Loading...
HomeMy WebLinkAbout921268.tiff ROY ROMER 7•elefar trambere: CiOVetDOi Main Building, Denver ,y' oy yam, i , r - (303)322-9076 PATRICIA A. NOLAN, MD, MPH Ptarmigan Place, Denver (303)320.1529 Executive Director First National Bank Building, Denver — r. r!.O(303)355-6.559 • Hazardous Materials and Waste Management Division Grand Inaction Office COLORADO �t�A g'� 4210 East 11th Avenue .• (303)248-7198 COL(IYRADO Denver, Colorado 80220-3716 _ _ Pueblo Office DEPARTMENT (303)3314830/FAX(303)331-4401 (719)543-8441 OFSHEALTH April 28, 1992 Certified Mail No. P 533 510 858 Rick Hoffman Laidlaw Waste Systems, Inc. 1441 Weld County Road 6 P.O. Box 320 Erie, Colorado 80516 RE: Amended Design and Operations Plan Denver Regional Landfill (South) Weld County, Colorado Dear Mr. Hoffman: The Hazardous Materials and Waste Management Division (the Division) of the Colorado Department of Health has completed its review of the Amended Design and Operations Plan for the Denver Regional Landfill (South) . The review of the Amended Design and Operations Plan is performed under the authority of the "Solid Waste Disposal Sites and Facilities Act, " Title 30, Article 20, Part 1 of the Colorado Revised Statues, as amended (the Statute) , and the "Regulations Pertaining to Solid Waste Disposal Sites and Facilities. " The Regulations were adopted for the implementation of the Statute and are contained in the Colorado Code of Regulations, 6 CCR 1007-2 (the Regulations) . The intent of the Amended Plan is to provide the revised site characterization, revised design and operations plan for the Denver Regional Landfill (South) expansion. The expansion area is contained wholly within the existing Certificate of Designation area. The Division views this application as a substantial change in operations, meaning a redesign or planned construction which would significantly change the planned design performance of the facility as originally designated. A substantial change of the planned design or construction of the solid waste facility necessitates the submittal of an amendment to the Design and Operations Plan, and a Division technical review. Based on the information contained within the Amended Plan and the subsequent amendment to the Plan, the Division finds that the site meets the minimum standards of the Solid Waste Statute and Regulations with the inclusion of the following recommendations. The Division requests that these recommendations be incorporated in PLo J5\j0 ID ` 921268 Rick Hoffman Denver Regional Landfill (South) April 28, 1992 page 2/3 the Amended Design and Operations Plan for the Denver Regional Landfill (South) . The recommendations are: 1. All health laws, standards, rules and regulations for the Department, Water Quality Control Commission, Air Pollution Control Commission and applicable zoning laws and ordinances shall be complied with. 2. One or more faults may traverse the proposed site. The Division wishes to be kept apprised of fault location and conditions discovered during excavation. The Division may request permeability evaluation of the fault and/or additional monitoring. 3 . If perched water conditions are encountered during excavation activities, the Division shall be notified within four working days. The Division may request that contingency plans be developed by the operator to mitigate perched conditions. 4. A certification report shall be prepared by the Applicant and reviewed by the Division prior to commencing with landfilling in the lined portion of any cell. The report shall provide written evidence that the quality assurance plan was implemented and the construction was performed in conformance with the design criteria, the project plans and specifications. 5. Appendix A of the Amended Design and Operations Plan specifies that non-destructive seam testing will performed; however the testing method and frequency of testing was not defined. The testing method and frequency shall be specified for the site and submitted to the Division for review and approval. If during the excavation, ongoing activities and monitoring of the site, information is revealed that changes the currently held concept of the site, the Division may request modifications to the design and operations, and monitoring program. In addition, regulatory changes that the Division may implement in the future may also become binding and necessitate modifications to design and operations plans. The Division cannot specifically require closure and post-closure Rick Hoffman Denver Regional Landfill (South) April 28, 1992 page 3/3 financial assurances. The inclusion of financial assurances as commitments for the owner and operator of the site is recommended. The Division requests written concurrence by the Applicant on all recommendations outlined above. Please contact Austin Buckingham at this office if you have any questions regarding the Divisions' recommendation for approval. Sincerely, Austin N. Buckingham Glenn Mallory Geologist Unit Leader Solid Waste and Incid t Solid Waste and In ident Management Section Management Section Hazardous Materials and Hazardous Materials and Waste Management Division Waste Management Division cc: B. Doty, Doty and Associates S. Hahn, Town of Erie D. O'Sadnick, Golder Associates, Inc. J. Pickle, Weld County Health Department S. Schreiber, Laidlaw Waste Systems, Inc. K. Schuett, Weld County Department of Planning Weld County Commissioners file: SW/WLD/LAI South Hello