Loading...
HomeMy WebLinkAbout940545.tiff RESOLUTION RE: APPROVE INSTALLATION OF TRAFFIC CONTROL DEVICES ON WELD COUNTY ROAD 32.5 AT WELD COUNTY ROAD 21 WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Weld County Engineering Department has recommended to the Board that the existing "Stop" sign on Weld County Road 21 at Weld County Road 32.5 be removed and a "Stop" sign be installed on Weld County Road 32.5 at Weld County Road 21, to ensure safety to the traveling public, and WHEREAS, the Board has determined that said traffic control devices are necessary for the protection of the general public. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Department of Engineering be, and hereby is, directed to remove the existing "Stop" sign on Weld County Road 21 at Weld County Road 32.5 and to install a "Stop" sign on Weld County Road 32.5 at Weld County Road 21, for the safety of the general public, and said signs shall conform to the State manual and specifications. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 13th day of June, A.D. , 1994. / i //��1 / /�� BOARD OF COUNTY COMMISSIONERS ATTEST: /J /Q)Q, // �a//�J WELD COUNTY, COL/ Weld County Clerk to the Board ,4r ; J /tW' H. Webster, air n BY: /� C Deputy Cl k to the Board Da e . Hall, ro- m APPROVED AS TO FORM: AGeorge7. 1a ,/ r. ,v1C. Baxter 444 .--------^ <' County Attor ey Co tance L. Harber arbara J. Kir eyer 940545 _' : 111 WCR 34 cL U EXISTING SIDEROAD O 4- -J Q T 4 N a EXISTING TEE SIGN z PROPOSED i STOP SIGN PROPOSED CHANGE TO 0 STOP AHEAD SIGN H x 0 W0 WCR 32.5 0 EXISTING STOP SIGN PROPOSED REMOVAL 4- J a a_ a Oa ce <of EXISTING STOP AHEAD SIGN Ln J PROPOSED CHANGE TO Lo D SIDEROAD SIGN A y W S U o STATE HWY 66 940545 mEmORAnDUm WIIBcTo Clerk to the Board Date Apr" 7 1994 COLORADO From George Cicoff, Public Works Director • Subject: Agenda Item It has been called to the attention of the Department that there is a need to change the traffic control signage at the intersection of WCR 32.5 X WCR 21. Currently, the traffic travels east and west on WCR 32.5, then north on WCR 21 to WCR 34. The southern portion of WCR 21 between WCR 32.5 X Colorado State Hwy. 66 is scheduled to received an asphalt surfacing. Currently, the flow of traffic through this intersection is controlled with a stop sign on the southeast corner which forces northbound traffic on WCR 21 to stop at the intersection. It is the recommendation of this Department that once construction is completed, the existing stop sign be removed and reset on the northeast corner to control traffic westbound on WCR 32.5 at the 'T' intersection. All signing will conform to the "Manual on Uniform Traffic Control Devices" . Please refer to the attached sketch. By a copy of this memo, we are requesting Mr. Barker to prepare the appropriate resolution. GC/zw:sign cc: Commissioner Kirkmeyer File 940545 Hello