Loading...
HomeMy WebLinkAbout881241.tiff Afteltreini DEPARTMENT OF PLANNING SERVICES SUBDIVISION EXEMPTION ADMINISTRATIVE REVIEW Applicant: Associated Natural Gas, Inc. Case #SE-348 Legal Description: Part of the NW} of Section 8, T7N, R58W of the 6th P.M. , Weld County, Colorado Criteria Checklist Meets Criteria '*J Yes No NA N N M X 1 . The proposal is consistent with the policies ‘o rn of the Weld County Comprehensive Plan. KX 2. The boundary change or temporary use location o which would be allowed on the subject property y. by granting the request will be compatible z with the surrounding land uses. MM X 3. In those instances when used pursuant to C tfJ Section 9-3 B. (2) of the Weld County M Subdivision Regulations, the request is the y best alternative to dispose of existing H N improvements in conjunction with the companion Z Recorded Exemption. LA co co � r APPROVEDtri a .. Subdivision Exemption is approved in accordance with information submitted �y p in the application and the policies of the County. The Department of n Planning Services has determined through its review that the standards of o0 Section 9-3 E. of the Weld County Subdivision Regulations have been met. 4.4 xfo This Subdivision Exemption is approved in conjunction with USR-849. • £ o tllo ry By Date Q/,3/mfr Current Planner p a (1812.41 LEGAL DESCRIPTION, A parcel of land being part of the Northwest Quarter (NW1/4) of Section Eight ( 8) , Township Seven (7) North, Range Fifty-eighth ( 58) West of the Sixth Principal Meridian (6th P . M . ) , Weld County, Colorado, and being more particularly described as follows : BEGINNING at the Northwest Corner (NW Cor) of said Section 8 and assuming the West line of said NW1/4 as bearing South 00. 23 ' 35" West as indicated on deed recorded June 24, 1983 in Book 1000 under Reception Number 01931328 of the records of the Weld County Clerk and Recorders : Thence South 00. 23 ' 35" West along said West line, - 110 . 1 feet to Iw the TRUE POINT OF BEGINNING : r r --1 N Thence along the Southerly Right-of-Way ( ROW) line of the w1g Colorado Department of Highways by the following three (3) o courses and distances x t� South 87. 18 ' 15" East, 30 . 0 feet k n North 46. 32 ' 40" East, 69 . 3 feet o South 87. 18 ' 15" East, 369 . 54 feet z Ni Thence South 00. 23 ' 35" West, 481 . 95 feet; z N Thence North 89. 36 ' 25" West, 449 . 20 feet to a point on the West Wm line of said NW1/4; tzi 1-• C I' Thence North 00° 23 ' 35" East along said West line, 450 .00 feet to % the TRUE POINT OF BEGINNING . y M .-- Said described parcel of land contains 4 . 000 acres , more or less, z and is subject to any rights-of-way or other easements as granted n - or reserved by instruments of record or as now existing on said rim described parcel of land . tzi W r w RI - u1 SURVEYOR'S CERTIFICATE m .P tl n I hereby certify that this legal description was prepared under 2 my personal supervision and that it is true and correct to the t7 best of my knowledge and belief. W o -no REG/si E` � • 9 (gold ipj •/,l • _Charles B. Jones i :X 2'LQ98 N; v. o as Colorado Regist- ed Profes, i tal t 8 2 Land Surveyor 22098 1, o .. le it 0 ,e� •• •• .0%Project Number : 1988-1068 , ` Date : July 26, 1988 JONES-WININGER Professional Surveyors , Inc. Greeley, Colorado 881241 GENERAL INFORMATION FOR SUBDIVISION EXEMPTION ASSOCIATED NATURAL GAS, INC. - NEW RAYMER GAS PLANT Note: This Subdivision Exemption is being filed in conjunction with an USR application already filed. Associated Natural Gas, Inc. is proposing a 30 million cubic foot per day natural gas processing plant. This facility is being built to supply natural gas to the front range market and to enhance the marketability of gas liquids derived from Weld County oil and gas wells. t 1-. H The plant site is within an agricultural area and is consistent H with the Weld County Comprehensive Plan and similar plants are � a located in agricultural zones. zn The facility will operate as a business with no proposed k o residential unit on the site . The closest residence is z approximately 1 mile to the east. Z The facility will operate 24 hours a day. Approximately twenty (20) LPG transport trucks a day will be needed for hauling of liquids . The plant will be manned 12 hours a day and operatecn unattended at night. H N I Future development in the area is anticipated to be additional z agricultural uses with continued development of the oil and gas o co in Weld County. This future development is compatible with the use intended and in fact is necessary in the case of oil and gas x �, development. The nearest municipality is New Rayner, two miles to the east. z � Domestic water will be purchased for use on the site. The sewage disposal will be handled by a septic system sized to accommodate the equivalent of a single family residence. No additional F,j1. sanitary facilities will be required. z Eo There are no storm water retention facilities at the present site r C and none are planned for the future addition. The site location O is not within any flood plain or known geologic hazard. o w The fire protection measures necessary for a facility of this n o type consist primarily of continued attention to safety oa procedures by the employees . Fire extinguishers will be available at the facility and in all vehicles . Fire protection is also provided by the New Rayner-Stoneham Fire Protection District. It is not the intent of Associated Natural Gas, Inc. to store or stockpile any quantity of materials or waste at the site . There is no waste associated with this facility and the only materials that will be stored are valves and piping materials for maintenance and repair of the facility. Product storage will be natural gas liquids . 881241 The facility will be designed in accordance with the following applicable codes to insure the protection of the health and safety of the inhabitants of the neighborhood and of Weld County and to meet all Weld County ordinance requirements. * - ANSI B31 . 3 - Chemical Plant and Petroleum Refinery Piping * - ANSI B31 .8 - Gas Transmission and Distribution Piping Systems * - ANSI BPV-VIII-1 - Rules for Construction of Pressure Vessels hi to N H - American Petroleum Institute - Welded Steel Tank for Oil w Storage NJ rn C - National Electric Code • C • 0 - National Fire Protection Association z z � - Flammable Liquids and Code Handbook • rn - Liquified Petroleum Gases Handbook m - DOT 49CFR Part 192 - Minimum Federal Safety Standards rg r for Gas Lines y H -"- H N * ANSI - American National Standards Institute zn co In compliance with Weld County and State regulations , the 11 °3 applicant has applied for the appropriate emissions permits . A copy of the lease agreement on the subject property is included Q in this application. Pi a n The equipment listed below will be installed for the gas plant: - (4) 30,000 gallon storage tanks • 0 - (8) 1100 H.P. compressors e - 300 BBL condensate tank o - 30 MM/day process skid or (2) two 15MM/day skids o o � - glycol skid - (2) truck loading terminals - 25 x 40 ' office (control room) 881241 Hello