Loading...
HomeMy WebLinkAbout850980.tiff .►+r, -S CHANGE Distribution to: ORDER OWNER 0 ARCHITECT 0 AIA DOCUMENT G701 CONTRACTOR ❑ FIELD 0 OTHER ❑ PROJECT: 1984 Renovation to: CHANGE ORDER NUMBER:Three (3) (name, address) Weld County Centennial Center Phase II-Law Enforcement Bldg. INITIATION DATE: November 4, 1985 TO (Contractor): Greeley, Colorado ARCHITECT'S PROJECT NO: N/A Roche Constructors, Inc. CONTRACT FOR: General Construction Post Office Box 1727 Greeley, Colorado 80632 L I CONTRACT DATE: December 10, 1984 You are directed to make the following changes in this Contract: Add to contract renovation of Phase II basement area: Total Cost $57,915.00 r^� Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) GivaYr`Er?'e`fD(AYill(iikt (iCatXwas $ 657,924.00 Net change by previously authorized Change Orders $ 39,413.00 The (Contract Sum) 4uu�+•36A1&Xoicl(Xd6XWALW(X r prior to this Change Order was $ 697,333.00 The (Contract Sum) (nifXlXtlr¢Xi1,fXe(ci'rf(gcGX vY) will be (increased)VekileataYcKXXXXiXiiidi by this Change Order $ 57,915.00 • The new (Contract Sum); `IXaWXtUigaXAWkiEOkinVI Ut4 including this Change Order will be $ 755,248.00 • The Contract Time will be IGRMA)¢X XWet)e`(1XI Cl4 (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorize Boer & Roberts Architects Roche Constructors, Inc. (\ u�� irr� A1�2NTE€T'Ighth Street CostAbTf ice Box 1727 Wp E R 75R Address Address Address ('1 Greeley, Colorado 80631 Greeley, Colorado 80632 Greeley. CO 80632 \\11��11�XX11 ` /, Chairman BY � 2 BY A(( BY• Rona of Commissioners DATE &1/4) L 16)p,g DATE it-$-$5' DATE 11/18/85 AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIA® • © 1978 850980 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W.,WASHINGTON/W. 20006 5(9 _ 5,f) pc�-7 A . II, I cfl 1474. (-/ Hello