Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
920436.tiff
CHANGE OWNER• Ft] ORDER ARCHITECT CONTRACTOR FIELD ❑ AIA DOCUMENT G701 OTHER ❑ PROJECT: Weld County Ambulance Bldgs. 1 F1 2 CHANGE ORDER NUMBER: 1 (name, address) DATE: 5/15/92 TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9114 (name, address) G.L. Hoff Construction CONTRACT DATE: 1629 West 8th Street Loveland, Co. 80537 CONTRACT FOR: The Contract is changed as follows: 1) The contractor will furnish and install the following items as described on the attached sheets. The total change will amount to $1349.00 2) The contractor will provide labor to place underslab fill to bring building up 12". The' total change will amount to $1879.00 3) The contractor will furnish and install utility taps (water and sewer) from property line to utility mains at Evans site only; not in original bid, excluding permit and fees. The total change will amount to $3814.00. 4) The contractor will furnish and install 4" conduit for phone system at both sites. Change amount $ 714.00 (Greeley) $ 658.00 (Evans) Not valid until signed by the Owner, Architect and Contractor. The original(Contract Sum)(Guaranteed Maximum Price)was $ 505,446.00 Net change by previously authorized Change Orders $ .00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $ 505,446.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order in the amount of $ 8,414.00 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be $ 513,860.00 The Contract Time will be(increased)(decreased)(unchanged)by ( )days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Bley Associates, Architects G.L. Hoff Construction Weld County ARCHITECT CONTRACTOR OWNER 2020 Clubhouse Drive 1629 W. 8th Street 915 10th Street Address Address Address Gree , Co.,0634 Loveland, Co. 80537 Greeley, Co. 80631 • 9 B /' 93- D E / � DATE I ' DA AlA DOCUMENT 0701 • CHANGE ORDER • 1987 EDITION • MA® • ©l98�'$Vt, AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, C.- IN I I E. 'r T I DG701-1987 WARNING:Unlicensed photocopying violates U. a i n to copyreth al" ' 20436 ��6ait O0 I G: Ptt (YAP) DEPUTY el FRK Trt_ 1121 M STREET: NORTH STATION A. Shore lines in ambulance bays 1 . Request: All outlets, lines, GFI rated at 30 AMPS and on individual breakers. 2. Rational: Safety (some ambulances draw nearly 20 amps) and if circuit breaker thrown on one unit, all others will remain unaffected and charging. Add: $ 493.00 B. 220 V Source 1 . Request: Add 220 V outlet in bay area near maintenance storage room. 2. Rational: Power source for air compressor and other tools/equipment requiring 220 V. Add: $ 112.00 C. Wall and Ceiling paint colors in bay area. 1 . Request: Change color to light grey. 2. Rationale: All ambulances are diesel, and exhaust fumes discolor walls and ceilings. Add: $ 41.00 D. Maintenance Room Floor 1 . Request: Provide slight floor grade towards bay area. 2. Rational: Drainage prevents standing water in storage area. Add: 5 88.00 E. Interior insulation/sound barriers 1 . Request: Add insulation/sound barriers to the following interior walls. a. West wall of west bedroom b. East and south walls of east bedroom c. East wall of director's office 2. Rationale: Reduced noise in sleep and work areas. Add: $ 110.00 F. Paint color in living area, kitchen and sleep rooms. 1 . Request: Change color to blue/grey. 2. Rationale: Employee request; promotes more relaxing atmosphere (stress reduction). Add: $ 41.00 G. Door #10 1 . Request: Change to right hand door. 2. Rationale: Opens to left (south) allowing better use of room space. No change .sr.nser i H. Door #6 1. Request: Replace Type E with Type F door. 2. Rationale: Allows occupant (office manager) to see general office area when door is closed. Add: $ 43.00 (Provide larger door lite; remains SC oak wood door. ELEVENTH AVENUE/34TH STREET: SOUTH STATION A. Shore lines in ambulance bays 1 . Request: All outlets, lines, GA rate at 30 amps and on individual breakers. 2. Rationale: Safety (some ambulances draw nearly 20 amps) and if circuit breaker thrown on one unit, all others will remain unaffected and charging. Add: $ 247.00 B. Wall and ceiling paint colors in bay area 1. Request: Change color to light grey 2. Rationale: All ambulances are diesel, and exhaust fumes discolor walls and ceilings. Add: $ 41.00 C. Interior insulation/sound barriers 1 . Request: Add insulation/sound barriers to the following interior walls: a. North and east walls of east bedroom. b. West wall of office. 2. Rationale: Reduce noise levels in work and sleep areas. Add: $ 92.00 D. Paint color in living area, kitchen, sleep rooms. 1 . Request: Change color to light blue/grey 2. Rationale: Employee request; promotes more relaxing atmosphere (stress reduction). Add: $ 41.00 2%03,3
Hello