamis S. Telephone No. 352-5805 6. Project No 3E-284 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• See attached print 9. Applicant• 10. Issued by By: Mountain Be11 Dark Railer, Fermium Name and Title 11. Final Inspection by Name and Title Name and Title Date • Date: Date: 06/73 NOTE: If dissatisfied with construction performed on this lob, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin Greeley 352-5801 2. Division construction manager A_J Earl Denver 266-4479 3. Colorado plant manager W. Horton _Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans, - 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with o-ccepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is chanced. 6. Permittee shall be responsible for any repairs necose.'ry as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee or 1 year after final acceptance of the 'work by the County, 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: mnmoenan In ac eptin this permi o under sped, representing the Permit en ye ies that he has read and understands all of the foregoing previsi ns: that he has auth ty to sign for and bind the Permittee; and t t by virtue of his signature the Permittee is bound by a e conditions set for herein. THE BOARD OF COUNTY COMMISSIONERS WELD NTY, COLORA d �� .f.LC � Y //3L -A. / //O/11-5 / (. JONX_ /424'71 ( //vE /2/L./a L.U8c2TY NDi7c5 ifivizivEL fL I-////).7 2-i /ic' /L-zv24-5r /';TJT -PZG _.� Tan !'C '; 5 Si7-7.7•/- STA? Of02 --- --- Ij ,//JTF_ : .oW/✓E[2 7-11 P22 V/Dr I t 2" COPJDUI7 Fk'OMSt/22/< TO P[R[I PELT % L /37F aW4I£4 A!$O TQ P' I/O6 '4•X6' /-< 'ii9:JO L'.fi_^.C'L?)AEO i£2t7//VnL t ::CU/N/ /ENT. BKYa 50 i ,';j r e ieli a30- �— ' /.</ /Cris 7" I-15C TOTAL 24 7' a2G 70 7,111._ LO' TJTHL CA. 2107' r . •,z �- ed./fr.' Y �sJ ----------- -5'-- (//'/ 5 ___ -,t,-- 9OO' 57, TS % Vic, /!0...5. S:-/ - '75- a _ r s771 -Z/•_7:.2 /AL - /G _ .GC O/S.27 CI /74/ 77.12/: O JE21,/EAD 0,102E2 _e,i Cn. VC ON C2-0d).L SA. 230 f I\, M \_ 2 5/3 .7 CG OS. `,4 an --2--/'F,</O eers- 25 G.COP/ 7kC7 C771OF FT Li/ ri/`!1 �I LIZ T7,^.Pi OF /-r V%L' IS/2 LT/1/e VOTE-$ / Tr/1.4G L2'Clf/L/'EO 9.9 •73 C. C/LL G/LC//✓/. 5 S S 0,9 %rS ///>v./14/2E O/' OO/A/C. /i/OUCK P/J.G iu /r :/C ri)4 "e [iC/Cc/ F/J/J/i?;_i7• /)GL L031- /4/ 2, G/2- /2F't'A. 4 C.411. TLC/2 Y ,57/25 TN:241 {„ee.7. 5525 F,L' fl4 7.5:V 5 'QN-ST 7G (2,-72--iN \n/ELL MOUNTAIN STATES TELEPHONE C EXCHANGE �_L u'1 �7%:i __ - JO( NO..1de msrnxr ..^, aqt:%/-'/ _ [Outer., LOCATION_/LA. / ;')''T cJ/P' /L-' //l_/;'_`.____ ATAROi____�' - OAT[ [rc or ARRROv(O-,�'�r�c%nru _r OAT[ // PAN? FORM 2063 J._ muro To / t_T04lST . Ju.co. -_- R/.- is., nz/T)- /a472?1far FCC ATPROVAL _ ORDER NLM0_ _ _ _ CAT DATE J ./i % r 2_ _. OF" t _ 2__ c*.RecZ/U/_.i L ern, COSTfaZ.TR. _ (YOM -' TOLL _ Rl0 C/LLO _ ._.-LIM[MO. Na [{T'O WEE [YI. NECESSITY or WORN 41,401 _ // i-%!//iZ?i 7.7 r, i5///c ii i."J3 rol-. I 'wen:.7,eSi ,' /.Dn S - S I p Permit No. �C4, 7c Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation Buried Wire 2. Location and description of work See attached print 3. Estimated construction schedule: Start- April 26. 1973 Permittee: Mannta1n Bell Complete. May 26, 1923 4. District: rree1ey Address• 2701 9Eh_Avenue 6. Telephone No. .351 5805 6. Project No C-3-5009 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• See attached print 9. Applicant: Mo_ imtRia Bell By :ark Romer, Beralran Date• 2/26/13 e and Title 2_ 10. Issued by M--- Date: ✓ Name and 11. Pil Inspection by Date: na Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J_N_ Martin Greeley 352-5801 2. Division construction manager -J. Earl Denver 266-4479 3. Colorado plant manager 1 JEoTt D31 Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours In advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Fermlttee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: In aceepti this permit the u signed, representing the Pe mittee, •erifies that he bas read and understands all of the foregoing p?cviss)bns; that he has a ority to sign for and bind the Perttee; and t by virtue of his signature the Permittee 1s bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD % TY, CO •RAD O O O O O O a /1 OG Ls Z C•00320 iaC0-� 1� _ L c 4y N , 1 R 44w KLQt5EY Its am .4,r PED 'tt(D STA 0+00 REASON FOR KO{W[' lµyt - I O.Tt q-13-72 95,80 11% II 402.-4121 --A,b-11 CO. QO, it22 & AVEL I IIMR BREWER 0`' m i t L/AYLk WELL '\ wJ--[y wc� 0 J w 0 N- W y ' v✓ L r II MR. COLLI N$ n STA.404-75 FIcLO OP,\v STA 13k SO STA IS}30 $TA 2St4S RED. 44,7 STA 27160 X - PL. PED. 0Y POw'CF POLE M.D. NR wEICHEL cR. OPEN FIELD fil6"4 Ra59r P.PEP/JeEd //•LS72 FOE' NEW 'Beim_ C///6 ANO /L40 G.odc L FIELD ENGINEEaED It -S-72. NO KN0wN IAAT-ARDS NO t«a''s 6uRtCD ufLITIC$ ty' 4Scr2540'r Ifl T CEMENT DITCNYEN\ Pith/AN O0.wt O,RT OPEN YIELD OUNTAIN STATES TELEPHONE COMPANY FG-O2.O/ MK UPIfiZELLCR HO PEO 4T•5 STA.51♦00 FORM 3065 [KCH.MOt f/U/OSO2/ _ //..- JUR R0.1�=�iQ L - -I DISTRICT E;ASEYtytt-C Y Y. --COUMTY--�� ,. Mutt) TO 7y_C/)4/S7 d.11/1/5.7 p1 qq HAZARDS--d.11/1/ —OAT( /own VOLTACK ---- [NORD sr_ _J!.�__=Lho e '_- OHo sv.hLZ. eKDe._A/W- C°M /7r Prur -- ....ovtw('2' l_,,Fei[ TiTLt,Q,. •-n l a[G�ATrtt//12-ZZ rcc....ovA5-_- /[�' �/J ORDER MEKO a .11:22.-.C2 '{ _ INV OAT _ -1 O �'q'V.- CA.RtWAL SSE tyro COAT TR. an YTCE nn.. LO. LIKE O. NECEtLTY O. WORK 111401 s Re..74,25-&... _rag _„7,_ty/%J/ i/i//) Elei �.j ERECT- f--0E-J_SN(ETI Permit No. 637 Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation Wire (burio ) _ 2. Location and description of work See attached print 3. Estimated construction schedule; Permittee: Momltain Bell complete May 25. 1973 4. District: Greeley Address: 2701 9th Avenue 6. Telephone No. 352 5805 6. Project No. 3E_006 7. Permit granted subject to general pro -visions listed on the bottom of this permit and other €.pecial provisions agreed to by permittee and Weld County. S. Special conditions- See attnebed print Start: April 25, 1973 9. Applicant - Mountain Bell 4/25/73 By: Jack Barer. Foreman Date• Name end Title 10. Issued by Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J F. Martin - Gz'eeley, 352-5801 2. Division construction manager A.J. Earl - Denver, 266-7444 3. Colorado plant manager W. Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less thanminhnum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trues, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Muni nn In ac-ept rg this permit e and signed, representing the Permittee, verifies that be has read and understands all oI the foregoing p ov .ions; that he as authority to sign for and bind the Per ttee; d that by virtue of his signature the Permittee is bound by . 1 the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELDNTY, COLORADO , G DUA✓T,v z m m o s m s r o_ m A a a O z O aN O y C M o o m n n a a x z m z n n o m o a n z -I a o m m m tit i a 0> I I -< m I -1',".r 0 1 j Il, n m l . m 1`1 - ^^r h I III I iii,:, : 1l1 1.1 In O D Icy 1;'. V 1.,� I I1I rj�i�D r{ I 1 { I / 'l9 x 1 I l01t4 i\N I I �•� L Cth 1 I 12. ^ I L; 1 r 6 I z I\ j i I 1� i q ra m 1 y i I' I IIII I I v lb! I 1? '0,1;1 j� 1 I e j I I I - m'v I. n I p 1 I 1 m IN I 1 Q bleb Io I A I x o N a z I �A I n I I< to -I blx I 1 ' m Ik R 1 1 I o°s 2 ` m 11 W a I it mm i °m 1 1 I I, I, II I O I I i i i I I I I 1 i I r 1 I t1 I 1-4 o r v o o TA t1,1 , I o Z n Y n c m O m In I m I xi o Ij p r2 i O D` tJ 2 ▪ 1 I L IZ h r F m r m i p I ? M I IC,LI I T r �, o • II' x {* 0 1. m I NJ O m (t,\j N j m 1 x jy s l I 1 0' I 8 I 1 I K rC I I i It1` I I I I 1 C e 1 RD. w-23 Mn / 7 _ MED 22. / 0/04 Permit No. 6 ?N8' Date CONSTRUCTION PERMIT MOVBTATA BELL TELEEEKNE 1. Type of installation led Cable 2. Location and description of work See attached R�int 3. Estimated construction schedule: Start• 1./24/73 Permittee: _Mountain Bell 4. District: Greeley Address• 2701 9th Avenue 6. Telephone No. 352-5805 6. Project No. 3E-022 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions' See attached print Complete• 5/24/73 9. Applicant- MOprttairt Rell By: I 10. Issued by 11. Final Inspection by ,and Title Ipf� a -e Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Jill. Martin - _Greeley 352-5801 2. Division construction manager . 7 Earl - Denver 266-7444. 3. Colorado plant manager V. Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld. County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be leas than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date• 4/24/73 Date: Date: By: Mnintean THE HOARD OF COUNTY COMMISSIONERS WELD •,_,a , COLORA (8 1 In kaceptipig this perml the uad signed, representing the Permittee, verifies that he has read and understands all of the foregoing proviions; that he as alit rity to sign for and binde Per ;3Nttee,.atid that by virtue of his signature the Permittee is bound by all the conditions set forth herein, y � � •• I1 A A (2 b 1 • n n TO an -O--S-22 ca4 u DG 1126,//2-147L+ OP. 14443 -4t24 - DC 1/26, !S0L. m a O 2^' of' CA. OFrOLE US I _ IWY 1 b2Z ASPHALT v g�nb l^agI F. Ft 171;iil q • i• F PI g A 8 l Y i .. r t 1 Z e ,ca pi i s p U: rrN H r M $ 1 ;1�tr It.. IN; 1 1 IJ r T Q a l i R,1 J I PI 2 'kit, ; , N; k9 Rh ik 1 y.n G lit o ! �gN rtr i �� 1m- _ ; b• I ba i 0 �41 I e t , LI ID N I r y Imo' a '+ I Q 1•A o I, g n ) N r N , !A 1rt p r p lryi P. I I Y O - 1Db I : I\ NI F.• I. fh • iMILor i I C •r 'o E rl r � e e� a. s o e o �Ia r`; :3, 1 i C o I iono, I�DpY Zr �I1I.�I i_ 6' 10 is 1 r. ii I P' $ IA's e i 41. iJ MI �i A.k R I h a tt34:IP 2 , t i i I I I • 22 00 Dti i =E w' N 0 w Jto 1.5".r \p ~nI$ I 4, rxismintip adz — O 6-X X U X iX /6' 33-- " 'HX W b 51 -22 —fl 604,,1-11L-0 DC 1126 1/2-147L* 0P.14 -M9.• 061126, LSOL m w co I'd 011)I3N 9a:1501J 1cl J m mzhmm? N Ookc e :•• n" jliO co r o. 77000$Dmz AI'• Ia5 P • N [ 4 .31'1;1 g, O a 0 c z 4 3$r' F 0 e ; O ;1 (r C 2 0 O A D v D v O 2 —4 t.7-{ a P 0 0 N " Permit No. Date "7 1. 2. Location and description of work See attached print Type of installation CONSTRUCTION PERMIT MDTINT TN HELL TELEPHONE Buried Gable 3. Estimated construction schedule: Start' Permittee: lionntain Bell District: Greeley £/19/73 Complete• 5/19/73 Address• 2701 9th Avenue K. Telephone No 352-5805 6. Project No. C^2-5219 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions- See attached print 9. Applicant - 10. Issued by ate- �i✓ Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1, Supervising foreman J N Martin — Greeley, 152-5801 2. Division construction manager A.J. Earl — Denver, 266.7444 3. Colorado plant manager W. R j'tOn — Denver. 266-7£555 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed to a location mutually agreed upon by Permittee and Weld. County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's Installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated w!thin 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Mountain Bell By: Jack Bauer. Foreman sale .nd Title Date• 4/19/73 Maintena .. u ervisor In a\0C.Sg1/211g this permit the unders ed, representing the ermittee. veres that he has read and understands all of the foregoing provisions; that he has authorl y to sign for and bindle Fermi and and t by virtue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COy COL, DO s C.4 . R[AWY .ORRbiW[ I ,LW[ „f TPEtft-r 4120 1.7.2 _/7 X1/0_2 'l✓o,,o_ErcEssi✓E-.0R/Dr/NG< oohnN f I kIn(JhN ) jT7. n i/7 S .S 07 5#S CA_ 1/41/4 2 rn /r_!! S fa z SAJ3r czc<, cJ i as Pl. rests? CL.S. �^ SG'v �� B SDK: G -SL �--J ` Jc--- 2:,./5./-/75,..4,9.26-S0 .._ Sid 5 H .....__),.‘,7cje✓ene 7 //e /c/' p/Pvvurn 2y ru/+vffr tTGiW✓ _ILLS //lA/Lif 2 P,92/( 7/2 Al //—'A N✓U,` et. Kra/37 k/z,\ iGQ `^ 2,er�-sc._.�� D /S/-L7S!✓i 5•,'-75 j/T'47k r'F-C) 'b7/1) Sr e://iNAt zrew / 70S. - 17,s,/ zrd7=3zn'c .z -rpm 3T4S=_2C'F Plz/C/f✓L.' Mf/ISDP14?!NTS Zip/ / Ti^r iffit ✓/D' 2r1r 2 Ti 7 v%'r f /C' ST'M 3705=3/d'r 4 ' STh /4\ NDnec rn_cwrncr t/vc>rzs_s zA,ss_ppiaA TC CTdraL ante T7YTz'Tr/ Y—FD7P--,,Sl/YK!'- LF! CAnte 7-2- /iv .F1,727/, -N - J ti),J 2 72, 7 ` N1. _77ny rn •/S;• 7Th W2?:,/,' /FY TJy_ G(/Nn L3) FC1L. Jf(Fi/!W of 0.99774, lnLz IW1if"l ✓'12 Z7 �:�UAi Pf _[U/'7PrP Z_i!SlR1Ci-. CABLE Is LESS 7y.9JV /O,o00 Fee, /ceoA0 Ca. REISSUE 2 tit CLiT. _.At Gi MOUNTAIN STATES TELEPHONE COMPANY [XCMANO[ -Ciffr/.- Y - JO[ NO. .W �� _"7/9 msrmer_% i -i!• it cocoa.. !J. `�✓ *SUMO roG/"--C7. /i71_; Ju to NAz+nos _ 7 OAT[ 7- /A-7' POWER VOLTAO[ -_- [NORD-STLy��OPJ+�7J .wows.. 4�_ wo [r_�?--CKa[Y�!/P [/r- -' A..NOVEoX..C•2, .TITlS Dux' 6e AT 7/42172/CC AP.R -L- PLO- LP. - LINE NO. J FORM 30(4 1�� COST CROSS WYO. 4V DATE -mss% ` 4T'O CROSS ITR. _ [ICY TOLL KITT. I TOCWRI. N[CWITY OR WORK UI4O)- .S£i ✓7.'7NC12 ITS .itifLr CONSTRUCTION PERMIT MOUNTAIN BELL SELEPRONE 1. Type of installation Buried Gable 2. Location and description of work See Attached Print 3. Estimated construction schedule: start- 4/19/73 Permittee: MDtmta_bBell Complete: 5/19/73 4. District: Greeley Address• 2701 9th Avenue 5. Telephone No 352-5805 6. Project No G-3-)921 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by ',ermine() and Weld County. See attached print S. Special conditions: 9. Applicant: Metmtein Bell BY' 7=ek Bnner� Boffin Date: 4/19/73 10. Issued by •%� A' ' _ Date: Name and 11. Final Inspection by Date: _ Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J N_ Martin - Greeley, 352.5801 2. Division construction manager A J. Earl - Denver, 266-7444 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started ani: shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Pennittee. If final joint Inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: r- v Maintendle Supervi or In BCcep ing this permit the and igned. representing the Permittee, veriliLfs that he has read and understands all of the foregoing pr ' ions: that he has au ority to sign for and bind the Perttee; athat by virtue of his signature the Permittee is bound by all the conditions set forth herein. W HD+ion - Denver, 26E1-7(1,55 THE BOARD OF COUNTY COMMISSIONERS WELD COUtYGY, COLORADO/� l�--t.�tiJJ 4,35.25— /inG, 226-256 INE5 :5 /7/UG ,7/...5..‘") Z7.5 £L /i4V-• s c i ��S7 /?G 21A-225 C \\ K\( Kam' O O O \\�f672)."- t w.�, I' } I} wa ICC 1 / -'k g, } - 4 -ow 3g� • • Permit Date • ‘411 CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation Buried Cable 2. Location and description of work BettSreen North 1st —North 2nd and North Parish Avenue 3. Estimated construction schedule: Start 4/16/73 Permittee: Mountain Bell Complete: 5116/73 4. District; GT_eeley Address 2701 9th Avenue, Greeley, Colorado 5. Telephone No. —35L-5.8.0.1-------- 6. Project No. C-2-5029 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld Count,, S. Special conditions' See attached print 9. Applicant: Mountain_Bef By: dac3LBauer, Sine _Foreman Date• April 16, 1973 ( Name and Title 10. Issued by ��/ ' Y` —"r ` Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: IT dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman I IC Martin - Drewlay 352-5Ro1 2. Division construction manager A.3, Earl — Denver 266-741,4 3. Colorado plant manager Jlt.--gOitQP - Denver 266-7455 PROVISIONS: a. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed In a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will bo started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9, Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise oat of any act or neglect of said County, Its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELQ$D}1NTY, COLORADO By: foregoin, is bound by uDervi.ur ace ting this/jiermit the un ro} "sions: U he has a the conditions set reigned, representing the Perini ority to sign for and bind the P orth herein. s that he has read and understands all of the d that by virtue of his,7gnature the Permittee ��u,�7 AirLO�JJY.%l( cfe/.5;2.O`ITS Permit No. Date 1. Type of installation 2. Location and description of work 35th Avenue - See attached print CONSTRUCTION PERMIT Mountain Bell Telephone Buried Cable 3. Estimated construction schedule: Start- 3-20-73 Permittee: Mountain Bell Complete: 4-20-73 4. District: Greeley Address: 2701 9th Avenue - Greeley s. Telephone No 352-5805 6. Project No. C-2-5163 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: See attached print 9. Applicant: 10. Issued by Mountain Bell By: Jack Bauer Foreantt Name, and Title 4�St Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. B. Martin - Greeletr2.801 2. Division construction manager A. 3. Earl - Dnvnmr 266-7444 3. Colorado plant manager W. Horton - Deaver 2667L55 Date: rch_2Q 1973 Date: PROVISIONS: I. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By b aintenance Su visor In ccepti g this permit th undersi ed, representing the Permittee, verifies at he has read and understands all of the foregoing ovi ons; that he has author to sign for and bi e Permi e; a t by virtue of his signature the Permittee is bound bythe conditions set fort erein. 0 I-` THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY. COLORADO I i 1 S r • TNIK1Y HOT% AJUJUC. —a— r--,' L N 6 wnLnMO pU. MwL Iqu, or00t • 300 1,1 wA Or �J9 rCOeGcbe —BOR n, U.ro�R „T ` B. 'Cs, P N �� J I ,yet V 24 x TO GRLY CO n 0-7 J -M- 7c; Permit No. Date March 5, 1973 CONSTRUCTION PERMIT 1, Type of installation _Bury ?dire 2. Location and description of work Perini t to bury wire on County Road 511 Conch for a distance rf 2579 ft from Coacty r{Z" 3, Estimated construction schedule: Start•rch 7.1974 Permittee: _Mountain. Staten Rpl1 Telarborte complete- March, 9,1973 4. District: Boulder Address 2775 Valmotif- Road 5. Telephone No 442-8221 6. Project No. C-3-5028 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: 9. Applicant' By: F�1ix Parks--Pnreman Date: March 5, 1973 tea,/ N.mmeaa Title 10. Issued by ' Date: Nome and Title 11. Final Inspection by Date: Nome and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Roger Lange 442-8221 2. Division construction manager .Tack art 266-447_9 3. Colorado plant manager Bill Horton 266-2455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction Plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements Of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the dnte work will be started and shalt notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise cut of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County.. Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD yY COLORADO r -, Mnintenence Su riser In accepting \his permit the undersign° representing the Permittee, verifies that he has read and understands all of the foregoing provisions`, that he has authority t sign for and bind the Permit • and b irtue of his signature the Permittee is bound by all the- conditions set forth here i Ar,Rcx °( ✓h1LES To _0,)C3 At '��'✓�,^^ "Lk EAST.- 1-' / M -c -e- So cm -r. 0 T JG� NC, z t I H:JT 171 D I "r-4 v 0 N ''1 I I I= , Iv I I I -I�ri1�I I I r mI A /• Jr I I m I-01 2. VA I m I I lt.x III I r.) 2 x 0 I 1 I -I 1' \' I ti I m 1 �, I 1 I In l'I I ta_ 1.... I I I I `Ln 1 In 14-tA dil 1 1 I ^.3I i V a 10 Iv - `O 0. -f in 1 Ig +c)-.4 x m t I 4_ r -.4). en ? 1— 11 I 0 N -_® r' I . I I `� I I+ I� , In I/�, I I i I' I i%' 111 .W ✓ n o r m a N I I 1q o r a t•• a o m I° 01 b'�I a tiA v IN m I•AI 1 a e o O eb m la �Ij' PI I r U" 1 (��iWl �1 , . 1u! VJ 1W I r` m IG L o r = > Icn ;' III 7i'n I. 11= I 1 1 A I 1 I 0 n 0 1 1?I - I 1kil � Rf I fi I t w l I�I � v, o 10 ' I II- t t' H I 1 '` 1 * I I, I�I7 11 I'to 1 1 r I I I I I 1 1 I I I L✓ 1 I I 1 I 1b = 1V1S NIVINf10 N m rn I s -n r c r ti; t n• LC C'11 2. (cb`t (A) i;Izr Ie-il,?) u H, 1324 -'3coc - 4 2 p T r*, r it 1 P i- Ad; 326-•3$14. 2.--1:1 f — --y -T .PLACe„ 3 , t -8- 2,0 -RI —8— G-O;—S--i--D b I r2 r T r 1 I K ri 6\ c `1 R 147 O d 0 1I O / 2b, ft al CC 7 I 1' A30 V) Bea rra2T r c A -4 1 t v 0 -4 A 1^ ' (I) — 'n r ftI 7- 7.,q Permit No. Date 5-7' 1. Type of installation 2. Location and description of work North on County Road i5 startins at Welker Road 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete• 4. District: Boulder Address' 2775 2-27-73 5, Telephone No. 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• 442-3221 C2-5345 3-2-73 Valmont Rd. 9. Applicant• 'fountain Refl. By: y 10. Issued by C- Felix Parks Foreman and Title Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: Roger Lange 1. Supervising foreman 2. Division construction manager A.1. Farl W. Horton Date• 2-26-73 Date: CONSTRUCTION PERMIT Buried Cable and buried wire 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform weld County of construction methods, equipment and operational procedu.:es that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Mai :•.,: a Supervisor leg this permit the unsigned, representing the Permittee, verifies that he has read and understands all of the foregoing pr. - 'ons: that he has a .ority to sign for and bind the Permittxd t t 'irtue of his signature the Permittee is bound by all he conditions set .rth herein. THE BOARD OF COUNTY COMMISSIONERS WEL TY, COLORA /4.2Y" 0 0 0 0 0 a mast A\ W «E Re noVA. c -s see F 31 IX frail-- tt (;400xta 2.800 S+" F-40) ey RtUr1 LANs LAK& PL. Pete's 8' 0e. c s= C.oauF k N Qy krt+ 1NO.a.� E a c oc Peo '°.a PE Pits PO it fb�E REn ow4+.S PO PG U 0 cic P z5 O xb 0 faL, 144^( C. -C. O hot 01 ——t fog (woo nZ Y P q x P 3 \6000 SwF-.) C- to ze szo 117 HOu'S� ❑ cbit Buttes --at �A s Libe' Watt R O Q J CAursolo euitaEb taAs uNe Lt/At& t L b VC y; f cN LAMJ LAKE PEb waT'e R l ,# 14 REASON FOR REISSU$ ISSUE Wiira R. L/Ale S (oar' AtIC a Road pc. t> i o.2 rt RL OVA - I Lc o r41®1 N crass a Ga ,L.P.at 4Jar l� C.cani*cr Pt aLtc Sovlc.E Fort LOGArgort7 OF GAS Last- 4q3 -Plot t) CPArrACT' Lnn-I.€ Tt-OASPtod/ VALI_Cy u Ara-rt toIsraJcr o& Locto A.) afS warsR INt s 53Z- 2-O9 3) Cons-vec no>v 't -o ot3TA,.v ?ewna(r F torn CotSASTY ti -JCL,.. t-ce R MOUNTAIN STATES TELEPHONE COMPANY FL FORM 3065 EXCHANGE J_;.. ^A�3 JOS NO. _Cecil- 02_1 ` _J«. ____ .. Dt TacT Bout -1 t 3 COUNTY 14, 6I -D µ S*SUED TO _QSJZ'chrI Q2Ail LOCATION AMR 1-N .."4 .o AJky` Ca uNT..i Rs_ st s Ju.CO. __------. MAZAROI_M�_`L.. ©___ __ _ _DATE Q ` -29-- Z_ ROGER VOLTAGE --.«»-... -_______ �11 aIPL. _LE` ? L.�q WcLli C 0.` CcdssT TO 6NORD.tY�7_:�1:_\c _��I.=�GOMO.EYSIL.r�P_CKO.W--A/W-------� .e.c. � APPROVED ,x.40--� .,,____TITLE JJic _ DATE 1W/j'.Z. FCC APPROVAL _ M ORDER I HO_ _ MK DATE .r _ _ _ _ _ OPN J�Ria._ CA.REC._ _ - .............. tST•D COST _____ST*. _____«.EXC$ _____-TOLL RLO- -CNDT. REC.._ tST'O NTCE.tXR _ �....� _`_ _ r. Lam. LINE NO. NECESSITY OF WORK (11101 N............................................... ___r......��__ ___ _SNEEL1_-OF _«IMEETI s • ` } 0 t / �kz. c"o+ 1. g6 8 - °oO 0 qO U 4 o70x o n O (O J'.. - i. N ,r N i _-1r .w_ a } V a ft N O O 2 V. x p�� al gal o liN i000 vm b y 1i� w l -O (f �L:::.t,G. — .W L L. as ��° J 57 8Y�e� A L A rig N 1,4Z rote t ppiaNtit.e) 1 1' 0 ' -1,10 .- z -a s r CG z -s 338D uwru 40 MOP l' U le i t Z $ I Nona POLO EE.iiov►4L.S VA«+re Ter s r! I, r'ore wine tEmovrll.s- pp —N *0 2 N i O f 0 O „a 2a »O 7. O > co ....DRAWN BY... L ...JIPPROVED.a b HEETS 2 Z r r C a C. • p o O 0 0 . O o ?IV C) O C. 0 O O O O 31 O O O ♦. O O O O O 0 O O O o O O 1/4 O J 0 .-. O O O .a C Ji O •, J `? '•= n •_ E O i O •+r`�i�. M ` ' ; N• . . n f ICJ i-J F I0 I4. I 0 -� 4 N N - .-P o0 N o 0 - N U 0 h _t r 6 0 O I r ♦ 0 0 N U ,T O_ 0 - 0. V •• .g, C• 0 •0 a y _;31 `^ . _ jWed w =t Zvi AC li—Cliti �: _ IV �'' V, o ON N N N V V LP N . U w N �) � _ t^ J J 0, 7. .t C, P . .h3i _r. 1 Z I a A c c _m Q c w N r u n t :l l� : i a n c v. N a - U c- 1- -• '` '2 .TI k a:� i.4 ITT 0 NC jr• i;3 r •(t p ^ t col V P ••".r..V r 1 _4_ I - �tiI 3 • 1^• + 4. rY X o a • Cc \ i c 9. 31 i I-- 10 } A C 0 N O 14 I0•f�'y SN 0. 0• N N N O 0 W Q` P N N 0 O I- 0• u P P N N O O It N a u, P 0. N N O O N M u 0. 0' N N O 0 It YY u , 0. 0• N N 0 0 u " P J 0 6 2> r ` 0 es w C IP ill A I" m cirri A 0 fri 1 1 O A i r 11 U • N - 1064 r 70 11) 1 o 11. N 0 -4 --- FORM t_.Sa.._�..:,..._._.. _r _...DRAWN BY..( -2--f _—APPROVED r/'r)- S C j c• "9 O :J rl a 77 n O a 0 0 0 0 C O 0 0 i o a M ^. O cw'.[ . S I C. pp 0 a 4 ,r .4 n_ 0 0 v o Al '. o c` CI₹I L i •�^•, it ^ z :I;' n - s n•-1y — ♦= % t v t w AFX a r na i? �3 t i e Y �T :: � in .t Q .A in s..Nt fl.,.. 1 ` g 3 > I J 1... ." 'a N N ; n.tw ZlII !6T'�r. XCAii OrKEI iV� GAT SOW II i ID Y Ow O N P 0. O 4 ,.. P1 .i w /n � ra I. ' — ?? ltt i' to N in I — C. Is I f o up r m '' r' to ZZ , Q rte. its0 0 Yc 0 yr. 00 " II PROJECT C -S6 a.C'_._._ LOCATIONA'>.,......_ _.._......._.» TAX -AREA ; 4_'.L_S..a�....._.r..n...�...,,._...._. l ENGND BY CI �_�' DRAWN BT.C�.1� / f CHECKED BY.. _ _APPROVED SHEET_.I..._OF. SHEETS L; i O s a x iipid a -are$ Permit No. 57 S Date 1. Type of installation e7_.cd-j rinr.---- 2. Location and description_ of work 2:57esst-C. 3. Estimated construction schedule: tart' z - - Permittee: '� / 4. District: 6. Telephone No CONSTRUCTION PERMIT ' �A A-.--4 -c-r A q -� - Complete' 5 ' .?O _,/ry�3 QQ Address: /:03 •3.l*JG J .f .y L8L 7s/G� 6. Project No �7& - _/L -r2 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. S. Special conditions' 9. Applicant: By: • Name a.d Title 10. Issued by 8•'t^� Name and Titl 11. Final Inspection by Name and Title NOTE: If dissatisfied with constructs n ✓peerrform d on 's job, please call the following people collect, in the following order: 1. Supervising foreman �2C_�..,.w 2. Division construction nianager(///]JJJr�.l2 1-1h t 3. Colorado plant manager Jam. js <- te: Date: Date' PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: C Main enhants Supervisor / In accepts g this permit the en. -igned, representing the Fermittee, verifies that he has read and un' -rstands all of the foregoing provisions: that he has a .ority to sign for and bind thg ermine ;; y'd S at bystue o his si; •a re the Permittee is bound by all the conditions set .rth herein. THE BOARD OF COUNTY COMMISSIONERS WELD TV, COLD 1%1 . fir Permit No. Date S741 By• CONSTRUCTION PERMIT YOlnit in tat 1 Tel n hnnn 1. Type of installation .- 1C'a 2. Location and description of work See Stt^Ched Print 3. Estimated construction schedule: Start Feb. 5, 1 73 Permittee: '-4'?^,'',0.1^ Y e1' Complete• "rir'n mai 4. District: C'"eole_y Address• 270'1 Of la ATrnnn fl 2r1e:+ Cn1nr-r]n 5. Telephone No 352-5800 6. Project No, C-2-5313 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions' See .rc qtr-ched--'rintS 9. Applicant: By: ,7i,C7C. L;11erf "Cre'"«pn Name and Title 10. Issued by 11. Final Inspection by Name and Title Name and Title Date • VQ 21 Date' Date: NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman .rtin *rer' ey 352—Sc01 2. Division construction manager a.J. E;-,rl."Darvar 76.(7--'71144 3. Colorado plant manager . `-Clion—Dennr 266-7/.55 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will he in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10- In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WEL y��-j71�NTY, COLORADO/ - t I/ Supervisor cepti g this per T t the under' -'ed, representing the Permittee, verifierthat he has read and understands all of the foregoing Drov sons; that he has auth • ty to sign for and bin the Per tee: aj' . rat by virtue of his signature the Permittee is bound by all the conditions set for . herein. T�F t - - s �.,, `_ i 3 -1) PEG 20.9 // CICLD caIVC PLO. Ll.r MR.M• CANNON VACAst LO UM FSCO PEO ..26.1 P O 1 z 0 I k I 7'I If 3 Pl D.w 10.L "TOM CtnENT CLIL. CvER +� w �I .f P 4 T • X FL F. too 74-31 STA.O+OO. STA• 11405 STA 2048L) STA 21 +55 STA. 41+75 STA 43+0$ 9TA 47+95 5' T Re/I/ATE 4J Lr: L 7 O L EA/GA,e"e.e 3 .(GAYS Pt'ae- 727 JTAer OF Woes FOe 5TAkES , IKASON FOR Aga! ME f OAT6 HWY. #52 TO. KT. LUProN LA. PL. ON 42.-L,94342.-L,943 4// CAL/T/0/L: PSCO W/GIY TEA, /O.t/ POWER L /4/E. h�p /3 S %— PZ MAQKCR �� STACo2�95 J netn inevF Oise fie05 r~ DE/ter ,r C/X/STP_[/CryaLC/ 722 CBTRW CnuAltV PE,e/'9/T. COL/TACT LEPi HAND WilTL7L .WPPG Y (77lrOz9L) FOR ESHC7 LOC.9Vac/ el,r ', OO rr.. / ///F. GRAVEL O O o OO 0 3 OIL TANKS 'OTHER' 2 9-Z4.72' /0//F?,ail/AA;IWS NOWT A91 STATES TELEPHONE COMPANY EG 02-01 EECRA.OE ...�_._�E�•`� i�� _Lth2t Zt c3r531, O ,n.ICr._aJ2A4AJC 1' Cou11Tr __(.,ja,Q luucD TO_Q�...%Q/� L OCATION -FT / L/PT:14/- a/241 PLO 21.4 PL D'./IAt nIu+i STA 74+1.6 FORM 3065 r N.CP Y ._JIp10 v` A10/2/ OAT( POWER VOLTAOC.___ �.___r CR0.o. _'QCS 3452 on .rZZGS_c.orr T� Y P 72En A...OVID etc acz TITLE Dccr_.(, ,L{ZPATC FCC APPROVAL_ ORDER RL.o_?Z_ZC' CPL__ __ w.OATZ _ Q 3Q s,on, i'2t2_ uucthkSO/L_, WO CO3T STIR. net _ _TOLL - PILO En•D MTCE.CXP. / O.Q _LII<*O. . _ MCCEWTT OF POR< ($14O1_./ZED Se £_70 / / _.. 3S2 - 33/3 permit No. .D6ptt,t_t /o2/Qd/717-- Date 0 CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. 2, location and description of work See attached print Type of installation Buried cable and wire 3. Estimated construction schedule: Permittee: Mountain Bell 4. K. Telephone 6. Project No C2-0941 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• See attached print Stn t.12/14/72 Complete: 1/14/73 District: Greeley Address- 2701 9th Avenue Greeley No 352-5800 -„ll barricades and/or other warning devices used in any construction within public 9. .Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 10. Issued by ` T - ` ,y Date Name and Title IL Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following 1. Supervising foreman J.N. Martin -Greeley 352-5801 2. Division construction manager A.J. Earl -Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-7455 people collect, in the following order: PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: THE BOARD OF COUNTY COMMISSIONERS WELDCOLORADO a1�li1TY rlr�'fi �f~ / Maintdli.nc Supervisor In accept g this per t the un signed, representing the Permittee, verifies that he ha foregoing provisions; that he has au ority to sign for and bind pre -Per ittee: §4d that by vi is bound ty all the conditions set forth herein. ; d understands all of the e signature the Permittee era; fCie• P /-'nnra: ro r < CO. Ccar. C _: F. ^ 4 SYq. '19B4.0D $nF. CA. .. 1 /441,c R Po sr a L tl4�V C.A.," dPr'f k Q?c /Y 8 — T T B �<a 4L.v. I i iav �i-nc r _ s.a. y•7O �Iu .pra/4(�1I ✓� II I _��.W.....ua T 4 c -3o' -•�. '.nn. o -n 3 0/Y T� A.6f A0 /en - F - ao fl9 kc .-•r BAeDLi PI, '1',.,4 :TP.I'.RJTr,. P.M -CyL - U Ce..IJ TV • I r "CO •'.l.1 L L/4Z CLOL. roznn).,'p Lcc CAA/ 50 `662 COILS I-5-3, Jot -14-0 PtL,3 f/DDC RS S/J 7 sr.. Pe C. se..35.I I by KCS/39 b 6 M b 9-CKT$. r s/J7 •• my i....F C1.a'rol.rr / -c<Y F L l f PC.L. n= LID 4/4L CLot. 70::^/11-:.S LCC t/r Cori l _ I-Y.j IJI-!.4 Nbt*ID,C. ' r.• , 2/5,' oo "s. 2,b Tt I "be 4. Ig I4-29 o3) :a •w :VzD %o p.p.( Pica OAS r` ¢ -- / r it, Ir-c cit...." c/ -r... 4--;.y :-.. X. ^---�ki_Joe.c-,1—O.ve M..v. _ _''jI1 f ,sr,w5 (I, I-Ic fnd'I-'C • _L/. 16) B� 1 i„:nec rr x Ic/-/10L./ I -I' ,10,-n2L. N I z fry A,pr-lLS I A., Fd 577 Country hi'', :t cal 'acme 30• -I-`C./96oi. o . Co "e a e —e --C .. w. n r Co,..?. PRonS c¢urck_ FLAGreo a� I ' L e ',,,, m ez L <s u j 11 C e,,,/p,..i„P-c 3s'JL, s I-2. 101.ISO mitt � � . 2C DC ' i ?•,..“! 01! el' Y9' L a. L6. O • e LL . a' o I- '24 I i^ Peo:24.4I q I 7. 97s.o•oo S �'' ASAW-1 rv• .D. /-9'.Ier-rs5L./ i AJAL-Ia0 / •a ...a --y e' nr Il i vim. '65 Y_ a. acid. yO� g P, I i�i(u l r,/ri N 1 191-1es • Pt a.'J1.6 ) I to 4/x3. - cDLI4_ Ddddddno AMC.0 FM_ if' POD 39.I LOT L /42 GLos loot ,1 I-Ioo L6c C/w Ioa LL c.•4] 2.0 D,C- E...2,...41AW.2 S4 L�_Jr .t Ia:I.I TSL /-D 3n; eL% IA; ST.. c..,.a-. 9 IL. -▪ 6, ./r Fn /'r.n. C/.c srA s• ..r'.. K` ku/j7 PI•'D KL r yap 4$ I LOc/4z ctea. ?al owe 1-ro tcc t/-/ 1•42.2 corm I -5A /0l-/47 Nflc.3D C an Co✓AI t __ _ OF F aCi / Lt. Y- F I -.. P -rr Si5 `Iry \ / /Y y r r, t.ifr o It 7.4 •�'. NI r` c 1 7 OtF V "T 10 S 11 ren T N /R/-G Pro 7/.J GOJr+TY 10040 a 30 - Pc p 7$.a pc 3-'37 rela 14.4 kc Sn, N >c.zan1-,o LC, >!, IS/-la-3++uGF Z 2 lac PLO YA FCD.,. 3 J+J] KCS/J] PU 0-fr. ncsir cur "4cn0 n~p r. .✓�i JT +P+ O�eK6,ir:1X�-1' a.-ra f^! a,�c•rr , G,L Mott 1 Permit No. Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE 1. Type of installation _BUried Cable 2. Location and description of work Bury telephone cable as per attached print. 3. Estimated construction schedule: Start. 12/1/72 Permittee: Mountain Bell Complete: 12/1/72 4. District: _ Greeley Address• 2701 9th Avenue Greeley 6. Telephone 'Co 352-5800 6. Project No C-2-0947 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• See attached print - All barricades and/or other warning devices used in any construction within public 9. A Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 19/711and any state or federal revision thereto. 10. Issued by .";4-677/.-.7 / . rag_ Jt- Date: Name and Title 11. Final Inspection by Date• Nam' and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J.N. Martin -Greeley 352-5801 2. Division construction manager A. J. Earl -Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. a Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld Comity a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance oI the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD ORADO —LA/ rt erit AV A By: • Maintenance . upervimr z�x In accepting this permit the und' signed, representing the Permit foregoing revisions; that he has aut•ority to sign for and bind JjpP is bound by all the conditions set forth herein. at he has read and understands all of the that by v tue of his signature the Permittee /rrw— rAC �_ 'v Permit No. r Date CONSTRUCTION PERMIT MOUNTAIN BELL TELEPHONE. 1. Type of installation - Buried cable 2, Location and description of work Bury telephone cable on West side of County Road #41 for approximately 1500' from County Road #64 Estimated construction schedule: Start' 12j1/72 Permitted: Mountain Bell Complete: 12/1/72 4. District: Greeley Address: 2701 9th Avenue Greeley 6. Telephone No. _352-5800 Project No. C-2-5286 7. Permit granted subject to general prdvlaione listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Special conditions: See attached print All barricades and/or other warning devices used in any construction within public - 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for St_eets'R highways 1971 an:: any state or federal revision thereto. 10. Issued by '`—e r - '"ems' Date: Name and Title 11, Final Inspection by Date' Name and Title NOTE: if dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. N. Martin -Greeley 352-5801 2. Division construction manager A. J. Earl -Denver 266-7444 W. Horton -Denver 266-7455_ 3, Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall Inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours In advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County, 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stillation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed Inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD NTY, COLORADO '�1(k By' Maintenance Sue visor In accepting this permit the unders ned, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has author y to sign for and bind the Permittee: and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. n c- w iU 2 I:81-4,13 f ii E RL4 LC0047J _ 2 -14 — /ACM CA's] FIUSTING s`r mt v (n • 4 Iv • 2,15..37CUlsZ -M f Coon- RaiGt ti I 11. L Type of installation /J (� _ �% 2, Location and description of work g-�*� / .fa -*imp -e"--'-,* ? S ^ i • �� ....,..,/49 74.--e e Ai_ .5,9-7 t . --I �� nfl 3. Es mated construction sc edule: Start' Permittee: %7,r L'e 4. District: 6. Telephone No. ...Z_( - t rei if 6. Protect No - - /_3 7 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. S. Special conditions' Permit No. Date sqs CONSTRUCTION PERMIT Complete: Address• .S'd'� 7724zi_i i Jcs .JL .e -r 2'--7Ir -7'3 - All barricades and/or other warning devices used in any construction within public Ri.hts-of-Way shall conform to the Manual on Uniform Traffic Control Devices for Streets-'& -Highways 1971 and area state or feciel.al revision' ther. to. 10. Issued by ' Name and Title Final Inspection by Name and Title NOTE: If dissatisfied with constructio porter ed thi oh, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction manager, "- 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such Installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County_ 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and' safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, ouch corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD >rQU,NTY, COLORADO • Date - Date; By: c--- nc Maintennne Z:1viwr v `� In a ceDng this permit the u reigned, representing the Permittee, verifies that he has read and understands all of the foregoing p jions; that he has a ority to sign for and bind the $epcnittee• d thayhy vi tie of signature the Permittee is bound by all the conditions set forth herein. 7----- Permit No. Date CONSTRUCTION PERMIT 1. Type of installation p� 2. Location and description of work w_. �Q-^ ( ,^- ���• �� 1*' " 90" 3. Estimated construction schedule: Starr Permittee: 4. District: 1Jh F -t -- F. Telephone No. " 7476 /1 - aZ Complete' Address• �� I 7�%—•* Z*% _��v t.,& 6. Project No. iscs 7, Permit ranted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions: All barricades and/or other 9. A Rights -of -Way shall conform Streets & Highways 1971 and 10. Issued by 11. Final Inspection by warning devices used in any construction within public to the Manual on Uniform Traffic Control Devices for any state or federal revision thereto. Date • Name and Title Name and Title s� NOTE: If dissatisfied with uctiono perfo ed on th- job, please call the following people collect, in the following order: 1. Supervising foreman dTf Date: 2. Division construction manage �a 3. Colorado plant manager 7 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shot.' be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circur,stances, 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may re, alt from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD CO , COLORADO By: r l Maintenance Supervisor In ac pting this permit the undAsigned, representing the Permittee, verifies that he has read and midstands all of the foregoing provisions; that he has autdority to sign for and bind the rmittee• ltd thy virtu of hi si_ • -t re the Permittee is bound by all the conditions set forth herein, .4--pe-ef N� OLD Al 4l Y.-.. it" lit S..?Pn Vii, ;E K/1 C_c_—re-J'�RRZL.B�.f_51D.e'ALCE_ r • j c t f /..7 -G ` "7'4-- Permit No. -T 3 Date CONSTRUCTION PERMIT 1. Type of installation A. 2. Location and desert Lion of work _irk 7, 3. Estimated construction schedule: � Start• ..1.� Permittee: ,t .Efi ,- CsC//Complete: -� - - ' - 1.7 5. Telephone No. .5 6. Project No LXjx--.<-Y z -et. -1/2 -en 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: All barricades and/or other warning devices used in any construction within public - 9. Rights -of -Way shallconform to the Manual on Uniform Traffic Control Devices for Streets e. Highways 1971 and any state or federal revision thereto. 4. District: 10. Issued by trr 11. Final Inspection by Name and Title Name and tee NOTE: If dissatisfied with constructio performed on this job, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction manager t?'C 6kr n 3. Colorado plant manage PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods. equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. S. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance If this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. Address• 5-25/ 7it'Q • . +/ Date • Date: By' MaintenlgCe pupervi.or In ac pti this perm t. the un signed. representing the Permittee, verifies that he has read and understands all of the foregoing prom o s; that he has nu orlty to sign for and bind the rmittee; d tha y v ue of signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD U TY, COLORADO lu , } ; ,',c 1 iil, ), 1 \1111t \tr to N- 14. Pt A it /a-as'22- CONSTRUCTION PERMIT MOM, tain BP11 1. Type of installation .Bl?r. Cable 2. Location and description of work County Road L8 and 11 installation of ?or te1ephon rabic, 3. Estimated construction schedule: Start• Nov. 1_5. 1972 Permittee: Mountain Bell Complete: rifle 15, 7972 4. District: Boulder Address• 2775 Valmont 6. Telephone No 442—8223 6. Project No. 2 —760 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions- - All barricades and/or other warning devices used in any construction within public - 9. j Richts-of-'Way shall conform to the Manual on Uniform Traffic Control Devices for S _eets-e, highways 1971 and any state or federal revision thereto. 10. Issued by 1Y Ne Y.uu •,iN Name and Title Date: 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman R. T. Wij Car 2. Division construction manager H. E. Boatright 3. Colorado plant manager '4- J. Xorton PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and In accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if thin date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such Installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado, Weld County, Colorado, will not be responsible for any damage that may result to said installation in the ma.:ntenance of the highway or to the installation placed inside County right-of-way limits. By: Malntenanro : prn9.or In . - opt g this permit the unders od, representing the Permittee, verifies that he has read and understands all of the foregoing pro • . ons; that he has author y to sign for and bind the Permittee; and that bX virtue of his signature a Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD r s , COLORADO al' u-�' (72 -r -ti I0-i� �§|!7 I; «°»A§ iv o� I}\ ..27`I i § I-15, \i� 6 �i� I _ \ , i ; \ I ! ; a iI »OH \ iw! ' /[0 /i / J &�'._©&1,' $�I.°\,�\ iI I /§.` ?| �0 2 �9;� /| i S) • .\ \ /�, \, r� _& �j. ., (2I\/ �;�`n;,\/� |��/�� re O /|$'� k, , , », /j',.. | |e 2 R f \ t / In' | § �( \,>0 3r [ / It nip nAiJ! r \ CA in 2 § RL 17M -11C_ LC. C47.94 Buzw IN WIJUIE% G RtA9- DES IC) BE PUKED APPP±_, t;' FM NN NG - --UMtCV CVF GRF"I L tOAJ 2» ««f Permit No. Date CONSTRUCTION PERMIT 1. Type of installation - � 2. Location and description/of work„ /in—e--e---e (r,./e4"' al AO -74 3. Estimated" construction schedule: Start Permittee: 4. District: 6. Telephone If, -Jo - -t 6. Project Nid 7. Permit granted subject to general provisions listed on the bottom Of this permit and other special provisions agreed to by permittee and Weld County. No. ✓ 6S"G -7v'// Complete • 3 9-' Address: /10.3 3L -164 d S. Special conditions• _ All barricades and/or other warning devices used in any construction within public 9. A Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. Name /and Title 10. Issued by `' �` t"` z� Date• Name end Title 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with constructlo perfor ed n th job, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction managed- r— 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal far relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY COLORADO Maintenance S In aceptingthis permit the ifndersign , representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority o sign for and bind th ermitte ; an that rtue of his signature the Permittee is bound by all the conditions set forth herein. /,7f • . Permit No. Date cbc 1. 2. Type of installation L//ol�catioQnnd description of work 4er 3. Estimated construction -_ ache ule: Permittee: 7,%� 7 4. District; �h• • . e_e 5. Telephone No -61/U- 6. Project 9;41- 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• All barricades and/or other warning devices used in any construction within public 9. A Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 10. Issued by —r 77 -'-e-- e Date: Name and Title U. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction perfol med on t job, please call the following people collect, in the following order: L Supervising foreman 2. Division construction manager CONSTRUCTION PERMIT 7, 1 fit • Start. Jo - / I - - 3. Colorado plant manager PROVISIONS: I. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans - 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall bold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Complete' Address: By" Maintenance Sup iaor In accepting this permit th ndersigned. foregoing provisioa9; that he has authority to ign for and bind the mittee• d that b virtr of ignature the Permittee is bound by all the conditions set forth herein, THE BOARD OF COUNTY COM1a1881ONERS WELD f�UU TY, COLORADO epresenting the Permittee, verifies that he has read and understands all of the St _ • LOCATION MA? & OUTLINE OF CONSTRUCTION REQUIRED 6, ler) it r9y�r al { M,O[ A. '7 -. -'.P- 7.2 Permit No. Date cfi CONSTRUCTION PERMIT 1. Type of installation -174'4 .�-K+/-�.t*�a0 -,v ttt..L.e -�'-'1.4-e4 c- 2. Location and description of work d6 J - - uc re 'RD. 4/1/ , 6- n� . Z""st .17 3. Estimated construction /scchhe-dule..-4O: Start• � - /4 - 7-. Permittee:2 /�4 C4DComplete' —fi - `i 42-74 o 4. District: ../..4 / i £4.s Address' 103-�.t.dC mil. 6. Telephone No. L S L -97/4 6. Project 3.im.2if. . N 2Lit.--e_4 .. Permit granted snbj26t to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions• All barricades and/or other warning devices used in any construction within public 9• Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 10. Issued by C' Name and Title It Final Inspection by Date: Name and Tit:c NOTE: If dissatisfied with constructio performed on this j , please call the following people collect, in the following order: Date: 1. Supervising foreman 2. Division construction manager 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By" j Maintenance Supe ..o In acceptiak this permit the ndersigned, epresenting the Permittee. verifies that he has read and understands all of the foregoing provisions: that he has authority to :ign for and bind the rmlttee' d that by virtue of hi ature the Permittee is bound by all the conditions set forth her• 1D ht e ,4-1 -e THE BOARD or COUNTY COMMISSIONERS WELD C9I1IJA'V. COLORADO • +<rrty (/Le 't 4 9— .Ad . Ye 72e 0.9 F/r.._.'GB --°t% jetcc(9 'c- y-7-2- Permit No. Date CONSTRUCTION PERMIT 1. Type of installation 2 i 2. Location and description of work 19 3. Estimated Permittee: 4. District: 5. Telephone 6. Project No - 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions. 'f - S construction schedule: Start• Cl Ao, 'Vo 6 i t. - 7S/ / Complete• Address - /0-/y-7 /51- /Jo 3' ,3-O -41/, J7 All barricades and/or other warning devices used in any construction within public " Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8. Highways 1971 and any state or federal revision thereto. — 10. Issued by Nome and Title 11. Final Inspection by _ Date• Name and Title NOTE: If dissatisfied with construction performed on thJob, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction mans 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will he in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6- Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall he held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near es practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits, THE BOARD OF COUNTY COMMISSIONERS 7 WELD TY, COLORADO 4 Date By: Matnien.n In ac ti g this permit the u. reigned, representing the Permittee, verifies that he has read and understands all of the foregoing pro% ns; that he has a orlty to sign for and bind the P,e:mitteg; Wtd tha y vi ue of signature the Permittee is bound by all the conditions set forth herein. _1baAY"p g C 1'42 6fr Are CNl.i)T C w /• Lc- • -cc, -v- 7 - Permit No. Date of 3 CONSTRUCTION PERMIT 1. Type of installation 1!* 2. Location and description of work ,J(/ 3. Estimated construction schedule: dStart Permittee: e ` Complete• /O - / Y —�--t �� ,p //JJ 4. District: --ii."-e.--g-t____Address• x-76 3 3. ..Tr -is -el 6. Telephone No G 7/4 i 1�l} 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• 9-., p -9z - AU barricades and/or other warning devices used in any construction within public 9- E Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. 10- Issued by Date• Name and Title 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with constructio performs on t is job, please call the following people collect, in the following order: 1. Supervising foreman 2. Division construction manager, 3. Colorado plant manager PROVISIONS: L Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3, Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD q., TY, COLORADO By: Matntcnan In , ccep ing this per t the un' orsigned, representing the Permittee. verif s that he has read and understands all of the foregoing rov ions; that he has a ,ority to sign for and bind th,4ermitteft; d thjby virtue of signature the Permittee is bound b} the conditions set orth herein, Fe --n Q Q -2d i.2 - Permit No. Date 1. Type of installation 2. Location and description of work 3. Estimated construction schedule: � Permittee: �/� / � � if 4. District S. Telephone No. iret- 1G 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. 8. Special conditions• All barricades and/or other warning devices used in any construction within pbulic 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets g High'.iays 1971 and any state or federal revision thereto. CONSTRUCTION PERMIT any 79J -en Start' J 9 Y -7a # Complete: Address' i d 9- O 3 Jo - -1'.i 10, Issued by C'i1•fh y//� 11. Final Inspection by Name and Title Name and TltIe NOTE: If dissatisfied with construction performed on thisob, please call the following people collect, in the following order: 1. Supervising foreman 44 .t7/JNy-4e 2. Division construction manager( r-R',afl 3. Colorado plant manager ` .'r - Ai PAOVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed In a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3, Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6, Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, Its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date - By: Maintenance Supervisor THE BOARD OF COUNTY COMMISSIONERS WELD CQIJNA/, COLORADO ^ t In accepting this permit the undersigned, representing thd�'%ermittee. verifies that he as r✓ad and understand foregoing provisions; that he has authority to sign for and bind th ermi ; an that b virtu f his signature the Permittee is bound by all the conditions set forth herein. Permit No. Date SLg CONSTRUCTION PERMIT 1. Type of installation 3 2. Location and description of work 3- Estimated construction schedule: Start- 9 - / 9 ` 7. Permittee: 7ttZ /3-41e 4, District: �u-wry 6. Telephone No 4 re, - 7,14 / 6. Project No, 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. Complete • Address: 9 - so -72 /zo.3 3 8. Special conditions: All barricades and/or other warning devices used in any construction within public - 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 10. Issued by e 2—e `-eras-- Name and Title Final Inspection by Date: Name and Title 11. NOTE: Date' If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman '!4 Ig-i 0Z -.--c0 2. Division construction manager 3. Colorado plant managerG—. PROVISIONS: (((/// 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plane. 3, Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Ste rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado. will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By' THE BOARD OF COUNTY COMMISSIONERS WELD r.QUfjI.TY, COLORADO Maintenance stuereiwr In accepf!'ng this permit the under a ed, representing tlfe''ermittee, verifies that he has read and understands all of the foregoing provisions; that he has autho ty to sign for and bind the ermit and t t by virtu f his signature the Permittee is bound by all the conditions set forth herein. ( ae -foL.Lec r 7 C 7/ 'CX '0) /.Lc cI Ll ''Cr 4) csr ,4'cco:= A'D', 7 e.r ru 9, /TN OG Vrtr Po I !di," 1. Type of installation "/ �^ _ p 2. Location and description of work t.- .,erad +Q -C° K-4 Cfl, TA -2 • z emu- - "-,N` cy %"tom 912c)•73 - CONSTRUCTION PERMIT Permit No. Date 3. Estimated construction schedule: chStart: 9' l‘ - 72 Permittee: 77T 4 • A9.. -L Complete: ! - 3 0 - 72 f) 4. District: ..--17-"—e r I'��'(/'Address: /.70 3 c3 -,-a! —Ij., 6. Telephone No. U 4 (' - 7-g? l 6. Project No 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: All barricades and/or other warning devices used in any construction within public — s. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8. Highways 1971 and any state or federal revision thereto. 10. Issued by ".'}/ roomy amp an 11. Final Inspection by Name and Title Name and Title t1 NOTE: If dissatisfied with construction performed o this ob, please call the following people collect, in the following order: 1. Supervising foreman 4 'c J,J%•K/J �,f/(, 2. Division construction manager 3, Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is Changed. 6. Permittee shall be responsible for any repairs necessary as a result oI such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final Inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be Initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to tbie roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: Date: By: Maintenance Su>dkrviso THE BOARD OF COUNTY COMMISSIONERS ip . WELD U TV, COLORADO ( 1X 1 In accepten this permit tiiai undersized, representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority to sign for and bind theeeemitteeh a that b virtue his glicnature the Permittee Is bound by all the conditions set forth herein. LOCATION MAP & OUTLINE OF CONSTRUCTION REQUIRED a4 ONEW Hot "late Atc 7 /✓I W wjl So faAllirw of nine, ■" ULNin C e,✓S7, stre.T, Ory 114 7%D ?CD S - t- } aap - SDI, I .4 twit h �r 11." 1 .lrm;ic 71r- 44 17.3? 1. Type of installation /J A 2. Location and description of �% n work J ""i°y°t -% c4 -^' Ml to f4serJOJA a 3. Estimated construction schedule: Start - Permit No. Date pry CONSTRUCTION PERMIT Permitter: 4. District - 6. Telephone No. icG - 7 5/, 6. Project No Complete• 9 - a3o - 7 2 3 Address- J.7 de Y 34 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: — Ail barricades and/or other warning devices used in any construction within pbulic- s. ' Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. - 10. Issued by 11. name aura .,.,c --c Name and Title Date: Final Inspection by Date: Name and Title NOTE: If dissatisfied with constructio perfor ed n this ob, please call the following people collect, in the following order: 1. Supervising foreman 2, Division construction manager -✓r,7 3, Colorado plant manager PROVISIONS: 1. Permitter shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Mainten a .uperviao In ac >' I ng this permit the unde geed, representing the Permittee, verifies that be has read and understands all of the foregoing prov lions: that he has authty to sign for and bind the rmittee- nd at by tue of his signature the Permittee is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD C0j1N,TY, COLORADO 4 WELD COUNTY; COLORADO UNDERGROUND AND UTILITY ` PERMIT PERMITTEE'S NAME `" C- i ,.j , P f�— ADDRESS DATE j• Your request for permission to install a ~ . i- E C ✓r+ 1. L. line along or across County Highway No. qr„ STat `'t- T C3'7 .ST ) E'Jfli}c -+r ?uu;niu6 t..:=ST Isc5CEET is granted, provided that the Permittee will ownand maintain the same after Installation. IT IS UNDERSTOOD that the Permittee will cause the installation at no expense whatsoever to Weld County and that the Permittee will own and maintain the same after installation. The ra +--� iA e line shall be installed beneath the surface of the right of way at a minimum depth of 36 inches, and the disturbed portion of the right of way shall be restored to its original condition. The back filling on the shoulders shall be made in six-inch lifts and mechanically tamped and packed, and the last twelve inches of back fill shall be of stable granular material such as crushed rock or gravel. Where the installation crosses the roadway, it shall be encased in pipe of larger diameter and the crossing shall be as nearly perpendicular to the roadway as physically possible. This installation shall be installed by the method of boring or Jack- ing through and beneath the road surface; however, open cut shall be allowed up to the edge of the shoulder portion of the road- way. No water shall be used in the boring and no tunneling shall be permitted Where the Installation crosses any ditch, canal or water carrying structures, wherever possible it shall be pushed through and beneath in a Pipe of larger diameter thereby eliminating the necessity of trenching. In no case shall the flow of water ever be imparted or interrupted. This work must be accomplished in accordance with accepted good practices and conform to the recommendations at the National Electric Safety Code and to such statutes as are applicable. - - SPECIAL PROVISIONS: Attached C.v_"' e - p Ai -I `1c ^.y,s 37m, DC`_t., : T Q OcPti4 af' 36' F•t7r• LL �1ALcA,Ev' Tc 8E McEPeHe Ail barricades and/or other warning devices used in any construction within public. e, Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for meet" bitty n, Streets Highways 1971 and any state or federal revision thereto. This work shall be completed within 3 e^ t? F1l! S ( 9 HO J 72 ) days from the above date. No work shall be allowed on Saturdays or Sundays. No open trench permitted in traveled roadway after dark, unless otherwise specified in special provisions. Saturday and Sunday work would apply to Heavy Traffic Reads. Permittee will be required to shut off lines and remove all combustible materials from the County right of way when re- quested to do so by Weld County, Colorado, because of necessary highway construction or maintenance operations. Permittee shall mark this installation with markers acceptable to Weld County, Colorado, at the locations designated by Weld County, Colorado, directly above such installations such as manholes and at section lines for cable (phone, power, water lines). The traveling public must be protected during this installation with proper warning signs or signals both day and night Warning signs and signals shall be Installed by and at the expense of the Permittee and in accordance with directions given by Weld County, Colorado or by their agent. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado. will not be responsible for any damage that may result in the maintenance of the highway or to the installation placed inside County right of way limits. Eve 'YES( , Maintenance Man on this section of the highway, with headquarters at or his successor, will represent Weld County, Colorado, In the construction of thi'mutilation and any directions that be may make consistent with the intent of this permit must be followed or this permit may be terminated forthwith. By: Ma. ���•r! 'supervisor In acng this permit the • • • ersigned, representing the Permlttee, verifies that be has read and understands all of the foregoing provisions; that he has - thority to Sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. jj� AA p jD j d . Ctd.fJk't•` THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO l letiC- Asa a SPEIAL:.- INSTRUCTIONS REQUIREMENTS' FORAMSTAttAT!Ott OF U itLTIES�M1�irtp { l T OF WAY Q �? .,..row ,. n r,. ... :. 01.' DEPARTMENT OF HIGHWAYS, WELD COUNTY, COLORADO 1. No cleated or track equipment to work on or move over asphalt surfaces without mats. 2. All disturbed portions of right of way are to be returned to original condition at a time designated by Weld County, Colorado. 2. Any materials from excavation as the result of utility installation will be removed from highway surface 'FACE DAY.'" - - 1, Under no condition is an asphalt surface to be cut unless otherwise specified in the special provisions. 5, Mud -jacking will be required where bores are larger than lines or encasements. 6. The ends of bored sections ARE NOT to be covered before being inspected. 7. No plastic line Is to be installed without encasement under pavement regardless of pressure and size. S. Encasement of line will be required from toe of slope to toe of slope under all highways and paved County road intersec- tions and approaches, if lines are over two inches in diameter or more than 100 psi pressure. 9. Manholes and other points of access to other underground utilities may be permitted within the right of way only when they are located beyond the shoulder of the through -traffic roadway. 10. All requests for installation will be reviewed in the field by representatives of Weld County, Colorado, prior to any issuance of any permit. 11. Where special cases warrant Weld County will permit the installation of underground utilities paralleling highways along the slope of the shoulder. In the event such permits are issued, it will be required by the contractorthat material removed must be replaced in like kind and with same or better compaction. No segregation of material will be permitted. 12. The construction of underground installations will generally require the services of an inspector furnished by Weld County, Colorado. The decision in regard to which project requires inspection is reserved by Weld County, Colorado. All costs relat- ing to the inspection of such utility installation will be borne by the Permittee, at a rate specified by Weld County. 13. All drainage facilities or siphons will be opened immediately upon completion of work at sites of drainage or siphon Installa- tion. Damaged portion of drainage or siphon facility will be replaced. All damaged sections are to be inspected by Weld County, Colorado, before being concealed in any manner. Drainage ditches orborrow pits are to be restored to original condi- tion immediately after backfilling is completed. 14. No meters are to be placed within the highway right of way, excepting within corporate limits where municipal regulations allow installation. 15. Thrust blocks will be required on all vertical and horizontal bends in water pipes as per list below. Pipe Size 2^ 3" 4" 6" 8" 10" 12" 14" 16" IS" 20" 24" THRUST BLOCK AREAS AND VOLUMES REQUIRED FOR WATER LINES INSTALLED ON WELD COUNTY, COLORADO R. O. W.'S Minimum Thrust Area for Tees and 90° Bends 0.3 sq. ft. 0.6 sq. ft. 1.0 sq. ft. 2.2 sq. ft. 3,8 eq. ft. 5.9 sq. ft 8.5 sq. ft. 12.0 sq. ft. 15.0 sq. ft. 19.0 sq. ft, 24.0 sq. ft. 34.0 sq. ft. Minimum Thrust Area for 45" Bends 0.2 sq. ft. 0,3 sq. ft. 0.4 sq. ft. 0.9 sq. it 1.6 sq. ft. 2.6 sq- it 3.6 sq. ft. 4.8 sq. ft. 6.3 sq. ft. 7.9 sq. ft. 9.3 eq. ft. 14.0 sq. ft. Minimum Volume of Concrete at 45° Vertical sends Down 0.05 cu. yds. 0.11 cu. yds. 0.20 cu. yds. 0.37 cn. yde, 0.66 cu. yds. 1.10 cu. yds. 1.50 cu. yds. 2.00 cu. yds. 2.70 cu. yds. 3.40 cu. yds. 4.00 cu. yds. 5.20 cu.yds. NOTE TO APPLICANT: This permit shall be made available at the site where and when work is being done. SPECIAL PROVISIONS: General: Open cute acrossthe driving surface of the roadway may be permitted at the discretion of Weld County, Colorado, and only after the following provisions are met. 1. No open trenches or hazardous ruts will be left over night or on weekends. Excavations will be securely tamped to pre- vent hazards developing before excavation is resumed. 2. Final back fill and tamping operations will be executed in no more than six inch mechanically tamped lifts and the final one inch will be a dry select road base material compacted to 90% of original. 3. Site inspections by Weld County, Colorado, will determine whether excavated material is suitable for backfill. If it is de- termined unsuitable the material will be removed from the site at the expense of the Permittee. 4. Permittee assumes responsibility for the maintenance of all open cuts for a period of one (1) year after construction whether in a gravelled surface or a paved roadway. If said cut is in need of repairs, Permittee is allowed seven (7) days after notification for theexecution of said repairs. 5. If the Permittee has not repaired Weld oyes cut or cuts within the allowed seven (7) days, Weld County, Colorado, will repair said cut and will bill Permittee for all expenses connected therewith. 6. No open cuts within paved roadway will be allowed without scoring pavement parallel to the center line of the utility and perpendicular to the center line of the road with a minimum width of 12 inches. 7. All water lines and sewer lines are to be suitably encased to allow for repair and/or maintenance without further dis- turbing the roadway. S. No puddling will be allowed. 9. That in all cases where existing black top or hard surfaced roads must be cut, then in such case a non -cancellable cash or surety bond payable to the County shall be required in the name of the contractor or the person causing the hard surfaced roadway to be disturbed prior to the commencement of the work, said bond shall assure recovery by the County of any expense incurred, within a period of one year following the completion and acceptance of the restored portion or portions of the hard surfaced roadway. Said recovery to be in the amount necessary to repair or replace said din turbed portion of the hard surfaced roadway. Said bond shall not be cancelled without thirty days notice to the County., The amount of said bond shall be set by the Board of County Commissioners and shall be reasonable; however,, inRo;. event shall the bond be less than $100.00. >E r g\(\_T S-1. \AOC'. }' Lk, 1..U._10 -11,1,,W,‘ 7 t 1- A im a A 7 a Z A 0 X _ a -4 1 0 ro 0 N 0 -40 m o o n AZ s a x X z 4,: y -40Iii m m a 0 i 0 D < m a z O 1 I. I 1 m z trio I I% .! - K-1 rr �? 1� X Vii: 1 I� I L.: I_r li 1' 1 1,... F i-„ 1' 1.- ; I -' I i- rte" a— ,� Lr �i F °n l 1 ,,,_4/ 1 t m 1? x 1 I' In11 p I f L,: ' y .. t a: 1. If' I I Imo. t • 'I I',. 1 < I 1 1- t'i I' I., r. '^ 0 1 a 1 i t. i' L, m � ' -0 G r I I I I :',7-., - f �- S , 1 I r� Imo' I I x l 1 z. 1 -,'+ 1:' I I -i m._ r r m I '.' I 1 r U:, '^•hr I I1 ( - l 1 1:, m I 14a.....I I 2 I-- -v r I 0 v IIt 1-: z 1 i 'i 1 z ( 1 < I < I- I 0 I2.:„. <. 1 - i I C I I 1 I I lc 1:c t�IY I I LC1 I' I I .,F I I I rt1N1I 1' H�1 1 1 I I' I7. -r". o 1^ 1� I I'I -4 „A —rip n -1 1 ' 1' . 1 ST 1 r m r. L I: 1 O I� �.: i�• - m 0 I :''I • I 1; I I r- I 19 1C -1,I I 11� I,:. I I; 1� 1 IC 1 r"-- 1 I, r z o II s v'- I 1 i A o r a E! n C P_ m I�IC I'1 1 m m I 1 L O I 11.12 y I < I-i" ti mm I Iv1 }-0 1 r I O { 1'^ , < II i �' )'..1 ,� IP 1� t 1 r I, o I per. I ) 1�'' 1}• I ' I m I- '.1 -1 I_ 1 • o 1,.7 I 0 n I 1 1 1 t J I r if z o >. II i ti 1 1 -17" m i p I 1 i „ v ''" p—: I I Irz • a? iI I Is, I C;; i -,3 N r' o m 1� I f+ I,`•I..T' � rsli '- PI I;_ I 3. I,ri I I 1 it, 'O I; J • 1-- i a 1, val, jy� 1 1 r o 1/ �� L I !F'_ I' I I II ~' 1 1. Permit No. Date CONSTRUCTION PERMIT n September 8. 1972 1. Type of installation Buried Cable 2. Location and description of work One andone half miles north of Wt,ghway 6.6 On County Road #5 Bury cable north along County Road #5 for 1394' and across County Road #34; 90 degree Turn to the east across County goad #5, 90'to existing Pedistal. 3. Estimated construction schedule: Start 9_11 72 Permittee: Mountain Bell Complete: 9-22-72 4, District_ Boulder Address• 2775 Valmont Rd., Boulder_ Colo. 80302 K. Telephone No. 442-8223 6. Project No C"2-5232 7. Permit granted subject to general provisions listed on the bottom of this permitand other special provisions agreed to by Permittee and Weld County. g, Special conditions: All barricades and/or other warning devices used in any Construction within public y Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways Hi1971 and any _2. state or federal revision thereto- 10- Issued by o _••Y Date - Name and Title 11- Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman R. T. Wilcox 442—8221 2. Division construction manager H. E. Boatright 266-4479 3. Colorado plant manager W. .T. HOrton 266-7455 PitOVTSIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2- Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9- Permittee shall hold 'Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County. its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD CO Y, COLORADO Marc".it.:-ry3r J ting this pe mit the und• signed, representing the Permit foregoing . : dsions; that he has au .rity to sign for and bind is bound by all the conditions set f• th herein. has read and understands all of the virtue of his signature the Permittee • • COUNTY ROAL 1334 AUGER SIR AIL 90' CAUTION . BURIED TOLL LINE CONS UN76tlt!71 BUR`3 10' W. Or W. ED≤IL OF ROAD BEERS A 14CA APPQDX tt4i. TO k1GH1•JA Lb 1 • t 1442? 71\ `, rAT. RL 10/4 'Se `"1' rUTION-.%RlLO DP^PS m FED ?.2 REASON FOR REISSUE 04/ C-2-07S'p LC 01400 3%W A,c'b -5Q 25• _ a v cJ RURAL. }+ELLI 10tY u - r LfDDt - :j I ISSUE TO Co APAc'or //WI TO MEAD GENERAL NOBS 9 N\LI\SUREINAI-N13 BCTWEIN KIS ARE TRENLH MF,fl5.LRE:DENTS - ALLOW lcEhC1-s 5101-.. OF P>rZ._ z) u -s . KC53? LA Cla • LK&IN BURIED CRBLE-PDRA ARCP, RECEIVED JUL 2. 1972 TRc34C_x ME.ESSLIKEI7 TN VS 11EM 1-5 1484' PR ICENCI ItICASiiRLR\CKTS ITCN\ -to IS32'4$Q' DATE • MGJ$TAIN STATES TELEPHONE COMPANY ettattar striver 150DL LCATIONA'PRDx I M1. 41. a MOD CI\N COUNTY RDflDtS MIZAROs_ N,Q7V6.. MOTLfl ,_OATH t4'%� EMRD. SY_ t--�� PHONE 449.1 VO. BY - L -X- CPO. �s *PROVED _ sm.k TITLE - IROER MEMO_ j _'12- ail *T'D cost STR. (ST'O MTCE. EXP. irCESUITY OP WORK (3140) PR_ t-1 JOo NO. C-Z_5Z32 COUNTY l� 1F 1 D aV DATE aP _ 1}CI72 EXCH _____TOLL FORM 3065 , ••s RUED to n U _ J l e4E Ccv.:s.T OW*R VOLTAOH R/W-1- Sy-i} cave). &G.Am:- fM}tits, ... FCC APPROOVAL_ -� OPM :i___ CA.REC~_-. -„ RLO cc_CC LC--LEL Mck L€lJME NO. . SHEET_ I__OF_ L-awwnns -a. 7PI ice/c2&.57a Permit No. Date CONSTRUCTION PERMIT 1. Type of installation -7' -1 LA 2. Location and description of w rk . - - - - - - -• - - ^- 1 - 3. Estimated construction schedule: Start: 87 Permittee: 'eras-rt`-'' �E7•-r •t' 4. District: 77-il • -z 6. Telephone No. efr - Complete• 7- 3i//-ff 2 Address• LO-' ✓'.r.s{� C i.. 6. Project No 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. S. Special conditions' --Ali barricades and/or other warning devices used in any construction within pbulic 9 ArRJ_nhts-of-;day shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. - 10. Issued by Gam" euj�- 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed o}t this job, please call the following people collect, in the following order: Date: 1. Supervising foreman 2. Division construction manager 3. Colorado plant manager y� PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction. improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation win be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this In- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightofway limits. By• Main tenan'bF uperviror THE BOARD OF COUNTY COMMIS LONERS WELD C, AJJi1TY, COLORADO In acc@Diing this permit the under- ed. representing the Permittee, verities that he has read and understands all of the foregoing provisions: that he has autho ' y to sign for and bind the Permittee; and that virtue of hiq.-etg ature the Permittee is bound by all the conditions set forth herein, 4E. 33. T�>�✓ 7 �_4.r�L . Xs 2.«_. 5, q. de. n1)-__4. . Permit No. Date August 22, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried cable 2. Location and description of work Bury tele ho go East 1100 feet. 3. Estimated construction schedule: Start 8/28/72 Permittee: Mountain Bell Complete: 9/4/72 4. District- Greeley__ 2701 9th Ave, Greeley b. Telephone No. 352-5800 6. Project No. 2e-612 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions: SEE ATTACHED PRINT - All barricades and/or other warning devices used in any construction within public 9. _Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. — 10. Issued by t` �� Date: 11- Final Inspection by Name and Title Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Martin -Greeley 352-5801 2. Division construction manager H.Boatright-Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3, Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4, Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance If this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 5- Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway In the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date: By: — aintcnanee ry Ain' In a .epti g this permit the undersi ed, representing the Permittee. verifies that he has read and understands all of the foregoing Dr • s ns; that he has authors to sign for and bin P ittee nd that briiiiiu of his signature the Permittee is bound by all 'he conditions sot forth erein, i .9 _ THE BOARD OF COUNTY COMMISSIONERS WELD , COLORADO O U O 0 7_ • .-t ii 03 fzd� m .• dX3'3D.It 0,153 4,1 a a z > r G x i o b O N n y m 0 m A A >> A x • AO O A -/ > O r • m N O -I !7 N m O• < I z I m -4 If IIb ill-Ir 11 IN • P:L,J�I, I\ IIWI &L- IG IVO c —IN I� Iv I�11J, In I t !v I I r 1 I I. 1� r- -I IN I I I I� A IN, 1 1 IIC I 111, I 1`I Ovyl If Imo; 1 I zrJ1 I I? -1 INm `I I{ r Ivy I 1 I\7 m 1'` 1 k I 1 x 0 11 it , i D o n_ x O I r z I a -A I K M < It o N1 -t m x 1 I • m 9 1 1 I O Daw I N I'- i S Iif ICI- Ir.,I -4 O r f• z O , C m 0 O 0 MOUNTAIN STATES TELEPHONE CO a 20' 04.),_..m1/41 POLE .9 54 s E. 0 Is n 1 (a 0 I 1 H n 0 N, \ 25C -10o —I•az— r S/ &/7 24✓ L PL 'D " LJIR E TERM TER/1 1 55- 1 I CO S m 0 Permit No. (f 7 Date August 22. 1972 CONSTRUCTION PERMIT 1. Type of installation Buried wire 2. Location and description of work Buried telephone wire T5N, R.64W, county road East and West. 1; miles South of Gill 3. Estimated construction schedule: Start• 8/28/72 Permittee: Mountain Bell Complete• 9/4/72 4, District: Greeley Address: 2701 9th Avenue Greeley 5. Telephone No. 352-5800 6. Project No. 9E-575 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 3. Special conditions- SEE ATTACHED PRINT - All barricades and/or other warning devices used in any construction within public — 9• • Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. — 10. Issued by Name and Title 11. Final Inspection by Date Name and Tine NOTE: If dissatisfied with construction performed on this job, please call the following people collect, In the following order: 1. Supervising foreman J. Martin — Greeley 352-5801 2. Division construction manager H. Boatright - Denver 266-7444 3. Colorado plant manager W• Horton - Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permitter shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permitter will do so promptly at its own expense upon written request from Weld County. Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right -or -way limits. Date. By: THE BOARD OF COUNTY COMMISSIONERS ittee, verifies that he mittee- . nd that by chance Su In accepting • permit the undersignrepresenting the foregoing provisions: that he has authority. • sign for and b - is bound by all the conditions set forth herein. d and understands all of the his signature the Permittee II I n N N Z 9 i i o m x l O b p N O i 0 I m O O m z D A D r x an Y O A < 0 'i n x ti -1 v' m in [ H z ~ m I rr O in 1 ° I 17 Iii f`_ .� 11 1 v I I ' 7 I',) r 1'• ; i 1 I 10 1 i �' I Is I' is I w I I I �-. I;-_, I'll I o I P 1 I •1 I I{ I{ I I I i I I of I I 1 xn.I ) 1 I r.r I m13 I.' I I(/ I I I I IQ (", I I r 1-1 I:) I 1r I I I m I;) if — I IO I m f iIF If- o I. 0 ' c 1 I x c v a I : > ta cc, 1 I < IIZ I I m ≤ I I I I C� I r1l i 1 I Iv( I I 1 O 1 �ih -I 0 -yi I' i o 0 > x m r I' r m 9 Ni I o I \ m h 1 a II I I I 1 ' I z I I .1 I 11 I I 1 I I s i I t i I n r b O % O a in 11 I 0 3 fl F FOC (31 Ito I()I > I p? o Iv I 'u o f < 1 -i I U1. m I"' I r o I o I, o I r - I' c l -i 11 C) I I IrA r I • > I0 I r I I I I, m N;, L I I$ 2 0> I H i:� . I m - m I L{ 1. 2 f 1 O P P 1I in rit n tal. I I '7 ( m I Ixn ` i i>I o I i m 41 'I, I`'` ! `1 (; ' t' 1,.. I 1 I O O C z Z m z O z m n O n -I1> �z 11 00 0 I 'w z z 0 a n £. rn ➢z 7 z H ' 0? I 7 r HI; (.9a ' 3� r rr I I `P Z I >ri i 11 in Z _n I p C '''EA. 1+70• '— — — — —1— 'N I; .11 a .,In II � C XI n 21 J ri •' II 1 TO C.C). STA. 15+1'J Permit No. Date CONSTRUCTION PERMIT August 22.1972 1. Type of installation Buried wire 2. Location and description of work Buried telephone_ wire , Highway Al\ East on road #46 700 feet 3. Estimated construction schedule: start. 8/28/72 Permittee: Mountain Bell complete: 9,(4/72 4. District: Greeley Address• 2701 9th Ave. Greeley 5. Telephone No. 352-5800 6. Project No 2E"523 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permitted and Weld County. 8. Special conditions• SEE ATTACH© PRINT All barricades and/or other warning devices used in any construction within public 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. 10. Issued by etty l '�" - Date: Name and Title 11. Final Inspection by Date• Name and Title NOTE; If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J • Martini-Gr e2 ey 352-5801 2. Division construction manager H. Boatright-Denver 266-7444 3. Colorado plant manager W. Horton -Denver 266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation, 2. Permittee's facilities shall be placed to a location mutually agreed upon by Permittee and Weld County and SP accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of ouch installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said Installation In the maintenance of the highway or to the installation placed inside County right-of-way limits. By: __ l Maintenance urervi.or THE BOARD OF COUNTY COMMISSIONcRS WELD C.OU , OLORADO 3 -/' In ace this permit the under- gned, representing the Permittee. verif s that he ad and understands all of the foregoing provisions; that he has autho• ty to sign for and bind th Sttee• nd that b virtu of his signature the Permittee is bound by all the conditions set forth , erein. P-76- 7_2 - Permit No. Date 449 CONSTRUCTION PERMIT 1. Type of installation Buried Wire 2. Location and description of work County Road 1 28 - One mile to I-25 3. Estimated construction schedule: Start 8-18-72 Permittee: Mountain Bell Complete• 8-31-72 4. District: Boulder, Colorado Address• 2775 Valmont Road 5. Telephone No. 442-8223 6. Project No C-2-0754 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. .1/2--- C%7 A S. Special conditions' AA' �2 - - 4 0.P E ',`, 1 All barricades and/or other warning devices used in any construction within public 2 Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for 10. Streets 2, Highways 1971 and any state or federal revision thereto. Issued by -eje Name and Vele Date. 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman R. T. Wilcox - 442-8221 2. Division construction manager B. E. Boatright - 266-4479 3. Colorado plant manager C_ Phnlpn — 266-4681 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittec shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence - 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO • By: i accep &ng this permit '4.he under ned, representing the Permittee. verifies that be has read and understands all of the foregoing i _ one: that he has autho ty to sign for and bind mittee; d thazby virtue of his signature the Permittee is bound by all the conditions set fort herein. 1000 X 2 = //dtO S),IIC t�l� iK -- 109 .V r - 14 004 344y O XO ,r 0 Cr S� : Ai iW I ti r ■�oQs_I �� r enil O W,... d _ _,.E 9S 1 y (€4. lirMgr . -, a Fang Ill ellIMI MN II IIIIMinnillIIIIIIIIIIIaisammill IR ..y} re a a Al anusinaus - a P N N w Alv V w a Y N N a P M �! N O N N a a 'r .. w a v v j> !i P 00 2 a a a 2 a _.��-�-.- ... . 5 O N a O S 0 O O O Q O d 0 0 0 4 0 0 • O 0 of O O o C P - - O O o J O O C. O , o a e 0 d .. O O O 6 .N 0... 0 o o 4 2 O O o O O w A a 0 0 j 4 Mr jtj O o O a O O O O 0 0 0 r 0 . 0 44 0 M rf tt 1. 0 N M 0 u' 44 0 S 0a it N M 2.4 G{ k N a Q. s v n 4- 4 . M f W J Y O Sy a *I 0 N Y Nre .. h y t r (F a a s g 44 a E i Q a A a Cr 4 a ` s - r; ' • . a a a a w a a w w w e PS N 0,0 N N M b . N N I-IIIIIIIIIIIIINIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4 w a a a a t a a a a N M N p 70 a a a, N O a•_ a p. •[ 0 v N+ : v N : H h w■�i� a 0 p 9•" a • ..._ -i+- /O 9.y *-- - D 20 S ►JF L./) 'J C3 trs N- • • m I \ c 07 NiTho // X —23 —lir. )2J — ZS" if- a,≤ -ii s t.r© Ai/WAY 64 s/ • s8z t N w 1\ 6 ti 14 N es-soox'2 =�f �. f.--- -- /G9 ,v o d o 4 a it in —/09// 10 5 X LEAVE ill C.S144 X 2 = JOit. !v!Y!4_1XQJ n Yc a PIPE Lint' R a t a h z 4 c t`. Permit No. Date 1. Supervising foreman 2. Division construction manager 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility Construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be Utilized and obtain the County's concurrence. 4. permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements oI the Current National Electrical Safety Code. 5. Fermittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety_ S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rlghtof-way limits. CONSTRUCTION PERMIT 1. Type of installation Buried Wire 2. Location and description of work County Road if 32. two miles to I-29_ P1are buried wire to Wm. Doke residence. 3. Estimated construction schedule: Start- R-1&.77 Permittee; Mountain Bell Complete' a -1R-77 4. District: Boulder, Colorado Address• 2775 Valmont Road. 5. Telephone No. 442-8223 6. Project No. C-2-5133 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County, 8. Special conditions' 9. 10. Issued by All barricades and/or other warning devices used in any construction within public A Rights -of -Flay shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 �annd any state or federal revision thereto. ' rc1•- VCL Cam- Date: .. _.. _... _ Name and Title 11. Final Inspection by Date' Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: R. T. Wilcox - 442-8221 By: Maintenan H. E. Boatright - 266-4479 W. J. Horton - 266-7455 THE BOARD OF COUNTY COMMISSIONERS In a:.ptin; this permit thUndersi:. d, representing the Permittee, verifies that he has read and understands all of the foregoing pro • •ns; that he has authorit to sign for and bind the. P.va*f%tee; and that b virtu f his signature the Permittee is bound by all the conditions set forth • rein. FED if" ° U pa tram ■ ?�.<< y. )1. | ( Q 2 I 13 k ) /. , ) 0, $ | \| 2 a 2 2 . ; , t | I. CA ! A•i /� \I f�� ) 1aI i |k\/4.. < } ! 7 @, I I | m All Q(j�1 -o *`[l/-|%, %1 7 &• t,•&, ©|c; % . ` I § « in.s.- / « # ...... 73 itita. f/ .,<| % • \`�]|`|'�: illI /• a r ! |', o ( 2 m ; A� f|r \$, y /,p �i' � /q/k ,.I &c|d /§ D o § \ ; t& % ,\//i-0` • o - % • a«Ra!|C !i<! ; & %r&t,; ©�mR ; | IX i / i k |Q — ,•t-'|'!® �L. t fl fl | � , I ' 15 } ( ' I ,�,, A I jI / § ; / IN I \, I |§ \� 1 1 ' ' t � I Permit No. Date s-9 July 28, 1922 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2, Location and description of work Y rk__lOrekt4 1n 47 a last -..d 7 Maloo h o€-}ier€eTd Colo. in Weld County. See attached. print. 3. Estimated construction schedule: Start- September. 1972 Permittee: Mt. Bell Telephone Qo. Complete• October, 1972 4. District: Cheyenne Wyo. Address• P.Q. Box 428, Chiyennn, Wyly 82001 S. Telephone No. 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by Permittee and Weld County. S. Special conditions• See attached print. (307) 634-2593 C2-5056 All barricades and/or other warning devices used in any construction within public 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. 10. Issued by *���G� %',�/// ��'and Date Name and Title 11. Final Inspection by Date - Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman Mr- R- P- Runt-.Cateynna 307 634-2792 2. Division construction manager Mr* F. W. Aensolt - Cheyenne 307-632-2911 3. Colorado plant manager V. HQrtQn - DPnver CO- - 766..7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Pormittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMeSIONERS WELD COUNTY COLORADO By: BF Kainten y e . uun .y / -ea., • In accep_i_ fs permit the .•,ers , ropres•n mg the Permittee, verifies that he has read and understands all of the foregoing provis. ns: that he has authority to sign for and bind the Permittee; and that by virtue of his signature the Permittee is bound by all the conditions set forth herein. 1 1396 + 68 W t 323+3Z EO,FOAD di/O,3 h (i3?73) /3L2+59 Permit No. Date CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work See attached copy of job print. 3. Estimated construction schedule: Start• 7-24^72 Permittee: Mountain States Tel. 8, Tel. 4. District: Boulder 6. Telephone No. 442..8223 6. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions: - All barricades and/or other warning devices used in any construction within public Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. Complete• Prior to 8015-72 Address• 2775 Valmont Pd.. Boulder. solo_ 80342 10. Project No. ____ . 2-5149 Issued by Et/ , lt.my and Title 11. Final Inspection by Name Jana Title Name and Title Date - Date • NOTE: If dissatisfied with construction performed on this job, please e call the following people collect, in the following order: 1. Supervising foreman R. T. Wil Goof 14142m=1_,_ 2. Division construction manager H. E. BOatri$ht 266 i'79 3. Colorado plant manager iiie T.:liorton 266-7455 PROVISIONS: Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all berm during utility construction, improvement, location or relocation. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code- Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUN S OLORADO 1• 2. 3. 4. 5. 6. 7. S. By: 6Z- i O- g T Maim:mer,e. u0'rvia. �- ln accepting I -permit t.e u.,:.rs , epre e t g the Permittee, verifies that he has read and understands all of the foregoing provisions; that he bas nut ority o sign for and bind the ee; and at by rtue of his signature the Permittee is bound by all the conditions set forth herein. ` lor bitOinfrita CAM x::11,: Prt tic/21/4 Permit No. qso Date �' �-lt /7 19/2 CONSTRUCTION PERMIT 1. Type of installation 2. Location and description of work / 7 /?72. 3. Estimated construction schedule: Start* Permittee: 4. District: --� t 1.1, R. Telephone No. f -L'1- /9S , 7 6. Project No. .,27;,,t•ma Complete: Le /7 /77z ��. Address: 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8. Special conditions - All barricades and/or other warning devices used in any construction within public 9• Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. .r r, 10. Issued by e2' ar .W� - -e 6 Date: Name and Title 11. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this Job, please call the following people collect, in the following order: 1. Supervising foreman .`ri<- 2. Division construction manager 3. Colorado plant manager PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be lees than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such Installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUN ,; OLORADO Date: By: Maintenanc In a pting this permit tbY' undersiv .., representing the Permittee, verifies that he has read and understands all of the foregoing pro font; that he has author '' to sign for and bind the ermines• d t by vir ue of his sign a the Permittee is bound by all the conditions set forth erefu. / yc� 1, / t .4 10. Issued by - i1 (7,1€1. %C/7,2 CONSTRUCTION PERMIT Permit No. `I- t 7 Date yr.Yt/ ♦r /77t 1. Type of installation „Lett 9k Lb* 2. Location and description of 3. Estimated construction schedule: Start' / $ / p 71 Permittee: Vrt Complete• 4. District: - :,t ° '� t i Address' 5. Telephone No. lc P6 4-75/4 / 6. Project No • ,. Permit granted subject to general Permittee and Weld County. S. Special conditions• /172 w� erE n , provisions listed on the bottom of this permit and other special provisions agreed to by All barricades and/or other warning devices used in any construction within public - n, Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. - Date• cor Name and Title 11. Final Inspection by - Date- Neme and Title NOTE: If dissatisfied with construction / performed o this lob, please call the following people collect, in the following order: !/ 1. Supervising foreman c if 2. Division construction manager /J-_SeM i 3. Colorado plant manager &As PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours In advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable Interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightofway limits. By' THE BOARD OF COUNTY COMMISSIONERS WELD COUOLORADO maintenance In aegeptidg this permtt-tlie undersigns representing the Permittee, verifies that he has read and understands all of the foregoing provisions; that he has authority o sign for and bind the Permittee,; and t t by virtue of b1a signatu;e the Permittee is bound by all the conditions set forth herein. ti gig -- Permit No. Date July 13, 1972 THE BOARD OF COUNTY COMMISSIONERS WELD COUNfl,,COLORADO arer the undersi ed, representing the Permittee, verifies that be has read and understands all of the CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Bury telephone Cable along County Rd 49(Keensburg Cutoff) and west on EE.stons Road 3. Estimated construction schedule: Start• July 17, 1972 Permittee- Mountain Bell Complete• Aug 17, 1972 4, District: Greeley Address• 2701 9th Ave., Greeley, Colo. F. Telephone No. 352-5800 6. Project No 2E 381- 7, Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. 8, Special conditions: See attached print fill barricades and/or other warning devices used in any construction within public 9. Rights -of -Way shall, conform to the Manual on Uniform Traffic Control Devices for Streets& Hijhways 1971 and any sca:.e or federal revision thereto. 10. Issued by Name and MU - 11. Final Inspection by Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: J. Martin -Greeley -352-5801 1. Supervising foreman 2. Division construction manager H. Boatright-Denver-266-7444 3. Colorado plant manager W. Horton -Denver -266-745S PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement• location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be lees than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 43 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7, Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the rightof-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date • Sr / rlldniotensnee In ac ant, g this pIL foregoing p ovi ions; that he has autho to sign for and bind the Permittee: and hat by v his signature the Permittee is bound by the conditions set forth herein. • Date: 1" is 390' '-c____.1 G1 C X05 • p D. X CC NE` ? 01, -ry ,'v c I+ rr PED 31x.2 PE D _910.B w Ur el • (y r - F 7-1.31 u t NLo -r: N C Li r r (p S r C n -xn W. F m O it C u' 2 T H tp -< C '0 P 0t9 n n m Z 1 O A m H m m m 0 1�5h1Vd 3RO U O1 rox N C L' JI\ LP Cu' N J -t—RL 13 IH • LC_ OGIL;En 9214' 557 • DIRT P,DAU HI3G-to PR a IS-(oH yl-4 Co EROTpNS ROAD E & ONE RUN•LOC--Y 9 a ' . I 0 --dX3'3O1N 0,153 I PI 0 > m-z__r—n. In a S 2 > 0 Zr; 0 0 a a > > y m A 0 0 A y 0 Z m m N y O ,o m O K I 2 I I� 0 1 it • I I I L'- I, I� I Ir IG7� IJ ICI I I�Ip 1� I I' I I II.n I'll jI: I I I I Ir IIIr- -rI I r z I rnI..<q-n • t F :zi I.0 C IC -U 1 Ir- ::I to rI f 0 O m A V '- C N Z m 0 m I I A - 0 I n O < r 3DNVH0X3 0 m 1V1S NIVINl0V N --I m -o z m n O ti m O O (CV I 1 .T flf 72 Permit No. Date YI7 July 13, 1972 1. Type of installation Bury telephone cable East and West from County Rd 51 on 2. Location and description of work county Rd 34 3. Estimated construction schedule: Start. July 17, 1972 Permittee: Mountain Bell Complete• Au>r 17, 1972 4. District: Greeley Address• 2701 9th Ave., Greeley, Colorado 6. Telephone No, 352-5800 C-2-5170 6. Project No. 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. See attached print S. Special conditions: All barricades and/or other warning devices used in any construction within public 9. Rights -of -May shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. CONSTRUCTION PERMIT Buried Cable 10. Issued by Name and Title Date: 11. Final Inspection by Date• Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Martin -Greeley -352-5801 2. Division construction manager H. Boatright-Denver-266-74144 3, Colorado plant manager W. Horton -Denver -266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures Sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plane. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be lens than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required fcr construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation inthe maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY COLORADO i / Maintena.• peroinor In 3qconfine this permit enders,.. , representing the Permittee, verifies that he has read and understands all of the foregoing pwisior:s: that he has authors to sign for and bind th tee; a that by sir is signature the Permittee is bound by all the conditions set forth ereiA. far fi C) C� - I-4 .1 F • - 3 3 z n - 9 -r -1 : O`+ G 3 • 6 Icri tl T N N Mr C ✓ 8 u a II II 0i I 1 �^. C$ e re .O• n o > i; m o •• ; 3.3 f> y S i it ' m. 0 n: s I� $ n < r • •" I^ nn ^ ft.T N IN s 1 N I i I • e IITI I�IU IhIIC' H a 'V n I lc'I'i11�11sI,'?. �\ lu K. I(° In IN ' -,i ;32, ? ilf-ITN � Ir\ r *11 S 4 I tlll I o 142 1 I. II n i1, t4���. I • IW o PH\ ni 0 -NCO D/-4 STA Oho& ' 60 2r.a _.. -.'fN 2>OO COwAA/ 1� tt-e1 ev tors k OFF/ce 8z �` - I.G4W '°CO 93.2 z r,c /C. /CO Paz? 9d. a STa. *CoZ -IR 37 !:L /!f•� n4, tG 00/27 Si vF r ('r G4 4 Car -n./, fD tor E<EVNJ t 0 x\ f `r21 C•. 5 ?l E CA, CLo$. 4 29 _C'LO Ju r o2 -1 Zs' JU 5 oL 7R rte.. /ox to /ow „C, C,..,,,_,_ Pntors: To CLoS, ✓ -J N n 0 cy Aid 77 (� f %6:71— Permit No. Ci Date July 13, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Bury telephone Cable from County Rd 46 South on County Rd 29 3. Estimated construction schedule: Start• Permittee: Mountain Bell Complete: Aug 17. 1972 4. District: Greeley Address• _ 2701 9th Ave., Greeley Colo. 5. Telephone No. 352-5800 6. Project No. 2E 406 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. July 17, 1972 See attached print S. Special condtttona• All barridades and/or other warning devices used in any construction within public 9.: Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets 8 Highways 1971 and any state or federal revision thereto. 10. issued by Cr .1(° Date: Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, In the following order: 1. Supervising foreman J. Martin -Greeley -352-5801 2. Division construction manager H. Boatright-Denver-266-7444 3. Colorado plant manager W. Horton -Denver -266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, Improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and to accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all Its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County. Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County rightof-way limits. By. Maintenance for In acce, nG is permit t undersi • . , ., representing the Permittee verifies that he has read and understands all of the foregoing provisions; that be has authorit to sign for and bind the is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNT\'CJOLORADO // y .�wAr.re IPIP.t 7 -1 4.te • and at by virlae'nhtifa signature the Permittee Z Pr j - Z -C -Z i§§ok)(§ O ii § § o , ; <O , 0 _ § 1-, § - 1. § ° k [ / / ; I}§I' I\/\ 14. � \/ IIr / k: k & c I I [ ° / . I , I at 6 I. M/ \\/� \/ \ciut,! /§\ I , J / � > o ` 4 e \ 6 R I , ® °� I h 2 7 § \ L ; • - t .® k< §E -1 01 I & [ ni < I \ § \; ( [ | ( x N E, , ®, { , § F-, CI o • \� r a ; 2 I-: o K I�° I \. /\| \« I E r r © ) : • ; \ Ir, s I33 of ! C C; c ; a | ) / ) / \. i < I r GI k E/ , (L \\;)2I i (i % % m i 1 /[•§( Ik§' ® t I \ ! k §| ) § \ - ' I O \ p ®IgI\ |,\� 11 I I " \ � . J. |:«L 2 ±.P- 2« /Kt.Z W7/2- SLY ,rte C<os u Re: Permit No. el VS -- Date July 13 r 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2. Location and description of work Bury telephone Cable from County Rd 14 North on County Rd 17 3. Estimated construction schedule: Start- July 17, 1972 Permittee: Mountain Bell Complete: Aug. 17, 1972 4. District: Greeley Address• 2701 9th Ave., Greeley, Colo. r,. Telephone No. 352-5800 6. Project No. 28 4-51 ^.. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. See attached print 8. Special conditions• - All barricades and/or other warning devices used in any construction within public Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. 10. Issued by 11. La( Name and Title Pinal Inspection by Date• Name and Title Date: NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Martin -Greeley -'152=,801 2. Division construction manager H. Boatright-Denver-266-7444 3. Colorado plant manager W. Horton -Denver -266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By. Mainte In nep)ing this perm t0 the tinders! d, representing the Permittee, verifies that be has read and understands all of the foregoing proWsloes; that he has auth y to sign for and bind the PeTh4ttee; an that by virr urufbhIs signature the Permittee is bound by all the conditions bet forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO n 4, n n>a o : a n i 1'1 < B i(L�n s a n 1^r eC PL °n aP IN IrL^i N e ‘1" 1 I. tic s m I' I - I � I ✓i k r I` I 1 a � 1 • I) Ce. 6WA N -I 453. ,- 3.G* /j not, /7Soi co..r rrn Sa Coen sr J3 .off \!1d I9 SN C? O n O I C4 -1 Ir 'I N see DIrc S' veer B' COVE 2 2O •14 f, • • .' i 2/p-; 7 749Permit No. H tit l Date July 13, 1972 1- Type of installation 2. Location and description of work Exit; Bury telephone Cable county Rd 17 west to lake (located 4 miles south of Windsor) CONSTRUCTION PERMIT Buried Cable 3. Estimated construction schedule: Start' Permittee: Mountain Bell Complete: Aug 17, 1972 4. District:—_Gree114y Address• are,Greeley Colo .5. Telephone No 352-5800 6. Project No. C-2-5173 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. See attached print 8. Special conditions: All barricades and/or other warning devices used in any construction within public — 9. Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. _ July 17. 1972 10. Issued by Name and Title 11. Final Inspection by Date: Name and Title NOTE: If dissatisfied with construction performed on this job, please call the following people collect, in the following order: 1. Supervising foreman J. Martin -Greeley -352-5801 2. Division construction manager H. Boatright-Denver-266-7444 3. Colorado plant manager W. Horton -Denver -266-7455 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3- Permittee shall inform Weld County of construction methods, equipment and operations:: procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 3. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee. If final joint inspection determines additional corrective measures necessary, such corrective measures shall he initiated within 30 days and com- pleted by Permittee within a reasonable Interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. Date • By: Mainten uoervisor In a . epti g this perms the unde geed, representing the Permittee, verifies that he has read and understands all of the foregoing provis ons; that he has ant rity to sign for and bind the ttee; aryil that by vi q ut-.e his signature the Permittee is bound by a the conditions set fo herein. THE BOARD OF COUNTY COMMISSIONERS WELD COUNTY RADO r; ne.-,r- 4 n • r z N rn m y n m vicn y y n m o in a • l x I 0 1 0 ro I -- F rl In1 hl JJ0 U1 I5 1 la n Nb O It, G el I� 0 U 1+ z a it 0 a P m O L I; i h 1 I 1 I Crt , 7J ; I I I NI o +1 9 n ✓ n IS > is TI IS o lu c 10 r , n o a I a- I [' Ib I I I � 1 J r 0 y m m a 0 r n m c>> n' I r - z zF: ▪ II n 0 1 1 I 1 I I 1 I I 0 O z Z Z N > W m rn 1 rn r rn -o 0 z m n 0 rn 0' 0 -n 0 8 W� on - 1Z O RO W n L\ 0 > ) z n u n fi F II •3 ✓ N C - n < Q f - ri 1y0 t r1 2' X I_ 4 - • C-1 N S'l RI__ 4 - 1 28C •=200#2- -8.5W --... LC O04GO County Ed it/7 O E G1 6' N CD O Ft a G l i, D320 (� 1its Eo{ I UI i�'V �+ i r_ ; ��>T nil) 29.0 (ASPbi `i-) 1 I r POW. POI.r-_ TIE ONLY Fa O 2.8 .5 X Pow, Po L TIE ONLY w LT r 0 19 0 E'Q 2Ow Note: Please leave permit at County Commissioners office to be picked up by Mountain Bell. Permit No. 'A37 Date June 29, 1972 CONSTRUCTION PERMIT 1. Type of installation Buried Cable 2, Location and description of work Bury telephone cable west on County Road 33 from Platte River North to 600 Ft North of Evans Bitch 3. Estimated construction schedule: Mountain Bell August 5, 1972 Permittee: Complete• 4. District: Greeley Address: 2701 9th Ave 3. Telephone No 352-5800 6. Project No. 2E 453 7. Permit granted subject to general provisions listed on the bottom of this permit and otller special provisions agreed to by permittee and Weld County. a Special conditions: See attached print All barricades and/or other warning devices used in any construction within public 9• Rights -of -Way shall conform to the Manual on Uniform Traffic Control Devices for Streets & Highways 1971 and any state or federal revision thereto. start. July 5, 1972 10. Issued by Name sea Title 11. Final Inspection by Date• Name and Title Date: NOTE: If dissatisfied with construction performed on this job, please call the following people collect in the following order: 1. Supervising foreman .3. Henry Greeley -352-5800 2. Division constructs^n manager H. Boatright-Denver-266-7 444 3. Colorado plant manager W Horton -Denver -266-7k5 PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. 5. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. S. Permittee shall return the right-of-way to its original condition as near as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary, such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the same may result from or arise out of any act or neglect of said County, its employees or agents, 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation. Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. By: Mainte .n t Supervisor I. accepting this permit the und- gned, representing the Permittee, verifies that ho foregoing provisions; that he has au.•.r'ty to sign for and bin cyt r zmittee; )N}d that by is bound by all the conditions set forth herein. THE BOARD OF COUNTY COMMISSIONERS WELD CQ JY, COLORADO L nd understands all of the a signature the Permittee `) O O O O O 1 IU O 0 C I a 1 l phC -L ul a/ 91V1S NIV1N 1 IJ m 0 8 n V Of DO /2t•SD 472)/171 N(JSNN 01' tit • S 0 z is 1 1 G i • iv Permit No. Date S-110 7 a, CONSTRUCTION PERMIT 1. Type of installation P}u 4 C cs,*. 2. Location and description of work I le g ' s - \Gr K ..$.CC / Tc•cv.rcil« / S'Z.CZ /1' J,e C F oloat 3. Estimated construction schedule: Start• Permittee: V at..reAn Irbs9. complete• ICI - R- 7 a p .. 4. District: tiAddress- i i r% c 0 "^ 2 A � . . ,Q �y f,��y�� F. Telephone No e+� 10 is ' r c 33 � 6. Project No, Ca-tai63 8`oZl'q 7. Permit granted subject to general provisions listed on the bottom of this permit and other special provisions agreed to by permittee and Weld County. S. Special conditions• 9. Applicant• 10. Issued by By: CIA. l,]wOOCLaw Yi.1 C -e ame and title Name and Title 11. Final Inspection by Date: Name and Title NOTE: It dissatisfied with construction performed on this job, please call the following people collect. In the following order: s- tin -1 a 1. Supervising foreman 2. Division construction manager Date • Date- &a5l T ..� i< Env.. c. . .,Y. 3. Colorado plant manager ._._ Ce\ - - at1O.-O"r--6-rtn-- PROVISIONS: 1. Permittee shall be responsible for establishing safety measures sufficient to protect the traveling public from any and all harm during utility construction, improvement, location or relocation. 2. Permittee's facilities shall be placed in a location mutually agreed upon by Permittee and Weld County and in accordance with details and specifications shown on the construction plans. 3. Permittee shall inform Weld County of construction methods, equipment and operational procedures that will be utilized and obtain the County's concurrence. 4. Permittee's installation will be in accordance with accepted practices and will not be less than minimum requirements of the Current National Electrical Safety Code. F. Permittee shall advise Weld County 48 hours in advance of the date work will be started and shall notify Weld County a minimum of 12 hours in advance if this date is changed. 6. Permittee shall be responsible for any repairs necessary as a result of such installation. The maintenance responsibility of work repairs shall be an obligation of the Permittee for 1 year after final acceptance of the work by the County. 7. Clearing of trees, bushes and other vegetation shall be held to the minimum required for construction and safety. 8. Permittee shall return the right-of-way to its original condition as neat as practicable and shall remove all its rubbish and debris following completion of construction and before final inspection by the County and Permittee- If final joint inspection determines additional corrective measures necessary. such corrective measures shall be initiated within 30 days and com- pleted by Permittee within a reasonable interval of time considering the circumstances. 9. Permittee shall hold Weld County harmless from any and all claims which may arise from the construction and mainten- ance of Permittee's facilities covered by this permit, except as the setae may result from or arise out of any act or neglect of said County, its employees or agents. 10. In the event any changes are made to this roadway in the future that would necessitate removal for relocation of this in- stallation, Permittee will do so promptly at its own expense upon written request from Weld County, Colorado. Weld County, Colorado, will not be responsible for any damage that may result to said installation in the maintenance of the highway or to the installation placed inside County right-of-way limits. THE BOARD OF COUNTY COMMISSIONERS WELD COUIW. COLORADO I By• Ye4 'C �a �irf1<<:�Ct. � �J l Maintenan Devisor CSC In acieptin, this permit he undersi:. ., representing the Permittee, verifies that he has read and understands all of the foregoing pr. s; that he has author to sign for and bind Permittee; and that by virtue of his signature the Permittee is bound by a he conditions set forth • erein. ...i e -2-6/L3 srA 52 X92 1* 0505 yazK vIEYarEs STA-c 0 K ON *WC*. LA/4c. PC -74 t4s z4-44-!' tor46 OH St, LNGa 4 r*MI0tC6 Jrf 1-"Uki5 — 8fz L'-iG C4 5cZAz'EL A +"7-7aP°lb ?13.L01 921 ro�ss,v+rr+)a.- 3alnV3Z+ G co v U. 6\ ) T C1 n B U C v Q t\ 1' Nat S-siNSMV&L z. r\ rn © LJ1 t w C --- Is - Fri rn 1 -Iii 1 P"--' , P70 co no l Zcn r c r • 44. is -14 kJ Co La • + 4 -t , Fs - a. P 'I N O Cl? W -A 4A) N-1' , c,, O 6N, y. GO E. el 4 9 C'' Sa x3 ' c n d o r'1 co c F CO ii r L m n 2 Y T to :. L, N c V }� 4If C, 7 A a ccs t O w r • W P -U W iQ .5 2J:Cc cifl&.3 T PLA C,C D OX 2C a -- "'Cc' Celt. L 0 ; C. fi • tLL 1POD 0,lfi y c w b c f9 ro a 02A0SddY C n 0 i N 11 IS NIYlNmal -n 0 v g i :.ttc3'A TOnSti3vA 01 +,9a£f + -r7Cl A°Jb }r .4- ?fY.i-bno 21 !urH9 SO ru z a rn • rn rn 3, o 'CO C7 i1 Ac.COQ4TMG Iar- CAeLL c ess s Co-JNTY LJ..t C t-itf\50RE.MC:41'S i flD?c/} r Ea ASQUE Exictla - 25 4:517_7_s- M/ 20/ -226 L AvAo7es $TeT"0..1S STA lO 32. A wiar“ 51441/41. IONS oa Eft L#4 E. E NOILSE r G T ` r `fit? G, 9F yr v C N a 4 0 1, \ , pc. 2so-za r , 1 < cT/JNrlR cuc.vE4r P1 br$ S«43U v✓, 214 - i✓G K SH 'A- ( -'.-7'-I ` D m re wth xfzvt r 3't.1 a x \1 ('98') CONT ON SH2 AO Mils C '. 7c - C.O4.17- Aso ✓E R/1/77 H C LOS. */4.480 r0 a as -4 - O /-/.e # / /,s&c5. W I-ZS-ol.t 160TH LS/-e7Si 42x•a0O 1 p a M y 7 Z Sr 0 z 1 w o 6 a a s i i yS r n a 0 0 a -t ,� ti 0 A M v\ a O IV < A Ii O 0 i }� f 1 w 9 w x 1 ' fv lZl' I 1 1 IC E p l I 1�, I I 1 In1 If 1 1 I's. I 1 F-- (1. I.., I C 1 I y r 15I I 1 Ft S. I 11 I Q I I. I* yi7 id-` I I 1 I s 1 t IC 1� CI Ir' I I I I I w 1'? Iz r I Of a I IN IC 1 I I n$ j- I c IZ X ,(�, o y f a 1 1 1 0 I I t 1-r < 1 ! ;C T � It1 1 I IN I j I , 1� j 1 I'1 l i - 1, i' a e. N.IN. I Ir.r 1 °CO ' x ^ is 1 . y I II' I r N, I�+T a sr-, I i�t r � r I� S r;-- 1 1 ` I. rs I • o IrjI 1 I 1NL • I 1(1 I ( I ' 1 I r I I 1 I I`fit• tri r ; n p " # 1 I s i Pt p o 0 l a a I I-. VI PI flit I I I o r! 0 1 i II U 4 j'.s n > 1 1 r r a I 1Iii ` '2r IU L 1 Itp r 1 1 1 • O a 1 i 1?I.1 -31 1 13) 1 , f\I 0I f I i I'C k 1c' ; w 11 19! 1 I I ' (T t 2 A C ran O z 1' S 3 N 0_ > t' pSi z O /N N Y/1 1 N '�t • - -•C r- L c ' o Le ! _i 1. i pi a-- t; r {O i 166TH —4' 9 �ut �� ig S1 -- it. z - s n S 1 • D U W I-- -- x-- -. \-\ - _ S M N W 1,^` J± 3 t U U* to N r x S. z t.N wP • a * W is col X. AQ;ari - 4. - P 4 'O 0 Q W O1 x3 Ia i c. 1S1- cco$QC " PL Lo rll?z c.ifis rf .0/a MARSH 't12L6 /.rl 4..C*An r, „ \/ACt rE r X 'MCA. re - :TA, .c' G tG %/ACE: u.!--); X VACATE F! AL p Su,.;.oa c N rt • WA RI m a )(II r a = pm N m a 9 Z > 0r m -I • p 7.O n A.. -Si) r. ✓ ▪ a r O5 u a p lo u n _- i A in a = M ? Pi 1 1 I t x t t I� i, 1�- 1 a I i Alla- It , 1 \ K. I, 1 I'kf I I .4 - ID I a 1 r r' I I I • 4' i � m I I I I- I _ :hi IJ' 'p N. I O r I' I li o= I'• i I I y 1 i y I� m .; {� I m II ti {? I I' I no I 1 I' I` I A >< I; I c i o > 1 I o {�{ 154 I ...c';, I > ▪ f1 ° I 1 .... ` 1 N I I\ m l i 1= 1ttl 1 Ili I I 1^a I; I' I i I OI I 1 lo -I% I 1; ..` ti p n a I 1., . I:6 r �'I ^ 111D 1.^.7 I r lv VI < <, 1 ,� �1 O I' - �� JW I x z I 1 i �' ? �Q I1 I G. I 1 I I ``V_ � IV NA i I N I ` e 4" L .N F I tn I- c-; r v A O C N I ). . o; A* i p c 1 A ll''i I m 1 i o o I, I<_ f" ,moo (In 0 C° I- I• I�1, , C IC l�LI\16` I+I i r ty g 'L I1' It xi I 11 1 L SI • r z 2 I I I rIA z VII - 5:l 1 NI PNo a kko!��� �IONf _171 ILI n •b I ;,� 0 O I. I i HIV It r,� 1- �1 I 1 IN + 1 11` 1 N' I 1� _IxiIJI I ' I I� t I r 1 1 l t I I I r z U, 1 1 m w Y r, f• \ P k ?3 O X P 4 kS u PTE I n PE ..1 PG Pro PtJ 1'!L * 9!3 914 ➢A. p(% 94; aCt ➢20 P Z! 944 P(c3 loz PG0 9 u JAV 9V'7 O JV a z Z � V A Z C' U h1 r G c Hello