Loading...
HomeMy WebLinkAbout941012.tiff RESOLUTION RE: ACTION OF BOARD CONCERNING SUBDIVISION PRELIMINARY PLAN - DOS RIOS ESTATES, 2ND FILING, 0/0 JOYCE ALLELY WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners held a public hearing on the 12th day of October, 1994, at the hour of 10:00 a.m. in the Chambers of the Board for the purpose of hearing the application of Dos Rios Estates, 2nd Filing, c/o Joyce Allely, 17 Dos Rios, Greelcy, Colorado 80634, for a Subdivision Preliminary Plan on the following described real estate, to-wit: Part of Section 34, Township 5 North, Range 66 West of the 6th P.M. , Weld County, Colorado WHEREAS, Ken Merritt, Landmark Engineering Ltd. , represented said applicant, and WHEREAS, at said hearing on October 12, 1994, the Board of County Commissioners, after hearing all of the testimony and statements of those present, deemed it advisable to continue said matter to November 7, 1994, at 1:30 p.m. , to allow the applicant further time to resolve certain issues. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Dos Rios Estates, 2nd Filing, c/o Joyce Allely, for a Subdivision Preliminary Plan on the hereinabove described parcel of land be, and hereby is, continued to November 7, 1994, at 1:30 p.m. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 12th day of October, A.D. , 1994. BOARD OF COUNTY COMMISSIONERS ATTEST: ateeMetith WELD COUNTY, COLORADO Weld County Clerk to the Board /, J ) /, 2 W. H.Webst , Ch irman r �n BY: 5/U &2 k-- ` I Deputy Clerk to the Board Dal all, P -Te APPROVED AS TO FORM: � ( I 44Geo gq(E. Baxter if t� County At ovne Con tance L. Harbert AMA_ J Amnterti Barbara J. Kir eyer 941012 PL0915 I�` c� e � ; f G; 2/); nTne.Q/rr; NLLEL�'`; Fief. HEARING CERTIFICATION DOCKET N0. 94-68 RE: SUBDIVISION PRELIMINARY PLAN - DOS RIOS ESTATES, 2ND FILING, C/0 JOYCE ALLELY A public hearing was conducted on October 12, 1994, at 10:00 a.m. , with the following present: Commissioner W. H. Webster, Chairman Commissioner Dale K. Hall, Pro-Tem Commissioner George E. Baxter Commissioner Constance L. Harbert Commissioner Barbara J. Kirkmeyer Also present: Acting Clerk to the Board, Shelly Miller Assistant County Attorney, Lee Morrison Planning Department representative, Gloria Dunn The following business was transacted: I hereby certify that pursuant to a notice dated September 21, 1994, and duly published September 29, 1994, in the Windsor Beacon, a public hearing was conducted to consider the request of Dos Rios Estates, 2nd Filing, c/o Joyce Allely, for a Subdivision Preliminary Plan. Lee Morrison, Assistant County Attorney, made this a matter of record. Gloria Dunn, Planning Department representative, entered the favorable recommendation of the Planning Commission into the record as written. Ms. Dunn noted, since the Planning Commission hearing, two additional items were received: a letter, dated September 14, 1994, from the City of Greeley Planning Commission including two conditions, Exhibit E; and a traffic study, dated October 1, 1993, from the Public Works Department, Exhibit K. She also requested an item "g" be added to said resolution under "The subdivision final plat submittal shall include the following:", regarding the examination of the wetlands in accordance with the Army Corps of Engineers letter dated August 4, 1994, and requiring the delineation and mapping of any wetlands. Mr. Morrison also noted, for the record, that a letter, in the form of a petition, dated September 30, 1994, Exhibit L, was submitted today; and a letter from Basin Exploration dated October 11, 1994, Exhibit M, was submitted yesterday. Ken Merritt, Landmark Engineering Ltd. , represented the applicant and stated the proposal is located near Weld County Road 52 and 47th Avenue, adjacent to Weld County Road 396. He said the subdivision will include 32 lots, ranging from 2.5 to 4.5 acres in size. Mr. Merritt noted Dos Rios, 1st Filing, is to the west and development will continue to the east, including off-site road improvements. He said the intent is to maintain the property for equestrian use, including an 8-foot wide equestrian trail along the roadway. Mr. Merritt indicated the property will be taken out of agricultural production in a phased manner, beginning along Alto Way on the first eight lots. The subdivision will proceed east and then north over time. He stated an initial planting of turf-type seed will minimize erosion, and the delivery of water to Mr. Pirnie's property has been addressed in a letter of agreement dated October 10, 1994, from Joyce Allely, Exhibit F. Mr. Merritt also submitted a letter, dated October 10, 1994, concerning a road improvements proposal. In reference to the petition submitted by surrounding neighbors, Craig Allely, son of Joyce Allely, addressed the limited access issue and stated the small farm road is not as platted in the original plat. Mr. Merritt reminded the Board members the request would again come before them for the final plat, and all issues would be addressed. He noted the letter from Basin Exploration came as a surprise, since Ms. Allely has been working closely with Basin over the last year. Mr. Merritt also indicated there is an existing well and easements on the property, and additional easements will be 941012 na PC RE: HEARING CERTIFICATION - DOS RIOS ESTATES, 2ND FILING, 0/0 ALLELY PAGE 2 incorporated. He also mentioned Basin's intent for horizontal and diagonal drilling and stated all issues will certainly be addressed, and he reiterated all concerns will be resolved at the final plat stage. Mr. Allely clarified Basin is not the only oil company with a leasehold and noted this is the first indication of any problems. Mr. Merritt reiterated Ms. Allely met with Basin numerous times over the past year and stated nothing will be done which conflicts with oil rights. Responding to questions from the Board, Mr. Merritt confirmed the 2nd Filing will be tied in with the 1st Filing and explained the plans for extending and paving roads. He clarified there is no intent to further improve the roads in the 1st Filing; however, the shoulder will be increased 8 to 10 feet for an equestrian trail. Mr. Allely reiterated he was not aware the farm access road was a problem and it was not part of the 1st Filing. He clarified the road was not even owned by Ms. Allely when the 1st Filing was platted, and when Ms. Allely purchased the property with said road on it, it was not intended to be used for residential access. In response to the Board, Drew Scheltinga, Public Works Department Engineer, recalled discussions concerning Dos Rios' request for maintenance on said road. He stated the road is not on the Weld County system, is not platted right-of- way, and is not maintained by Weld County. Mr. Morrison referred to Exhibit L and noted for the record that red indicates sections platted, but unfinished; green indicates undedicated roads kept open by residents who own tractors; and blue indicates the main road through the new development. Mr. Allely stated the section platted, but unfinished, would require another crossing of the Evans Ditch and is probably unnecessary. Mr. Scheltinga noted the north/south road was originally platted for further development, but it was never used. Mr. Merritt confirmed only one access to 1st Filing exists; however, there will be one additional access on Road 396 to 2nd Filing. Mr. Allely stated there are 25 platted lots in 1st Filing, with homes on all lots except for two. The Board voiced concerns regarding only one access to 1st Filing and the necessity of emergency accesses. Mr. Merritt noted traffic impact was part of the submittal, indicating the most impact being on Road 396, with an emergency access off 47th Avenue by way of a dedicated easement. Discussion ensued about connecting the cul-de-sacs, and Mr. Merritt indicated staff agreed they should be separated for design and to prevent the creation of a "by- pass". After further comments, Mr. Scheltinga indicated the paving of Road 396 and 47th Avenue is not included in the Five-Year Plan and stated he has not seen the letter from Ms. Allely concerning the road improvement proposal. He explained the developer would share the paving costs proportioned by the increase in traffic, and an agreement would be required. Mr. Merritt stated, as a Condition of Approval, Ms. Allely is required to provide on-going grading and dust mitigation, and as indicated in said letter, the problems will be solved by contributing money for paving. There was further discussion concerning emergency access, and Mr. Scheltinga confirmed the existing gravel roads are fairly standard for a subdivision. Pat Braddy, surrounding property owner, stated several concerns, encouraged the Board to require irrigation water for each lot, and answered questions from the Board. Jeff Wellborn, Attorney representing Basin Exploration, stated he is unaware of any conversations with the developer and first notice of this proposal was received on October 3, 1994. He stated Basin is not opposed to or in support of this development; however, he indicated no discussions have occurred at the Denver Office level. Mr. Wellborn indicated Basin has had a lease with Joyce Allely since 1981 and is planning two more drill sites on the lease. He stated there has been no investigation of directional or diagonal drilling and reiterated his concern that no discussions have occurred at the Denver Office. Monty Kastner, Land Manager for Basin, presented a map indicating the existing well and the existing and additional flow lines to the production facility. He stated there is a road planned near the existing well and a proposed home 100 to 200 feet from the well. Mr. Kastner noted two acres in surface area are required to rework a well, and there appears to be no space allowed for the additional drilling sites. 941012 RE: HEARING CERTIFICATION - DOS RIOS ESTATES, 2ND FILING, C/O ALLELY PAGE 3 He also indicated the location of CIG's gas easement and 24- to 30-inch main gas line. Mr. Wellborn indicated the goal is to work with the developer and reach an agreement for future designation of drilling and flow line sites. Commissioner Harbert suggested a lack of communication at Basin, and Mr. Wellborn reiterated he was unaware of any communication and was not noticed for the Planning Commission hearing. Commissioner Kirkmeyer confirmed that Basin was listed as a mineral lessee. Mr. Morrison clarified the gas lines and easements owned by CIG and Public Service have been addressed through correspondence, Exhibits 13 and 18, and the development will be detailed with respect to said easements. He noted building and zoning setback requirements also exist. Dick Pirnie, surrounding property owner, stated concerns about his license to have a structure for collecting water in the borrow pit and whether the structure can be moved. Mr. Morrison suggested an agreement among the applicant, the County, and Mr. Pirnie for the delivery of the water. Mr. Scheltinga stated he sees no problem with the structure as long as it does not become a traffic hazard. Hugh Arnold, surrounding property owner, indicated Road 396 is difficult to maintain and definitely would need a hard surface with the new addition. He also stated concerns about traffic traveling west since the two subdivisions will be tied together. Mr. Merritt stated the conversations occurred with a local representative from Basin, and not with Denver; however, he has notes indicating the location of the well, lines and 200-foot setback requirements per said conversations. He indicated negotiations need to continue with Basin and all issues will be addressed appropriately. Mr. Merritt confirmed the limitations noted in the correspondence from Coastal (CIG) and Public Service will be respected and stated it is necessary to relocate Mr. Pirnie's structure 100 feet to the south to divert the water back into the river as required. He suggested Mr. Pirnie execute another license to continue the use of the water and agreed to do whatever is necessary to provide water to Mr. Pirnie, with the Engineer's direction. Mr. Merritt agreed there will be some traffic traveling west; however, paving Road 396 should lessen the impact to the west. He reiterated the 2nd Filing will generate under 200 trips per day and the traffic will use the improved roads. He also agreed that weeds are a concern; however, a cover will be provided to mitigate dust, the homeowners may be able to purchase irrigation water from the City of Greeley. Mr. Merritt referred to photographs of Dos Rios 1st Filing and noted the maintenance of vegetative cover by domestic water, indicating some sort of irrigation water system could be made available. He stated the oil company issues, Mr. Pirnie's structure, and the irrigation system will be resolved by the Final Plat stage. He then submitted a copy of the revised draft covenants for the record as Exhibit J. Discussion ensued concerning disclosure of easements on the plat, and Mr. Morrison clarified the approved subdivision plat will show easements, roads, lot lines, etc. , and suggested the limitations provided by Public Services and CIG be included as a note on the plat. Mr. Merritt stated Basin's full approval would be gained, including a proposed agreement and/or revisions to the site design to accommodate Basin's needs. Mr. Morrison noted the final plat must comply with the preliminary plan and modifications could present problems; therefore, he would feel more comfortable if no final decision was made today. Mr. Allely stated concerns and requested this hearing be continued to allow more time to further address matters with Basin and Weld County. Commissioner Hall expressed concerns about the adjustment of roadways and accesses. Commissioner Harbert agreed the roads and accesses need to be addressed and stated an adequate emergency access must be provided in the area. Mr. Morrison stated there is a possible alternative access in terms of ownership, since the Allelys own the farm to the west over which the farm road is located. Commissioner Hall also stated the plan to pave 2nd Filing and not pave 1st filing is not efficient or consistent, and the subdivision should be maintained as one development. He stated the western exit must be addressed and questioned whether the unfinished platted road proposed to cross the Evans Ditch must be completed as a 941012 RE: HEARING CERTIFICATION - DOS RIOS ESTATES, 2ND FILING, C/O ALLELY PAGE 4 Condition of 1st Filing. Commissioner Hall reiterated that 1st Filing and 2nd Filing should be addressed as one development. Commissioner Harbert objected to the paving of 1st Filing and noted the residences also object to paving. She commented on other older subdivisions with gravel roads and compared the cost of lots in 1964 to the cost of lots today. Commissioner Harbert also noted the developer will pave the new lots and suggested only Alto Way be paved. Commissioner Baxter also suggested both Filings be addressed at the continuance hearing, as well as accesses, paving, and the oil issues. Mr. Merritt reiterated all issues will be addressed, including off-site road access to the west, and noted the Allelys are one of 25 owners in 1st Filing. Mr. Allely clarified 1st Filing was developed by Dos Rios, Inc. , and Ms. Allely was not involved. Commissioner Kirkmeyer reiterated the road, irrigation water, and wetlands issues must all be addressed. Mr. Morrison indicated the 1st Filing roads may be evaluated as off-site accesses similar to Road 396. After further discussion, Commissioner Kirkmeyer moved to continue the request of Dos Rios Estates, 2nd Filing, c/o Joyce Allely, for a Subdivision Preliminary Plan. The motion was seconded by Commissioner Harbert, and it carried unanimously. This Certification was approved on the 17th day of October, 1994. APPROVED: ATTEST: ilizeldth BOARD OF COUNTY COMMISSIONERS WELD COUNTY, C LORADO Weld County Clerk h k to the �Board & y��j✓���Q � By: al �_ 1 V, Lt� W H. Webster, Chair an wv � Deputy C rk to the Board / Dale Hall, Pro TAPE #94-39 V'Geo e . Baxter DOCKET #94-68 Constance L. Harbe t PL0915 Barbara J. Kir meyer 941012 NOTICE Pursuant to the laws of the State of Colorado and the Weld County Subdivision Ordinance, a public hearing will be held in the Chambers of the Board of County Commissioners of Weld County, Colorado, Weld County Centennial Center, 915 10th Street, First Floor, Greeley, Colorado, at the time specified. All persons in any manner interested in the Subdivision Preliminary Plan are requested to attend and may be heard. Should the applicant or any interested party desire the presence of a court reporter to make a record of the proceedings, in addition to the taped record which will be kept during the hearing, the Clerk to the Board shall be advised in writing of such action at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the requesting party. BE IT ALSO KNOWN that the text and maps so certified by the Weld County Planning Commission may be examined in the office of the Clerk to the Board of County Commissioners, located in the Weld County Centennial Center, 915 10th Street, Third Floor, Greeley, Colorado. DOCKET NO: 94-68 APPLICANT Dos Rios Estates, 2nd Filing clo Joyce Allely 17 Dos Rios Greeley, Colorado 80634 DATE: October 12, 1994 TIME: 10:00 a.m. REQUEST: Subdivision Preliminary Plan LEGAL DESCRIPTION: Part of Section 34, Township 5 North, Range 66 West of the 6th P.M. , Weld County, Colorado LOCATION: South of and adjacent to Weld County Road 52; west of and adjacent to 47th Avenue BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO BY: DONALD D. WARDEN WELD COUNTY CLERK TO THE BOARD BY: SHELLY K. MILLER DEPUTY CLERK TO THE BOARD DATED: September 21, 1994 PUBLISHED: September 29, 1994, in the Windsor Beacon &X + D 941.137 is L&flt'u <— o C' d . fQl N 'Vas• m U, Io on ; X' ..4 „ , I, ; , . U c:7'2 CThae:C. 6 oaqm : zo of-i .11-k. lc, eme e. e. ti. l.LCil ri= it;c..) a _ r. t � i a— i24 U '� ate' `- r rel tram CC c, .-1.o CI) v�Z.y cdi—i111 u Ux � / . aaM a N Zm6 u.. 0ZCO : .> :, o ¢ wa • Fxo m 1/1 6 W EO Plv� t9 Q ' N (7, w' U tr. O Nco �y V— l� c-w rna us'+ R A !J It C11 C.3 — J U1 IS 41 i'Jr c` p r CC O ap o (. CO W I I- .is 0„ Al a -Pi ve>„ ..... .(02.. e t„ Li , � � > op ,.„0 it„.... OO O <,„„,/ # ZE908 of1VHofnn'A3133un—44L YOF" , s(ic ZEB08 00Vtl010O‘A3133H0—99L XOB'O'd NOTICE Pursuant to the laws of the State of Colorado and the Weld County Subdivision Ordinance, a public hearing will be held in the Chambers of the Board of County srormissioners of Weld County, dldradd," `Weld CounM Centennial Center.91 , AFFIDAVIT OF PUBLICATION 10th Street, First Floor, Greeley,Colorado,at the time All persons in any manne r interested in the STATE OF COLORADO Subdivision Preliminary Plan a 5$ are requested to attend and may be heard. COUNTY OF WELD • Should the applicant or any I, ROGER A. LIP �p interested party desire the t"( "; of said County of Weld, being duty presence of a court reporter to sworn,say that I am publisher of • make a record of the proceed- ings,in addition to the taped record which will be kept dun WINDSOR BEACON ing the hearing, the Clerk to the Board shall be advised in writing of such action at least a weekly newspaper having a general circulation in said five days prior to the hearing. cost of engaging a courtCounty and State, published R.in the town of WINDSOR, in The reporter shall be borne by the said County and State; and that the notice, of which the requesting party. annexed is/a true copy, has been published in said weekly BE IT ALSO KNOWN that the for 60 successive weeks, that the notice was teal and maps so certified by ublish to the regular and entire issue of every number of the Weld County Planning P Commission may be examined the paper during the period and time of publication, and in in the office of the Clerk to the the newspaper proper and not in a.supplement,lame and that Board of County - PaPe P Pe PP r11. Commissioners,located in the the first publication of said notice was in said paper bearing Weld County Centennial date of the Center,915 10th Street,Third the �,.J -Y Floor,Greeley,Colorado. m'"7_t day of_ 2,11-t z'r^-�� , A.D., 1941°77 and the DOCKET NO:94-68 last publication bearing the date of the _day of A.D., 19_ and that APPLICANT Dos Rios the said WINDSOR BEACON has bean published Estates, 2nd Filing, 17 Dos Rios, Greeley, Colorado continuously and uninterruptedly for the period of 5 80634 consecutive weeks, in said County and State. nbr to the c/o Joyce Allely P' date of first publication of said notice, and the same is a DATE:October 12,1994 newspaper within the meaning of an Act to regulate printing of legal notices and advertisements, approved May 18, TIME:10:00 a.m. 1931, and all prior acts so far as in force. REQUEST: Subdivision Preliminary Plan • LEGAL DESCRIPTION: Part • i./\ • of Section 34, Township 5 J �B ISHER North,Range 66 West of the 6th P.M.. Weld County, Colorado C!4/f/ Subscribed and sworn to before me this—' day of LOCATION: South of and -. lC 2,,..4trr.. (�y�g19 '71/ adjacent to Weld County Road a .. `� 52; west of and adjacent to I 47th Avenue i .di( BOARD OF COUNTY COM- NOTARY PUBLIC MISSIONERS WELD COUNTY.COLORADO My commission expires / BY:DONALD D.WARDEN WELD COUNTY CLERK TO THE BOARD BY:SHELLY K.MILLER DEPUTY CLERK TO THE BOARD DATED:September 21,1994 Published in the Windsor Beacon en S%Wombat 29, 1994. • 911197 CERTIFICATE OF MAILING The undersigned hereby certifies that a true and correct copy of the foregoing Notice of Hearing, Docket #94-68, was placed in the United States mail, first class mail, postage prepaid, addressed to the following property owners. DATED this t ?UoQ day of >bite icb.tt , 1994. PUBLIC SERVICE COMPANY OF COLORADO DOS RIOS ESTATES, 2ND FILING 500 PRUDENTIAL PLAZA C/O JOYCE, DONALD, CRAIG, AND ERIC 1050 17TH STREET ALLELY DENVER, CO 80265-0501 17 DOS RIOS GREELEY, CO 80634 JEANNETTE MILO CORNELIA RAISLEY JEANNETTE MILO 1611 20TH AVENUE COURT CORNELIA RAISLEY GREELEY, CO 80631 1611 29TH AVENUE COURT GREELEY, CO 80631 RICHARD AND NANCY MARSHALL 4990 47TH AVENUE RICHARD LUSTER GREELEY, CO 80634 JULIA OUSKA 24 DOS RI0S MICHAEL STARK GREELEY, CO 80634 KAREN LORD 5000 47TH AVENUE THOMAS AND FAYE HUDDLESTON GREELEY, CO 80634 23 DOS RIOS GREELEY, CO 80634 STEVEN HAMMERS 5110 47TH AVENUE WILLIAM, JR. , AND PATRICIA HUMPHRIES GREELEY, CO 80634 3 DOS RIOS GREELEY, CO 80634 DAN AND MELINDA CARSON 4903 46TH AVENUE DICK AND VIRGINIA PIRNIE GREELEY, CO 80634 4813 WEST 54TH STREET ROAD GREELEY, CO 80634 MARVIN AND RUBY OGDEN 4931 46TH AVENUE JAMES UTZINGER GREELEY, CO 80634 18 DOS RIOS GREELEY, CO 80634 LARRY AND LYNDA PETERSEN P.O. BOX 4415 STEVEN AND DEANNA BUTHERUS ESTES PARK, CO 80517 19 DOS RIOS GREELEY, CO 80634 EDWARD AND ELISABETH WIRICK 4550 51ST STREET PATRICK AND MARY BRADDY GREELEY, CO 80634 5311 54TH STREET ROAD GREELEY, CO 80634 ROBERT AND GLORIA BECK 5300 47TH AVENUE PAUL SPECK GREELEY, CO 80634 1938 7TH AVENUE GREELEY, CO 80631 11- o bl ,. �II >. • _ i ,R�., r?T -s 121 = J \, 9: x.19 — I jlLlLIl [ es - C] U O ij W 4. _ x _ om W ro Ln — — LL >-J C/) l - c a CC CC x aCO 1d. o m >4 Sr- J W F 0 9 W 0 0 go v)3 d. or` - .0 wr- ¢ a ¢tea N m • • cr ct to 03 w x I- 0 r Y Q lal J CI O P.,� (44t 36909 O0VtlO1O0'A313380-9SL X08'OA CERTIFICATE OF MAILING - DOS RIOS ESTATES, 2ND FILING PAGE 2 ESTHER SCHANK 4020 WEST 54TH STREET ROAD GREELEY, CO 80634 WEST HILL-N-PARK, INC. P.O. BOX 929 GREELEY, CO 80632 EDWIN C. AND GERTRUDE M. PIRNIE BOX 40 45254 WELD COUNTY ROAD 81 BRIGGSDALE, CO 80611 DEBORAH E. MCCRARY 1992 FORREST HILLS ROAD PRESCOTT, AZ 86301 JUDITH E. KOLB 5895 EAST CALLE DEL CIERVO TUCSON, AZ 85718 NORDIC PETROLEUMS, INC. 9745 EAST HAMPDEN AVENUE DENVER, CO 80231 BASIN OPERATING COMPANY 370 17TH STREET, SUITE 1800 DENVER, CO 80202 AEON ENERGY COMPANY 777 SOUTH WADSWORTH BOULEVARD LAKEWOOD, CO 80226-4349 7 �, Deputy Clerkoto the Board 941197 ,' "`-31 CO I 1Qn J (NS r) • HV] C i19' +" L_`I Lt....11)1M 1 1 1 P�!0;7.,11/4� r " _ 6'� Intl OFT -5 ill 9: 19 y� p CLERK = ia. W o� TOT EE ? _ CM C/5 uJ C/� - F— Q QC o `• H V) 4— W O C....)- n= en G. �y Oazco ] cn w r-i r-i < co z6O fn w x H< E - ko F H O'> N GI a N [.*.7 I' 10 22'+ 4 1i ' OW W0 O 1094 7C 4\ X44 `r c _I IoW noY mau . l a a..r;cl. �J c . « Q la CCO` iT't4J LL■■`■ t III z '4.-,,O m = E5mo'o ao I1, oN n m2 o CO Q >oC Y 00p0 cc JOp�� 4 OO Bilitsitcfr 88909 00180'00'A313380—89L XOB'O'd 9141.SI Hello