HomeMy WebLinkAbout930725.tiff RESOLUTION RE: APPROVE CERTIFICATION OF INTENT TO PROCEED TO COLORADO HIGHWAY COMMISSION AND AUTHORIZE CHAIRMAN TO SIGN SPECIAL BRIDGE FUND PROJECT ESTIMATE - BRIDGE #32.5/218 WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Certification of Intent to Proceed to certify the County of Weld's intent to proceed with Bridge Project, Structure Number WEL 032.5-021.0B, to the Colorado Highway Commission and a Special Bridge Fund Project Estimate for said bridge, with the terms and conditions being as stated in said documents, and WHEREAS, after review, the Board deems it advisable to approve said documents, copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Certification of Intent to Proceed to certify the County of Weld's intent to proceed with Bridge Project, Structure Number WEL 032.5-021.OB, to the Colorado Highway Commission be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said Special Bridge Fund Project Estimate for Bridge #32.5/21B. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 4th day of August, A.D. , 1993. J1111 // A BOARD OF COUNTY COMMISSIONERS ATTEST: G� WEL COUNTY, COLORADO Weld County Clerk to the Board Const nce L. Harbert, ha��ir9yman BY: k/ t Deputy Clerk the Board W. H. bs''EEer, Pro-(( Tem 66666 APPROVED AS TO FORM: „;,0;:4: /ry e . Baxter t / e?”County A a1 K. Hall Attorney arbara J. Kirkmey 930725 SPECIAL BRIDGE FUND BRIDGE PROJECT ESTIMATE Structure Number WEL 032.5-021.OB County WELD Engineering: Preliminary Engineering $ 25,000.00 Design Engineering 35.000.00 Construction Engineering 70.000.00 and staking Project Engineering 75.000.00 Final Inspection 2,000.00 TOTAL ENGINEERING COSTS: $ 207,000.00 Labor - Materials - Equipment: Mobilization $ 65,000.00 Site Preparation 75.000.00 Excavation 70.000.00 Abutments/Piers/Piling 100,000.00 Structure/Deck/Guard Rail 386,940.00 Approaches 200,000.00 Pavement 75,000.00 TOTAL LABOR - MATERIALS - EQUIPMENT COSTS: $ 971.940.00 Contingencies: $ 100,000.00 TOTAL PROJECT COST $1.278,940.00 Date of Bid Proposal: May 1, 1994 Project Start Date: September 15. 1994 Project Completion Date: January 15, 1995 Estimate Prepared By: 1"/ /� Civil Engineer I (signature and title) Approved Chairman, 2,2 22.Board of County Commissioners: 1y (signature) 081O/93 330'725 CERTIFICATION OF INTENT TO PROCEED The County of WELD hereby certifies to the Colorado Highway Commission that it intends to proceed with the Bridge Project, Structure Number WEL 032.5-021.OB , for which it received Special Bridge Fund Account monies; and certifies that it has, or will have September 1, 1993 (date) , the required twenty percent local matching funds. Attached is a design engineer's preliminary cost estimate and a specific construction schedule, including a project start date and a projected project completion date, pursuant to the State Department of Highways Procedural Directive Number 43.1, paragraph 5*. By: FLEX tri. (county official DREW SCHELTINGA (official's name printed) COUNTY ENGINEER (title) Date: JULY 29, 1993 * This attachment is a requirement unless good cause is shown for a delayed transmittal. intent.cer 930725 fet* mEMORAnDU WilkTo Clerk to the Board oem July 29, 1993 COLORADO From Denny M. Graham, Civil Engineer II I fS/ovJ/' subjectAgenda Item Please add the following to the Board's agenda for Wednesday, August 4, 1993: 1. Certification of Intent to Proceed - WEL-032.5-021.0B 2. Certification of Intent to Proceed - WEL-023.0-074.0A Appropriate documentation is attached. DG/pds:ctb2O Attachment cc: Commissioner Baxter File 930725 . 930723 Hello