Loading...
HomeMy WebLinkAbout920961.tiff HALL-IRWIN • CONSTRUCTION/ co . 'EXCAVATING/ PIPE LINE / GENERAL CONTRACTORS:Pipelines QUOTATION and CONTRACT Utilities i(-'• Weld County, CO iDAIL September 28, 1992 County Court House RFI-f RENCE 8r, sanitary sewer line extension Greeley,C0 80631 for Weld County Ambulance Services Building, Attention: Don Warden Greeley, CO. Plans by Norton, Underwood and Lamb •%'V offer for your considerailon the toIllp m,.} i!+•airrz,ili. . i;en a er:r ook:I -.,)..iii CO•!.:otiit(`• a finding contract betwee' Hai•lrwin Construction Co. and the party ;i pijrTies i'i:t:iie:ri ao,:n,(.: ITEM DESCRIPTION UNIT QUANTITY 1 8" PVC DR-35 sewer pipe L.P. 516 2 41 ID sanitary sewer manholes Each 2 3 Stabilization rock Ton 500 4 Deep de-watering wells and pumping units Each 2 TOTAL BID• N0,985.00 ATTENTION IS CALLED TO SPECIAL AND ADDITIONAL CONDITIONS ON BACK. A-1 Additional Conditions: If additional deep de-watering wells are needed, each additional well will be billed as an extra to this proposal at x'4,500.00 each. eve hope our quotation meets with your approv,_iI and we will apprec:ute your valued order. Itiis quotation is submitted in duplicate. if acceptable, please sign in the space provide() below and retort one copy to us. I he other is for your files. Special attention is called to the feria; L;r!d Conditions listed on the reverse sloe of this contract. as they are a binding part of this quotation. ACCEPTED: VELD COUNTY, CO. HALT IRWIN CONSTRUCTION CO. • f. BY:_.. . ----- BY. . . .._447". prep. ident.._ ...._._. .. • is@a:) ATTEST —._s, 1�.6 ! c.,' .&., r_� //)t6�_` -_ t ATTEST ::tea! BY: 'f� c y e-1-- �z c Sec4yi; )ATE: 9/30/92 920961 FasC.'C" ..1)(..t rn rn TERMS AND CONDITIONS 1) PAYMENT TERMS: Net, 10th of month following date of invoice. All accounts 30 days past due will be charged a finance charge of 20/0 per month, which is an annual percentage rate of 24%. If pay- ment is not made when due. Hall-Irwin may employ an attorney to take any action necessary to en- force collection of the payment due. In addition, Hall-Irwin shall be entitled to recover all the costs of such actions, including attorney's fees. Furthermore, it is understood and agreed that if payments are not made when due, Hall-Irwin may refuse to proceed with the work and in no way be liable for any damages whatsoever by reason of such refusal. 2) PAYMENT GUARANTEES: Hai! Irwin rr,av at any t;Me require Hsi/merit in advance or satisfactory guarantee that invoices w q be paid if a, ire hay me r is not made or satisfactory guarantee not received, Hall-Irwin shall be released from this quotation/contract. and the owner or contractor shall pay any expenses incurred to Hall-Irwin 3) , QUOTATION EXPIRATIONS AND DELAY: This quotation may be withdrawn or modified by Hall-Irwin Construction Co. if not accepted within 30 days from above date. Delivery of products or performance of services herein quoted are subject to delays occasioned by circumstances beyond our control. 4) TAXES: Quotation includes sales and use taxes where applicable. 5) WARRANTY: Hall-Irwin warrants that all labor and services will be performed in a professional and workmanlike manner in accordance with approved plans and specifications. This work is under war- ranty for a period of one year from the date of contract. Any claim against such work shall be made within same one year period. 6) HARD ROCK Cost of such excavation will be negotiated with the owner at the time such conditions are encountered. 7) All staking, surveying, tap fees, permits, licenses, easements, compaction tests, rights of way and ac- cesses shall be furnished and paid for by the owner. tincaerr t, 0 MO' r 9) RELOCATION OF EXISTING UTILITIES. It relocation of existing utilities is necessary to accommodate the installation of the above bid items. such relocation will be the responsbility of the owner, including any and all costs involved. 10) QUANITITES: All quantities are approximate and for bidding purposes only. Final payment will be made on actual quantities installed and by the unit price bid. 11) ASPHALT REPAIR: Asphalt repair and or replacement is not included in this quotation, unless other- wise specified in the quote. 12) ADJUSTMENTS: Adjustment of manhole rings and water valve boxes to finish pavement grade is not included in this quotation • 920260 Hello