HomeMy WebLinkAbout941349.tiff_ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
1?-?0-04 04 :00x41 Fruh ', , ,L,1O,L P902/C0a
CHANGE OWNER 0
ORDER ARCHITECT' 0
CONTRACTOR 0
AM DOCUMENT 0701 -FIELD ❑
OTHER ❑
PROJECT; TRANSMITTER BUILDING ADDITION
(name, add[essno ROAD 16 AMID 17 CHANGE ORDER NUMBER: 'my
Yr COIA1iADp DATE: 12/20/94
TO CONTRACTOR: R.A.S. BUILDERS, INC. ARCHITECT'S PROJECT NO:
(name, address) 180 E. HAMDPEN AVE. , #201
ENGLEWOOD, CO 80110 CONTRACT DATE; 12/05/94
CONTRACT FOR: XT>:tAREyxnu213
The Contract drn ed 26 follows:
1. FILL ALL .rS IN BLOCK WAILS WITH GRCUF (PER ATTACHED PRpPOSAI).
ADD
2. ADD 4 GROUND RODS AT BUILDING CORNERS (PER ATTACHED PROPOSAL) $ 942.00
3. PROVIDE 220 VOLT ELECTRIC TRIC OUTLET FOR HEATER/AIR CONDITICNER ADD $ 200.00
(PER A 1) ADD . $ 1 75.00
4. PROVIDE R-30 INSULATION AT ROOF SYSTEM AND PROVIDE 1/2" A.C.
PLYWOCO =at FINISH ( PER ATTACHED) . ADD $ 774.00
0. CLEAR SEAT, t[PL'ERIOR CONCRETE FLOOR (PER ATTACHED 1.
6. GEAR SEAL EX'T'ERIOR CONCRETE 13L,OCK (PER ATrACFTLa3). `DD $ 150.00
ADD $ 200.00
SUmUrAL $2,441 .00
G.C. OH&P G 10% 244.00
TOTAL $2,685.00
Not valid until signed by the Owner,Architect and Contractor,
The original(Contact Sum)POOMXIOSOODIMRIKEIX109was ' 24 893.00
Net change by previously authorized Change Orden
m $ 6,278.00
The(Contract Su
pour to this Change order was j 26,278.00
The(Contract Sure) will be Oneneued)
by this Change Order in the amount of t 2,685.00
The new(Contract Sum) including this Change Order will be I 28,963.00
Thetis:ow erTimewill y FAIR ( 4 )days.
The dare of Substantial Completion as of the dare of this Change Order therefore is 12/30/94
NOTE: This summary does not reflect changes N the Contract Sum,Contract Time or Guaranteed Maximum Price which have been audnnnzed by
Con tmetbn Change Directive.
R.A.S. BUIIDEWS, INC. ,/��/ /74' 110.)
ARU]IITecT �(�-
180 F.CrOµ Own, . I C f� 1_
Address 180 E. HAMPDETL AVE , #201 U76+'1 /- ,
Arhircrfi � /cm et ENGT EWOOD, CD 80110 Address / 0 t s i /j lL_s_//U/t co
l (
FP/ By PAUL ADOLPH Err at
DATE DATE12/20/94 DATE Ir92-d19/
MA DOCUMENT Old • f'NaNg:F own • ,Wes trumon - ,yes• • ®,7e7 . rim
AMR&ICAN WGITTUT! OF ARCM:t'tiab, ass New YORK Ave, N.W., WASHINGTON, IOC. 20005 G701-1987
DEC 20 '94 16: 02 303 762 1404 PAGE . 002
0MI..)t0 941349
.._..................... ....... . . ... . .
.:L—L -1La :S'J.➢.. S. A. J.
timmas
morprmnsoli
ralsoelealilirr22VER
1,44
ONSTRUCTION
December 15, 1994
RAS Builders
197 f, Hampden, Suite 271
Englewood, Co. 80110
Attention Mr. Paul Adolph
Re: KOZO Transmitter
Building 4ddltion
Dear Mr, Adg rpf7,
Per, .lack Fisher of your Copy on verbal approval
12-14..94, we aro filling al! black cells, for the sum of
5942.00. Cost of
pumping, would have been $1320.0.7,
i ly,
ell#4;,ZH)
Connie K, Yitrner
C.K. Zitrner Construction, Inc.
•
12-15-94 08,49AM P002 SIZ
DEC 20 ' 94 16:02 303 762 1404 PAGE . 003
911349
2-20-04 u4
MPS ELECTRICMCICHANGE ORDER
4670 South Inca
INGLEW000. COLORADO 90110 Number 1
(309) 761-1.7.19e2sn* ,
.n;!Ilan•La..?ION
TO •
,.oe Nina .w...awe
.aar.wa Cow TRACT w. , e.f.a Wen.Wenn esesa.
t`. y�)
We Neer w.e tr m.we S.ergo w eeettia0 Deny ;I
/. _.7> ..2 a t9 . aesecei //A ft_, ;I
a a A/a - hcithe l,teni,:a,._ zr
eiz
I
•
• i•
I,
NOTt TAN Change tree become eft of era M esM.mance with the existing aentract
WE AGREE hereby to make the change(s) *pacified above at tills price C.,) S I II
' Er, I ,t
; PREVIOUS CONTRACT AMOUNT , S I ;:
.-....+o—manlwac*.
• RCVISEA CONTRACT TOTAL 1 S
ACCEPTED—The prim end-opeatirleaddria of
this ayes Order are sattefaetory and are heaby SC- Pets bf aaegtanee
egged.Al work tb n*Derionned under Same tonne and
I eandkne fo ga"a in Sf Qb*I cannot a'10 Oar Ob signature p a
12-1 5-96 02: 239M roox gee
DEC 20 '94 16: 03 303 762 1404 PRGE . 004
941349
ITZNER
1
ONS RUCTION
fit "
December ED, 1994
RA.S Builders
160 E. Hampden Ave., Suite 001
Englewood, Co. 60110
Attention; Pout Adolph Aer KDGZ Transmitter
building Addition
Dear Fur,
Following is the add on price for R-30 Insulation and
1/2" AC plywood installed on inside of oddltlon. Price Is
$774.00 added to contract.
Work authorizations to date are $254',2.30.
Thank Yau,
Connie k. i'It
O.K. Zit!►le truotfon, Inc.
DEC 20 ' 94 16: 03 303 762 1404 PRGE . 005
91,1349
Hello