HomeMy WebLinkAbout851159.tiff SINS No. : 6835 IN-85-40 UNITED STATES 1 enl1nT tRIPItt NUCLEAR REGULATORY COMMISSION Li j [�'J OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 MAY2 919gg May 22, 1985 IE INFORMATION NOTICE NO. 85-40: DEFICIENCIES IN EQUIPMENT QUALIFICATION TESTING AND CERTIFICATION PROCESS Addressees: All holders of a nuclear power reactor operating license (OL) or a construction permit (CP). Purpose: This information notice is to alert licensees that quality-related deficiencies in the qualification documentation, review, approval , and certification process have been identified by the Vendor Program Branch (VPB) of the NRC during its review of qualification activities. NRC observations suggest that some vendor qualification activities and practices may not provide a sufficient basis for qualification certification. It is suggested that recipients review this information for specific and generic applicability to ensure that documentation supporting environmental qualification of safety-related equipment at their facilities is complete. Suggestions contained in this notice do not constitute NRC requirements; therefore, no specific action or response is required. Description of Circumstances: 10 CFR 50.49, Regulatory Guide 1.89 (Revision 1, June 1984) , and IEEE Standards 323-1974 and 323-1983 each require auditable information demonstrating qualifi- cation to provide continuing assurance to licensee management and the NRC that equipment in use is qualified for the entire period during which it is installed in the nuclear power plant. 10 CFR 50, Appendix B, provides quality assurance requirements for the generation of all elements of qualification files. IEEE Standard 323-1974, Section 8 (endorsed by Regulatory Guide 1.89) , requires that individual elements of qualification files be reviewed and approved by the licensee. Since July 1982, the VPB has actively inspected vendor qualification efforts for compliance to these NRC requirements. Inspections have been performed at manufacturing facilities, independent testing laboratories, architect-engineers, and nuclear steam supply system (NSSS) vendors. NRC observations at the vendor level provide examples where more active licensee participation in the qualification effort should have occurred. In some cases, certification of qualification is now difficult to justify because of documen- tation and test practices employed by vendors. Some examples of NRC findings follow. 8505200600 851159 IN 85-40 May 22, 1985 Page 2 of 3 1. Qualification activities not performed under a QA program consistent with 10 CFR 50, Appendix B o Qualification testing of Class 1E equipment was conducted without appropriate QA programs. o No QA requirements were imposed on organizations providing safety- related services (such as irradiation, calibration, and analyses) associated with the qualification process. 2. Qualification test report conclusions not supported by test data or test data not available o Test profiles shown in qualification reports were not actually achieved during test. o Reports identified specimens or materials that were different from those actually tested. o Test records showed inadequate sensitivity/resolution of test equipment. o Documentation required by the standards referenced in the test report was not available (test plans, equipment lists, and calibration records). o Test anomalies were not adequately reported or evaluated. o Similarity between test specimens and items to be qualified was not established. 3. Documentation to support the validity of qualification not maintained for lifetime of the equipment o Supporting test data were destroyed after five years. 4. Inadequate review, approval , or certification of test results o Interfaces/responsibilities of organizations involved in the qualification process were not clearly defined. o Test reports contained statements that testing satisfied the "guidelines" or "intent" of standards referenced in the specification. Detailed descriptions of NRC findings and results of these inspections are published in NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," Volumes 6, 7, and 8. This report is published quarterly by the NRC, and it can be obtained from the Superintendent of Documents, U. S. Government Printing Office, Post Office Box 37082, Washington, D.C. 20013-7982. IN 85-40 May 22, 1985 Page 3 of 3 Correspondence with contractors and vendors relative to the inspection data contained in NUREG-0040 is placed in the NRC Public Document Room, 1717 H Street, N. W. , Washington, D. C. 20555. Discussion: The deficiencies described in this notice resulted from the review of a vendor' s qualification activities against the applicable procurement document requirement or, in the case of generic qualification, against the applicable QA criteria. An overall assessment of identified deficiencies (1) suggests that some vendor qualification activities may not adequately support the applicable NRC require- ments, and (2) emphasizes the need for increased licensee attention to the adequacy of their vendor procurement control practices for qualification activities and the definition of responsibilities and interfaces in the qualification process. Documentation from vendors and test laboratories form the basis for meeting the equipment qualification requirements of paragraphs (d), (e), (f) and (j) of 10 CFR 50.49. This documentation may include procurement specifications, test plans, test procedures, test logbooks, qualification test reports, test data, analyses and corrective action to resolve test anomalies, test configurations and interfaces, and quality assurance information. The NRC staff considers the above-identified deficiencies to be representative examples of problems with vendors and test laboratories providing qualification services to other vendors and user utilities. Although there may be specific problems applicable to a particular utility, the staff expects that user utilities will consider the overall applicability of the above information in establishing qualification of safety-related equipment. No specific action or written response is required by this notice. If you have any questions regarding this notice, please contact the Regional Administrator of the appropriate NRC regional office or this office. `Edward . Jordan, Director Divis n of Emergency Preparedness and ngineering Response Office of Inspection and Enforcement Technical Contact: G. T. Hubbard, IE (301) 492-9759 Attachment: List of Recently Issued IE Information Notices Attachment 1 IN 85-40 May 22, 1985 LIST OF RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No. Subject Issue Issued to 85-39 Auditability of Electrical 5/22/85 All power reactor Equipment Qualification facilities holding Records At Licensees' an OL or CP Facilities 85-38 Loose Parts Obstruct Control 5/21/85 All PWR facilities Rod Drive Mechanism designed by B&W holding an OL or CP 85-37 Chemical Cleaning Of Steam 5/14/85 All pressure water Generator At Milestone 2 reactor facilities holding an OL or CP 84-55 Seal Table Leaks At PWRs 5/14/85 All power reactor Sup. 1 facilities holding an OL or CP 85-20 Motor-Operated Valve Failures 5/14/85 All power reactor Sup. 1 Due To Hammering Effect facilities holding an OL or CP 85-36 Malfunction Of A Dry-Storage, 5/9/85 All licensees Panoramic, Gamma Exposure possessing gamma Irradiator irradiators 84-52 Inadequate Material 5/8/85 All power reactor Sup. 1 Procurement Controls On facilities holding The Part Of Licensees And an OL or CP Vendors 85-35 Failure Of Air Check Valves 4/30/85 All power reactor To Seat facilities holding an OL or CP 85-34 Heat Tracing Contributes To 4/30/85 All power reactor Corrosion Failure Of Stainless facilities holding Steel Piping an OL or CP 84-84 Deficiencies In Ferro- 4/24/85 All power reactor Rev. 1 Resonant Transformers facilities holding an OL or CP OL = Operating License CP = Construction Permit SSINS No. : 6835 IN 85-39 UNITED NUCLEAR REGULATORYTCOMMISSION 1 ES WELD COt�li9 Cr .'I" j" OFFICE OF INSPECTION AND ENFORCEMENT 11l fn ' ry ', WASHINGTON, D.C. 20555 ill r � � MAY 2 91985 1 May 22, 1985 GitEE[_EY. COQ o. IE INFORMATION NOTICE NO. 85-39: AUDITABILITY OF ELECTRICAL EQUIPMENT QUALIFICATION RECORDS AT LICENSEES' FACILITIES Addressees: All holders of a nuclear power reactor operating license (OL) or a construction permit (CP). Purpose: This information notice is being issued to alert licensees of deficiencies in the implementation of 10 CFR 50.49 requirements at operating facilities. These deficiencies were identified during recent NRC inspections and relate to the review and approval of qualification documents by licensees and auditability of qualification files. It is suggested that recipients review this notice for generic applicability to ensure that their equipment files contain adequate and auditable documentation to support environmental qualification requirements. Suggestions contained in this notice do not constitute NRC requirements; therefore, no specific action or response is required. Description of Circumstances: On May 23, 1980, the NRC issued Memorandum and Order CLI-80-21 specifying that all holders of a nuclear power reactor OL or CP must meet the requirements set forth in Division of Operating Reactors (DOR) guidelines and NUREG-0588. In mid-1981, the NRC issued Safety Evaluation Reports (SERs) on environmental qualification of safety-related electrical equipment to licensees of all operating plants. Where additional qualification information was required, licensees were directed to respond to the NRC within 90 days of receipt of the SER. With technical support from the Franklin Research Center (FRC), the NRC staff reviewed licensees' submittals and published the results in Technical Evaluation Reports (TERs). These TERs became part of the new SERs for each of the 71 operating plants that the staff reviewed. Subsequently, licensees responded with commitments to correct specific deficiencies identified in the TERs and schedules of completion dates to meet the qualification deadline required by 10 CFR 50.49. 8505200590 r AI , IN 85-39 May 22, 1985 Page 2 of 3 The staff has conducted a number of inspections at licensees' facilities to review licensee implementation of 10 CFR 50.49 requirements and to verify that TER corrective action commitments are being properly implemented. These inspections have identified deficiencies in the contents and auditability of document files used to support equipment qualification. Specific examples follow: 1. Equipment qualification (EQ) files contained no indication that the documentation contained in these files had been reviewed by the licensee or that the licensee had determined the equipment to be qualified. 2. Handwritten material used to support qualification was not signed or dated and showed no indication that this material had been verified or approved. 3. The required postaccident operating time for equipment was not correlated to qualified life as established in the test report. 4. The qualification of replacement equipment was not upgraded as required by 10 CFR 50.49. Qualification of some replacement equipment was based on previously allowed DOR guidelines that stated "equipment is considered qualified for main steam line break (MSLB) environmental conditions if it was qualified for a loss-of-coolant accident (LOCA) environment in plants with automatic spray systems not subject to disabling single component failures. " This basis of qualification is not acceptable without additional justification for replacement equipment was procured and installed after February 22, 1983. 5. The applicability of generic communications such as vendor technical letters, Part 21 reports, and NRC information notices and bulletins affecting qualification and performance of specific equipment were not considered in establishing and maintaining the qualified status of the equipment. 6. Certain documents used to support qualification (procurement documents, test reports, certificates of conformance, vendor correspondence, etc. ) were not contained in the files nor did the files reference where these documents could be found. 7. Some reports discussed test anomalies and modifications to equipment during testing but the licensee had not provided evaluations or analyses to assess the applicability of this information to the qualification of the installed equipment. Discussion: Licensees and permit holders are responsible for the adequacy and completeness of documents and for the EQ review process used to support the qualification of safety-related equipment at their facilities. Paragraph (j) of 10 CFR 50.49 states that a record of qualification, including documentation in paragraph (d) of the regulation, must be maintained in an auditable form for the entire period IN 85-39 May 22, 1985 Page 3 of 3 during which the covered item is installed in the nuclear power plant or is stored for future use. Section 3 of IEEE-323-1971 and 1974 defines auditable data as information that is documented and organized so as to be readily under- standable and traceable to permit independent verification of inferences or conclusions based on the information. An EQ test report, in and of itself, does not completely support a determination that equipment is qualified. In order to ensure that plant-specific requirements are adequately considered, the following types of additional information may be needed: (1) required postaccident operating time compared to the duration of time the equipment has been demonstrated to be qualified; (2) similarity of tested equipment to that installed in the plant (e.g. , insulation class, materials of components of the equipment, and tested configuration); (3) evaluations of the adequacy of test conditions, aging calculations for qualified life, and replace- ment interval determination; (4) effects of decreases in insulation resistance on equipment performance; (5) evaluations of test anamolies; and (6) applicabi- lity of EQ problems reported in IE information notices and bulletins and their resolution. No specific action or written response is required by this notice. If you have any questions concerning this notice, please contact the Regional Administrator of the appropriate NRC regional office or this office. EdwarV J- ordan, Director Divis' of Emergency Preparedness and ngineering Response Office of Inspection and Enforcement Technical Contact: G. T. Hubbard, IE (301) 492-9759 Attachment: List of Recently Issued IE Information Notices Attachment 1 IN 85-39 May 22, 1985 LIST OF RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No. Subject Issue Issued to 85-38 Loose Parts Obstruct Control 5/21/85 All PWR facilities Rod Drive Mechanism designed by B&W holding an OL or CP 85-37 Chemical Cleaning Of Steam 5/14/85 All pressure water Generator At Milestone 2 reactor facilities holding an OL or CP 84-55 Seal Table Leaks At PWRs 5/14/85 All power reactor Sup. 1 facilities holding an OL or CP 85-20 Motor-Operated Valve Failures 5/14/85 All power reactor Sup. 1 Due To Hammering Effect facilities holding an OL or CP 85-36 Malfunction Of A Dry-Storage, 5/9/85 All licensees Panoramic, Gamma Exposure possessing gamma Irradiator irradiators 84-52 Inadequate Material 5/8/85 All power reactor Sup. 1 Procurement Controls On facilities holding The Part Of Licensees And an OL or CP Vendors 85-35 Failure Of Air Check Valves 4/30/85 All power reactor To Seat facilities holding an OL or CP 85-34 Heat Tracing Contributes To 4/30/85 All power reactor Corrosion Failure Of Stainless facilities holding Steel Piping an OL or CP 84-84 Deficiencies In Ferro- 4/24/85 All power reactor Rev. 1 Resonant Transformers facilities holding an OL or CP 85-33 Undersized Nozzle-To-Shell 4/22/85 All power reactor Welded Joints In Tanks And facilities holding Heat Exchangers Constructed an OL or CP Under The Rules Of The ASME Boiler And Pressure Vessel Code OL = Operating License CP = Construction Permit Hello