Loading...
HomeMy WebLinkAbout910260.tiff INTERGOVERNMENTAL AGREEMENT THIS AGREEMENT, made and entered into this N..) day of , 1991, by and between the COUNTY OF WELD, Slate of o rado, hereinafter called "County, " and the CITY OF GREELEY, Colorado, hereinafter called "City. " WHEREAS, County Bridge 60.5/29A, also known as the 4th Street Bridge over Sheep Draw, is located one-half in the City and one-half in the County; and, WHEREAS, the bridge is deficient in load-carrying capacity; and, WHEREAS, the City and the County jointly applied to the Special Highway Committee for funds to replace the bridge at the request of the County; and, WHEREAS, on October 18, 1990, Two Hundred Eighty-Eight Thousand Dollars ($288, 000) in State Special Bridge Funds was granted; and, WHEREAS , Seventy Thousand Dollars ($70, 000) was the estimated total local matching funds needed for the project at the time of application, anticipated to be provided equally by the City and the County; and, WHEREAS, it is in the best interests of the citizens of the City and County to replace the bridge. NOW, THEREFORE, in consideration of the mutual covenants and conditions hereinafter set forth, the County and City mutually agree as follows: 1. The City will provide fifty percent (50%) of the local matching funds not to exceed Thirty Five Thousand Dollars ($35, 000) . This amount to be paid within thirty (30) days of receipt of an invoice from the County. 2. The County shall be the lead agency and have jurisdiction over the structure upon execution of this Agreement, allowing for full authority in contractual arrangements during the prosecution of the project. 3 . The County shall be responsible for the design, construction, and administration of the project. 4 . The County will inspect and maintain the new bridge subsequent to construction of the new bridge and include it in any required bridge inventory. 910260 Hiti O M 5. If the City annexes the portion of the bridge presently in the County, the City assumes responsibility for maintenance, inspection, and inventory. IN WITNESS WHEREOF, the parties hereto have duly executed the agreement the day and year first above written. CITY OF GREELEY, COLORADO BOARD OF COUNTY COMMISSIONERS George Kenn dy, Chairman pro-Tem 'ATTEST '1/4 .; 3 ATTEST: � lif ing if AY:tIl i' A 7 a i IIIbonmr ,/ b - 'y r Deputy Cl4rk to the Board t. AP O LEGAL FORM: City Attorney APPROVED AS TO SUBSTANCE: Cit anager 910260, CITY OF GREELEY, COLORADO ORDINANCE NO. 12 , 1991 AN ORDINANCE AUTHORIZING THE MAYOR TO SIGN AN INTERGOVERNMENTAL AGREEMENT WITH WELD COUNTY FOR THE REPLACEMENT OF THE 4TH STREET SHEEP DRAW BRIDGE. BE IT ORDAINED BY THE CITY COUNCIL OF GREELEY, COLORADO: Section 1. The Mayor of the City of Greeley is hereby authorized to sign, on behalf of the City of Greeley, an intergovernmental agreement (a copy of which is attached hereto and incorporated herein) with Weld County, Colorado for the replacement of the 4th Street Bridge over Sheep Draw. Section 2 . This intergovernmental agreement is in the best interests of the health, safety and welfare of the citizens of Greeley, Colorado. Section 3 . This ordinance will take effect five (5) days after its final publication, as provided by the Greeley City Charter. PASSED AND ADOPTED, SIGNED AND APPROVED this 19th day of March , 1991. ATTEST: THE CITY OF GREELEY, COLORADO hk. _/ � By: �l.�i.c�� Cityrk Mayor 9102S0 cer*I6MEMORAnDum gee To Clerk to the Board April 1, �91 Date Denny M. Graham, Civil Engineer II7)1/ (// COLORADO From t/• ' Agenda Items submct: Please place the following items on the Board's agenda for Wednesday, April 3, 1991: Contract for Engineering Services for Bridge 60.5/29A between (1/6.259 Weld County and Zoyiopoulos and Associates, Inc. Intergovernmental Agreement between Weld County and the City of Greeley pertaining to Bridge 60.5/29A. 9/01,00 Appropriate documentation is attached. DS/mw:cesitag.mrw cc: Commissioner Harbert File Acoal 9102511 Hello