Loading...
HomeMy WebLinkAbout930391.tiff u ADAMS LAWN CO. CHANGE ORDER P. O. Box 512 aULT, COLORADO 80610 Number 2 on bldg #1 /PHONE DATE (303) 834-1587 April 15 , 199 JOB NAME/LOCATION TO Weld County Purchasing ------�----------------...------------....__....__...___...__..----------------____-________----_------ A m bs1.1,an c e b 1 dg #1 915 10th Street -._..-..__3 r.d_._Fl Floor C.ent enn..}...d,..l..._..Bldg _...__....._.__.._.._._.. JOB NUMBER J V G lV U U R J 1. 1 U PO 201136 102202 Gr_eE1.e.y..,___.C.Q._._...8.0.631._._____._.____..__._..._._..___.__.._.___.....__.., EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT I We hereby agree to make the change(s)specified below: Additional sprinkler work includes:...-._...._- Ya1 Ye_:_ sprinkler heads_,_ sprinkler line, _ control wi.r.e .-..iater_a�nd e_cluipment to irrigate sod _area_chang__d_ue to realignment of' driveway to ambulance garage labor and materials Total amount $760.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at this price c $ 760i_CIO DATE PREVIOUS CONTRACT AMOUNT $ 7677.50 AUTif ZED SIGNATURE(CONTRACTOR) \ REVISED CONTRACT TOTAL $ 8437 .50 ACCEPTED—The above prices and specifications of Z.V this Change Order are satisfactory and are hereby ac- Date of acce nce cepted.All work to be performed under same terms and conditions as specified in original contract unless other- Signature wise stipulated. (OWN I 930391 RICHTER PLUMBING AND HEATING, INC. 308 N. 8th Avenue: Greeley, Colorado 80631 (303) 353-1601 ' DATE: August 6, 1992 PROPOSAL SUBMITTED TO: Adams Landscape JOB LOCATION: North 11th Avenue - Greeley site JOB ADDRESS: Greeley, Colorado 80631 TELEPHONE: We will furnish labor and material to install a 1" sprinkler tap into the existing i" water service into the building and adjacent to the existing meter pit. A main shut-off valve and drain valve will be located in the new meter pit with a 1" copper line coming out through the upper side of the meter pit. -A vacuum breaker (furnished by Adams Landscaping) will be installed on the vertical copper line outside and above -. the meter pit and then back down into the ground with a 1" female adapter attached and ready for a service line to the sprinkler. This bid includes permits . Hello