Loading...
HomeMy WebLinkAbout921002.tiff RESOLUTION RE: ACTION OF BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO, CONCERNING SITE APPLICATION OF TOWN OF PLATTEVILLE AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has received a Site Application from the Town of Platteville concerning a new lift station which will provide sanitary sewer service for 27 lots within the Town of Platteville, which is an addition to an existing sewage treatment facility located on the following described parcel of land, to-wit: Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado WHEREAS, the regulations for site applications for an existing sewage treatment facility require review of the site application by the Board of County Commissioners, and further, that various local and State agencies be given the opportunity to review and comment on said site application, and WHEREAS, the Site Application from the Town of Platteville was submitted to the Board of County Commissioners of Weld County for review and comments, a copy of said application being attached hereto and incorporated herein by reference, and WHEREAS, after study and review, the Board finds that said site application is compatible with the Weld County Comprehensive Plan, and that it is in the best interest of Weld County to recommend approval of said application. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Site Application submitted by the Town of Platteville be, and hereby is, recommended favorably to the Colorado Department of Health's District Engineer as being compatible with the Weld County Comprehensive Plan. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said site application. PL0079 921002 P!-bar79 c , - P1, , ► inETCvi RE: SITE APPLICATION - TOWN OF PLATTEVILLE PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 14th day of October, A.D. , 1992. �/ �'!/GG'G �< BOARD OF COUNTY COMMISSIONERS ATTEST• WELD C NTY, COLORADO Weld County Clerk to the Board 7 Ge r e Ken dy, Chairman BY: t 2-1,f -19-72.-1 .49 -)(7) - l i /Led-- Deputy Clerk' to theBeard Constance L. Harbert, ford-)C7)47 APP R!�!�!//o999--///��777:D AS TO FORM: A 7 C. W. Kir 7�y� t� / . �.� r 44 County Attorney Gor a ��� Q 1)/(4(1 W. H. Webste 921002 SUMMARY OF THE WELD COUNTY PLANNING COMMISSION MEETING October 6, 1992 A regular meeting of the Weld County Planning Commission was held October 6, 1992 in the County Commissioners' Hearing Room (Room #101) , Weld County Centennial Building, 915 Tenth Street, Greeley, Colorado. The meeting was called to order by the Chairperson, Judy Yamaguchi, at 1:30 p.m. Tape 422 Roll Call Richard Kimmel Present Jean Hoffman Present Tom Rulon Present Bill O'Hare Absent Judy Yamaguchi Present Juliette Kroekel Absent Don Feldhaus Absent Shirley Camenisch Present Bud Clemons Present Also present: Lanell Swanson, Current Planner; Brian Grubb, Current Planner, Department of Planning Services; Lee Morrison, Assistant County Attorney; Sharyn Ruff, Secretary. The summary of the last regular meeting of the Weld County Planning Commission, held on September 15, 1992, was approved as read. Judy Yamaguchi extended condolences to Juliette Kroekel for the loss of a family member. NAME: Town of Platteville ADDRESS: P.O. Box 70, Platteville, CO 80651 REQUEST: Site application for a new lift station which will provide sanitary sewer service for 27 lots within the Town of Platteville. LEGAL DESCRIPTION: Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado. LOCATION: Within the Town of Platteville Town limits . Bob Thorson, Town Administrator, Town of Platteville, and Jack Baysinger, representatives, explained this request is for a lift station to run sewer lines for 27 new lots. This facility will have a warning system and a back-up generator in case of power failure. The Chairperson asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. 921002 SUMMARY OF THE WELD COUNTY PLANNING COMMISSION HEARING October 6, 1992 Page 2 Jean Hoffman moved the application for the Town of Platteville be forwarded to the Board of County Commissioners with the Planning Commission' s recommendation for approval. Motion seconded by Shirley Camenisch. The Chairperson asked the secretary to poll the members of the Planning Commission for their decision. Richard Kimmel - yes; Jean Hoffman - yes; Tom Rulon - yes; Judy Yamaguchi - yes; Shirley Camenisch - yes; Bud Clemons - yes . Motion carried unanimously. CASE NUMBER: USR-966 NAME: Waste Services Company, c/o Brad Keirnes ADDRESS: P.O. Box 3365, Greeley, CO 80633 REQUEST: A Site Specific Development Plan and a Special Review permit for a solid waste disposal site and facility in the A (Agricultural) zone district. LEGAL DESCRIPTION: Part of Sections 2 and 3, T2N, R64W and part of Sections 26, 27, 34 and 35, T3N, R64W of the 6th P.M. , Weld County, Colorado. LOCATION: Approximately 3.5 miles north of the Town of Keenesburg; approximately .5 miles west of a private road at the north end of Weld County Road 59 right-of-way. Brad Keirnes, President of Wastes Services Development Corporation, introduced Bob D' Amico, Leonard Butler, Chip Woertz, Bill Jeffries, Kurt Erickson, Mark McMullen, Matt Delach, John Houtchens , and Craig Harrison, all department heads or affiliates of Wastes Services Company. He then gave a detailed overview of the request. Highlights include proposed isolated location, compatible with surrounding land uses, three miles from a public thoroughfare, and on a private road at the end of a dead end county road. Leonard Butler, Geologist, gave a detailed technical overview of the request. Brad Keirnes also discussed the paved roads throughout the area due to the fact that Coors Ash Facility, located near the proposed site, was curtailing operations. There would be no increase in traffic for this area beyond what Coors is permitted. Vehicles would be enclosed minimizing roadside debris along the haul route. There will be a service area for local waste processing and also a regional service to include the metro Denver area and the airport facility at a later date. Preference will be given to the local Keenesburg area for jobs that will help stimulate the local economy. Discussion and questions followed. 921002 COLORADO DEPARTMENT OF HEALTH Water Quality Control Division 4210 East 11th Avenue Denver, Colorado 80220 APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF: A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS, OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY. B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3)) • APPLICANT: Jack E. and Albert L. Baysinger and George W.Taylor C/O Baysinger Bros. ADDRESS: P.O.Box 151 , Brighton, Colorado 80601 PHONE:' 659-2909 Consulting Engineer's. Name and Address: Cecil Crowe, Alpha Engineering P.O.Box 392, Fort Lupton, Colorado 80621 PHONE: 857-2308 A. Summary of information regarding new sewage treatment plant: N/A 1. Proposed Location: (Legal Description) 1/4, 1/4, Section Township , Range County. 2. Type and capacity of treatment facility proposed: Processes Used Hydraulic Organic gal/day lbs. BOD5/day Present PE Design PE % Domestic % Industrial 3. Location of facility: Attach a flap of the area which includes the following: (a) 5-mile radius: all sewage treatment plants, lift stations, and domestic water supply intakes. (b) 1-mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Effluent disposal: Surface discharge to watercourse �^ Subsurface disposal Land_ Evaporation Other State water quality classification of receiving watercourse(s) Proposed Effluent Limitations developed in conjunction with Planning and Standards Section, WQCD: BOD5_ mg/1 SS mg/1 Fecal Coliform /100 mi , Total Residual Chlorine mg/1 Ammonia mg/1 Other 5. Will a State or Federal grant be sought to finance any portion of this project? 6. Present zoning of site area? Zoning with a 1--mile radius of site?_ 7. What is the distance downstream from the discharge to the nearest domestic water supply intake? (Name of Supply) (Address of Supply) What is the distance downstream from the discharge to the nearest other point of diversion? (Name of User) (Address of User) T — -1- 921002 WQCD-3 (Revised 8-83) 8. Who has the responsibility for operating the proposed facility? 9. Who owns the land upon which the facility will be constructed? (Please attach copies of the document creating authority in the applicant to construct the proposed facility at this site. ) 10. Estimated project cost : Who is financially responsible for the construction and operation of the facility? 11. Names and addresses of all water and/or sanitation districts within 5 miles downstream of proposed wastewater treatment facility site. (Attach a separate sheet of paper if necessary. ) 12. Is the facility in a 100 year flood plain or other natural hazard area? If so, what precautions are being taken? Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources or other Agency? (Agency Name) If so, what is that designation? 13. Please include all additional factors that might help the Water Quality Control Division make an informed decision on your application for site approval. B. Information regarding lift stations: 1. The proposed lift station when fully developed will generate the following additional load: Peak Hydraulic (NGD) 5100 P.E. to be served 68 2. Is the site located in a 100 year flood plain? NO If yes, on a' separate sheet of paper describe the protective measures to be taken. 3. Describe emergency system in case of station and/or power failure. Provide Emergency Power with a gasoline powered generator. 4. Name and address of facility providing treatment: Platteville, CO-0040355 P.O.Box 70, Platteville, Colorado 80651 5. The proposed lift station when fully developed will increase the loading of the treatment plant to 40 % of hydraulic and 36 % of organic capacity and TOwn of Platteville,Co. agrees to treat this wastewater? Yes X No (Treatment Agency) Date Signature and Title 2 921002 WQCD-3 (Revised 8-83) C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. N/A D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the 201 Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further comments or questions, please call 320-8333, Extension 5272. Recommend Recommend No Date Apprpval Disapproval Comment Signature of Representative _ 1. n Management Agency i� 2. 1 -1-q� _ Town of Plattev 11 ������'''���jjjjjj Local Government: lea o�Towns(If site is inside boundary or within////////////hree mil s) and Sanitation Districts. 3. /D-/9- 4 �l.-. t George Kenned oard f County Commisi bne,= 10/14 7/7 4. -,-qa _ _ Town of Plattev lle�� Lam/ LtCe p�, `T 5. $ �$ �a _ lat evil a an ng & Zoning Comm. City/County Planning Authority 6. North Front Range Water Quality Assoc Council of Governments/Regional Planning 7. _ _ N/A State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures. ) I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater Treatment Works, " and have posted the site in accordance with the regulations. An engineering report, as described by the regulations, has been prepared and is enclosed. DATE _ Signature of Applicant TYPED NAME -3- 921002 WQCD-3 (Revised 8-83) • ATTACHMENT TO SITE APPLICATION In accordance with C.R. S. 1981, 25-8-702 (2)(a), (b) , and (c) , and the "Regulations for Site Applications for Domestic Wastewater Treatment Works", the Water Quality Control Division must determine that each site location is consistent with the longrauge, comprehensive planning for the area in which it is to be located, that the plant on the proposed site will be managed to minimize the potential adverse impacts on water quality, and must encourage the consolidation of wastewater treatment works whenever feasible. In making this determination, the Division requires each applicant for a site approval for a domestic wastewater treatment works to supply an engineering report describing the project and showing the applicant 's capabilities to manage and operate the fallity over the life of the project to determine the potential adverse impacts on water quality. The report shall be considered the culmination of the planning process and es a minimum shall address the isiioir.s : Service area definition including existing population and population projections, flow/loading projections, and relationship to other water and wastewater treatment plants in the area. Proposed effluent limitations as developed in coordination with the Planning and Standards Section of the Division. (Allow minimum four weeks processing time. ) Analysis of existing facilities including performance of those facilities. Analysis of treatment alternatives considered. Flood plain and natural hazard analysis. Detailed description of selected alternatives including legal description of the site, treatment system description, design capacities, and operational staffing needs. Legal arrangements showing control of site for the project life. • Institutional arrangements such as contract and/or covenant terms for all users which will be finalized to accomplished acceptable waste treatment. Management capabilities for controlling the wastewater throughout and treatment within the capacity limitations of the proposed treatment works, i.e. , user contracts, operating agreements, pretreatment requirements. Financial system which has been developed to provide for necessary capital and continued operation, maintenance, and replacement through the life of the project. This would include, for example, anticipated fee structure. Implementation plan and schedule including estimated construction time and estimated start-up date. Depending on the proposed project, some of the above items may not be applicable to address. I❑ such cases, simply indicate on the application form the non applicability of those. -4- WQCD-3 (Revised 8-83) 921002 DEPARTMENT OF PLANNING SERVICES PHONE(303)358-4000,EXT.4400 915 10th STREET GREELEY,COLORADO 80831 C. COLORADO September 16, 1992 Robert Thorson Town of Platteville P.O. Box 70 Platteville, CO 80651 Subject: Request for a Site Application on a parcel of land described as Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado. Dear Bob: I have scheduled a meeting with the Weld County Planning Commission on Tuesday, October 6 , 1992 , at 1:30 p.m. to consider your application. This meeting will take place in the County Commissioners' Hearing Room, first floor, Weld County Centennial Center, 915 Tenth Street, Greeley, Colorado. It is recommended that you or a representative be in attendance to answer any questions the Board of County Commissioners might have with respect to your application. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. It is the responsibility of the applicant to call the Department of Planning Services' office a few days before the date of the Commissioners' hearing to obtain the recommendation. • If you have any questions concerning this matter, please feel free to call me. Respectfully, CYantil--t Lanell J . Swanson Current Planner 921002 Alia ,� # mEmoRAnDum John Pickle, Director, To Environmental Protection Services tptember 15, 1992 COLORADO From Lanell Swanson, Current P1 P Subjsc$ita Appliratinn - Lift C Ptinn in Tnwn of Platteville Attached is a site application for a new lift station for the Town of Platteville sanitary sewer system. The lift station will be located within the Town of Platteville town limits. However, it is our policy to review this type of application. I have scheduled this application before the Weld County Planning Commission for October 6 , 1992. Please review and return any comments to me as soon as possible. Thanks . 321002 BEFORE THE WELD COUNTY, COLORADO, PLANNING coMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Jean Hoffman that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: NAME: Town of Platteville ADDRESS: P.O. Box 70, Platteville, CO 80651 REQUEST: Site application for a new lift station which will provide sanitary sewer service for 27 lots within the Town of Platteville. LEGAL DESCRIPTION: Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado. LOCATION: Within the Town of Platteville Town limits. be recommended favorably to the Board of County Commissioners for the following reasons: The lift station will not adversely affect the local water quality. This request is compatible with the Weld County Comprehensive Plan in that it is an addition to an existing sanitary treatment plant located within and which services an incorporated municipality. The Weld County Health Department has reviewed this proposal and has set forth no objections. Motion seconded by Shirley Camenisch. VOTE: For Passage Against Passage Richard Kimmel Jean Hoffman Tom Rulon Judy Yamaguchi Shirley Camenisch Bud Clemons The Chairman declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioners for further proceedings. CERTIFICATION OF COPY I, Sharyn Ruff, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution, is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on October 6, 1992. Dated the 6t of Octob , 1992. Sharyn F. Ruff / Secretary 921002 INVENTORY OF ITEMS SUBMITTED FOR CONSIDERATION Applicant: Site Application Town of Platteville Submitted or Prepared Prior to Hearing At Hearing 1. Application 5 pages X 2. DPS Recommendation X 3. DPS Case File Summary Sheet X 4. Referral from Weld County Health Department X 5. September 19, 1992, letter to applicant X I hereby certify that the 5 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commission hearing. I further certify that these items were forwarded to the Clerk to the Board's office on October 8, 1992. r re t Planne STATE OF COLORADO ) COUNTY OF WELD SUBSCRIBED AND SWORN TO BEFORE ME THIS day of ik _19C1,c3--. SEAL NOT PURL ,0m UIUIIII My Commission Expires My Commission expires ltoCerlba(21,1 5 , oO�tl...... S• . .7 317 t =� : Ja ,f•• "toil, • 4 ,40 oa 921092 Date: October 6, 1992 NAME: Town of Platteville ADDRESS: P.O. Box 7O, Platteville, CO 80651 REQUEST: Site application for a new lift station which will provide sanitary sewer service for 27 lots within the Town of Platteville. LEGAL DESCRIPTION: Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado. LOCATION: Within the Town of Platteville Town limits. The Department of Planning Services' staff recommends approval of this request. The lift station will not adversely affect the local water quality. This request is compatible with the Weld County Comprehensive Plan in that it is an addition to an existing sanitary treatment plant located within and which services an incorporated municipality. The Weld County Health Department has reviewed this proposal and has set forth no objections. 921O `� mEmORAnDum Tis WIIDCTo Lanell Swanson Date September 28, 1992 COLORADO From John S. Pickle Subject: Site Application - Lift Station, Town of Platteville I have reviewed this proposal and have also consulted with the Colorado Department of Health, Water Quality Division. We have no objection to this proposal. This will be an improvement to their sewer system. Thank you for the opportunity to review this proposal. '0 ` wbid B isv I Q�YP/inning 921002 LAND-USE APPLICATION SUMMARY SHEET Date: September 29, 1992 NAME: Town of Platteville ADDRESS: P.O. Box 7O, Platteville, CO 80651 REQUEST: Site application for a new lift station which will provide sanitary sewer services for 27 lots within the Town of Platteville. LEGAL DESCRIPTION: Outlot A, Village Vista Subdivision, Town of Platteville, Weld County, Colorado. LOCATION: Within the Town of Platteville town limits The Colorado Department of Health, Water Quality Control Commission's regulations require that the applicant submit the site application to all appropriate local governments, planning agencies, and state agencies for review and comment prior to submission to the Colorado Department of Health's District Engineer. The regulations also state that if the proposed facility is to be located within the boundaries of a city or town, the planning agency and Commissioners should comment upon the relationship of the treatment works to the comprehensive plan for the area as it affects water quality. The Weld County Health Department has reviewed the proposed lift station and has no objection§ to this proposal. 921002 7 I APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OF A LIFT STATION FOR THE VILLAGE VISTA SUBDIVISION IN THE TOWN OF PLATTEVILLE, WELD COUNTY, COLORADO. The proposed lift station will provide sanitary sewer service for 27 lots of the Village Vista Subdivision. The capacity of the Town of Platteville sewage treatment plant is 0. 348 MGD hydraulic and 494 lbs. BOD 5 per day organic. The current use of the treatment plant is 0. 133 MGD hydraulic and 164 lbs. BOD 5 per day organic. The addition of the 27 lots of this subdivision will make the total use 0. 138 MGD hydraulic and 178 lbs. BOD 5 per day organic. This will bring total use to 40% of available hydraulic capacity and 38% of available organic capacity. • • • 921.002 Hello