HomeMy WebLinkAbout880283.tiff RESOLUTION RE: APPROVE CHANGE ORDER TO RBD, INC. CONCERNING BRIDGE 6/23B WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, Weld County entered into a contract for certain engineering and design services with RBD, Inc. concerning Bridge 6/23B, and WHEREAS, additional engineering and design services are necessary, and the Board has been presented with a Change Order for said services, in the amount of $3 ,900 .00 , and WHEREAS , after review, the Board deems it advisable to approve said Change Order to RBD, Inc. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Change Order, in the amount of $3 , 900 .00 , to RBD, Inc. be , and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 20th day of April, A.D. , 1988 . ) BOARD OF COUNTY COMMISSIONERS ATTEST: %/ ti ✓f 1 'u� �nJ WEL OUN�TTY, COLORADO Weld County lerk and Recorder Q/( and Clerk to the Board "Gene R. Bran ner, Chairman BY: '2 L-y/ , _y) C.W. Kir•y, Pr•-Tem Deputy County lerk APPROVED AS TO FORM: a.que ` rt s --- , (71_ �;.Z.shi .ice-i ._.�_ /7 .,2.,+ 1 / Arc, County County Attorney (��"l Frank Yamaguchi r5 ,t, r'�(� Ypn 880283 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST DEPARTMENT: Engineering IA' E: April 5, 1988 PERSON REQUESTING: Drew L. Scheltinga r � ATTACH A COPY OF ALL RELEVANT DATA BRIEF DESCRIPTION OF PROBLEM/ISSUE: RBD, Inc. is designing 6/23B which is being replaced through a grant from the Federal Bridge Rehabilitation and Replacement Program, which is administered by the Colorado Department of Highways. When this project began RBD was directed to design a bridge that would pass the 100-year storm and could be constructed within the existing Weld County right-of-way. Through the preliminary design process, which has taken several months, the Colorado Department of Highways determined the proper design condition was for the 25-year flood. This lowered the requirement for the structure and RBD, Inc. was directed to change the design to a concrete box culvert. Also, with the construction of this type it was not possible to keep the construction within the existing right-of-way without violating slope and width requirements. Throughout this process, RBD, Inc. was required to make numerous changes which were beyond the normal scope of preliminary design. RBD, Inc. ' s request is for a change order to cover additional services in the amount of $3,900. WHAT OPTIONS EXIST FOR THE BOARD? Approve a change order for RBD, Inc. in the amount of $3,900.00 or deny the request. 880283 Work Session - RBD, Inc. Page 2 RECOMMENDATION TO THE BOARD: I agree with the decisions to scale down this project from a bridge to a concrete box culvert. There will be a substantial savings in the construction cost. Some of these decisions are difficult to anticipate until all the information during the preliminary design is gathered. Because the configuration of the structure was changed and because the decision to acquire right-of-way was made, I agree with RBD, Inc. 's request. BOARD ACTION: BY REVIEW BY WORK SESSION DATE: COMMENTS/DIRECTION: INITIAL: APPROVE DISAPPROVE Johnson 1 Brantner c,tty-1 Kirby ar-1 rsixt/Itid -r4 Lacy Yamaguchi DLS/rs:wsrbd 880283 Hello