Loading...
HomeMy WebLinkAbout851463.tiff I o a RESOLUTION RE: APPROVE FUNDING APPLICATIONS FOR WELD COUNTY BRIDGES 25/62A, 6/23B and 54/27A AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been advised by the Weld County Engineer that Weld County Bridges 25/62A, 6/23B and 54/27A have substained significant deterioration and must be replaced, and WHEREAS, after study and review, the Board deems it advisable to submit Funding Applications for the above stated bridges to Colorado Counties, Inc. , copies of which are attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that submittal of Funding Applications for the replacement of Weld County Bridges 25/62A, 6/23B and 54/27A be, and hereby are, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said Funding Applications. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 21st day of August, .yA.D. , �.D. , nn1985`. BOARD OF ATTEST: /► ( ( �Tt� WELD COUNTY, COLORADNTY O Weld County Clerk and Recorder . y,.a "-Asa-- and Clerk to the Board J ine J .h son, Chairman a Ikc � ` - y ranH Pro-Tem D ut County Cherk P Y APPRO D AS TO FORM: C.W. Kir Go d ac County Attorney Franc Yamag I g oon 851463 '-- A/ / ljn dq Lk/ � - �! SPECIAL BRIDGE FCND BRIDGE PROJECT ESTIMATE Structure Number 25/62A County WELD Engineering: Preliminary Engineering $ 8,000 Design Engineering 15,000 Construction Engineering and staking 39,000 Project Engineering 4,000 Final Inspection 1,000 TOTAL ENGINEERING COSTS: $ 67,000 Labor — Materials — Equipment: Mobilization $ 50,000 Site Preparation 10,000 Excavation 17,000 Abutments/Piers/Piling 70,000 Structure/Deck/Guard Rail 73,000 Approaches 30,000 Pavement 4,000 TOTAL LABOR — MATERIALS — EQUIPMENT COSTS: $ 254,000 Contingencies: $ 60,000 TOTAL PROJECT COST $ 381,000 Date of Bid Proposal: June 15, 1986 Project Start Date: August 1, 1986 Project Completion Date: November 1, 1986 Estimate Prepared By: �fl2/ (Civil Engineer II) (signature and title) Approved Chairman, Board of County Commissioners: `�a • signature) ATTEST: 7J'� la BY: b 6117O3 ty County Clerk omN SPECIAL LRI DGE Fes: D (.1 kJ BRIDGE PROJECT ESTIMATE Structure Number 54/27A County WELD Engineering: Preliminary Engineering $ 3,000 Design Engineering 7,000 Construction Engineering and staking 24,000 Project Engineering 4,000 Final Inspection 1,000 TOTAL ENGINEERING COSTS: $ 39,000 Labor - Materials - Equipment: Mobilization $ 20,000 Site Preparation 8,000 Excavation 7,000 Abutments/Piers/Piling 17,000 Structure/Deck/Guard Rail 57,000 Approaches 30,000 20,000 Pavement TOTAL LABOR - MATERIALS - EQUIPMENT COSTS: $ 159,000 Contingencies: $ 50,000 TOTAL PROJECT COST $ 248,000 Date of Bid Proposal: June 15, 1986 Project Start Date: August 1, 1986 Project Completion Date: November ,1,,,,,1198866 Estimate Prepared By: e�{ , eets3-��r�`r9r C `Civil Engineer II) (signature and title) Approved Chairman, Board of County r_Commissio ner • c A `' 1 u1n. +n (signature) kBy: fn/Q la Q . �11/YY),�ALAQ�C uu y ty Clerk f7) SPECIAL LRIDGE FUND t ,/BRIDGE PROJECT ESTIMATE Structure Nµmber 6/236 County WELD Engineering: Preliminary Engineering $ 3,000 Design Engineering 7,000 Construction Engineering and staking 24,000 Project Engineering 4,000 Final Inspection 1,000 TOTAL ENGINEERING COSTS: $ 39,000 Labor — Materials — Equipment: Mobilization $ 21,000 Site Preparation 8,000 Excavation 7,000 Abutments/Piers/Piling 17,000 Structure/Deck/Guard Rail 57,000 Approaches 25,000 Pavement 15,000 TOTAL LABOR — MATERIALS — EQUIPMENT COSTS: $ 150,000 Contingencies: $ 50,000 TOTAL PROJECT COST $ 239,000 Date of Bid Proposal: June 15, 1986 Project Start Date: August 1, 1986 Project Completion Date: November 1, 1986 Estimate Prepared By: 6/5/.7. (Civil Engineer II) (signature and title) Approved Chairman, Board of County Commissioners: an ,p ,,,,,, /� (signature) ATTEST: ('(�w,n tWn. ' BY: ( � @Sit ty C 1�erk i Hello