Loading...
HomeMy WebLinkAbout851276.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS 4201 East Arkansas Ave. Denver, Colorado 80222 �: G9 (3O3) 757-9011 AI1£ID CC1iTy r•,,,, ,., #85-35 Highway News FOR MORE INF a�951 7Tei-¢$ j, Aug. 22, 1985 RELEASE AT W AUG 2 .71985 / 1 Li I-70 GLENWOOD CANYON CONSTRUCTION SUSPENDED FOR LABOR DAY WEEKEND A holiday work schedule calls for regular traffic operations at the Glenwood Canyon Interstate 70 construction zones from Friday noon, August 30 through midnight Monday, September 2. Work is to resume on Tuesday after Labor Day. Since April 22, motorists traveling U.S. 6 through Glenwood Canyon have encountered one lane escort car operations. In recent weeks the one way plan has been in effect from 7 a.m. to 6 p.m. Mondays through Thursdays and 7 a.m. to noon Fridays. O 00 BRS 0037(1 ) BRIDGE ON S.H. 37, WELD COUNTY The Department's Division of Highways accepted two bids at the August 22 opening for a bridge rehabilitation project on S.H. 37 in Weld county. The Set-Aside project, located 1 .4 miles north of Kersey, consists of hot bituminous pavement, deck rehabilitation and guardrail for a bridge crossing the South Platte River. Only certified, prequalified minority business enterprises were allowed to submit bids. Dumar Contractors of Greeley turned in an apparently successful bid of $349,172 for the project, which requires completion within 80 working days following its Notice to Proceed. Resident engineer is L. G. Duncan of Greeley. O 00 C 07-0157-05 U.S. 36 AT S.H. 157 IN BOULDER Providing signing and guardrail in Boulder near the Denver-Boulder Turnpike interchange with the Foothills Parkway drew four bidders August 22 when Division of Highways engineers opened sealed envelopes. An apparently successful bid of $76,294 was received from Flatiron Paving of Boulder. Resident engineer is H. L. Toland, Boulder. The project is scheduled for completion within twenty workable days after it starts. O 00 (Over) rtmMw. Ar�ersu��s 851276 bd mrq V2?/$s Highway News Page 2 Department of Highways Aug. 22, 1985 MP 01-0095-18 CHECK DAM IN SHERIDAN Pebble Haulers, Inc. of Colorado Springs turned in an apparently successful bid of $86,646 at the Division of Highways August 22 opening to build a check dam on Bear Creek near Sheridan. The project is located near Sheridan Blvd. (S.H. 95) and Hampden Ave. 1U.S. 285) south of the Bear Valley shopping center in Denver. It consists of grouted rubble slope and ditch paving, shotcrete, riprap and structures. Five firms bid the project, which calls for completion within 25 workable days. John Ward of Englewood is resident engineer. O 00 MG 5000(7) PAVEMENT MARKING IN FORT COLLINS Resident engineer Lewis Garton of Loveland will coordinate a project for striping various streets and roads in Fort Collins, if contract award follows bidding activity which occurred at the Division of Highways headquarters August 22. Four firms turned in offers for the project, which is scheduled for completion within thirty workable days after its start. D. T. Construction, Inc. of Rifle submitted an apparently successful bid of $114,250. O 00 BRO 0044(2) BRIDGE IN VAIL Replacing a bridge on Vail Valley Drive over Gore Creek in Vail drew eight bidders August 22 when Division of Highways engineers opened sealed envelopes. An apparently successful bid of $136,374 was received from Sewell Construction of Vail . Scheduled for completion within 60 workable days the project includes stabilization, structures, hot bituminous pavement, topsoil , seeding and mulching. M. J. Smith of Eagle is resident engineer. O 00 Page 3 Highway News Department of Highways August 22, 1985 CONTRACTS AWARDED Road/ Bid Contract Project Street Description Awarded to Opening Awarded IXFU 121-1 (15) Wadsworth To reconstruct the Bituminous Roadways of 7/25/85 8/16/85 Blvd. Wadsworth Blvd. , Colorado, Inc. West Jewell Ave. $1 ,252,254 intersection in Lakewood. MP 24-u006-08 US 6 To resurface 1 .7 Elam Construction, 8/8/85 8/15/85 miles of U.S. 6 Inc. $195,533 in Garfield county. MP 01-0070-18 I-70 To resurface 1 .9 RKS Industries, 8/8/85 8/19/85 miles of I-70 near Inc. $107,433 the Denver Coliseum. MP 44-0070-17 I-70 Project for hot B&B Excavating, Inc. 8/8/85 8/14/85 bituminous pave- $230,607 ment overlay on an I-70 frontage road near Vail . MP 10-0075-22 Broad- To resurface 1 .9 miles Kiewit Western 8/8/85 8/16/85 way of Broadway in Co. $151 ,872 Englewood. 000 BIDS TO BE OPENED Sept. 5, ADD, 10:30 a.m. , Resurfacing U.S. 287 south of Eads , consisting of hot bituminous pavement overlay, beginning at S.H. 96 (Milepost 110.59) and extending south to Milepost 106.84, a distance of 3.75 miles, in Kiowa county, MP 45-0287-03. ADD, 10:45 a.m. , Resurfacing S.H. 96 east of Wetmore, consisting of hot bituminous pavement overlay and striping, beginning 5.2 miles east of the Custer- Pueblo county line at Milepost 34.38 and extending east to Milepost 41 .86, a distance of 71 miles, in Pueblo county, MP 02-0096-38. Sept. 12: 9:30 a.m. , Widening S.H. 69 north of Gardner, consisting of grading, structures, stabilization, hot bituminous pavement, precast concrete box culvert, striping, seeding and mulching, beginning 3.3 miles south of the Huerfano/Custer county line and extending 3.28 miles north, in Huerfano county, SR 0069(14) . (More) (Over) Page 4 Highway News Department of Highways August 22, 1985 BIDS TO BE OPENED Continued Sept. 12: 9:45 a.m. , Improving the median on Colorado Blvd. near Martin Luther King Drive in Denver, consisting of median edging, median cover, landscaping and sprinkler system, located on S.H. 2, beginning north of 30th Ave. and extending three tenths of a mile north to 34th Ave. , MPO1-0002-41 . Certified, prequalified minority bidders only. 10:00 a.m. , Resurfacing University Blvd. south of Denver, consisting of hot bituminous pavement overlay, striping and planing, located on S.H. 177, beginning a tenth of a mile south of S.H. 88 (Belleview Ave. ) and extending four miles south to County Line Road, in Arapahoe county, C 10-0177-15. Sept. 19: 9:30 a.m. , Reconstructing Interstate 76 near Brighton, consisting of grading, structures, stabilization, concrete and hot bituminous pavement, two bridges, signing, striping, lighting, topsoil , seeding, and mulching, beginning at S.H. 7 and extending 1 .8 miles southwesterly; also consisting of structures and concrete pavement, located on I-76 about a tenth of a mile southwest of the inter- section with S.N. 7, both projects in Adams county, I-IR 76-1 (117) and CC 12-0076-01 . 10:00 a.m. , Glenwood Canyon construction area traffic control support, consisting of flagging, traffic control supervisor and construction signing, located two miles east of Glenwood Springs and extending 12 miles easterly, in Garfield county, I 70-2(153) . * * * Hello