HomeMy WebLinkAbout940972.tiff RESOLUTION
RE: APPROVE IMPACT ASSISTANCE PROGRAM APPLICATION FOR WELD COUNTY ROAD 19
PROJECT TO COLORADO DEPARTMENT OF LOCAL AFFAIRS AND AUTHORIZE CHAIRMAN TO
SIGN
WHEREAS, the Board of County Commissioners of Weld County, Colorado,
pursuant to Colorado statute and the Weld County Home Rule Charter, is vested
with the authority of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with an Impact Assistance Program
Application for the Weld County Road 19 Project to be submitted to the Colorado
Department of Local Affairs by the County of Weld, State of Colorado, by and
through the Board of County Commissioners of Weld County, with terms and
conditions being as stated in said application, and
WHEREAS, after review, the Board deems it advisable to approve said
application, a copy of which is attached hereto and incorporated herein by
reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Impact Assistance Program Application for the Weld
County Road 19 Project to be submitted to the Colorado Department of Local
Affairs by the County of Weld, State of Colorado, by and through the Board of
County Commissioners of Weld County, be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is,
authorized to sign said application.
The above and foregoing Resolution was, on motion duly made and seconded,
adopted by the following vote on the 3rd day of October, A.D. , 1994.
/00 /�F ���YB®'�A_, BOARD OF COUNTY COMMISSIONERS
ATTEST: �GG'Eccri�! WELD COUNTY, COLORADO
�, /1 Weld County Clerk to the Board ,�// . �i2 7 /
. Webster, C airm
BY: Qte PP.,Xx t=Yh� �
eputy Jerk to the Board Dale K, Hall, Pro7T m
APPROVED AS TO FORM: x
,Geor_gezgl Baxter
/47
County AttolnQy • Constance L. Harbert!
/ c!
en-Barbara J. Kirkieyer
940972
PrOO/R
Rev. 10/15/91 STATE OF COLORADO
Department of Local Affairs (For Use by State)
IMPACT ASSISTANCE PROGRAM APPLICATION
Public Facilities/Community Development Projects
A. GENERAL AND SUMMARY INFORMATION
1. Name/Title of Proposed Project: Weld County Road 19
2. Applicant: Weld County
(In the case of a multi-jurisdictional application, name of the "lead" municipality or county).
In the case of a multi-jurisdictional application, names of other directly participating municipalities and counties:
n/a
If applying on behalf of another entity, name of that entity: n/a
3. Chief Elected Official (In the case of a multi-jurisdictional application, chief elected official of the "lead" municipality or
county):
•
Name: W. H. Webster Title: Chairman, Board of Cnunry
Commissioners
Mailing Address: P.O. Box 758, Greeley, CO 80632 Phone: (303) 356-4000
4. Designated Contact Person for the Application:
Name: Donald D. Warden Title: Director, Finance/Administration
Mailing Address: P.O. Box 758, Greeley, CO 80632 Phone:(303) 356-4000, X4218
5. Brief Description of Proposed Project (,os words or lees).
Attach a map showing the location of the project, two copies of the preliminary plans, cost estimates, and any
other engineering documents.
Weld County Road (WCR) 19 between WCR 2 and State Highway is greatly impacted by
seven oil and gas facilities with heavy oil and gas traffic. (See attached map
and facility locations.) Because of the heavy oil and gas industry traffic, the
current roadway is difficult to maintain as a gravel road. In addition, the poor
condition and obsolete design create safety issues for the traveling public. The
weight the oil and gas trucks and volume of traffic require the road's design to be
improved and the road paved.
6. Local Priority*: 1
*Relative to other applications (e.g. 1 of 2, 2 of 4, etc.)
Page 1 of 8 Pages 940972
B. BUDGET & INFORMATION
1. Project Budget & Funding Sources
Project Funding
Total Impact Other Funds Requested or
Cost Assistance Committed
Amount Source Status*
ADMINISTRATION
Personnel: (list) $ 5,025 $ 5,025 County Committed
Contracted Services: (list)
Operating/Travel/Other:
PROJECT ACTIVITIES (list)
Road Improvements:
Base Course 288,000 $ 183,800 104,200 County Committed
Asphalt 259,200 259,200
Shoulder Improvements 88,300 88,300 County Committed
Right-of-way 15,000 15,000 County Committed
Reconditioning 65,020 65,020 County Committed
Admin/Engineering 70,400 70,400 County 'Committed
Miscellaneous (see detail) 95,055 95,055 County Committed
*(e.g., committed, in application stage, etc.)
TOTAL $ 886,000 $ 443,000 $ 443,000
2. Financial Information
(Provide for all municipalities, counties, and districts directly participating in the application and for any entity on
whose behalf the application is being submitted: Attach additional sheets if necessary.)
Weld County
(Entity Name) (Entity Name) (Entity Name)
a. Assessed Valuation (Year 94 ) 1,244,261,980
b: Mill Levy 22.457
c. Overlapping Mill Levy* 86.342
d. Sales Tax Rate (%) / Annual Revenue 0 / 0 / /
e. Long-Term Debt, by Type/Amount 4, 159,643 Revenue / /
f. Annual Budget** (General Fund) 24,395,547
Total (Year 1994 ) 75,459,450 _
Carry Forward (as of 1/1/ 94 ) 491,464
•
*Sum of mill levies of overlapping lurisdictions (e.g.,sum of levies of municipality,school district, etc.).
"For fund most relevant to application (e.g., General Fund for housing applications, Sewer Fund for sewer applications,etc.). •
940972
Page 2 of 8 Pages
g. Water***
Tap Fee n/a
Avg. Monthly User Charges****
Number of Taps Served by Applicant
Fund Carry Forward (as of 1/1/___)
h. Sewer***
Tap Fee n/a
Avg. Monthly User Charge****
•
Number of Taps Served by Applicant
Fund Carry Forward (as of 1/1/___)
***Not required If not relevant to application (e.g., not required for housing rehabilitation applications).
****Divide sum of monthly residential revenues by number of residential taps served.
C. PROJECT JUSTIFICATION
1. List the major energy/mineral development projects affecting the applicant. Cite work force numbers and
projections.
See attached list of oil and gas facility locations for specific impact. Weld
County has over 8,000 oil and gas wells with over 1, 100 new wells in 1993, and
estimates of 1,000 new wells in 1994.
2. Cite the number of energy/mineral production employees residing within the jurisdiction.
What was the 1990 Census population of the applicant jurisdiction: 137.200 List the current estimated population
for the applicant jurisdiction: 142.375 . (Current most recent lottery distribution estimate is acceptable.) What
is the population projection for the applicant in 5 years? 157,000 . What was the source of the estimate?
State demographer
3. Cite how the proposed project will mitigate any adverse impacts related to energy and mineral development.
The proposed project will improve a county road heavily impacted by seven oil and
gas installations.
4. List proposed energy/mineral projects which have the potential to affect the community.
See attached list of oil and gas facility locations in the neighborhood of the
project.
5. List recent energy/mineral project closures or reduction in production/employment which affect the applicant
jurisdiction.
In 1994, over 1, 100 new oil and gas wells were drilled in Weld County. It is
anticipated that over 1,000 more will be drilled in 1994. All of these wells
and the supporting facilities impact Weld County's road and bridge system,
oftentimes adversely.
•
. , t 940972
Page 3 of 8 Pages
D. OTHER PROJECT INFORMAT,_d
1. Why is the project needed? What are the specific goals of the project'?
The project is needed to upgrade a road impacted directly by seven oil and gas
facilities. The county's gravel road was not deisgned for the weight of trucks and
volume of traffic caused by these oil and gas facilities. As a result, the road
is a maintenance problem and has safety issues.
2. How were the cost estimates arrived at? Have preliminary architectural/engineering studies been completed? What
additional design work must still be completed? Use the "Physical Improvements Cost Estimate Worksheet'
attached at the end of this section, for projects involving structures other than single-family housing.)
The Director of Public Works and County Engineer have developed the cost estimates
based upon the Weld County project accounting system costs for similiar projects.
Detailed engineering design work has not been done, only preliminary design. See
attached detailed estimates.
•
3. Describe any in-kind contributions by type and value in support of this project.
Only in-kind is $5,025 for administration of the grant. Some of the work would be
done by County forces, and gravel provided from County gravel pits.
Was the cash value of the in-kind contributions calculated into the Project Budget (B.1.)? Yes_ No
4. Why cannot the project be funded locally? What other funding alternatives have been explored?Did the applicant
jurisdiction take the full property tax revenue increase in the current budget year? Yes X No _
Weld County has over 3,500 miles of county roads to maintain. In 1995, a $3 million
jail is required, which limits capital budget items. The Road ane Bridge Fund has
been increased the maximum amount under TABOR & the Home Rule Charter 5% limitation
for 1995. A ballot issue to exceed the tax limitation is on the November 8, 1994
general election with all excess granted going towards public safety demands.
5. In the space provided, describe local commitment to the project, including local fees or regulations altered to ensure
project success, local taxing efforts to address continuing development and maintenance needs, and local citizen
support.
Weld County has committed 50% matching funds. The county has taken the maximum
allowable property tax amount since 1976. A $500 drilling rig moving fee is
assessed for each rig move. However, in 1993, the fee raised $189,000 and identifiable
road damage repair by rig moves totalled $456,307.
Page 4 of 8 Pages 940972
6. If the project is funded, what on-going operational obligations will be incurred? What is the applicant's plan for
addressing these additional costs? When do you expect the project to start? When will it be completed?
County Road and Bridge Fund would fund all future operational and maintenance
costs of the road improvements to WCR 19.
7. If the proposed project requires operating revenue (e.g. revenue to support operation/maintenance costs),
attach a detailed budget showing current operating revenues and expenses or how such revenues and
expenses will be addressed in the future.
n/a
8. Identify any capital improvements, service, facility, or other plan in which this project has been identified as a
community need. Does the applicant have a capital improvements program? Yes X No _
3-5 Road and Bridge Capital Plan
9. List the names, titles, and pertinent experience of the following persons who will be responsible for managing the
project. If known, list the qualifications of the person/s to be recruited or assigned each particular job.
a. Project manager (overall project administration).
Donald D. Warden, Director of Finance and Administration
b. Project Coordinator (day to day operations).
George Cicoff, Director of Public Works
c. Fiscal manager.
Donald D. Warden, Director of Finance and Administration
d. Project engineer:
George Cicoff, Director of Public Works
a Project architect:
n/a
f. Consultant:
n/a
10. Indicate below whether any of the proposed project activities will be undertaken in flood hazard areas. List floodplain
maps/studies reviewed in reaching this conclusion? Yes _ No
***********************************************************************************************************
ek/W Z0LOti :
Signature, Chief Elected Official'
W. H. Webster
Name (typed or printed)
Chairman, Board of County Commissioners
Title •
10/3/94
Date
*APPLICATION MUST BE SIGNED BY THE RESIDING ELECTED OFFICIAL OF THE APPLICANT OR SPONSORING
JURISDICTION.
94V7. i�r
Page 5 of 8 Pages
PHYSICAL IMPROVEMENTS COST ESTIMATE WORKSHEET
(Required for projects involving structures and facilities other
than single-family housing units)
SOURCE OF ESTIMATE: Director of Public Works DATE OF ESTIMATE: 9/26/94
Act. Description No. of Units Unit Total
No. or Size Price Cost
See attached detailed estimates of
two sections of WCR 19 totalling
$880,975.00
940972
Page 6 of 8 Pages
CONSTRUCTION ESTIMATE
LOCATION: 19 WCR 4-WCR 2
DATE: 9/20/94
LENGTH OF ROAD: 1.0 MI
EXISTING GRAVEL DEPTH: 0
UNITS QUANTITY PRICE/UNIT COST
PROPOSED GRAVEL DEPTH 6 TONS 5,800 $10.00 58,000.00
PROPOSED ASPHALT DEPTH 3 TONS 2,400 $24.00 57,600.00
SIGNING 0.00
MAILBOXES 0.00
CULVERT BAND EACH 0 $30.00 0.00
36"EXTERNAL CULVERT LF 0 $10.29 0.00
SIZE 0.00
SIZE 0.00
RECONDITIONING SQ.YD. 18,000 $0.74 13,320.00
CLEARING &GRUBBING MI 1.0 $700.00 700.00
CUT 0.00
FILL CU.YD. 0 $3.00 0.00
UTILITIES 0.00
DRIVEWAYS 0.00
CONCRETE BOXES EACH 2 $3,000.00 6,000.00
MULTIPLATES EACH 0 $5,000.00 0.00
BRIDGES 0.00
RIGHT-OF-WAY LS 0 $15,000.00 0.00
WATER VALVES 0.00
MANHOLE EXTENTION 0.00
BASE FOR SHOULDER TON 750 $10.00 7,500.00
BASE OF SHOULDER WIDENING TON 800 $6.00 4,800.00
ADMIN./ENG. LS 1 0 $55,000.001 15,400.00
CSS-1H .GAL 700 $1.00 700.00
SUB EX. I 0.00
FENCE MISC. LF 0' $3.00 i 0.00
MOVE DITCH .BLS 0 $25,000.001 0.001
PLUS 5% CONTINGENCY $8,201.00
TOTAL I $164,020.)
:constr.fc
940972
CONSTRUCTION ESTIMATE
LOCATION: 19 HWY 52-WCR 6
DATE: 9/20/94
LENGTH OF ROAD: 3.5 MI
EXISTING GRAVEL DEPTH: 0
UNITS QUANTITY PRICE/UNIT COST
PROPOSED GRAVEL DEPTH 6 TONS 23,0001 $10.00 230,000.00
PROPOSED ASPHALT DEPTH 3 TONS 8,400 $24.00 201,600.00
SIGNING 0.00
MAILBOXES 0.00
CULVERT BAND EACH 2 $30.00 60.00
36" EXTERNAL CULVERT LF 20 $10.29 205.80
SIZE 0.00
SIZE 0.00
RECONDITIONING SQ. YD. 70,000 $0.70 51,700.00
CLEARING&GRUBBING MI 4 $7.00 2,450.00
CUT 0.00
FILL CU.YD. 3,600 $3.00 10,800.00
UTILITIES 0.00
DRIVEWAYS 0.00
CONCRETE BOXES EACH 2 $3,000.00 3,000.00
MULTIPLATES EACH 1 $5,000.00 5,000.00
BRIDGES 0.00
RIGHT-OF-WAY LS 1 $15,000.00 15,000.00
WATER VALVES 0.00
MANHOLE EXTENTION 0.00
BASE FOR SHOULDER TON 2,800 $10.00 28,000.00
BASE OF SHOULDER WIDENING TON 8,000] $6.00 48,000.00
ADMIN./ENG. LS 11 $55,000.00 55,000.00
CSS-1H GAL 2,500 $1.00 2,500.00
SUB EX. I 0.00
FENCE MISC. ILF 1 1,5001 $3.00 4,500.00
MOVE DITCH LS 1 I $25,000.00 I 25,000.00
PLUS 5% CONTINGENCY $34,140.00
TOTAL l____$716,955.80
NOTE: If the ditch cannot be moved, at the north end of the project, then two outbuildings
will have to be moved.
:constr.fc
940972
N
01
.
e ,
i - — �
. 1 \ ` V
. T
N IN-
co u-n ®m
c.--.) .
s N. .moo a C7
1■ n
e o
■ice
N
-.v.-. - 1 1
_ ...
e ��p co ,i- i�
\` ® m''II• m ---+d. — D—
II .=...
0
Li
E I
LI
II
L
e II
tit T ■ :il ' 0.t+� a I '
z
'1 `V X `Y NA A .....
W V N
z
J
OIL & GAS FACILITY LOCATIONS
1. Public Service 9. Basin Operating Company
Natural Gas Compressor Station Oil Consolidation Facility
NW4 NW4 34-1-67 SW4 NW4 36-2-68
2. Vessels Oil and Gas 10. Basin Operating Company
Natural Gas Processing Plant Water Injection Well
SE4 SE4 28-1-67 SW4 NE4 3-1-68
3. Associated Natural Gas 11. K&N Front Range Gathering
Natural Gas Compressor Station Natural Gas Processing Plant
SE4 SW4 30-1-67 NW4 NW4 14-2-67
4. K&N Front Range Gathering 12. Amoco Production Company
Natural Gas Processing Plant Water Injection Well
NW4 NW4 15-1-67 NW4 SW4 19-2-66
5. Vessels Oil and Gas 13. K&N Front Range Gathering
Natural Gas Compressor Station Natural Gas Processing Plant
SW4 NW4 15-1-67 NE4 NW4 14-1-66
6. Wright's Disposal 14. Weld County Disposal
Water Injection Well Water Injection Well
SE4 SW4 10-1-67 NW4 NW4 12-1-66
7. Associated Natural Gas 15. K&N Front Range Gathering
Natural Gas Processing Plant Natural Gas Processing Plant
SW4 SW4 34-2-67 NW4 NW4 14-2-66
8. Associated Natural Gas 16. North American Resources Company
Propane Storage Natural Gas Processing Plant
SE4 SE4 33-2-67 SW4 SW4 11-2-66
:facility.fc (9/20/94)
940972
Hello