ALPHA ENGINEERING CO.
LAND DEVELOPMENT PROPERTY SURVEYS
P.O. BOX 392 617 5th STREET
FORT LUPTON, COLORADO 80621
MAY 14, 1992 0 GENE
MR. KEITH SCHUETT
PLANNER NAY .1 8 1992 El
WELD COUNTY, COLORADO
DEPARTMENT OF PLANNING SERVICES Weld County Planning
915 10TH STREET
GREELEY, CO 80631
623-6031 #4400
RE: ROGGEN DISPOSAL ELEVATIONS OF POND C. WELD COUNTY, COLORADO.
DEAR MR. SCHUETT:
PRINTED ON THIS LETTER ARE THE LAST ELEVATIONS WE OBTAINED FROM THE
SITE. THE BENCH MARK USED IS THE TOP NORTH SIDE OF THE WOOD RAMP
EAST OF POND C. OTHER ELEVATIONS WERE AT THE HIGH POINT OF THE
DIKE. IF YOU HAVE FURTHER QUESTIONS PLEASE CONTACT ME.
SINCERELY,
?`- /( c
CECIL R. CROWE PE & LS 12330
23,12- 23.2 2
X u X3. 1'3
X
0ff°
X
23/2
23.61C.Z o
20
TPa(Ape 2oaot
T Gs+•: /-oh7�D
2 3.2
1V 19.73 `
X x
23.32 x a 3,3¢-
2-3,14—
LOCAL FAX METRO
857 —2308 (303) 573-518 6
FORT LUPTON 573-5186 DENVER
PL04n1
92.023
toy 1992 1.\\'fa
rDbor,Inn DEPARTMENT OF HEALTH
1517-16 AVENUE COURT
GREELEY, COLORADO 80631
O ADMINISTRATION (303)353-0586
HEALTH PROTECTION (303)353-0635
COMMUNITY HEALTH (303)353-0639
COLORADO
May 11, 1992
HAND DELIVERED
Mr. Mike Cervi
Roggen Disposal
P.O. Box 300397
Denver, Colorado 80203
Mr. Cervi:
We have reviewed the plan for repair of Pond B outlined in your letter of May 5,
1992, and the attached letter from Mr. Crowe. The following comments summarize
our evaluation:
1. The proposed remediation plan offers no specific dates for valve repair or
liner testing. We require a schedule for all aspects of the plan.
2. The time period offered to empty Pond B is much too lengthy. We require
that Pond B be actively emptied by pumping, and the contents transferred
to an approved facility. This process should begin immediately, and be
accomplished by June 1, 1992.
3. We find no written methodology for testing the liner. We require a
written document, outlining this methodology. Further, the results of the
liner evaluation when completed, must be forwarded to this office for
review and concurrence.
In summary, we find the proposed plan does not adequately address the issues of
non-compliance in an effective and timely manner.
Mr. Cervi, the situation which exists at Roggen Disposal is a very serious
potential health hazard and must be addressed aggressively and immediately.
Consequently, you have until May 14, 1992, to address our concerns as outlined
in this letter, and to begin pumping and transfer of the contents of Pond B.
4
Mr. Mike Cervi
Roggen Disposal
HAND DELIVERED
May 11, 1992
Page 2
A follow-up inspection will be conducted on May 15, 1992. If at that time you
have not taken the indicated action, we will recommend revocation of USR-
481:81:27.
If you have any further questions, please contact me.
Very truly yours,
ohn S. Pickle, M.S.E.H.
Director
Environmental Protection Services
JSP/lam-E929
Attachments
cc: Randy Gordon, M.D. , M.P.H. , Director, Weld County Health Department
Lee Morrison, Assistant Weld County Attorney
Keith Schuett, Planning
Austin Buckingham, Colorado Department of Health
MAN, - 1 1 - 9 2 MON N 1 6 : 17 C & C CATTLE CO P 0 1
(/c:DO y�-
u,� RECEIVED
SANITATION DIVISION
MAY 1j 1992
2L.)
�J WELB C0M !IL LTII DDT.
7A,de
ROGGEN DISPOSAL INC.
/ P. O.BOX 300397
Denver, Co 80203
303-830-7156
7.54,,,L4'(<1
May 11, 1992
Mr. John S. Pickle, Director
Environmental Protection Services
Weld County Department of Health
1517 16 Ave Court !\ MAY 1 n hgyc
Greeley, Colorado 80631 CY
ILLA6 ^^�(qq
Dear Mr. Pickle:
This letter is in response to your hand delivered letter
dated May 11, 1992.
We have made arrangements for a pump to begin emptying Pond
B at the Roggen Disposal on Thursday, May 14th. We will
make every effort to meet your deadline of June 1, for
completion of the job.
We have not submitted written methodology for testing the
liner because, as laymen, we do not know what those tests
would involve. We shall ask Cecil Crowe, as a licensed
engineer, to conduct appropriate tests on the liner as soon
as that operation is feasible and I assume he will follow
standard procedures in the testing process. We shall ask him
to prepare a written methodology for you.
The damaged valve serving Pond B has been repaired.
We are faxing a copy of this letter to you today and will
follow that with a hard copy by U. S. mail.
Sincerely,
itti (L'
„,
LAwa
Mike Cervi .ice
^ .4004 ROY ROMER rekfas Numbers
Main Building,Denver I 5.11
Governor (303)322-9076f
PATRICIA A. NOLAN, MD, MPH ptarmigan Dever
`�— Executive Director Oo3)32O-1529 be JLAY 1 2 1992 l First National Bank Ba '
(303)355-6559 t
Hazardous Materials and Waste Management Division Grand Junction Office V�e` ��c " '--
rn��nt�AM 4210 East 11th Avenue ( ) 7198 F�� BBHq
COLCII�i ) Denver,Colorado 80220-3716 pueblo Office
(303) 331-4830/FAX(303) 331-4401 (719)543-8441
DEPARTMENT
OFAHEALTH
May 7, 1992
CERTIFIED MAIL # i)373- 370-1P?
Weld County Disposal Inc.
12018 Warfield
San Antonio, Texas 78216
Attention: Mr. Howard Duckworth
Re: Hazardous Substance Response Fund
Dear Mr. Duckworth
The Hazardous Materials and Waste Management Division of the
Colorado Department of Health (the Division) has not received, as
of this date by this office, your 4th quarter of 1991 and the 1st
quarter 1992 user fee for the Hazardous Substance Response Fund. In
accordance with Title 25, Article 16, Section 104.5 of the Colorado
Revised Statutes 1982, any operator who fails to collect or to
transmit, within thirty (30) days of the end of the quarter, is
liable for payment of a civil penalty of ten percent (10%) of the
total amount of fee money uncollected or untransmitted.
Please remit this payment to:
Colorado Department of Health
Hazardous Materials and Waste Management Division
Attention: Poul E. Poulsen
4210 East 11th Avenue
Room 351
Denver, Colorado 80220
If you have any questions, please contact me at (303) 331-4806.
Sincerely,
Poul E. Poulsen
Engineer
Solid Waste and Incident Management Section
Hazardous Materials and Waste Management Division
cc: Austin Buckingham
Weld County Planning Dept.
File: SW/WLD/WEL-2
Opasted recycled paper
MAY- 7-92 THU 11:12 HMWM FAX MO, 3033314401 P. 02
ROY ROMER Teligier Noshes:
. Main Building Denver
J ^ �, .;., Governor
)322-9076
> lis yr
PATRICIA A. NOLAN, MD, MPH Ptarmigan ,Deaver
(303)320-1529
. _ Executive Director sot National Bank Wang,Deaver
(343)355-6559
Plosnedena Mater)alt and Waste Division Omnd lonttlon Once
4210 East 11th Avenue Management (3AO)246-7198
COLORADO Denver,Colorado 80220-3716
(303)33t-4830!PAX(303)331-4401 Pueblo Office
DEPARTMENT (719)5434441
OFAHEALTH
May 7, 1992
•
John Pickle
Weld County Health Department
1517 16th Avenue Court
Greeley, Colorado 80631
RE: Remediation of Pond B
Roggen Disposal
Weld County
Dear Mr. Pickle: .
The Hazardous Materials and Waste Management Division (the
Division) of the Colorado Department of Health has reviewed the
Cervi/Roggen Disposal, Inc. May 5, 1992 letter. The Division
offers the following comments regarding the proposed remediation
plan.
1. A schedule for all aspects of the remediation plan should
be provided (valve repair, liner testing, etc.) .
2. Pond B should be actively emptied by pumping. The
evaporation and aeration process is too lengthy. Pond B
should be emptied in a matter of weeks not months. The
pond continues to leak and the potential for impact the
environment and human health exists.
3. The methodology for testing the liner should be
specified, presented in a document and approved by Weld
County and Division. Results of the liner testing should
be forwarded to the County and the Division for review
and concurrence.
Based on the information provided, the Division finds that the plan
is inadequate for resolving the issues of noncompliance in a
thorough and expeditious manner.
•
MAY 19KWIll
Weld C3: tr P6mnaR9 .rsudsdpaper
Inn- I-be 1nU 11.1G nllwfl mitt NU. JU i144u1 r. u
P
John Pickle •
Roggen Disposal Inc.
May 7, 1992
Page 2/2
I may be contacted at this office, if you have any additional
questions.
Sincerely,
C
Austin N. Buckingham
Geologist 7
Hazardous Materials and Waste Management Division
cc: Cervi, Roggen Disposal, Inc.
file: WLD/ROG
n.? r )7(4 S'c% u_e'{7
ROGGEN DISPOSAL INC. E �i -'-- I V DE
P. O.BOX 300397 �ANITATIO`I DI�iISlOYI
Denver, Co 80203 „ 1gg2
303-830-7156 of Oo
° 13 ���1 `a�i�� ' BEM
May 5, 1992
Mr. John S. Pickle, Director
Environmental Protection Services
Weld County Department of Health
1517 16 Ave Court
Greeley, Colorado 80631
Dear Mr. Pickle:
This letter is in response to your Certified Letter No. : P
685 662 839 . Following is our plan for remedying the
concerns expressed in the letter.
1. Pond B will continue to be emptied by evaporation
and an aeration system will be installed to accelerate the
evaporation. An assessment will be made of the pond's liner
by a Professional Engineer, registered in the State of
Colorado.
2. The damaged valve serving Pond B will be repaired.
3 . A minimum three (3) feet of freeboard will be
maintained in the approved pond.
4. The engineer who will evaluate the liner as soon as
the pond is dry is Cecil Crowe of Alpha Engineering, Fort
Lupton, Colorado. We estimate that it should be dry by
September 1, 1992
I am enclosing a copy of the letter we received from Cecil
Crowe following our request to him to assist us in taking
care of the situation as outlined in your letter.
Sincerely,
0 DD07ilae__ .).A..2).c.i
MAY Mike
1992 Cervi a/
t� -
®
tq C'E7 nc.alt7 Planning
•
s:. ALPHA ENGINEERING CO
Y
LAND DEVELOPMENT PROPERT Y SURVEYS
P.O. BOX 392 617 5th STREET
FORT LUPTON, COLORADO 80621
April 30, 1992
Mr. Mike Cervi
Roggen Disposal
P.O. Box 300397
Denver, Colorado 80203
Mr. Cervi:
In response to the certified letter dated April 22, 1992 I suggest
that you state that you will take the following action;
1 . We will continue to empty pond B by evaporation and would in
stall an aeration system to accelerate the evaporation with your
approval.
2. The damaged valve serving pond B will be repaired.
3. A minimum of three (3 ) feet of freeboard will be maintained in
the approved pond.
4. We have contacted Cecil Crowe of Alpha Engineering, Fort
Lupton, Colorado to evaluate the liner as soon as the pond is dry.
We estimate that it should be dry by September 1 , 1992 if we are
allowed to install the aeration equipment.
5. If aeration equipment is installed in both pond B and C it will
be possible to continue to operate the facility while pond B is
being drained.
I am enclosing an item from the Greely Tribune, Wednesday, April
15, 1992 that states that we had the second wettest March in the last
100 years. We can prepare a plan for the aeration equipment in
about a week if it is approved to use it.
I will be back in Fort Lupton on Wednesday May 6, 1992.
Sincerely:
Cecil R. Crowe, PE & LS 12330
•
LOCAL FAX METRO
857 -2308 (303) 573 -5186
-1- , , irsT--*f g77 . FipF nnIVFR
•
tS
•
ri31 DEPARTMENT OF HEALTH
1517- 16 AVENUE COURT
GRE1ELEY, COLORADO 80631
ADMINISTRATION (303)353-0586
4." 0
HEALTH PROTECTION (303)353.0635
yes .; •
COMMUNITY HEALTH (303)353-0639
COLORADO
April 22, 1992
1 II
Certified Letter No. : P 685 662 839 « I r
Mr. Mike Cervi APR 2 3 892
Roggen Disposal
P.O. Box 300397
Denver, Colorado 80203 Weld Cod"r4 Planning
Mr. Cervi:
I am in receipt of a report from Trevor Jiricek of our office, regarding the
inspection of your facility on April 15, 1992 and April 16, 1992. This report,
along with laboratory analysis from monitoring well adjacent to Pond B, indicate
that the liner in Pond B is damaged. In addition, you indicate that a valve
serving Pond B is damaged.
A review of the file indicates that this violation has been reported to you at
least as early as April 1991. Indeed, you indicated in your letter to
Commissioner Lacey of April 15, 1991, that you were taking action to empty the
Pond in question, so as to assess the liner condition.
I feel our approach in this matter has been quite reasonable. It appears that
you however, have not proceeded with your plans for repair in a timely manner.
The operation of this site in its current state, is in violation of the Colorado
Solid Waste Diposal Sites and Facilities Act Regulations. You are also in
violation of Development Standards #4, #12, and #17 of USR-481:81:27. Please be
advised that our office requires the following action:
1. Pond B must be emptied and an assessment be made of the liner by a
Professional Engineer, registered in the State of Colorado.
2. The damaged valve serving Pond B must be repaired.
3. The minimum three (3) feet of free board must be maintained in the
approved Pond, with Pond B being emptied.
1
Mr. Mike Cervi
Roggen Disposal
Certified Letter No. : P 685 662 839
April 22, 1992
Page 2
4. A written plan for repair must be submitted to our office within ten (10)
days of receipt of this letter. This plan must indicate name of Engineer,
reasonable date for assessment, and reasonable date for repair, etc.
5. We understand that it might be impossible to maintain three (3) feet free
board while Pond B is being drained. In this case, you may have to
consider a temporary, voluntary closure of your facility.
You are required to respond within ten (10) days of receipt of this letter.
Failure to respond will result in further legal action, which may include
recommendation of revocation of USR-481:81:27.
If you have any questions, or if you need further information, please contact me.
Very truly yours,
John S. Pickle, M.S.E.H.
Director
Environmental Protection Services
JSP/lam-E790
cc: Randy Gordon, M.D. , M.P.H. , Director, Weld County Health Department
Lee Morrison, Assistant Weld County Attorney
Keith Schuett, Weld County Planning Department