HomeMy WebLinkAbout530023.tiff S. H . 254 109/113 Now 119 9/21/1953 Supplemental agreement for increase in cost on Project S 0072 ( 1 ) : Longmont - East . see Book 27 page 502 OM I "�- I• ■mss•;; • • is • I. • •o; .L.: t I - t 6 r4 3 t • • JCT. u$.fl? T°• ■ • 4.0at. • a • \ . rte. se 1 Y e 9 ■ • ■ i0 • n: 12 I 1 7 1. e •• i p < �•' �HARNEY I 10 �G �a 22 o : : \,. _.... te ° • • r1 V • ' '1N ;j SINNN a N , I R ? II11 1° a 16 ( 15 ( %) N VOL, Z AA O. •{ • • • II X • . . 1.7-"N 714 / C9 / i 73 1 RESOLUTION AUTHORIZING CHAIRMAN OF THE BOARD TO SIGN AGREEMENT WITH COLORADO DEPARTMENT OF HIGHWAYS FOR INCREASE IN PRICES ON PROJECT S 0072(1) BE IT RESOLVED, that the Chairman of the Board be and he is hereby authorized to sign agreement with the Colorado Department of Highways, copy of which is hereto attached. AYES: THE BOARD OF COUNTY COMMISSIONERS, WELD COUNTY, COLORADO. DATED: SEPTEMBER 21, 1953. ::i' 4))1, RESOLUTION AUTHORIZING CHAIRMAN OF THE BOARD TO SIGN AGREEMENT WITH COLORADO DEPARTMENT OF HIGHWAYS FOR INCREASE IN PRICES ON PROJECT S 9972(1) I * s �1 i.• d .r::_:• _ _ Cc::=,:ry Cemmut,“,::s. trorm SHD s" OWNER N° 12365 STATE HIGHWAY DEPARTMENT OF COLORADO SUPPLEMENTAL AGREEMENT AND/OR WORK ORDER Data.......Stpt 1c, 1953 To J.H.-N.M. Monaghan and. Associated Companies contractor. S pRojEurNa 0u72(1).__ Address. &zaae..1,...Aexhyi..C.41PDdo....-•-------.._----........_Located Near Longmont East Perform new work not on approved plane Perform work on approved plans You are hereby Instructed to Furnish material as follows: Observe changes in plans Furnish and install an additional 160 feet of Corrugated Metal Culvert Pipe, Left of Stations 110421 to 111+81. This is made necessary by removing ditch from right of way, and routing it thru corral (feed,lot) . Cost of items involved at original contract prices: Item 14b Dry Common Excavation (Str.) 40 cu.yd. @ 1P 2.50 $ 100.00 Item 53b 18" Corrugated' Metal Culvert Pipe 160 lin.ft. @ 14 3.50 560.00 Total $ 660.00. Less Item 13d Unclassified Ditch Excavation 50 cu.yd. @ E 0.60 30.00 Total increased cost of Project S 0072(1) $ 633.00 APP KAY e = ;+f1 1'• i� lilt" Cttul1TT C0MMISSI0NFAS, L' ATM, COLORADO LtY, C4 1RADO No work covered by this wort?., order has been started. Note: Classification shown is not final, and quantities shown are not pay quantities and are subject to change on final estimate. / I hereby accept tbil{ order, both as work to be performed and prices on which payment is to be based. J.H.-N.N. Monaghan and Associated Companies Sept.16 Signed/.$/_..1..H.M^osta�D ).._..._..__..__...._.._..-, a..�... Submitted with approval of Diet Engineer-._...._.._...._ .. 't _ 19..._-._... Checked and Recorded.. 19. _._ ''' _._...._._.. _..._..._..._..._..__.._.......�._..._, 111 .._.._-.. Approved by Staff'Constru bon Engineer ......_. ...., 19..._.._... INSorm shall be TRUCTIONS Ninr avz additional aannd all changes in pDpies of this flans. This order must state staatteerwhaethae original contract prices Delver se" or at creasee m°usupplemental i an nit e-Lati y°er lump .m prim ies of every order shall be mailed to the Denver office in:date of lase. le Work must not proceed until this order is approved by the District linatasa.reverse al �j If additional ,mace is necessary for description sad 4 m (maatttlea continue 7/' / Hello