Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
941027
CHANGE OWNER - fs County of Weld ORDER ARCHITECT O CONTRACTOR ❑ FIELD AIA DOCUMENT G701 OTHE •0 OTHER O • PROJECT: Island Grove Regional CHANGE ORDER NUMBER: 2 (name, address) Treatment Center DATE, October 17, 1994 TO CONTRACTOR: Greeley, Colorado • ARCHITECT'S PROJECT NO: 66006 (name, address) Thissen Construction Corp. CONTRACTDATE: A ril 1994 2900 F street P 11, • Greeley,- Colorado 80631 CONTRACT FOR: General Construction Attn: Mr. Curtis Naibauer The Contract is changed as follows: A. Items 1 through 5 as described on proposal request dated September 15, 1994, copy attached: Add: $2,023.00 • B. Add one exterior concrete slab on grade for bicycle racks; size 10' x 10' x 4"; located at east end of building as directed by Architect: • Add: $ 200.00 Total this change order: Add: $2,223.00 - Not valid until signed by the Owner, Architect and Contractor. The original(Contract Sum)(Guaranteed Maximum Price)was $ 1,068,297.00 Net change by previously authorized Change Orders $ —44,261 .00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $ 1,024,036.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)( (ar ;w/) (r•^cha4 ge4)by this Change Order in the amount of $ + 2,223.00 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be $ 1,026,259.00 The Contract Time will be(increased)el ( i•-"g^•t)by Seventy—Two ( 72 )days• The date of Substantial Completion as of die date of this Change Order thereibre is December 1, 1994 NOTE: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Roberts Architects Thissen Construction Coro. County of Weld ARCHITECT CONTRACTOR OWNER 809 9th Street 7900 F Street 915 10th Street Address Address Address Greeley, Colorado 8 6 Sreell/P'/.y r{r/i,horarioo//$063 Greeley, Colorado LLLoorrado(,9�(80631/BY • 7 BY / ,��.JI w/Ir / �n'- BY -jl_' { ! /'\�! jr sG ' '(/ �'- • DATE l • : - DATE`-rl0 / 7/4 DATE it://9/9 v �/�/ 9/ / / y CAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT G701. • CHANGE ORDER • 19X7 EDITION • AIA® • ©1917 • IIIE n•,, v�63M,:1) AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON. D.C. 2155%, Ll' G701 941027 Cr-rvIip WARNING:Unlicensed photocopying vlolc ht isms and is subject to legal prosecution. ci9! 7i 1544 2 :: 15 ^07357.053' 7HISS�IJ COIaS7 c 01 • PROPOSAL I OWNER ARCHITECT REQUEST CO NTRACTOR RACTOR /:! ,i raw, AM DOCUMENT G704 FIELD �� � OTHER f wasraROe ddrest' Island Grove Regional • PROPOSAL REQUEST NO: � wa• Treatment Center • Greeley, Colored' OWNER: DATE: September 15, 1994 TO: (Contractor) ' 'Thissen Construction Corp. 1 ARCHITECT'S PROJECT NO; 68006 • 2900 F Street Greeley, Colorado 80631 CONTRACT FOR: General Contruction L3.ttn: Mr. Curtis Naibauer CONTRACT DATED: April 11, 1994 Please submit an itemized quotation for changes In the Contract Sum and/or Time Incidental to proposed modifica- tions to the Contract Documents described herein. THIS IS NOT A CHANGE OREIER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. • Description: Winn descripnen of the Work) 1. Change glass color to integral bronze tint at (43) windows ' per drawings SK-1 thru SK-4: ' Add'. $ 43040 2. Furnish and install two electric eyes and connect to security 'r,monitor system per drawing SK-5: . Add $ 327 OP 3. Furnish and instep one dedicated electrical circuit at room b-2 for Intoxili1er machine per drawing SK-6 139. 00 Add E 4. Change configuration of two toilet stall partitions in Ditto* Area per drawing SK-7 Add $ 4hA-n0 5. Change opening #88 from single to double doors Per drawing SK-8 Add $ 701,00 Attachments; ;silt cashed docvmeml that support d*.eripiionl ..I�� �f f ©rJ2 C) Drawings SK•61 through SK-8 ell dated 9/15/94 s"T� ' (r Li �,J Post-It"brand fax transmittal memo 7071 Not e e � tam ----- • 421, x, ARCHITECT; Roberts Architect*, 809 9th Street, Greeley, Colorado 80631 BY: Wayne A. Roberts A'p 941027 CAUTION: You should sign en original AEA document which has thle caution printed In red. An original assures that changes will not be pbecured as may occur when documents are reproduced. Al* DOCUMENT crop • PROPOSAL REQUEST • APRIL 1970 EDITION • AIA® • 01970 • THE AMERICAN INSTITUTE Of ARCHITECTS, ins NEW YORK AVE„ N.W., WA5HINc.TON, p,C, 20006 ONE PAGE WARNINpt Mimed bholoon iaouiMsre.IIt ,,......t ...,_...._.._- .
Hello