HomeMy WebLinkAbout930738.tiff CHANGE OWNER ORDER ARCHITECT CONTRACTOR12 FIELD ❑ A1A DOCUMENT G701 OTHER ❑ PROJECT: Weld County Jail Renovation CHANGE ORDER NUMBER: 2 (name, address) 915 10th Street Greeley, Colorado 80631 DATE: 7/6/93 TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9216 (name, address) Thissen Construction Co. CONTRACT DATE. 2900 "F" Street CONTRACT FOR: Greeley, Co. 80631 The Contract is changed as follows: Proposal Request No. 2 Item 1: Add $ 120.00 Item 2: Deduct ($ 10,110.00) Item 3: Add $ 253.00 Item 4: Add $ 1,619.00 Item 5: Add $ 3,200.00 Item 6: Deduct ($ 5,643.00) Item 7: Add . .$ . .3,275.00 . . Total ($ 7,286.00) See Attached Sheet for Continuation Not valid until signed by the Owner, Architect and Contractor. The original(Contract Sum)(Guaranteed Maximum Price)was $ 1,172,650.00 Net change by previously authorized Change Orders $ 139,062.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was E 1,311,712.00 The(contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) 292,205.00 (unchanged)by this Change Order in the amount of J S The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be . $ 1,603,917.00 The Contract Time will be(increased)(decreased)(unchanged)by ( 21 )days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Bley Associates Thissen Construction Weld County ARCHITECT CONTRACFOR OWNER 2020 C7uhhouce Drive 2900 "F" Street 915 10th Street Address Address Address Creel Co. 80634 Greeley Co orado 80631 Greeley, Colorado 80631 B r BY / BY DATE DATE vav cis DATE 0 7 L+//--/ AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6701- 987 WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. 9 30738 Proposal Request No. 3 Item 1 : Add $ 5,873.00 Item 2: Add $ 9,733.00 Item 3: Add $ 2,275.00 Item 4: Add $ 13,852.00 Item 5: Add $ 4,092.00 Item 6: Add $ 1,739.00 Item 7: Add $ 13,343.00 Item 8: Add $ 2,480.00 Item 9: Add S 5,230.00 Item 10: Add $ 235,322.00 Item 11A: Deduct ( $ 2,606.00) Item 11B: Deduct ( $ 3,817.00) Total $ 305,516.00 Proposal Request Contractor Revision ( $ 713.00) (See Attached) Proposal Request No. 3 Item 6 is void deduct ( $ 1,739.00) Proposal Request No. 3 Item 10 is void deduct ( $ 9,236.00) Total Proposal Request No. 3 $ 293,828.00 The following are information request changes made in the field because of existing conditions or changes by Owner. IR-01 Cost included with P.R.#1 IR-02 No change IR-03 No change IR-04 Add $347.00 IR-05 No change IR-06 No change IR-07 No change IR-08 Deduct ($870.00) IR-09 Add $188.00 IR-10 No change IR-11 No change IR-12 Add 8120.00 IR-13 Add $667.00 IR-14 No change IR-15 Cost included with P.R. #2 IR-16,16A No change IR-17 No change IR-18 No change IR-19 No change IR-20 No change IR-21 Add $3,785.00 (By Owner) IR-22-24 No change IR-25 Add $1 ,428.00 See Proposal Request Nos. 2 and 3 for Item information and information requests IR-01 through IR-21 . Proposal Request No. 2 ($ 7,286.00) Deduct Proposal Request No. 3 $ 293,828.00 Add Information Requests 1-25 $ 5,663.00 Add Grand Total Change Order 2 $ 292,205.00 Also see attached meeting letter_regarding existing graphics panel in Master Control. THISSEN CONSTRUCTION CORPORATION 2900 F street Greeley, Colorado 80631 Phone: 353-8242 Fax: 351-0530 July 15 , 1993 Bley Associates 2020 Clubhouse Drive Greeley, CO. 80634 Attention: John Sohl Subject: Weld County Jail Renovation 915 10th Street Greeley, CO. Re: Proposal Request No. 3 Rev. I . R. 25 Gentlemen : The estimated price decrease for revision to Proposal Request No. 3 is a deduct of $ 713.00, with no time extension. The additional cost for I .R. 25 , adding flooring to the walk-in cooler/freezer is $ 1 ,428.00 . Attached are breakdown sheets by item. If you have any questions, please contact me. Sincerely, THISSEN CONSTRUCTION CORPORATION Karl Schmidt Superintendant COST SUMMARY P.R. 3 Rev. Deduct ($ 713.00) I .R. 25 Add $1 , 428. 00 TOTAL ADD $ 715.00 PROJECT : WELD COUNTY JAIL RENOVATION PRICING LOCATION: GREELEY, CO. PROPOSAL REQUEST NO. 3 REVISION DATE: JULY 15, 1993 SUPPLE; ITEM QUANTITY ; UNIT MATERIAL UNIT ;EQUIP./SUB.; UNIT LABOR ; TOTAL 0 0 0 0 PR 3 REV. 0 0 0 0 0 0 0 0 DELETE FRAME 24 I LS 0 0 0 0 0 0 0 ADD DOOR 13 1 LS 0 0 0 0 0 0 0 DENO WALL B OFFICE 119 1 LS 0 0 -42 (42) (42) DELETE BLOCK OFFICE 101/102 1 LS 0 -1716 (1,716) 0 (1,716) ADD STUDS/DRYWALL 101/102 1 LS 536 536 0 655 655 1,190 INSULATE WALLS 1 LS 264 264 0 130 130 394 DELETE GYP CEILINGS B EXIST 1 LS -172 (172) 0 -259 (259) (431) ACOUST IN LIEU DRYWALL 1 LS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' SUBTOTALS I 627 ; (1,7161; 484 (605); , , ;OVERHEAD 0.100 (61) ;PROFIT 0.050 (33) ;BOND 0.020 (14) TOTALS ' , (713). DESCRIPTION: PR 3 REVISION THISSEN CONSTRUCTION CORPORATION BY : KS DATE : 15-Jul-93 PROJECT : WELD COUNTY JAIL RENOVATION PRICING LOCATION: GREELEY, CO. INFORMATION REQUEST 25 DATE: JULY 15, 1993 :SUPPLR: ITEM QUANTITY ; UNIT ; MATERIAL UNIT (EQUIP,/SUB.; UNIT ; LABOR TOTAL ; INSTALL NEW FLOOR IN 0 0 0 0 WALK IN COOLER/FREEZER 0 0 0 0 0 0 0 0 0 0 0 0 FLOORING I LS 860 860 0 159 159 1,019 ;LEVEL EXISTING FLOOR I LS 50 50 35 35 108 108 193 15 0 ; 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ; SUBTOTALS ; ; 910 i ; 35 ; 267 ; 1,212 OVERHEAD 0.100 121 PROFIT 0.050 67 BOND 0.020 28 ; I TOTALS i ; ; i ; ; ; 1,428 DESCRIPTION: IR-25 THISSEN CONSTRUCTION CORPORATION BY : KS DATE : 15-Jul-93 Empire Electric, 9nc ELECTRICAL DESIGN - CONSTRUCTION - MAINTENANCE July 13, 1993 BLEY & ASSOCIATES 2020 Club House Drive Greeley, CO 80631 ATTN: John Sohl RE: July 9, 1993 Meeting to discuss graphic panel changes. In Attendance: Terry Reeves - Empire Electric Bill Duffus - Electro Media Karl Schmidt - Thissen Construction Jim Hartman - Weld Cnty Sheriffs Dept. Pat Rogers - Weld Cnty Sheriffs Dept. Dear John, - The following items were discussed and considered to be the best options available within budget constraints. 1 . Reduce the graphic panels into one half size (approximately) off the existing panels and relocate panels to the east windows of the control room. The owner is to select area colors, as refined on color sample strip, given to owner on July 9th. 2. Lower existing alarm box below new graphic panel location. 3 . Install a remote digital display for the tele-center equipment. Display to be relocated from rack to center of console, in front of control room officer. 4 . Install a remote reset button or switch for the tele-center. This is to be next to the remote digital display. 5. To relocate tele-center will require additional money not included in cost. 10575 W. 12Oth Avenue 123 E.4th Street Road Broomfield,Colorado 80021 Greeley,Colorado 80631 Phone 469-1781 Fax 469-5164 Phone 352-1860 Denver 893-5213 Page 2 Should you have further questions, please contact me at our Greeley Office . Respectfully, EMPIRE ELECT/IC, INC. �i Terry Reeves Foreman cc: Pat Persichino - Weld Cnty Jail Rick Dill - Weld Cnty Jail Karl Schmidt - Thissen Construction John Sohl - Bley C Associates Bill Duffus - Electro Media P.S. In a subsequent letter there will be another idea presented by Electro Media on how the intercom system can be refined. Hello