November 20, 1991
Mr. Robert L. Pearson
Manager, Safety and Environmental Affairs
Associated Natural Gas, Inc.
P. 0. Box 5493
Denver, CO 80217
Dear Mr. Pearson:
Thank you for your letter of November 18. The Department of Planning Services'
staff has considered your proposal to install a 24' by 30'building to the site
permitted by Amended USR-542, and has determined the addition of this building
will not be considered a major change to the permit as approved. The building
permit has been released from zoning.
Please let me know if you have any questions.
Sincerely yours,
Lanell J. Sw on
Current Planner
LJS/sfr
It-01-1613
al wig
A55OCIPTED NKTLAIL 615, INC.
r_.,
\i ►:T. 2 r, 1991
November 18, 1991 ;°�..ri :"""'"'`'
Ms. Lanell J. Swanson
Current Planner
Department of Planning Services
Weld Zounty
Greeley, CO 80631
RE: Modification-Kersey Plant
Dear Ms. Swanson:
Associated Natural Gas, Inc. is requesting your permission to install a 24' x
30' building on the above referenced facility? The proposed building is for
noise reduction for the existing air compressors.
Thank you for your cooperation in this matter. If you need additional
information or have any questions, please contact me at the number below.
Sincerely,
Associated Natural Gas, Inc.
egijiga44142---
L. Pearson
Manacer, Safety & Environmental Affairs
RLP/hc
900 REPUBLIC PLAZA • 370 SEVENTEENTH STREET • DENVER,COLORADO 80202 • (303)595-3331 • FAX(303)595-0480
MAIL NG ADDRESS P O BOX 5493 • DENVER, COLORADO 80217
44\1../
DEPARTMENT OF PLANNING SERVICES
j1 PHONE(303)356.4000,EXT.4400
91510th STREET
GREELEY,COLORADO 80631
O
•
COLORADO
August 2, 1991
Bob Pearson, Manager, Safety and Environmental Affairs
Associated Natural Gas, Inc.
P. O. Box 5493
Denver, CO 80217
Subject: Amended USR-542
Dear Mr. Pearson:
Thank you for your letter of August 1. The Department of Planning Services'
staff has considered your proposals as outlined in your letter and updated USR
plat and has determined that the relocations and substitutions will not be
considered a major change to Amended USR-542. It is my understanding from our
conversation this morning, that you will submit one more updated plat which shows
the elimination of the existing B plant which is to be relocated.
I have received a letter from Glenn Miller, Fire Marshal, Platteville Fire
District, regarding the replacement of the wood fence with a fifteen foot
corrugated steel double fence with four inches of styrofoam between the steel.
He has stated that a fence made of a noncombustible product would be much safer
than the wood fence as originally proposed. The Department of Planning Services'
has no objection to this substitution.
The expansion of the office will not be considered a major change to the USR.
Please let me know if you have any questions.
Very truly yours,
Lanell J. Swanson
Current Planner
ASSOCKTED NKTIUIL 645, INC.
August 1, 1991
Ms. Lanell J. Swanson
Current Planner
Department of Planning Services
Weld County Colorado
Greeley, CO 80631
Re: Modification-Kersey Plant
Dear Ms. Swanson:
As per our conversation August 1, 1991, Associated Natural Gas, Inc. is proposing
the attached modification to our Kersey Plant Facility. There will be no added
equipment. Our plans are to relocate and replace some of the outdated equipment
and use this modification to come in compliance with EPA's storm water runoff,
SPCC plans, NFPA identification system, uniform fire code standards, and improve
the plant safety.
1. The existing four (4) oil tanks: Proposed relocation is to the product
storage area with fire wall area around tanks for SPCC plan, fire code
grouping of liquified petroleum gas (LPG) and NFAP fire rating.
2. Glycol/Regen system consist of two (2) gas fired heaters: The proposal
is to relocate the heaters in what is called the HMO area. Heaters will
be spaced 150 ' minimum away from any other plant equipment. A 15' high
sound and fire abatement fence will be installed.
3. Process skid consists of "A" and "B" Plant Processing: Proposal is to up-
grade "B" plant with replacement process skid and remove existing "B" plant
skid.
4. Per amended USR--542:83:5 there are fourteen (14) engines and compressors:
Propose to relocate compressors per attached plot and delete by one (1 )
engine and compressor.
5. The existing ground level pipe rack: Proposal is to raise the pipe rack
for safety reasons.
6. Existing office and shop: Office and storage with electric control panel.
Proposal is to combine office and shop; office ana storage, electrical
control panel by proposed office expansion and delete office & storage with
electric control panel and the two (2) truck loading racks.
7. The existing 15' high sound abatement fence: Propose re relocate along
the north/south and east/west fence line per attached clot. ANi3I plans
to upgrade and paint the relocated sound abatement fence.
90C 2CPUB_,C P_AZA • 370 ST "-N-EFNT STREET • DEN."<,COQ ORADO 80202 • (303)595-3331 • FAX(303)595-C480
MAILING ADDRESS: PO BOX 5493 • DENVER, COLORADO 80217
/4- v., tziE
ASSOCIKTED NTIR4L 645, INC.
page 2
8. Existing field gas inlet scrubbers consist of three (3) above ground
scrubbers located on the south east fence line and one (1) inlet scrubber
located on "B" plant skid. Proposal is to relocate the one (1) "B' plant
scrubber along the south east fence line.
9. Existing inlet field gas to the plants underground piping consists of three
(3) inlet drips. Proposal is to inspect, repair or replace underground
drips as needed and perform annual inspection and maintenance.
10. The remodification of the Kersey Facility will enable ANGI to install a
storm water runoff drainage system as per attached plot to meet EPA storm
water runoff regulation.
Thank you for your cooperation in this matter. If you should need any additional
information, please contact me at (303) 595-3331.
Sincerely,
Associated Natural Gas, Inc.
041,9
Robert L. Pearson
Manager, Safety & Environmental Affairs
Enclosure
RLP/hc
It
AS5OCIKTED NKTU141. 615, INC
Page3
METHANOL
THE PROPOSED REMODIFICIATION
KERSEY PLANT FACILITY
1. Existing Plants: The facility is operated by two plants:
Plant A
Plant B
2. Existing Gas Fired Engine Compressors Total: 13
Proposed modification is to group inlet compression, refrigeration
compression, recompression and inlet booster compression together.
3. Existing Gas Fired Heaters Total: 2
Proposed modification is to relocate heaters into one general area.
4. Existing Iinlet Separators Total: 3
Proposed modification is to relocate Plant B inlet separator along
southwest fence line, grouping it with the existing two separators.
5. Existing Plant Storage Tanks Consist of 3 Y-Grade Storage Tanks
and 3 Condensate Storage Tanks.
Proposed modification is to relocate the existing 3 condendate storage
tanks, add one additional condensate storage, and one additional y-grade
storage tank. All to be located in one area of the plant.
6. Existing Plant Building
Proposed modification is to enlarge present building to accomodate
electrician and plant controls from outside environment.
7. The existing noise buffer fences located on the north south plant engine
area.
Proposed modification is to relocate the existing noise buffer fences to
the back fence line along the north south and east west fence line. This
will upgrade the noise buffer.
8. Plant Entrance
Proposed modification for the plant entrance will be with trees and shrubs
along the north south fence line.
' Pla>♦ville Fire Protection Strict
P.O. Box 122 • Platteville, CO 80651
(303) 785-2232
Gilcrest Fire Department Platteville Fire Department
P.O. Box 43 P.O. Box 568
Gilcrest, CO 80623 Platteville, CO 80651
Lanell Swensen 7/30/91
Weld County Planning
915 10th Street
Greeley
This letter is to confirm our phone conversation of
7/31/91 regarding the wood fence located at the Associated
natural gas plant on Rd 35 . I would very much agree that a
fence made of a noncombustible product would be much safer
then the wood .
Sin e
enn Mil er, Fire Marshal
Platteville Fire District 777,77771771
l IJ
-----
4
ASSOCIKTED NKTIRAL GAS, INC.
July 22, 1991
Ms. Lanell J. Swanson
Current Planner
Department of Planning Services
Weld County Colorado
Greeley, CO 80631
Re; Modification-Kersey Plant
Dear Ms. Swanson;
Associated Natural Gas, Inc. (ANGI) is proposing the attached modification of
our Kersey Plant Facility. As per our conservation on July 22, 1991, we are
supplying the following information for your review and determination as to
whether the proposed modification requires a use by special review or an
amendment to the USR 542.
If it is determined that an USR is required, Associated Natural Gas, Inc. is
requesting permission from the Weld County Board of County Commissioners an
approval to construct prior to obtaining approval of the needed site specific
development plan and amended special review permit.
We will submit a complete special review application and fee on or before August
1, 1991.
All activities and construction that applies to the amended USR conducted on the
property is at ANGI 's own risk.
We will comply with any conditions of approval identified through the special
review application process.
All construction will be in accordance with the requirements of the Weld County
Building Code Ordinance.
We will comply with any other county, state, and federal requirements which may
apply to the use of the property.
If the site specific development plan and special review permit are not approve,
Associated Natural Gas, Inc. will remove any improvements not authorized under
the existing zoning.
900 REPUBLuC°._AZA • 37C S' .ENTE LN S7:=ET ® DENVER,COLORADO 80202 • (3C3)595-3331 • FAX(303)595-0480
MAILING ADDRESS PO BOX 5493 ® r):-NVER, COLORADO 80217
AGI
A55OCIITED NOVA 645, INC.
Page 2
Thank you for your cooperation in this matter. Should you require any additional
information or have any questions, please contact me at (303) 595-3331.
Sincerely,
Associated Natural Gas, Inc.
waspe....„_
Robert L. Pearson
Manager, Safety & Environmental Affairs