Loading...
HomeMy WebLinkAbout850355.tiff CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AM DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: 1984 Renovation to: CHANGE ORDER NUMBER: One (1) name, address) Weld County Centennial Center Phase II - Law Enforcement Building INITIATION DATE: TO (Contractor): ARCHITECT'S PROJECT NO: Roche Constructors , Inc. CONTRACT FOR: General Construction P. 0. Box 1727 Greeley, Colorado 80632 L I CONTRACT DATE: December 10, 1984 You are directed to make the following changes in this Contract: Remodel the main control room equipment as described Add $ 18,920 in Section 16406 1.1 Paragraph 3. Increase Construction Management fee for Add 1 ,041 additional work Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 657,924 . Net change by previously authorized Change Orders $ -0 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was $ 657 ,924 . The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) $ 19,961 by this Change Order The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ 677,885 . The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is • Authorized: BOER & ROBERTS ROCHE CONSTRUCTORS, INC. WELD COUNTY COMMISSIONERus AR TE T. ciyNT$ACLox 1727 ITRTenth Street to drs �lghth Street s fi Address Address Address n Greeley. Colorado(� 80631 a Greeley,/e Colorado 080632 Greeley, Colorado 80631 Lcra BY OI �%l?-O-( BY .`{ 414. kilt Y DATE Mao CoL k 9 s 5 DATE 5-4-85- DATE ,6 //31 S5 J) AIA DOCUMENT RCHI ORDER S, APRIL AVE.,EDITION • AIA © "1006 4 `, tf (9/-�. 6701 —1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AV N.W., WASHIKGEO N, D.C. 20006 •,IJ Hello