9/21/1953 Supplemental agreement for
increase in cost on Project
S 0072 ( 1 ) :
Longmont - East . see Book 27 page 502
OM I
"�- I• ■mss•;; • • is • I. • •o; .L.: t
I - t 6 r4 3 t
•
• JCT. u$.fl? T°• ■ • 4.0at. • a • \ .
rte. se 1
Y e 9 ■ • ■ i0 • n: 12 I 1 7 1. e ••
i p < �•' �HARNEY I 10 �G �a
22 o
: : \,.
_....
te
° • •
r1
V • ' '1N ;j SINNN a N , I R ? II11 1° a 16 ( 15 ( %) N VOL,
Z
AA O. •{ • • • II X • . . 1.7-"N 714
/ C9 / i 73
1
RESOLUTION AUTHORIZING CHAIRMAN
OF THE BOARD TO SIGN AGREEMENT WITH
COLORADO DEPARTMENT OF HIGHWAYS FOR
INCREASE IN PRICES ON PROJECT S 0072(1)
BE IT RESOLVED, that the Chairman of the Board be and he is hereby
authorized to sign agreement with the Colorado Department of Highways,
copy of which is hereto attached.
AYES:
THE BOARD OF COUNTY COMMISSIONERS,
WELD COUNTY, COLORADO.
DATED: SEPTEMBER 21, 1953.
::i'
4))1, RESOLUTION AUTHORIZING CHAIRMAN
OF THE BOARD TO SIGN AGREEMENT
WITH COLORADO DEPARTMENT OF HIGHWAYS
FOR INCREASE IN PRICES ON PROJECT
S 9972(1)
I
* s �1 i.• d
.r::_:• _ _ Cc::=,:ry Cemmut,“,::s.
trorm SHD s"
OWNER N° 12365
STATE HIGHWAY DEPARTMENT OF COLORADO
SUPPLEMENTAL AGREEMENT AND/OR WORK ORDER Data.......Stpt 1c, 1953
To J.H.-N.M. Monaghan and. Associated Companies contractor. S pRojEurNa 0u72(1).__
Address. &zaae..1,...Aexhyi..C.41PDdo....-•-------.._----........_Located Near Longmont East
Perform new work not on approved plane
Perform work on approved plans
You are hereby Instructed to
Furnish material as follows:
Observe changes in plans
Furnish and install an additional 160 feet of Corrugated Metal Culvert Pipe, Left of
Stations 110421 to 111+81. This is made necessary by removing ditch from right of way,
and routing it thru corral (feed,lot) .
Cost of items involved at original contract prices:
Item 14b Dry Common Excavation (Str.) 40 cu.yd. @ 1P 2.50 $ 100.00
Item 53b 18" Corrugated' Metal Culvert Pipe 160 lin.ft. @ 14 3.50 560.00
Total $ 660.00.
Less Item 13d Unclassified Ditch Excavation 50 cu.yd. @ E 0.60 30.00
Total increased cost of Project S 0072(1) $ 633.00
APP KAY
e = ;+f1 1'• i� lilt" Cttul1TT C0MMISSI0NFAS,
L' ATM, COLORADO
LtY, C4 1RADO
No work covered by this wort?., order has been started.
Note: Classification shown is not final, and quantities shown are not pay quantities and are subject to change on final
estimate. /
I hereby accept tbil{ order, both as work to be performed and prices on which payment is to be based.
J.H.-N.N. Monaghan and Associated Companies Sept.16
Signed/.$/_..1..H.M^osta�D ).._..._..__..__...._.._..-, a..�...
Submitted with approval of Diet Engineer-._...._.._...._ .. 't _ 19..._-._...
Checked and Recorded.. 19.
_._
''' _._...._._.. _..._..._..._..._..__.._.......�._..._,
111 .._.._-..
Approved by Staff'Constru bon Engineer ......_. ...., 19..._.._...
INSorm shall be TRUCTIONS
Ninr avz additional
aannd all changes in pDpies of this flans. This order must state staatteerwhaethae original contract prices
Delver se" or at creasee m°usupplemental i an nit e-Lati y°er lump .m prim ies of
every order shall be mailed to the Denver office in:date of lase.
le
Work must not proceed until this order is approved by the District linatasa.reverse al �j
If additional ,mace is necessary for description sad 4 m (maatttlea continue 7/'
/
Hello