Loading...
HomeMy WebLinkAbout880038.tiff RESOLUTION RE: APPROVE PAYMENT TO CREATIVE STRUCTURES, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, Weld County and Adams County jointly applied for Federal Funds for the design and construction of Bridge 2/25A, and WHEREAS , Adams County contracted Bob Tallarico, of Creative Structures, Inc. , to create the original set of design plans for said Bridge, and WHEREAS, the original design plans did not contain design and construction aspects required by the Colorado Department of Highways, and WHEREAS, pursuant to requirements of the Colorado Department of Highways , plans cannot be changed or altered without the consent of the original design engineer, and WHEREAS , Bob Tallarico has reviewed and checked the changes which were made to the original design; and submitted a request for payment for said services in the amount of $1 ,275 .00 . NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that payment to Bob Tallarico in the amount of $1 ,275 . 00 be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 18th day of January, A.D. , 1988 . K BOARD OF COUNTY COMMISSIONERS ATTEST: /`II 1vr ' tin� WEL COUNTY, COLORADO Weld County `Clerk and Recorder and Clerk to the Board ene R. Brant �Chairman ,-t? 1 O/ t BY puty .< e , Clerk C.W. Kirby, P -Tern eputy Count Clerk APPROVED AS TO FORM: Ja que • e o p''' M. La•7 O ,27 l•!.-e--e-r- �'. i ounty Attorney Df�+iIli`" Frank 'amaguchi ./ F 880038 mEm®RAfnDUm WilkTo __Clerk to the Board Date __Jarpaar/ 1 1988 COLORADO From—Drew L. Scheltinga, County Engineer \� Subject Payment to Creative Structures Inc. = Bridge 2/25A Please place on the agenda "Consideration of Payment to Creative Structures Inc." Attached is a copy of the Review/Work Session Request that has been approved by the Commissioners. Thank you for your assistance. DLS/bf:mcttb 880038 BOARD OF WELD COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST DEPARTMENT: Engineering DATE: January 4, 1988 PERSON REQUESTING: Drew L. Scheltinga ATTACH A COPY OF ALL RELEVANT DATA (Reports, memos, letters, etc. ) BRIEF DESCRIPTION OF PROBLEM/ISSUE: Bridge 2/25A is our shared project with Adams County over the Platte River. It was originally designed by Bob Tallarico of Creative Structures Inc. It was originally designed under contract to Adams County and was intended for construction by Adams County crews and therefore did not contain design and construction aspects required by the Colorado Department of Highways for federal grants. Subsequently, Weld County and Adams County agreed to jointly apply for federal funds. After the grant was received it was decided to revise the existing set of bridge plans as opposed to spending $30,000 to $40,000 for a new set of plans. The plans have been reviewed by the State Highway Department and changes have been made by Weld County Engineering Department staff in accordance with the State requirements. However, plans cannot be changed without the permission of the original design engineer. Mr. Tallarico has reviewed and approved all the changes that have been made. Mr. Tallarico has billed Weld County in the amount of $1,275.00 to review and check the changes that have been made. This bill represents approximately 20 hours of work at a standard billing rate. I know that in the last year Mr. Tallarico has spent considerably more than 20 hours reviewing the several changes required by the highway department. His request for payment is very reasonable. I request the Commissioners pass a Resolution to authorize payment. WHAT OPTIONS EXIST FOR THE BOARD? (Include consequences, impacts, costs, etc. of options): The option is whether or not to pay the charges as submitted. Since this charge is after approval of our contract with the State it can be matched under our agreement to the 80% limit. Therefore, the expense to Weld County will be $255.00. 880038 RECOMMENDATION TO THE BOARD: Since Mr. Tallarico's charges are very reasonable and since the expenses will be matched 80% by our grant, I recommend authorization be approved by the Commissioners. BOARD ACTION: BY REVIEW BY WORK SESSION DATED: COMMENTS/DIRECTION: INITIAL: APPROVE DISAPPROVE Johnson ✓ Brantner �/ Kirby Lacy —AV Yamaguchi DLS/bf xc: Bette Rhoden, Director of Purchasing E180038 T E u 0 c CONSULTING ENGINEERS c E amp .sig. THE RANCH OFFICE COMMONS•2006 WEST 120TH AVENUE,SUITE B•DENVER,COLORADO 80234•(303)46-2995 4.0 x p••• -- Weld County Engineering Attn: Drew Scheltinga - P.O. Box 758 Greeley, CO 80631 Statement for professional services Date Description Charge Credit Balance Due 17Feb87 Job #2686 — 168th Avenue Bridge 900.00 over the South Platte — Balance 1Dec87 Job #2686 — 168th Avenue Bridge 375.00 over the South Platte Revision Consultation and Conferences 1Dec87 Balance 1275.00 — THANK YOU — TPie act Hello