Loading...
HomeMy WebLinkAbout861151.tiff RESOLUTION RE: APPROVE FUNDING APPLICATION FOR WELD COUNTY BRIDGE 58/47B AND AUTHORIZE CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter , is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been advised by the Weld County Engineering Department that Weld County Bridge 58/47B has significant deterioration and must be replaced, and WHEREAS , after study and review, the Board deems it advisable to submit a funding application for the above stated bridge to Colorado Counties, Inc. , a copy of said application being attached. hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that submittal of the funding application for the replacement of Weld County Bridge 58/47B be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said funding application. The above and foregoing Resolution was, on motion duly made and seconded , adopted by the following vote on the 8th day of December , A.D. , 1986 . /- w.n IVA {- BOARD OF COUNTY COMMISSIONERS �`n ATTEST: %MI QnA�PIr'✓ WELD COUNTY, COLORADO Weld County Clerk and Recorder _ _ �•� �.•� - and Clerk to the Board Ja qu ne = sy , C airman ` j, r . - i BY: f)it l XL G o •`file, a �V , "•,- .-Tem D putt' County Cl k APPROVED AS, TO FORM: Gene R. Brantner c.w.� � C‘7 ounty Attorney Franmaguch• / __ 861151 SPECIAL BRIDGE FUND BRIDGE PROJECT ESTIMATE Structure Number 58/47B County _ WELD Engineering: Preliminary Engineering S 20,000 Design Engineering 40,000 Construction Engineering and staking 10,000 Project Engineering 10,000 Final Inspection 2,000 TOTAL ENGINEERING COSTS: $ 82,000 Labor — Materials — Eouipment: Mobilization S 20,000 Site Preparation 30,000 Excavation 150,000 Abutments/Piers/Piling 500,000 Structure/Deck/Guard Rail 700,00 Approaches 400,000 Pavement 200,000 TOTAL LABOR - MATERIALS - EQUIPMENT COSTS: $ 2,000,000 00 Contingencies: 10% $ 200,000 TOTAL PROJECT COST $ 2,282,000 Date of Bid Proposal: March 1988 Project Start Date: June 1988 Project Completion Date: June 1989 __.. Estimate Prepared By: Rex L. Cantrell , Civil Engineer II - Weld County r_nainr?eriny (signature and title) Approved Chairman, Board of County Commissioners: pc..0% (signature) 861151 plc''; mEmoRAnDum WilkTo Cleri tp the Board — —_ Date_ narpmhar_5_, 14gfi ---- COLORADO From Rex L CAntrellt_fivil _Engineer TT..=..-Engineering Department_______ Subject: Funding Application Request and Authorization for Chairman____.. to Sign Application Please place on the Board's agenda for consideration, the application for funding to replace Weld County Bridge WEL 058.0 - 047.OB. The bridge has significant deterioration and is priority one for replacement. RLC/bf Hello