Loading...
HomeMy WebLinkAbout851255.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS u* oft 4201 East Arkansas Ave. ! t`+ Denver, Colorado 80222 �¢�� It (303) 757-9011 #85-14 .. ,,.8°"°`d' FOR MORE INFORMATION: 757-9228 Highway News Nif April 4, 1985 WELD Cr"NTy rrax=.;r,, , v�RS RELEASE AT WI ---.1-.y �s APR 91985 '+', ; , � A U.S. 40 BYPASS v !!"� FOR WINTER PARK? U.S. 40 planning for Winter Park will be discussed at the commu- nity's Town Hall beginning at 7 p.m. on Wednesday, April 10. Sponsored by the Colorado Department of Highways and town officials, an informal public meet- ing will start with a presentation by URS, consulting firm for a U.S. 40 study. Project _ Area '1° \ Map I-25 TRAFFIC DIVERSION RESUMES JoHNSOMs CORNER \aE NORTH OF LONGMONT ►a..aI n 1 QWIN 5�b Interstate 25 resurfacing between Longmont M and Loveland resumes Monday, April 8, with northbound I-25 diverted to a one-way frontage g road through September. 4y 5E sNNoswe r. Traffic will be shifted to the frontage 5road on the east side of I-25, from just north c of the S.H. 66 interchange (exit 243) . After `j detouring about eleven miles, motorists will treturn to main line 1-25 near Johnson's Corner a^, (County Road 16E) . cc. MEAD mu,. , t wslt1 LONPIDNT rtTEwa 311 66 sari lib- `EGEND 3M 119 O interchange Locations tTltAINIPOIMInITION. 91152 Polar urns 1-11 Bridge Rehabilitation Sites Outside Resurfacing Section 851255 C,-I YV146:�l-LGX S Highway News Page 2 Department of Highways April 4, 1985 CONTRACTS AWARDED Road Bid Contract Project Street Description Awarded To Opening Awarded C 55-0550-08 US 550 To resurface 24.6 miles Burnett Construc- 3/21/85 3/27/85 of US 550 in San Juan tion Company county. $1,533,455 M 6605(1) S. Will coordinate a Kirkland Trenching 3/21/85 3/27/85 Fourth street improvement & Excavating St. project for South $50,207 Fourth St. in Canon City. BRF 050-3(32) US 50 For construction Civil Constructors 3/28/85 3/28/85 of a permanent, Inc. of Colorado concrete bridge $393,113 on U.S. 50 west of Canon City. The project begins 1.3 miles east of Park- dale & extends a tenth of a mile easterly. 0 0 0 BIDS TO BE OPENED, POSTPONEMENTS OF SEVERAL PROJECTS FR 006-3 (6) FRU 138-1(1) Four traffic signals in Sterling, on U.S. 138 (4th St.) at U.S. 6 (Chestnut St.) and other streets, in Logan county. Bids were not opened at 10 a.m. April 4, as previously advertised, but are rescheduled to open at 10: 30 a.:n. April 18. BRMU 0033(2) Larimer Viaduct Replacement in Denver, consisting of grading, struc- tures, bridges, hot bituminous pavement, signing, striping, lighting, signalization, topsoil, seeding and mulching, located on SH 33, beginning 0.1 mile south of the intersection of I-25 and 13th Avenue and extending 0.9 mile northeasterly. This project provides a Walnut St. Viaduct connection to the new West Colfax Viaduct. Originally scheduled for a bid opening at 9:30 a.m. April 11, this opening is now set for 9:30 a.m. May 9 (Revised plans will be mailed to contractors around April 18) . (MORE) Highway News Page 3 Department of Highways April 4, 1985 IXFU 470-1(17) I 25-2(156) IXFU 470-1(7) Centennial Parkway paving in the Denver area, paving 6.63 miles of the Denver area southwest circumferential route, three combined projects in Douglas county. Project No. IXFU 470-1(17) consists of grading, stabilization, structures, concrete and hot bituminous pavement, signing, striping, signalization, guardrail, topsoil, seeding, and mulching on C-470 beginning half a mile west of Broadway and extending 6.63 miles east. Project No. I 25-2 (156) begins 0.2 mile east of Yosemite and extends 0.43 mile east to Interstate 25; it consists of grading, stabilization, concrete and hot bituminous paving, guardrail, topsoil, seeding and mulching. Project No. IXFU 470-1(7) , Phase B, consists of grading, stabilization and concrete pavement at the Broadway interchange ramps. This combined project had a 10 a.m. April 11 bid opening scheduled, but instead the bids are to open at 10:45 a.m. , April 18. 0 0 0 BIDS TO BE OPENED, NEW ANNOUNCEMENTS April 25: 9:30 a.m. Rehabilitating two bridges on S.H. 119, including grading and concrete and hot bituminous pavement, beginning at the junction of US 6 and SH 119 and extending 0.1 mile northerly, in Clear Creek county, and located a tenth of a mile north of the junction of US 6 and SH 119 and extending 0.1 mile northerly, in Gilpin county, BRS 0119(26) and BRS 0119(27) . Certified, prequalified minority bidders only. 9:45 a.m. , Widening El Paso Blvd. in Manitou Springs, con- sisting of grading, stabilization, hot bituminous and concrete pavement, and curb and gutter, beginning at Garden of the Gods Road and extending 0.23 mile easterly, in El Paso county, MR 2090(1) . Certified, prequalified minority bidders only. 0 0 0 FR 024 - 3 (23) U.S. 24 IN ELBERT COUNTY The Department's Division of Highways accepted three bids at the April 4 opening for a Set-Aside project which will resurface U.S. 24 near Matheson. The project begins eight tenths of a mile west of the community and extends 3.9 miles east, with a net project length of 3.1 miles. It consists of grading, stabilization, structures, paving, striping, seeding and mulching. Only certified, prequalified minority business enterprises were allowed to bid. Koga Engineering & Construction, Inc. of Littleton turned in an apparently successful bid of $1,189,398 on the project, which requires completion within seventy working days after the Notice to Proceed. Resident engineer is J. W. Goetzcke of Limon. (OVER) Highway News Page 4 Department of Highways April 4, 1985 MP 99-2000-08 I-25 IN PUEBLO Turf mowing for Interstate 25 at six Pueblo interchanges drew three bidders at the Division of Highways April 4 opening. An apparently success- ful bid of $68,994 was received from Sniders' Aggregate, Inc. of Canon City. The 1-25 interchanges include Central Ave. , Abriendo Ave. , 6th and 13th Streets, the U.S. 50 East Bypass and U.S. 50/S.H. 47. This project is a maintenance contract covering the period May 1 through September 31 this year. Ron Richards, Maintenance Superintendent in Pueblo, will coordinate the contract. O 0 0 MP 23-0285-03 MP 23-0160-07 RESURFACING NEAR MONTE VISTA The Division of Highways accepted four bids April 4 for a combined project to resurface U.S. 285 and U.S. 160 near Monte Vista in Rio Grande county. An apparently successful bid of $369,574 was received from Andersen Construction Co. of Alamosa. Two project locations call for hot bituminous pavement overlay. One, on U.S. 285, begins 2.2 miles north of Monte Vista and extends five miles north. A second, on U.S. 160, begins at the U.S. 285 junction in the community and extends a mile and a half southeasterly. J. T. Ungefug of Alamosa is resident engineer. The project is scheduled for completion within twenty working days after its Notice to Proceed. O 0 0 FCU-HES 036-1(28) BOULDER TURNPIKE AT SHERIDAN BLVD. IN WESTMINSTER Resident engineer Steve Horton of Arvada will coordinate a Set-Aside, Boulder Turnpike ramp project in Westminster, if a contract is awarded following a Division of Highways April 4 bid opening in Denver. Designed to provide a west- bound off-ramp for U.S. 36 at Sheridan Blvd. ,the project begins about 300 feet north of 88th Ave. and extends three tenths of a mile north. It includes grading, stabilization, paving, signing, striping, topsoil, seeding and mulching. Bidding was open only to certified, prequalified minority business firms. Dumar Contractors, Inc. of Greeley turned in an apparently successful bid of $167,989 on the project, which requires completion within 35 working days. Three minority firms submitted offers on this project. • * * Hello