Loading...
HomeMy WebLinkAbout851248.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS JNNT Cs N« 4201 East Arkansas Ave. Denver, Colorado 80222 • (303) 757.9011 • .��8 • FOR MORE INFORMATION4..,757,-,,9228 #85-6 Highway News RELEASE AT WILL r- - , --� February 7, 1985 I FEB 1 21985 / BRM 0007 (2) i 17TH ST. BRIDGE IN BOULDER The Department s Divitioi of Highways accepted four bids at the February 7 opening for a project to replace the 17th Street bridge over Boulder Creek in Boulder. Bebo Construction Company, Inc. of Berthoud submitted an apparently successful bid of $739,327 on the project, which requires completion within 95 working days following the Notice to Proceed. Hal Toland of Boulder is resident engineer. The project includes grading, structures, hot bituminous and concrete paving, and lighting. 0 0 0 FCU 157-1 (9) STREET IMPROVEMENTS IN BOULDER Lawrence Construction Company of Littleton turned in an apparently successful bid of $949,567 at the Division of Highways February 7 opening to improve two locations in Boulder. One site is Arapahoe Avenue just east of 47th Street; the second is just north of Pearl St. at the future 47th Street Parkway. Work includes grading, structures, a concrete box culvert, stabilization, paving, topsoil, seeding and mulching. Five firms submitted offers. After the project begins, the Arapahoe Ave. construction requires completion within sixty workable days but the Pearl St. Construction is to be completed within forty workable days. Resident engineer is Hal Toland of Boulder. 0 0 0 IXMU 1022(1) COUNTY LINE ROAD SOUTH OF DENVER A Set-Aside intersection improvement project south of Denver drew four bidders at the Division of Highways February 7 opening. Only certified, prequalified minority business enterprises were able to bid. The project is located on County Line Road (the border between Arapahoe and Douglas counties) beginning 0.3 mile west of S.Holly Street and extending half a mile east. Included are grading, structures, paving, signing, striping, signal- ization, topsoil, seeding and mulching. An apparently successful bid of $756,669 was received from Roberts Con- struction Company of Denver. Resident engineer is John Ward of Englewood; the project is scheduled for completion within 100 working days. 0 0 0 (OVER) �- tIRANN Arw 851248 Highway News Page 2 Department of Highways February 7, 1985 CONTRACTS AWARDED Road/ Bid Contract Pro'ect Street Description Awarded To Opening Awarded IR 70-1(101) I-70 Bank & channel sta- SEM Construc- 1/10/85 2/1/85 bilization along 170 tion Co. & the Colorado River $43,589 near DeBeque. I 70-2 (119) I-70 A project at the Flatiron Struc- 1/17/85 2/1/85 Grizzly Creek, I 70 tures Co. interchange in Glen- $5,784,025 wood Canyon. The project begins three miles east of Glenwood Springs & extends 0.3 mile easterly. It includes grading, struc- tures, retaining walls, stabilization, paving, signing, striping, topsoil, seeding & mulching. IR 70-1 (103) I-70 To sign the Loma Port Kiewit Western Co. 1/17/85 2/1/85 of Entry on I-70 in $174,971 Mesa county. IR 25-1 (107) I-25 Bridge replacement Tectonic Con- 1/24/85 2/1/85 project on I-25 struction Co. south of the Pueblo/ $563,231 Huerfano county line. I-IR 76-1(82) I-76 I-76 construction in Siegrist Construc- 1/24/85 2/1/85 Jefferson county. The tion Co. project begins 0.7 mile $2,214,654 east of Wadsworth Blvd. just west of Marshall Street, and extends 0.8 mile northeast to Sheridan Blvd. IR 70-1 (100) I-70 A Set-Aside project to MG Concrete, Inc. 1/31/85 2/1/85 protect I-70 west of $337,815 Fruita. (MORE) Highway News Page 3 Department of Highways February 7, 1985 CONTRACTS AWARDED (continued) Road/ Bid Contract Project Street Description Awarded To Opening Awarded MP 04-0083-35 SH 83 Pavement overlay for Broderick and 1/31/85 2/1/85 1.6 miles of SH 83 in Gibbons, Inc. Colorado Springs. $304,150 BRS 0394 (1) SH 394 Replacing the SH 394 Duckels Construc- 1/31/85 2/5/85 bridge over the Yampa tion, Inc. River south of Craig. $928,723 IR 70-2(130) I-70 A slide repair & bank Richmond Construc- 1/31/85 2/6/85 stabilization project tion Co. along I-70 in Eagle $171,738 county. 0 0 0 BIDS TO BE OPENED Feb. 28: 9:30 a.m., Traffic/safety improvements in southwest metropolitan Denver area, consisting of hot bituminous pavement (patching) , structures, signing, striping, signalization, curb and gutter, and sodding, at various locations on S.H. 30 (Havana St.) and S.H. 83 (Parker Rd.) , in Arapahoe and Denver counties. Certified, prequalified minority bidders only. MP 10-0000-02 9:45 a.m. , Resurfacing U.S. 85 south of Fort Lupton, consisting of hot bituminous pavement overlay, beginning about 4.7 miles south of the community and extend- ing 5.2 miles north, in Weld county, C 03-0085-20. Certified, prequalified minority bidders only. 10:00 a.m. , Resurfacing S.H. 17 south of Moffat, consisting of hot bituminous pavement overlay, concrete box culvert, and guard rail, beginning 41 miles north of Hooper and extending 12.4 miles north to Moffat, in Saguache county, C 35-0017-08. 10:15 a.m. , Resurfacing S. Parker Road near Cherry Creek State Recreation Area, consisting of hot bituminous pavement overlay and striping, located on S.H. 83, beginning at 1-225 and extending 1.9 miles southerly, in Arapahoe county, MP-C 10-0083-13. March 7: 9:30 a.m. , Riverside Slide area snowshed on U.S. 550, including grading, structures, stabilization, hot bituminous pavement, lighting, and guard rail, located four miles south of Ouray, in Ouray county, FC 550-2(10) . Hello