HomeMy WebLinkAbout930723.tiff RESOLUTION
RE: APPROVE CERTIFICATION OF INTENT TO PROCEED TO COLORADO HIGHWAY COMMISSION
AND AUTHORIZE CHAIRMAN TO SIGN SPECIAL BRIDGE FUND PROJECT ESTIMATE -
BRIDGE 1123/74A
WHEREAS, the Board of County Commissioners of Weld County, Colorado,
pursuant to Colorado statute and the Weld County Home Rule Charter, is vested
with the authority of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with a Certification of Intent to
Proceed to certify the County of Weld's intent to proceed with Bridge Project,
Structure Number WEL 023.0-074.OA, to the Colorado Highway Commission and a
Special Bridge Fund Project Estimate for said bridge, with the terms and
conditions being as stated in said documents, and
WHEREAS, after review, the Board deems it advisable to approve said
documents, copies of which are attached hereto and incorporated herein by
reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Certification of Intent to Proceed to certify the
County of Weld's intent to proceed with Bridge Project, Structure Number WEL
023.0-074.OA, to the Colorado Highway Commission be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is,
authorized to sign said Special Bridge Fund Project Estimate for Bridge #23/74A.
The above and foregoing Resolution was, on motion duly made and seconded,
adopted by the following vote on the 4th day of August, A.D. , 1993.
BOARD OF COUNTY COMMISSIONERS
ATTEST: /seta, WELD COUNTY, COLORADO
Weld County Clerk to the Board
Constance/144
L.Harbert, Chairman
� � W/�1i 4�/Ll//
Deputy 1 r to the Boa W. Webster, P -Tem
APPROVED AS TO FORM: , ��� -`
Ge erE. Baxter
jam.
igur[�y Attorney Dal K. Hall
Barbara J. Kirkmeye
930723
SPECIAL BRIDGE FUND
BRIDGE PROJECT ESTIMATE
Structure Number WEL 023.0-074.OA County WELD
Engineering;
Preliminary Engineering $ 10,000,00
Design Engineering 15,000.00
Construction Engineering 20.000.00
and staking
Project Engineering 15.000.00
T S N Final Inspection1.000.00
Labor ENnaterRiais COEquipment: $ 61.000.00
Mobilization $ 20,000.00
Site Preparation 10,000.00
Excavation 25.000.00
Abutments/Piers/Piling 80,000.00
Structure/Deck/Guard Rail 80,000.00
Approaches 40,000.00
Pavement 25,000.00
TOTAL LABOR - MATERIALS - EQUIPMENT COSTS: $ 280,000.00
Contingencies: $ 50.000.00
TOTAL PROJECT COST $ 391,000.00
Date of Bid Proposal: May 1, 1994
Project Start Date: September 15. 1994
Project Completion Date: January 15, 1995
Estimate Prepared By: Civil Engineer I
(signature and title)
Approved Chairman,
Board of County Commissioners:
(signature) Q$ py 8
930723
CERTIFICATION OF INTENT TO PROCEED
The County of WELD hereby certifies to the Colorado
Highway Commission that it intends to proceed with the Bridge Project,
Structure Number WEL 023.0-074.OA , for which it received Special
Bridge Fund Account monies; and certifies that it has, or will have
September 1. 1993 (date) , the required twenty percent local
matching funds. Attached is a design engineer's preliminary cost estimate and
a specific construction schedule, including a project start date and a
projected project completion date, pursuant to the State Department of Highways
Procedural Directive Number 43.1, paragraph 5*.
By: —
(county official)
DREW SCHELTINGA
(official's name printed)
COUNTY ENGINEER
(title)
Date: JULY 29. 1993