HomeMy WebLinkAbout930534.tiff RESOLUTION
RE: ACTION OF BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO,
CONCERNING SITE APPLICATION OF THE CITY OF GREELEY WASTEWATER DEPARTMENT,
CIO FRANK STEPHENS, AND AUTHORIZE CHAIRMAN TO SIGN
WHEREAS, the Board of County Commissioners of Weld County, Colorado,
pursuant to Colorado statute and the Weld County Home Rule Charter, is vested
with the authority of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has received a Site Application from the City of Greeley
Wastewater Department, c/o Frank Stephens, concerning the construction of a lift
station located on the following described parcel of land, to-wit:
Part of the SW! of Section 33, Township 6 North, Range
66 West of the 6th P.M. , Weld County, Colorado
WHEREAS, the regulations for site applications for the construction of a
lift station require review of the site application by the Board of County
Commissioners, and further, that various local and State agencies be given the
opportunity to review and comment on said site application, and
WHEREAS, the Site Application from the City of Greeley Wastewater
Department was submitted to the Board of County Commissioners of Weld County for
review and comments, a copy of said application being attached hereto and
incorporated herein by reference, and
WHEREAS, after study and review, the Board finds it in the best interest
of Weld County to recommend approval of said application for the following
reasons:
1. Said site application is consistent with the Weld County
Comprehensive Plan's Public Facility and Service Goals
and Policies and the Urban Growth Boundary Area Goals
and Policies.
2. The proposed lift station will be an efficient and cost
effective wastewater treatment and will not be a
duplication of services.
3. The lift station, when constructed, will have the
capacity to serve Pronto Foods and is not located in a
floodplain.
4. This proposal does not appear to have negative impacts
on the general health, safety, and welfare of the
present and future residents of Weld County.
PL0079
930534
9t,of79
RE: SITE APPLICATION - CITY OF GREELEY WASTEWATER DEPARTMENT
PAGE 2
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Site Application submitted by the City of Greeley
Wastewater Department be, and hereby is, recommended favorably to the Colorado
Department of Health as being compatible with the Weld County Comprehensive Plan.
BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is,
authorized to sign said site application.
The above and foregoing Resolution was, on motion duly made and seconded,
adopted by the following vote on the 16th day of June, A.D. , 1993.
/.1 f/)' BOARD OF COUNTY COMMISSIONERS
ATTEST: J � WE COUNTY, COLORADO
Gitte
Weld County Clerk to the Board ��J � JC'a
/f 4, (. `.."`/
Constancerbert, Chairman
BY: /1��4,e0/`� { of IY
JQJ
rd W. L�
APPROVED AS TO FORM: (AVe
G org E. Baxter
Imo-_
County Attdrnhy Dale K. Hall •
kee- .l f�Y/7utLCA
ar c!{bara J. Kirkme er 6
930534
BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION
RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS
Moved by Jean Hoffman that the following resolution be introduced for passage by the
Weld County Planning Commission that the application for:
NAME: City of Greeley Wastewater Department, c/o Frank Stephens
REQUEST: Site Application for approval of construction of a lift station.
LEGAL DESCRIPTION: Part of the SW4 of Section 33, T6N, R66W of the 6th P.M. ,
Weld County, Colorado.
LOCATION: South of Greeley No. 3 Canal on the west side of 71st Avenue; north of
F Street.
be recommended favorably to the Board of County Commissioners for the following
reasons:
This request is consistent with the Weld County Comprehensive Plan's Public Facility
and Service Goals and Policies and the Urban Growth Boundary Area Goals and Policies.
The proposed lift station will be an efficient and cost effective wastewater
treatment and will not be a duplication of services. The lift station when
constructed will have the capacity to serve Pronto Foods and is not located in a
floodplain. This proposal does not appear to have negative impacts on the general
health, safety, and welfare of the present and future residents of Weld County.
The City of Greeley, Weld County Health Department, and the North Front Range Water
Quality Protection Association have recommended approval of this proposal.
Motion seconded by Juliette Kroekel.
VOTE:
For Passage Against Passage
Richard Kimmel
Bill O'Hare
Shirley Camenisch
Judy Yamaguchi
Bud Clemons
Juliette Kroekel
Jean Hoffman
The Chairperson declared the resolution passed and ordered that a certified copy be
forwarded with the file of this case to the Board of County Commissioners for further
proceedings.
CERTIFICATION OF COPY
I, Sharyn Ruff, Recording Secretary for the Weld County Planning Commission, do
hereby certify that the above and foregoing resolution, is a true copy of the
resolution of the Planning Commission of Weld County, Colorado, adopted on June
15, 1993.
D ted the 15t of
f
Sharyn F. Ruff 930.534
Secretary
Date: June 15, 1993
NAME: City of Greeley Wastewater Department, c/o Frank Stephens
REQUEST: Site Application for approval of construction of a lift station.
LEGAL DESCRIPTION: Part of the SW4 of Section 33, T6N, R66W of the 6th P.M. ,
Weld County, Colorado.
LOCATION: North of Greeley No. 3 Canal on the west side of 71st Avenue.
The Department of Planning Services' staff recommends that this request be
approved for the following reasons:
This request is consistent with the Weld County Comprehensive Plan's Public
Facility and Service Goals and Policies and the Urban Growth Boundary Area Goals
and Policies. The proposed lift station will be an efficient and cost effective
wastewater treatment and will not be a duplication of services. The lift station
when constructed will have the capacity to serve Pronto Foods and is not located
in a floodplain. This proposal does not appear to have negative impacts on the
general health, safety, and welfare of the present and future residents of Weld
County.
The City of Greeley, Weld County Health Department, and the North Front Range
Water Quality Protection Association have recommended approval of this proposal.
s�es�a
ATTA ENT NO. 5
iOL)K.ADU DEPARTMENT of HEALTH
';.iter Quality Cantr.>I Division
-.10 EJSt lath Avenue
saver, Colorado S020
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF:
A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS,
OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY.
B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3))
APPLICANT: CITY OF GREELEY WASTEWATER DEPARTMENT
ADDRESS: 1000 10TH STREET, GREELEY, CO 80631 PHONE: 350-9817 Consulting Engineer's Name and Address: MICHAEL C . KETTERLING, PE, KLH-NUL
ENGINEERING, 1020 28TH AVE. , GREELEY, CO 80631 PHONE: 351-0550
A. Summary of information regarding new sewage treatment plant:
if 1. Proposed Location: (Legal Description) 1/4, 1/4, Section
Township , Range ,
County.
2. Type and capacity of treatment facility proposed: Processes Used
Hydraulic Organic
gal/day lbs. BOD5/day
Present PE Design PE X Domestic X Industrial
3. Location of facility:
Attach a map of the area which includes the following:
(a) 5-mile radius: all sewage treatment plants, lift stations, and domestic
water supply intakes.
(b) 1-mile radius: habitable buildings, location of potable water wells, and
an approximate indication of the topography.
4. Effluent disposal: Surface discharge to watercourse
Subsurface disposal Land
Evaporation Other
State water quality classification of receiving watercourse(s)
Proposed Effluent Limitations developed in conjunction with Planning and Standards
Section, WQCD: BOD5 mg/1 SS mg/1 Fecal Coliform /100 ml
r
Total Residual Chlorine mg/1 Ammonia mg/1 Other
5. Will a State or Federal grant be sought to finance any portion of this project?
6. Present zoning of site area?
Zoning with a 1-mile radius of site?
7. What is the distance downstream from the discharge to the nearest domestic water
supply intake?
(Name of Supply)
(Address of Supply)
What is the distance downstream from the discharge to the nearest other point of
diversion?
(Name of User)
(Address of User)
-1- 930S34
WQCD-3 (Revised 8-83)
• •
S. .ho has the responsibility for operating the proposed facility?
4. Who owns the land upon which the facility will be constructed?
(Please attach copies of the document creating authority in the applicant to
construct the proposed facility at this site.)
10. Estimated project cost:
Who is financially responsible for the construction and operation of the facility?
11. Names and addresses of all water and/or sanitation districts within S miles
downstream of proposed wastewater treatment facility site.
(Attach a separate sheet of paper if necessary.)
12. Is the facility in a 100 year flood plain or other natural hazard area?
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board,
Department of Natural Resources or other Agency?
(Agency Name)
If co, what is that designation?
13. Please include all additional factors that might help the Water Quality Control
Division make an informed decision on your application for site approval.
B. Information regarding lift stations:
1. The proposed lift station when fully developed will generate the following additional
load: Peak Hydraulic (MCD) 0.02 P.E. to be served 265
2. Is the site located In a 100 year flood plain? NO
If yes, on a separate sheet of paper describe the protective measures to be taken.
3. Describe emergency system in case of station and/or power failure. POWER SUPPLY IS
AVAILABLE FROM TWO INDEPENDENT SOURCES & CITY HAS PORTABLE AUX. GENERATOR
4. Name and address of facility providing treatment: CITY OF GREELEY
300 EAST 8TH STREET, GREELEY, CO 80631
5. The proposed lift station when fully developed will increase the loading of the
treatment plant to 73 X of hydraulic and 71 X of organic capacity and
THE CITY OF GREELEY agrees to treat this wastewater? Yes X No
(Treatment Agency) (�
05-07 .93 Ac„w�jgg11������� dd i�
Date SAM BOONS PRbeeftif1l OSGER{{tie
CITY OF GREELEY
930S34
-2-
WQCD-3 (Revised 8-83)
•
C. If the facility will be located on or adjacent to a site that is owned or managed by a
Federal or State agency, send the agency a copy of this application.
D. Recommendation of governmental authorities:
Please address the following issues in your recommendatldn decision. Are the proposed
facilities consistent with the comprehensive plan and any other plans for the area,
including the _101 Facility Plan or 208 Water Quality Management Plan, as they affect water
quality? If you have any further comments or questions, please call )20-8))), Extension
3272.
Recommend Recommend No
late flvoruval Disapproval Comment �gna tare_ of Representative
1. 5;zo-3 14 eAkA _
MMan�,Bl,emennge y
2• .5-2.0.93 v /d+wCGC�'-.Jett/
Local Government: Cities or Towns (If
site is inside boundary or within three
miles) and Sanitation Districts.
Boar of Cou y misslo ners
c. s/h7 f3
cal Health Authority
S.
City/County Planning Authority
6. )O 1/43 1/ dFgLivett7vC'/Ia(C"
Council of Governments/Regional Pianni,.;
7.
State Geologist
(For lift stations, the signature of the State Geologist is not required. Applications for
treatment plants require all signatures.)
I certify that I am familiar with the requirements of the "Regulations for Site Applications
For Domestic Wastewater Treatment Works," and have posted the site in accordance with the
regulations. An engineering report, as described by the regulations, has been prepared and is
enclosed.
DATE05-07-V3 a„„: SAM BOONE
Signature of Applicant TYPED NAilE
PROJECT MANAGER
CITY OF GREELEY
930534
FARMERS SPUR LIFT STATION
PRELIMINARY ENGINEERING REPORT
1. The proposed wastewater lift station is located in the
SW1/4 of Section 33 , T. 6N. , R.66W. , in Weld County, Colorado. This
location is north of the Greeley No. 3 Canal on the west side of
71st Avenue. (See attached vicinity map. )
The lift station will provide service to Pronto Foods which is
located to the southwest of where the Burlington Northern Railroad
crosses "O" Street. (NE1/4 of Section 33)
Presently, Pronto Foods generates 20, 000 gallons per day of
wastewater with a BOD of approximately 2200 mg/l.
There are no existing wastewater treatment plants within 4. 5
miles of Pronto Foods.
2. It is not anticipated that the City of Greeley will
institute effluent limitations on the wastewater generated by
Pronto Foods.
3. Pronto Foods is now hauling, on a daily basis, the
wastewater it generates to the City of Greeley's First Avenue
wastewater treatment facility.
4. It is not practical for Pronto Foods to treat their
wastewater on-site.
5. The proposed lift station is located just outside the
limits of the Cache La Poudre River 100-year floodplain. The top
elevation of the lift station is proposed to be higher than the
banks of the No. 3 Canal and the roadway surface of 71st Avenue.
The lift station will be supplied with power from two
independent sources. In the case of a complete power failure, an
930534
alarm will be activated at the police station via telephone lines.
6. The lift station is required to allow sanitary sewer
service from Pronto Foods to flow by gravity under the Cache La
Poudre River and then be pumped up into the existing Sheep Draw
Sewer located at the intersection of 59th Avenue and "C" Street.
The City will not increase their current operations staff due to
the addition of this lift station to their system.
7. The City of Greeley will acquire a right-of-way from the
current land owner for the lift station site.
8. The City of Greeley wastewater department will finance a
portion of the construction cost as well as operation and
maintenance costs of the completed lift station through the life of
the project. Pronto Foods will be charged a monthly fee for use of
the system.
9. The implementation schedule for this lift station is as
follows:
A. Construction time: August 16th through November 19th,
1993
B. Project Start-up: November 24, 1993
930534
/♦760) \ R. tc6 W. I1 _
i (� � -. 'I
o — n •
AD — � . a �� �. heal i'
7[a n6 ;.
0723
>3> on6 �' �_� \' ♦ Lis Y.__A20 d • a.
'• �� .� i3
% I
��30� -J zQ 4. B ` e\well \ SCALE: = 2000'!
.. {
. J Well° 2 4726 - 28 °
5> 1 -- f,---`, Oy
"si ° ;Al L
___ °R
I� q° = Farm "0" STREET
-_-e ♦> O .a 0719_. �. qn.°
5.
•
r � .EV 1\I V E�C1WROSSING ,♦7 _ A694 S°UT•94-6, , A
, A
°i'`�� A � 4685
�II iii '2oa�'---� .: ---�� .i
j1 O . 33 fi
34 mIVE ,.
a 32�/ &
�� P SED .'.
\'u!` �� •E� � ' LIF TATI. N i.` f ;,�
,. c�
♦ 469? w -
5 _�
- � i � of !
one � . � ' . •: Ts.-
I S E �- •W ... .� . .
�� ���� EW n
•
,\ : 7/ C-2 04)
11 n' ) )---7J.J'' 3,
rTh
3 "7 • th (STR � � / ��• :
0 3-441
I/
o SuEsta_' ♦>y0 D 7 �
Z i\ PROPOSED RIVER CROSSING
$ LIFT STATION FOR
FARMERS SPUR 8"
� " '� i I SEWER SERVICE.
ell ` 4a. _ .. �o J
•;I♦en W. fOth STRE. le .•. 4813
U.S HWY. 4. 3H elton
�/ ' ' mil' VICINITY MAP
a
o% / /Pt ''� ° :� i/`ire
o
' — PREPARED BY:
e' -._ -I i -._- KLH-NUL Engineering Inc.
10 ;v ✓ %° 1 PROJECT NO. 93006
.° • a 1��� 7e°- ' DATE: MAY 1993
•I ifs
�_P ( - nO : • III
930534
ATTACHMENT NO. 5
COLORADO DEPARTMENT OF HEALTH
'.;.:ter Quality Control Division
-_10 East 11th Avenue
eneer, Colorado 20'_0
APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OR EXPANSION OF:
A) DOMESTIC WASTEWATER TREATMENT WORKS (INCLUDING TREATMENT PLANTS,
OUTFALL SEWERS, AND LIFT STATIONS) OVER 2,000 GPD CAPACITY.
B) INTERCEPTORS (IF REQUIRED BY C.R.S. 25-8-702 (3))
APPLICANT: CITY OF GREELEY WASTEWATER DEPARTMENT
ADDRESS: 1000 10TH STREET , GREELEY , CO 80631 PHONE: 350-9817
Consulting Engineer's Name and Address: MICHAEL C . KETTERLING , PE , KLH-NUL
ENGINEERING , 1020 28TH AVE . , GREELEY , CO 80631 PHONE: 351 -0550
A. Summary of information regarding new sewage treatment plant:
1. Proposed Location: (Legal Description) 1/4, 1/4, Section
Township , Range
County.
2. Type and capacity of treatment facility proposed: Processes Used
Hydraulic Organic
• gal/day lbs. BODS/day
Present PE Design PE % Domestic Z Industrial
3. Location of facility:
Attach a map of the area which includes the following:
(a) 5-mile radius: all sewage treatment plants, lift stations, and domestic
water supply intakes.
(b) 1-mile radius: habitable buildings, location of potable water wells, and
an approximate indication of the topography.
4. Effluent disposal: Surface discharge to watercourse
Subsurface disposal Land
Evaporation Other
State water quality classification of receiving watercourse(s)
Proposed Effluent Limitations developed in conjunction with Planning and Standards
Section, WQCD: BOD5- mg/1 SS mg/1 Fecal Coliform /100 ml
Total Residual Chlorine mg/1 Ammonia mg/1 Other
5. Will a State or Federal grant be sought to finance any portion of this project?
6. Present zoning of site area?
Zoning with a 1-mile radius of site?
7. What is the distance downstream from the discharge to the nearest domestic water
supply intake?
(Name of Supply)
(Address of Supply)
What is the distance downstream from the discharge to the nearest other point of
diversion?
(Name of User)
(Address of User)
-1-
WQCD-3 (Revised 8-83) 930534
S. Cho has the responsibility for operating the proposed facility?
d. Who owns the land upon which the facility will be constructed?
(Please attach copies of the document creating authority in the applicant to
construct the proposed facility at this site. )
10. Estimated project cost :
Who is financially responsible for the construction and operation of the facility?
11. Names and addresses of all water and/or sanitation districts within 5 miles
downstream of proposed wastewater treatment facility site.
(Attach a separate sheet of paper if necessary. )
12. Is the facility in a 100 year flood plain or other natural hazard area?
If so, what precautions are being taken?
Has the flood plain been designated by the Colorado Water Conservation Board,
Department of Natural Resources or other Agency?
(Agency Name)
If so, what is that designation?
13. Please include all additional factors that might help the Water Quality Control
Division make an informed decision on your application for site approval.
B. Information regarding lift stations:
1. The proposed lift station when fully developed will generate the following additional
load: Peak Hydraulic (MGD) 0 . 02 P.E. to be served 265
2. Is the site located in a 100 year flood plain? NO
If yes, on a separate sheet of paper describe the protective measures to be taken.
3. Describe emergency system in case of station and/or power failure. POWER SUPPLY IS
AVAILABLE FROM TWO INDEPENDENT SOURCES CITY HAS PORTABLE AUX . GENERATOR
4. Name and address of facility providing treatment: CITY OF GREELEY
300 EAST 8TH STREET , GREELEY , CO 80631
5. The proposed lift station when fully developed will increase the loading of the
treatment plant to 73 X of hydraulic and 71 % of organic capacity and
THE CITY OF GREELEY agrees to treat this wastewater? Yes X No
(Treatment Agency)
OS- 07 .93 Date g d ti
SAM BO GREELEY N , PRO N'CT I UtRGEA
CITY Otie
z- 9::0S3.t
WQCD-3 (Revised 8-83)
•
C. If the facility will be Located on or adjacent to a site that is owned or managed by a
Federal or State agency, send the agency a copy of this application.
D. Recommendation of governmental authorities:
Please address the following issues in your recommendation decision. Are the proposed
facilities consistent with the comprehensive plan and any other plans for the area,
including the 201 Facility Plan or 208 Water Quality Management Plan, as they affect water
quality? If you have any further comments or questions, please call 320-8333, Extension
3272.
Recommend Recommend No
Date Approval -Disapproval Commentagnattare of Representative
1. 5-,20-93 V v-r00/3(-- S Si-71A eAdt.A
Maanna8,ementt Agency
2. O
5253 (SintGC��
Local Government: Cities or' Towns (If
site is inside boundary or within three
miles) and Sanitation Districts.
Boar 7611/,;y Co uiesioners 63 /9/.j
s7,,\7S3
l He h u r ty
5. D•
ty County Plan ir,g Au ho ty wL.
6. Y41-/2/3 �/ / -r - /
Council of Governments/Regional Planni,.;
7.
State Geologist
(For lift stations, the signature of the State Geologist is not required. Applications for
treatment plants require all signatures.)
I certify that I am familiar with the requirements of the "Regulations for Site Applications
For Domestic Wastewater Treatment Works," and have posted the site in accordance with the
regulations. An engineering report, as described by the regulations, has been prepared and is
enclosed.
DATEOS-07-93 /2G;,,„� s7,_J`• SAM BOONE
Signature of Applicant TYPED NAME
PROJECT MANAGER
CITY OF GREELEY
-3-
WQCD-3 (Revises& R—R'1\ 930534
ATTACHMENT TO SITE APPLICATION
:n accordance with C.R.S. 1981, .5-8-702 (2)(a) , (c) , and (c) , and the "Regulations for Site
\prlications for Domestic Wastewater Treatment Works", the Water Quality Control Division must
Jeterrine that each site location is consistent with the longrange, comprehensive planning for
the area in which it is to be located, that the plant on the proposed site will be managed to
-ltni.ize the potential adverse impacts on water quality, and must encourage the consolidation
wastewater treatment works whenever feasible.
In making this determination, the Division requires each applicant for a site approval for a
domestic wastewater treatment works to supply an engineering report describing the project a^d
showing the applicant's capabilities to manage and operate the faility over the life of the
?reject to determine the potential adverse impacts on water quality. The report shall be
considered the culmination of the planning process and as a minimum shall address the
following:
Service area definition including existing population and population projections,
flow/loading projections, and relationship to other water and wastewater treatment plants
in the area.
Proposed effluent limitations as developed in coordination with the Planning and Standards
Section of the Division. (Allow minimum four weeks processing time. )
Analysis of existing facilities including performance of those facilities.
Analysis of treatment alternatives considered.
Flood plain and natural hazard analysis.
Detailed description of selected alternatives including legal description of the site,
treatment system description, design capacities, and operational staffing needs.
Legal arrangements showing control of site for the project life.
Institutional arrangements such as contract and/or covenant terms for all users which will
be finalized to accomplished acceptable waste treatment.
Management capabilities for controlling the wastewater throughout and treatment within the
capacity limitations of the proposed treatment works, i.e. , user contracts, operating
agreements, pretreatment requirements.
Financial system which has been developed to provide for necessary capital and continued
operation, maintenance, and replacement through the life of the project. This would
include, for example, anticipated fee structure.
Implementation plan and schedule including estimated construction time and estimated
start-up date.
Depending on the proposed project, some of the above items may not be applicable to address.
In such cases, simply indicate on the application form the non applicability of those.
•
-4- 930534.