Loading...
HomeMy WebLinkAbout851249.tiff STATE OF COLORADO DEPARTMENT OF HIGHWAYS '- !/Err ru y 4201 East Arkansas Ave. . ++\ Denver, Colorado 80222 +� (303) 757-9011 J� 8,4 #85-7 � `,o�__o � FOR MORE INFORMATION: 757-9228 Highway News RELEASE AT WILL February 14, 1985 NEW ROADWAY DESIGN MANUAL AVAILABLE It defines design speeds, control of access, and staged construc- tion. It explains horizontal and vertical alignments, superelevation, median standards and much more. It' s the Roadway Design Manual, available for a price which includes revisions provided to buyers until January, 1988, or until a new printing is made. ArltAti IIS/i WW1 CaJdr! C^'1"'S?; 71,3 ROADWAY DESIGN MANUAL ORDER FORM r-� n I c,' � ';i 1� j4, ' ' FEB 2 01985 SEND TO: Manuals at $20.00 each. Manual binders at $5.00 each. (Mailing included, no charge) TOTAL AMOUNT ENCLOSED ALL ORDERS PREPAID. Mail or bring order form to: Colorado Department of Highways Room 117 4201 East Arkarsas Avenue Denver, Colorado 80222 851249 !7 1 -2 C, kc Highway News Page 2 Department of Highways Feb. 14, 1985 I 70-1 (53) I-70 BEAVERTAIL TUNNELS, DE BEQUE CANYON The Department's Division of Highways accepted 13 bids at the Feb. 14 open- ing for a project to build Interstate 70 tunnels through the Beavertail area in DeBeque Canyon, 23 miles east of Grand Junction. A joint venture of Morrison- Knudsen Company, Inc. and Mergentime Corporation, Boise, Idaho submitted an apparently successful bid of $9,877,320 on the project. The project also includes grading, structures, stabilization, seeding, asphalt paving, guard rail, lighting, signing and striping. The project, 1.2 miles long, requires completion within 390 working days following the Notice to Proceed. Resident engineer is W. R. Nelson of Grand Junction.. Each of the firms was specially prequalified for this project. The pre- qualification process demanded the same kind of experience and bonding ability asked for before Glenwood Canyon's Hanging Lake pilot bore project was advertised for bids. O 0 0 I 70-2 (126) I-70 IN GLENWOOD CANYON The second project whose bids were opened by the Division of Highways February 14 is for Interstate 70 construction west of Bair Ranch in Glenwood Canyon. The project begins nine and a half miles east of Glenwood Springs and extends 2.1 miles easterly. It consists of grading, stabilization, paving, striping, topsoil, seeding and mulching. Three firms turned in offers for this project, which requires completion within 180 working days following its Notice to Proceed. Tectonic Construction Company of Englewood turned in an apparently successful bid of $1,962,657 on the project, which is to be coordinated by resident engineer M. J. Smith of Eagle. O 0 0 IXMU 0075 (11) CC 10-0075-17 LITTLETON RAILROAD DEPRESSION Providing earthwork and structures for the Littleton Railroad Depression drew five bidders at the Division of Highways February 14 opening. A combined pro- ject is located on Main and Alamo Streets, the one-way streets east of S. Santa Fe Drive in Littleton. Work includes grading, structures, reinforced earth walls, hot bituminous paving, topsoil, seeding and mulching. Kiewit Western Company of Littleton submitted an apparently successful bid of $2,153,001 on the combined project, which is scheduled to be completed within 165 workable days following its start. John Ward of Englewood is resident engineer. O 0 0 Highway News Page 3 Department of Hignways Feb. 14, 1985 BIDS TO BE OPENED Add: March 7: 9;45 a.m„ Resurfacing S.H. 89 north of Lycan, consisting of hot bituminous overlay and striping, beginning in the Town of Lycan, and extending 14.9 miles north (net length 8.3 miles) , in Baca and Prowers counties, C 17-0089-08. 10:00 a.m. , Widening W. 64th Ave. west of Federal Blvd. in Adams county, consisting of grading, stabilization, hot bituminous and concrete pavement, structures, topsoil, signalization and striping, located at the inter- section of West 64th Ave. and U.S. 287 and extending 0.098 mile west along 64th Ave. through the intersection, in Adams county, MU 1686(1) . Certified, pre- qualified minority bidders only. 10:15 a.m. , University Blvd. drainage improvements in Littleton, consisting of grading, structures, storm sewer, hot bituminous pave- ment, striping, curb and gutter, topsoil, and sodding, located on S.H. 177 (University Blvd. ) , beginning at Arapahoe Rd. and extending 0.06 mile south, in Arapahoe county, MP 10-0177-13. Certified, prequalified minority bidders only. 10:30 a.m. , widening S.H. 93 north of Golden, consisting of grading, structures, stabilization, hot bituminous pavement, signing, striping, seeding and mulching, beginning two miles north of Golden and extending 1.9 miles north, in Jefferson county, FR-HES 093-1(6) . O O O CONTRACTS AWARDED Road/ Bid Contract Project Street Description Awarded To Opening Awarded MP 45-0096-21 SH 96 To provide hot bitu- A&S Construction 1/31/85 2/11/85 minous pavement over- Co. $317,921 lay for 4.8 miles of SH 96 west of Towner in Kiowa county. * * * Hello