Loading...
HomeMy WebLinkAbout930534.tiff RESOLUTION RE: ACTION OF BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO, CONCERNING SITE APPLICATION OF THE CITY OF GREELEY WASTEWATER DEPARTMENT, CIO FRANK STEPHENS, AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has received a Site Application from the City of Greeley Wastewater Department, c/o Frank Stephens, concerning the construction of a lift station located on the following described parcel of land, to-wit: Part of the SW! of Section 33, Township 6 North, Range 66 West of the 6th P.M. , Weld County, Colorado WHEREAS, the regulations for site applications for the construction of a lift station require review of the site application by the Board of County Commissioners, and further, that various local and State agencies be given the opportunity to review and comment on said site application, and WHEREAS, the Site Application from the City of Greeley Wastewater Department was submitted to the Board of County Commissioners of Weld County for review and comments, a copy of said application being attached hereto and incorporated herein by reference, and WHEREAS, after study and review, the Board finds it in the best interest of Weld County to recommend approval of said application for the following reasons: 1. Said site application is consistent with the Weld County Comprehensive Plan's Public Facility and Service Goals and Policies and the Urban Growth Boundary Area Goals and Policies. 2. The proposed lift station will be an efficient and cost effective wastewater treatment and will not be a duplication of services. 3. The lift station, when constructed, will have the capacity to serve Pronto Foods and is not located in a floodplain. 4. This proposal does not appear to have negative impacts on the general health, safety, and welfare of the present and future residents of Weld County. PL0079 930534 9t,of79 RE: SITE APPLICATION - CITY OF GREELEY WASTEWATER DEPARTMENT PAGE 2 NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Site Application submitted by the City of Greeley Wastewater Department be, and hereby is, recommended favorably to the Colorado Department of Health as being compatible with the Weld County Comprehensive Plan. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said site application. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 16th day of June, A.D. , 1993. /.1 f/)' BOARD OF COUNTY COMMISSIONERS ATTEST: J � WE COUNTY, COLORADO Gitte Weld County Clerk to the Board ��J � JC'a /f 4, (. `.."`/ Constancerbert, Chairman BY: /1��4,e0/`� { of IY JQJ rd W. L� APPROVED AS TO FORM: (AVe G org E. Baxter Imo-_ County Attdrnhy Dale K. Hall • kee- .l f�Y/7utLCA ar c!{bara J. Kirkme er 6 930534 BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Jean Hoffman that the following resolution be introduced for passage by the Weld County Planning Commission that the application for: NAME: City of Greeley Wastewater Department, c/o Frank Stephens REQUEST: Site Application for approval of construction of a lift station. LEGAL DESCRIPTION: Part of the SW4 of Section 33, T6N, R66W of the 6th P.M. , Weld County, Colorado. LOCATION: South of Greeley No. 3 Canal on the west side of 71st Avenue; north of F Street. be recommended favorably to the Board of County Commissioners for the following reasons: This request is consistent with the Weld County Comprehensive Plan's Public Facility and Service Goals and Policies and the Urban Growth Boundary Area Goals and Policies. The proposed lift station will be an efficient and cost effective wastewater treatment and will not be a duplication of services. The lift station when constructed will have the capacity to serve Pronto Foods and is not located in a floodplain. This proposal does not appear to have negative impacts on the general health, safety, and welfare of the present and future residents of Weld County. The City of Greeley, Weld County Health Department, and the North Front Range Water Quality Protection Association have recommended approval of this proposal. Motion seconded by Juliette Kroekel. VOTE: For Passage Against Passage Richard Kimmel Bill O'Hare Shirley Camenisch Judy Yamaguchi Bud Clemons Juliette Kroekel Jean Hoffman The Chairperson declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioners for further proceedings. CERTIFICATION OF COPY I, Sharyn Ruff, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution, is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on June 15, 1993. D ted the 15t of f Sharyn F. Ruff 930.534 Secretary Date: June 15, 1993 NAME: City of Greeley Wastewater Department, c/o Frank Stephens REQUEST: Site Application for approval of construction of a lift station. LEGAL DESCRIPTION: Part of the SW4 of Section 33, T6N, R66W of the 6th P.M. , Weld County, Colorado. LOCATION: North of Greeley No. 3 Canal on the west side of 71st Avenue. The Department of Planning Services' staff recommends that this request be approved for the following reasons: This request is consistent with the Weld County Comprehensive Plan's Public Facility and Service Goals and Policies and the Urban Growth Boundary Area Goals and Policies. The proposed lift station will be an efficient and cost effective wastewater treatment and will not be a duplication of services. The lift station when constructed will have the capacity to serve Pronto Foods and is not located in a floodplain. This proposal does not appear to have negative impacts on the general health, safety, and welfare of the present and future residents of Weld County. The City of Greeley, Weld County Health Department, and the North Front Range Water Quality Protection Association have recommended approval of this proposal. s�es�a ATTA ENT NO. 5 iOL)K.ADU DEPARTMENT of HEALTH ';.iter Quality Cantr.>I Division -.10 EJSt lath Avenue saver, Colorado S020 APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF: A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS, OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY. B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3)) APPLICANT: CITY OF GREELEY WASTEWATER DEPARTMENT ADDRESS: 1000 10TH STREET, GREELEY, CO 80631 PHONE: 350-9817 Consulting Engineer's Name and Address: MICHAEL C . KETTERLING, PE, KLH-NUL ENGINEERING, 1020 28TH AVE. , GREELEY, CO 80631 PHONE: 351-0550 A. Summary of information regarding new sewage treatment plant: if 1. Proposed Location: (Legal Description) 1/4, 1/4, Section Township , Range , County. 2. Type and capacity of treatment facility proposed: Processes Used Hydraulic Organic gal/day lbs. BOD5/day Present PE Design PE X Domestic X Industrial 3. Location of facility: Attach a map of the area which includes the following: (a) 5-mile radius: all sewage treatment plants, lift stations, and domestic water supply intakes. (b) 1-mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Effluent disposal: Surface discharge to watercourse Subsurface disposal Land Evaporation Other State water quality classification of receiving watercourse(s) Proposed Effluent Limitations developed in conjunction with Planning and Standards Section, WQCD: BOD5 mg/1 SS mg/1 Fecal Coliform /100 ml r Total Residual Chlorine mg/1 Ammonia mg/1 Other 5. Will a State or Federal grant be sought to finance any portion of this project? 6. Present zoning of site area? Zoning with a 1-mile radius of site? 7. What is the distance downstream from the discharge to the nearest domestic water supply intake? (Name of Supply) (Address of Supply) What is the distance downstream from the discharge to the nearest other point of diversion? (Name of User) (Address of User) -1- 930S34 WQCD-3 (Revised 8-83) • • S. .ho has the responsibility for operating the proposed facility? 4. Who owns the land upon which the facility will be constructed? (Please attach copies of the document creating authority in the applicant to construct the proposed facility at this site.) 10. Estimated project cost: Who is financially responsible for the construction and operation of the facility? 11. Names and addresses of all water and/or sanitation districts within S miles downstream of proposed wastewater treatment facility site. (Attach a separate sheet of paper if necessary.) 12. Is the facility in a 100 year flood plain or other natural hazard area? If so, what precautions are being taken? Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources or other Agency? (Agency Name) If co, what is that designation? 13. Please include all additional factors that might help the Water Quality Control Division make an informed decision on your application for site approval. B. Information regarding lift stations: 1. The proposed lift station when fully developed will generate the following additional load: Peak Hydraulic (MCD) 0.02 P.E. to be served 265 2. Is the site located In a 100 year flood plain? NO If yes, on a separate sheet of paper describe the protective measures to be taken. 3. Describe emergency system in case of station and/or power failure. POWER SUPPLY IS AVAILABLE FROM TWO INDEPENDENT SOURCES & CITY HAS PORTABLE AUX. GENERATOR 4. Name and address of facility providing treatment: CITY OF GREELEY 300 EAST 8TH STREET, GREELEY, CO 80631 5. The proposed lift station when fully developed will increase the loading of the treatment plant to 73 X of hydraulic and 71 X of organic capacity and THE CITY OF GREELEY agrees to treat this wastewater? Yes X No (Treatment Agency) (� 05-07 .93 Ac„w�jgg11������� dd i� Date SAM BOONS PRbeeftif1l OSGER{{tie CITY OF GREELEY 930S34 -2- WQCD-3 (Revised 8-83) • C. If the facility will be located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendatldn decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the _101 Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further comments or questions, please call )20-8))), Extension 3272. Recommend Recommend No late flvoruval Disapproval Comment �gna tare_ of Representative 1. 5;zo-3 14 eAkA _ MMan�,Bl,emennge y 2• .5-2.0.93 v /d+wCGC�'-.Jett/ Local Government: Cities or Towns (If site is inside boundary or within three miles) and Sanitation Districts. Boar of Cou y misslo ners c. s/h7 f3 cal Health Authority S. City/County Planning Authority 6. )O 1/43 1/ dFgLivett7vC'/Ia(C" Council of Governments/Regional Pianni,.; 7. State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures.) I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater Treatment Works," and have posted the site in accordance with the regulations. An engineering report, as described by the regulations, has been prepared and is enclosed. DATE05-07-V3 a„„: SAM BOONE Signature of Applicant TYPED NAilE PROJECT MANAGER CITY OF GREELEY 930534 FARMERS SPUR LIFT STATION PRELIMINARY ENGINEERING REPORT 1. The proposed wastewater lift station is located in the SW1/4 of Section 33 , T. 6N. , R.66W. , in Weld County, Colorado. This location is north of the Greeley No. 3 Canal on the west side of 71st Avenue. (See attached vicinity map. ) The lift station will provide service to Pronto Foods which is located to the southwest of where the Burlington Northern Railroad crosses "O" Street. (NE1/4 of Section 33) Presently, Pronto Foods generates 20, 000 gallons per day of wastewater with a BOD of approximately 2200 mg/l. There are no existing wastewater treatment plants within 4. 5 miles of Pronto Foods. 2. It is not anticipated that the City of Greeley will institute effluent limitations on the wastewater generated by Pronto Foods. 3. Pronto Foods is now hauling, on a daily basis, the wastewater it generates to the City of Greeley's First Avenue wastewater treatment facility. 4. It is not practical for Pronto Foods to treat their wastewater on-site. 5. The proposed lift station is located just outside the limits of the Cache La Poudre River 100-year floodplain. The top elevation of the lift station is proposed to be higher than the banks of the No. 3 Canal and the roadway surface of 71st Avenue. The lift station will be supplied with power from two independent sources. In the case of a complete power failure, an 930534 alarm will be activated at the police station via telephone lines. 6. The lift station is required to allow sanitary sewer service from Pronto Foods to flow by gravity under the Cache La Poudre River and then be pumped up into the existing Sheep Draw Sewer located at the intersection of 59th Avenue and "C" Street. The City will not increase their current operations staff due to the addition of this lift station to their system. 7. The City of Greeley will acquire a right-of-way from the current land owner for the lift station site. 8. The City of Greeley wastewater department will finance a portion of the construction cost as well as operation and maintenance costs of the completed lift station through the life of the project. Pronto Foods will be charged a monthly fee for use of the system. 9. The implementation schedule for this lift station is as follows: A. Construction time: August 16th through November 19th, 1993 B. Project Start-up: November 24, 1993 930534 /♦760) \ R. tc6 W. I1 _ i (� � -. 'I o — n • AD — � . a �� �. heal i' 7[a n6 ;. 0723 >3> on6 �' �_� \' ♦ Lis Y.__A20 d • a. '• �� .� i3 % I ��30� -J zQ 4. B ` e\well \ SCALE: = 2000'! .. { . J Well° 2 4726 - 28 ° 5> 1 -- f,---`, Oy "si ° ;Al L ___ °R I� q° = Farm "0" STREET -_-e ♦> O .a 0719_. �. qn.° 5. • r � .EV 1\I V E�C1WROSSING ,♦7 _ A694 S°UT•94-6, , A , A °i'`�� A � 4685 �II iii '2oa�'---� .: ---�� .i j1 O . 33 fi 34 mIVE ,. a 32�/ & �� P SED .'. \'u!` �� •E� � ' LIF TATI. N i.` f ;,� ,. c� ♦ 469? w - 5 _� - � i � of ! one � . � ' . •: Ts.- I S E �- •W ... .� . . �� ���� EW n • ,\ : 7/ C-2 04) 11 n' ) )---7J.J'' 3, rTh 3 "7 • th (STR � � / ��• : 0 3-441 I/ o SuEsta_' ♦>y0 D 7 � Z i\ PROPOSED RIVER CROSSING $ LIFT STATION FOR FARMERS SPUR 8" � " '� i I SEWER SERVICE. ell ` 4a. _ .. �o J •;I♦en W. fOth STRE. le .•. 4813 U.S HWY. 4. 3H elton �/ ' ' mil' VICINITY MAP a o% / /Pt ''� ° :� i/`ire o ' — PREPARED BY: e' -._ -I i -._- KLH-NUL Engineering Inc. 10 ;v ✓ %° 1 PROJECT NO. 93006 .° • a 1��� 7e°- ' DATE: MAY 1993 •I ifs �_P ( - nO : • III 930534 ATTACHMENT NO. 5 COLORADO DEPARTMENT OF HEALTH '.;.:ter Quality Control Division -_10 East 11th Avenue eneer, Colorado 20'_0 APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF: A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS, OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY. B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3)) APPLICANT: CITY OF GREELEY WASTEWATER DEPARTMENT ADDRESS: 1000 10TH STREET , GREELEY , CO 80631 PHONE: 350-9817 Consulting Engineer's Name and Address: MICHAEL C . KETTERLING , PE , KLH-NUL ENGINEERING , 1020 28TH AVE . , GREELEY , CO 80631 PHONE: 351 -0550 A. Summary of information regarding new sewage treatment plant: 1. Proposed Location: (Legal Description) 1/4, 1/4, Section Township , Range County. 2. Type and capacity of treatment facility proposed: Processes Used Hydraulic Organic • gal/day lbs. BODS/day Present PE Design PE % Domestic Z Industrial 3. Location of facility: Attach a map of the area which includes the following: (a) 5-mile radius: all sewage treatment plants, lift stations, and domestic water supply intakes. (b) 1-mile radius: habitable buildings, location of potable water wells, and an approximate indication of the topography. 4. Effluent disposal: Surface discharge to watercourse Subsurface disposal Land Evaporation Other State water quality classification of receiving watercourse(s) Proposed Effluent Limitations developed in conjunction with Planning and Standards Section, WQCD: BOD5- mg/1 SS mg/1 Fecal Coliform /100 ml Total Residual Chlorine mg/1 Ammonia mg/1 Other 5. Will a State or Federal grant be sought to finance any portion of this project? 6. Present zoning of site area? Zoning with a 1-mile radius of site? 7. What is the distance downstream from the discharge to the nearest domestic water supply intake? (Name of Supply) (Address of Supply) What is the distance downstream from the discharge to the nearest other point of diversion? (Name of User) (Address of User) -1- WQCD-3 (Revised 8-83) 930534 S. Cho has the responsibility for operating the proposed facility? d. Who owns the land upon which the facility will be constructed? (Please attach copies of the document creating authority in the applicant to construct the proposed facility at this site. ) 10. Estimated project cost : Who is financially responsible for the construction and operation of the facility? 11. Names and addresses of all water and/or sanitation districts within 5 miles downstream of proposed wastewater treatment facility site. (Attach a separate sheet of paper if necessary. ) 12. Is the facility in a 100 year flood plain or other natural hazard area? If so, what precautions are being taken? Has the flood plain been designated by the Colorado Water Conservation Board, Department of Natural Resources or other Agency? (Agency Name) If so, what is that designation? 13. Please include all additional factors that might help the Water Quality Control Division make an informed decision on your application for site approval. B. Information regarding lift stations: 1. The proposed lift station when fully developed will generate the following additional load: Peak Hydraulic (MGD) 0 . 02 P.E. to be served 265 2. Is the site located in a 100 year flood plain? NO If yes, on a separate sheet of paper describe the protective measures to be taken. 3. Describe emergency system in case of station and/or power failure. POWER SUPPLY IS AVAILABLE FROM TWO INDEPENDENT SOURCES CITY HAS PORTABLE AUX . GENERATOR 4. Name and address of facility providing treatment: CITY OF GREELEY 300 EAST 8TH STREET , GREELEY , CO 80631 5. The proposed lift station when fully developed will increase the loading of the treatment plant to 73 X of hydraulic and 71 % of organic capacity and THE CITY OF GREELEY agrees to treat this wastewater? Yes X No (Treatment Agency) OS- 07 .93 Date g d ti SAM BO GREELEY N , PRO N'CT I UtRGEA CITY Otie z- 9::0S3.t WQCD-3 (Revised 8-83) • C. If the facility will be Located on or adjacent to a site that is owned or managed by a Federal or State agency, send the agency a copy of this application. D. Recommendation of governmental authorities: Please address the following issues in your recommendation decision. Are the proposed facilities consistent with the comprehensive plan and any other plans for the area, including the 201 Facility Plan or 208 Water Quality Management Plan, as they affect water quality? If you have any further comments or questions, please call 320-8333, Extension 3272. Recommend Recommend No Date Approval -Disapproval Commentagnattare of Representative 1. 5-,20-93 V v-r00/3(-- S Si-71A eAdt.A Maanna8,ementt Agency 2. O 5253 (SintGC�� Local Government: Cities or' Towns (If site is inside boundary or within three miles) and Sanitation Districts. Boar 7611/,;y Co uiesioners 63 /9/.j s7,,\7S3 l He h u r ty 5. D• ty County Plan ir,g Au ho ty wL. 6. Y41-/2/3 �/ / -r - / Council of Governments/Regional Planni,.; 7. State Geologist (For lift stations, the signature of the State Geologist is not required. Applications for treatment plants require all signatures.) I certify that I am familiar with the requirements of the "Regulations for Site Applications For Domestic Wastewater Treatment Works," and have posted the site in accordance with the regulations. An engineering report, as described by the regulations, has been prepared and is enclosed. DATEOS-07-93 /2G;,,„� s7,_J`• SAM BOONE Signature of Applicant TYPED NAME PROJECT MANAGER CITY OF GREELEY -3- WQCD-3 (Revises& R—R'1\ 930534 ATTACHMENT TO SITE APPLICATION :n accordance with C.R.S. 1981, .5-8-702 (2)(a) , (c) , and (c) , and the "Regulations for Site \prlications for Domestic Wastewater Treatment Works", the Water Quality Control Division must Jeterrine that each site location is consistent with the longrange, comprehensive planning for the area in which it is to be located, that the plant on the proposed site will be managed to -ltni.ize the potential adverse impacts on water quality, and must encourage the consolidation wastewater treatment works whenever feasible. In making this determination, the Division requires each applicant for a site approval for a domestic wastewater treatment works to supply an engineering report describing the project a^d showing the applicant's capabilities to manage and operate the faility over the life of the ?reject to determine the potential adverse impacts on water quality. The report shall be considered the culmination of the planning process and as a minimum shall address the following: Service area definition including existing population and population projections, flow/loading projections, and relationship to other water and wastewater treatment plants in the area. Proposed effluent limitations as developed in coordination with the Planning and Standards Section of the Division. (Allow minimum four weeks processing time. ) Analysis of existing facilities including performance of those facilities. Analysis of treatment alternatives considered. Flood plain and natural hazard analysis. Detailed description of selected alternatives including legal description of the site, treatment system description, design capacities, and operational staffing needs. Legal arrangements showing control of site for the project life. Institutional arrangements such as contract and/or covenant terms for all users which will be finalized to accomplished acceptable waste treatment. Management capabilities for controlling the wastewater throughout and treatment within the capacity limitations of the proposed treatment works, i.e. , user contracts, operating agreements, pretreatment requirements. Financial system which has been developed to provide for necessary capital and continued operation, maintenance, and replacement through the life of the project. This would include, for example, anticipated fee structure. Implementation plan and schedule including estimated construction time and estimated start-up date. Depending on the proposed project, some of the above items may not be applicable to address. In such cases, simply indicate on the application form the non applicability of those. • -4- 930534. unrn-1 ra...,taea a_R1' Hello