Loading...
HomeMy WebLinkAbout911445.tiff CHANGE _ Distribution to: ORDER OWNERARCHITECT Q AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT:Weld County Human Services Renovation CHANGE ORDER NUMBER: 1-5 (name, address) INITIATION DATE: TO (Contractor): ARCHITECT'S PROJECT NO: 9101 Growling Bear Construction CONTRACT FOR: 6310 W. 10th Street, Unit #4 Greeley, Colorado 80634 CONTRACT DATE: You are directed to make the following changes in this Contract: 1.) Remove the existing steam boiler and furnish and install one (1) 300,000 MU hot water boiler. Install one (1:) hot water supply line to the second floor and twelve (12) feet of baseboard radiation. Furnish hot water pumps and controls for a complete working system. Amount $ 11,935.00. 2) Contractor to install the fire main line tan. This is an additional amount to install and repair all work that is necessary in the Pedestrian Mall. Amount $ 3,341,00 3) Contractor to furnish and install all electrical changes required to finish the electrical service problems for both the Human Services and Radio Station. Amount $ 5,843.75 4) Contractor to wrap 20 columns in basement as required by Building Inspectors. Amount $1,650.0 S) Contractor to add an additional 2 x 4 light fixture in stairway up to Radio Station. Amount $ 170.00 6) Contractor to add two dedicated receptacles required by United Way. Amount $ 432.00 -) Contractor to hook up all electrical items to finish the installation of the new boiler and pumps. Amount $ 1,091.37 (See Attached Continuation Sheet) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 337,171.00 Net change by previously authorized Change Orders $ .00 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 337,171.00 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order $ 27,199.22 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 364,370.22 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Sept. 30, 1991 Authorized: Bley Associates Growling Bear Weld County ARg�IMctlubhouse Drive C°ditc-toR 10th Street OWN915 10thStreet Address Address Address Creel , Colorad Greeley, Color Greele Colorado BY iY//�LL-K... La/-14.. BY • @ATE t l h DATE A.-3pl/9� DATE 12/11/91 m 1 1 / // S d AIA DOCUMENT G70 • CHANGE ER • APR 19778 E ITION AIA9 • © 1978 ^t THE AMERICAN INSTITUTE OF ARCHITE T , 1735/N Y KK N�V_ ASHINGTO�.v. TC. 20006 - G701 —197 -+ T- r- nn I I ATTEST: ,...nn e 0 BY: iS CT.RRK Continuation Sheet for Change Order AIA Document G701 Weld County Human Services Renovation - Change Order Numbers 1-5 81 Contractor to furnish and install plumbing changes specified by the County. Amount S 264.00 9) Contractor to furnish and install elevator machine room exhaust vent per code. • Amount $ 979.00 10) Contractor to wrap new chase for elevator machine room exhaust vent. Amount $ 100.00 11) Contractor to furnish and install a new metal door cover for the rear base- ment door hatch. Amount $ 715.00 12) Contractor to furnish and install all items not shown on the original plans due to plan changes or existing conditions. 1) Cover and box out columns in walls 2) Wing wall at bottom of stairs 3) Re-do drywall in bathroom 4) New ceiling at Radio Station stair 5) Wrap EF-1 chase with drywall Amount $ 678.10 9114445 Hello