Loading...
HomeMy WebLinkAbout920774.tiff CHANGE OWNER -- ARCHITECT aORDER CONTRACTOR FIELD ❑ • AlA DOCUMENT G701 OTHER 0 PROJECT: Weld County Ambulance Buildings CHANGE ORDER NUMBER: 2 (name, address)Greeley (No.1) Evans (No. 2) DATE: 8/13/92 TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9114 (name, address) G.L. Hoff Construction 1629 West 8th Street CONTRACT DATE: Loveland, Co. 80537 CONTRACT FOR: The Contract is changed as follows: 1) The General Contractor will provide trim extensions at window heads, clad to ( $54.00) match existing windows. 2) The General Contractor will provide fire alarm changes as reqested by City/ County as per Architect's Proposal Request #3 dated 7/23/92 ( Greeley $855.00) ( Evans $200.00) 3) The General Contractor will provide light fixture change in the garage bays of both buildings as specified in Proposal Request #2 ( Greeley $2008.00) ( Evans $1292.00) 4) The General Contractor will provide extra outlets in the medical ( Greeley $ 123.00) storage rooms in both facilities as requested by the County and as ( Evans $ 106.00 shown on Proposal Request #3. I Note 5, 6 on attached sheet. Not valid until signed by the Owner, Architect and Contractor. • The original(Contract Sum)(Guaranteed Maximum Price)was f 505,466.00 Net change by previously authorized Change Orders f 8,414.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $ 513,860.00 The(Contract Sum)(Guaranteed Maximum Price)will be jincresed (decreased) (unchanged)by this Change Order in the amount of $ 6,597.00 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be $ 520,457.00 The Contract Time will be(increased)(decreased)(unchanged)by ( 0 )days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Bley Associates G.L. Hoff Construction Weld County ARCHITECT CONTRACTOR OWNER 2020 Clubhouse Drive 1629 W. 8th Street 915 10th Street Address Address Address Greeley, Co. 7- z..7 Loveland, Co. Greeley, Co. BY BY .15//C/1 X . TE DATE DATE VL(.LL(il..lt /7 n/ /99c7-- AM DOCUMENT 0701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE ;J AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6701-1987 WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. 920 774 ar00/11 5) The General Contractor will provide gas line extension from furnace (Greeley $ 426.00) room to patio at both facilities as requested by the County. Final (Evans $ 693.00) connection to grill is by the Owner. 6) The General Contractor will provide roof vents (lumber yard quality) and paint to match roof at locations shown by the Architect at both sites. (Greeley $ 508.00) (Evans $ 332.00) Hello